500 WORLD WAY 90045

Certificate Information: 500 WORLD WAY 90045

Application / Permit
17016-10000-33718
Plan Check / Job No.
B17LA20735
Group
Building
Type
Bldg-Addition
Sub-Type
Commercial
Primary Use
(3) Airport Building
Work Description
Tenant Improvement to LAX Terminal 5 to include installation of new storefront glazing system, new public restrooms, offices, ticket counters, exterior canopy, floor infill and voluntary structural alteration to portion of existing structural framing elements.
Permit Issued
Issued on 8/17/2018
Issuing Office
Metro
Current Status
CofO Issued on 9/10/2020
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 1/16/2018 APPLICANT
Green Plans Picked Up 1/22/2018 APPLICANT
Disabled Access Plans Picked Up 1/31/2018 APPLICANT
Assigned to Plan Check Engineer 2/1/2018 ARMEN JIVALAGIAN
Corrections Issued 2/13/2018 ARMEN JIVALAGIAN
Quality Review Completed 2/13/2018 SIAVOSH POURSABAHIAN
Building Plans Picked Up 2/13/2018 APPLICANT
Applicant returned to address corrections 3/2/2018 ARMEN JIVALAGIAN
Applicant returned to address corrections 3/7/2018 ARMEN JIVALAGIAN
Applicant returned to address corrections 3/16/2018 ARMEN JIVALAGIAN
Plan Check Approved 7/31/2018 ARMEN JIVALAGIAN
Issued 8/17/2018 LADBS
CofO in Progress 9/10/2020 JONATHAN ALLEN
Permit Finaled 9/10/2020 JONATHAN ALLEN
CofO Issued 9/10/2020 JONATHAN ALLEN
Permit Finaled 9/10/2020 JONATHAN ALLEN

Permit Application Clearance Information

City owned building/parcel Cleared 1/17/2018 HAROOT AVANESIAN
CPC Cleared 3/2/2018 DIANA JIMENEZ
CPC Cleared 3/2/2018 DIANA JIMENEZ
CPC Cleared 3/2/2018 DIANA JIMENEZ
Eng Process Fee Ord 176,300 Cleared 3/2/2018 NAZILA NOORIFAR
Sewer availability Cleared 3/2/2018 NAZILA NOORIFAR
Tract Map conditions Cleared 3/2/2018 DIANA JIMENEZ
ZA Case Cleared 3/2/2018 DIANA JIMENEZ
Green Code Cleared 3/5/2018 KATHRYN BUTTERWORTH
DAS Clearance Cleared 3/6/2018 WAI LAU
Low Impact Development Cleared 3/6/2018 AMMAR ELTAWIL
Roof/Waste drainage to street Cleared 3/6/2018 STEVE MELGAR
Abandoned oil well Cleared 3/7/2018 ROBERT DUFF
Abandoned oil well approval Cleared 3/7/2018 ROBERT DUFF
Airport buildings Cleared 3/7/2018 ANDREW KO
Fire Marshall Fire Life Safety Cleared 3/7/2018 ANDREW KO
Specific Plan Cleared 3/15/2018 PEDRO AYALA
Project Permit Cleared 6/28/2018 LIPING TENG

Contact Information

Architect Thompson, Keith Arnold; Lic. No.: C31063 7 PANDALE      FOOTHILL RANCH, CA 92610
Contractor Hensel Phelps Construction Co; Lic. No.: 1020262-B 420 SIXTH AVENUE      GREELEY, CO 80631
Engineer Bouquet, Thomas Campbell; Lic. No.: S4007 155 N LAKE AVE SUITE 600      PASADENA, CA 91101

Inspector Information

NICK LAROCCA, (213) 473-2153 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Steel/Welding 12/7/2018 Conditional Approval TIMOTHY GRIFFITH
Deputy Steel/Welding 12/10/2018 Conditional Approval TIMOTHY GRIFFITH
Deputy Steel/Welding 12/11/2018 Conditional Approval ALBERT COMISARI
Deputy Steel/Welding 12/12/2018 Conditional Approval TIMOTHY GRIFFITH
Structural Steel Frame 12/12/2018 Not Ready for Inspection TIMOTHY GRIFFITH
Deputy Steel/Welding 12/13/2018 Conditional Approval TIMOTHY GRIFFITH
Deputy Steel/Welding 12/18/2018 Conditional Approval TIMOTHY GRIFFITH
Deputy Steel/Welding 12/19/2018 Conditional Approval TIMOTHY GRIFFITH
Deputy Steel/Welding 12/20/2018 Conditional Approval TIMOTHY GRIFFITH
Deputy Steel/Welding 12/21/2018 Conditional Approval TIMOTHY GRIFFITH
Deputy Steel/Welding 12/24/2018 Conditional Approval TIMOTHY GRIFFITH
Deputy Steel/Welding 1/4/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Steel/Welding 1/7/2019 Conditional Approval ALBERT COMISARI
Deputy Steel/Welding 1/8/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Steel/Welding 1/9/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Steel/Welding 1/10/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 1/16/2019 Conditional Approval TIMOTHY GRIFFITH
Excavation/Setback/Form/Re-Bar 1/24/2019 Partial Approval TIMOTHY GRIFFITH
Footing/Foundation/Slab 1/24/2019 Partial Approval TIMOTHY GRIFFITH
METHANE-Barrier 1/24/2019 Approved TIMOTHY GRIFFITH
METHANE-Subgrade 1/24/2019 Approved TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 1/25/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Fireproofing 1/25/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 1/25/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 1/28/2019 Conditional Approval ALBERT COMISARI
Deputy Fireproofing 1/28/2019 Conditional Approval ALBERT COMISARI
Deputy Reinf. Concrete 1/28/2019 Conditional Approval ALBERT COMISARI
Deputy Drilled-In Anchors 1/29/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Fireproofing 1/29/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 1/29/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 1/30/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Fireproofing 1/30/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 1/30/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 1/31/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Fireproofing 1/31/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 1/31/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 2/1/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Fireproofing 2/1/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 2/1/2019 Conditional Approval TIMOTHY GRIFFITH
Light Gage Steel Frame 2/1/2019 Partial Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 2/4/2019 Conditional Approval ALBERT COMISARI
Deputy Fireproofing 2/4/2019 Conditional Approval ALBERT COMISARI
Deputy Reinf. Concrete 2/4/2019 Conditional Approval ALBERT COMISARI
Deputy Drilled-In Anchors 2/5/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Fireproofing 2/5/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 2/5/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 2/6/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Fireproofing 2/6/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 2/6/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 2/7/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Fireproofing 2/7/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 2/7/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Grading 2/14/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 2/19/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 2/20/2019 Conditional Approval ALBERT COMISARI
Deputy Fireproofing 2/20/2019 Conditional Approval ALBERT COMISARI
Deputy Reinf. Concrete 2/20/2019 Conditional Approval ALBERT COMISARI
Deputy Drilled-In Anchors 2/21/2019 Conditional Approval ALBERT COMISARI
Deputy Fireproofing 2/21/2019 Conditional Approval ALBERT COMISARI
Deputy Reinf. Concrete 2/21/2019 Conditional Approval ALBERT COMISARI
Deputy Drilled-In Anchors 2/22/2019 Conditional Approval ALBERT COMISARI
Deputy Fireproofing 2/22/2019 Conditional Approval ALBERT COMISARI
Deputy Reinf. Concrete 2/22/2019 Conditional Approval ALBERT COMISARI
Excavation/Setback/Form/Re-Bar 2/22/2019 Partial Approval ALBERT COMISARI
Deputy Drilled-In Anchors 2/25/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Fireproofing 2/25/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 2/25/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 2/26/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Fireproofing 2/26/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 2/26/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 2/28/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Fireproofing 2/28/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 2/28/2019 Conditional Approval TIMOTHY GRIFFITH
Excavation/Setback/Form/Re-Bar 2/28/2019 Partial Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 3/1/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Fireproofing 3/1/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 3/1/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 3/4/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Fireproofing 3/4/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 3/4/2019 Conditional Approval TIMOTHY GRIFFITH
Excavation/Setback/Form/Re-Bar 3/4/2019 Partial Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 3/5/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Fireproofing 3/5/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 3/5/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Fireproofing 3/6/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 3/6/2019 Conditional Approval TIMOTHY GRIFFITH
Excavation/Setback/Form/Re-Bar 3/6/2019 Partial Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 3/7/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Fireproofing 3/7/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 3/7/2019 Conditional Approval TIMOTHY GRIFFITH
Excavation/Setback/Form/Re-Bar 3/7/2019 Approved TIMOTHY GRIFFITH
Light Gage Steel Frame 3/7/2019 Not Ready for Inspection TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 3/8/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Fireproofing 3/8/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 3/8/2019 Conditional Approval TIMOTHY GRIFFITH
Excavation/Setback/Form/Re-Bar 3/8/2019 Approved TIMOTHY GRIFFITH
Light Gage Steel Frame 3/8/2019 Partial Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 3/11/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Fireproofing 3/11/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 3/11/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 3/12/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Fireproofing 3/12/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 3/12/2019 Conditional Approval TIMOTHY GRIFFITH
Excavation/Setback/Form/Re-Bar 3/12/2019 Partial Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 3/13/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Fireproofing 3/13/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 3/13/2019 Conditional Approval TIMOTHY GRIFFITH
Excavation/Setback/Form/Re-Bar 3/13/2019 Not Ready for Inspection TIMOTHY GRIFFITH
Drywall Nailing 3/14/2019 Partial Approval TIMOTHY GRIFFITH
Excavation/Setback/Form/Re-Bar 3/18/2019 Not Ready for Inspection TIMOTHY GRIFFITH
Excavation/Setback/Form/Re-Bar 3/19/2019 Partial Approval TIMOTHY GRIFFITH
Excavation/Setback/Form/Re-Bar 3/20/2019 Partial Approval TIMOTHY GRIFFITH
Structural Steel Frame 3/21/2019 Partial Approval TIMOTHY GRIFFITH
Excavation/Setback/Form/Re-Bar 3/22/2019 Partial Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 3/26/2019 Conditional Approval ALBERT COMISARI
Deputy Drilled-In Anchors 3/27/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Fireproofing 3/27/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Masonry 3/27/2019 Conditional Approval TIMOTHY GRIFFITH
Excavation/Setback/Form/Re-Bar 3/27/2019 Partial Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 3/28/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Fireproofing 3/28/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Masonry 3/28/2019 Conditional Approval TIMOTHY GRIFFITH
Excavation/Setback/Form/Re-Bar 3/28/2019 Partial Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 3/29/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Fireproofing 3/29/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Masonry 3/29/2019 Conditional Approval TIMOTHY GRIFFITH
Light Gage Steel Frame 3/29/2019 Partial Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 4/1/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Fireproofing 4/1/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Masonry 4/1/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 4/2/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Fireproofing 4/2/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Masonry 4/2/2019 Conditional Approval TIMOTHY GRIFFITH
Excavation/Setback/Form/Re-Bar 4/2/2019 Partial Approval TIMOTHY GRIFFITH
Light Gage Steel Frame 4/3/2019 Not Ready for Inspection TIMOTHY GRIFFITH
Excavation/Setback/Form/Re-Bar 4/4/2019 Partial Approval TIMOTHY GRIFFITH
Light Gage Steel Frame 4/4/2019 Not Ready for Inspection TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 4/5/2019 Conditional Approval TIMOTHY GRIFFITH
Excavation/Setback/Form/Re-Bar 4/5/2019 Partial Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 4/8/2019 Conditional Approval TIMOTHY GRIFFITH
Excavation/Setback/Form/Re-Bar 4/8/2019 Not Ready for Inspection TIMOTHY GRIFFITH
Light Gage Steel Frame 4/8/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 4/9/2019 Conditional Approval TIMOTHY GRIFFITH
Structural Steel Frame 4/9/2019 Partial Approval TIMOTHY GRIFFITH
Light Gage Steel Frame 4/10/2019 Partial Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 4/11/2019 Conditional Approval TIMOTHY GRIFFITH
Light Gage Steel Frame 4/11/2019 Partial Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 4/12/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 4/12/2019 Conditional Approval TIMOTHY GRIFFITH
Excavation/Setback/Form/Re-Bar 4/12/2019 Partial Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 4/15/2019 Conditional Approval ALBERT COMISARI
Deputy Drilled-In Anchors 4/16/2019 Conditional Approval ALBERT COMISARI
Deputy Drilled-In Anchors 4/17/2019 Conditional Approval ALBERT COMISARI
Excavation/Setback/Form/Re-Bar 4/17/2019 Not Ready for Inspection ALBERT COMISARI
Deputy Drilled-In Anchors 4/18/2019 Conditional Approval ALBERT COMISARI
Excavation/Setback/Form/Re-Bar 4/18/2019 Not Ready for Inspection ALBERT COMISARI
Deputy Drilled-In Anchors 4/19/2019 Conditional Approval ALBERT COMISARI
Light Gage Steel Frame 4/19/2019 Conditional Approval ALBERT COMISARI
Deputy Drilled-In Anchors 4/23/2019 Conditional Approval ALBERT COMISARI
T-Bar Ceiling 4/23/2019 Not Ready for Inspection ALBERT COMISARI
Deputy Drilled-In Anchors 4/24/2019 Conditional Approval TIMOTHY GRIFFITH
Drywall Nailing 4/24/2019 Partial Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 4/25/2019 Conditional Approval TIMOTHY GRIFFITH
Light Gage Steel Frame 4/25/2019 Partial Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 4/26/2019 Conditional Approval TIMOTHY GRIFFITH
T-Bar Ceiling 4/26/2019 Approved TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 4/29/2019 Conditional Approval TIMOTHY GRIFFITH
T-Bar Ceiling 4/29/2019 Not Ready for Inspection TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 4/30/2019 Conditional Approval TIMOTHY GRIFFITH
T-Bar Ceiling 4/30/2019 Partial Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 5/1/2019 Conditional Approval TIMOTHY GRIFFITH
T-Bar Ceiling 5/1/2019 Approved TIMOTHY GRIFFITH
T-Bar Ceiling 5/2/2019 Partial Approval TIMOTHY GRIFFITH
T-Bar Ceiling 5/3/2019 Not Ready for Inspection TIMOTHY GRIFFITH
Deputy Fireproofing 5/6/2019 Conditional Approval ALBERT COMISARI
Deputy Reinf. Concrete 5/6/2019 Conditional Approval ALBERT COMISARI
Deputy Fireproofing 5/7/2019 Conditional Approval ALBERT COMISARI
Deputy Grading 5/7/2019 Conditional Approval ALBERT COMISARI
Deputy Reinf. Concrete 5/7/2019 Conditional Approval ALBERT COMISARI
Deputy Drilled-In Anchors 5/8/2019 Conditional Approval ALBERT COMISARI
Deputy Fireproofing 5/8/2019 Conditional Approval ALBERT COMISARI
Deputy Reinf. Concrete 5/8/2019 Conditional Approval ALBERT COMISARI
Deputy Drilled-In Anchors 5/9/2019 Conditional Approval ALBERT COMISARI
Deputy Fireproofing 5/9/2019 Conditional Approval ALBERT COMISARI
Deputy Reinf. Concrete 5/9/2019 Conditional Approval ALBERT COMISARI
Light Gage Steel Frame 5/9/2019 Not Ready for Inspection ALBERT COMISARI
Deputy Drilled-In Anchors 5/10/2019 Conditional Approval ALBERT COMISARI
Deputy Fireproofing 5/10/2019 Conditional Approval ALBERT COMISARI
Deputy Reinf. Concrete 5/10/2019 Conditional Approval ALBERT COMISARI
Light Gage Steel Frame 5/10/2019 Not Ready for Inspection ALBERT COMISARI
Deputy Drilled-In Anchors 5/13/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Fireproofing 5/13/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 5/13/2019 Conditional Approval ALBERT COMISARI
Deputy Reinf. Concrete 5/13/2019 Conditional Approval TIMOTHY GRIFFITH
Light Gage Steel Frame 5/13/2019 Partial Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 5/14/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Fireproofing 5/14/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 5/14/2019 Conditional Approval TIMOTHY GRIFFITH
Light Gage Steel Frame 5/14/2019 Partial Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 5/15/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Fireproofing 5/15/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 5/15/2019 Conditional Approval TIMOTHY GRIFFITH
Light Gage Steel Frame 5/15/2019 Partial Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 5/16/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Fireproofing 5/16/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 5/16/2019 Conditional Approval TIMOTHY GRIFFITH
T-Bar Ceiling 5/16/2019 Partial Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 5/17/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Fireproofing 5/17/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 5/17/2019 Conditional Approval TIMOTHY GRIFFITH
T-Bar Ceiling 5/17/2019 Partial Approval TIMOTHY GRIFFITH
T-Bar Ceiling 5/18/2019 Partial Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 5/20/2019 Conditional Approval TIMOTHY GRIFFITH
T-Bar Ceiling 5/20/2019 Partial Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 5/21/2019 Conditional Approval TIMOTHY GRIFFITH
T-Bar Ceiling 5/21/2019 Partial Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 5/22/2019 Conditional Approval TIMOTHY GRIFFITH
T-Bar Ceiling 5/22/2019 Partial Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 5/23/2019 Conditional Approval TIMOTHY GRIFFITH
T-Bar Ceiling 5/23/2019 Partial Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 5/24/2019 Conditional Approval TIMOTHY GRIFFITH
T-Bar Ceiling 5/24/2019 Partial Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 5/29/2019 Conditional Approval TIMOTHY GRIFFITH
T-Bar Ceiling 5/29/2019 Partial Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 5/30/2019 Conditional Approval TIMOTHY GRIFFITH
T-Bar Ceiling 5/30/2019 Partial Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 5/31/2019 Conditional Approval TIMOTHY GRIFFITH
T-Bar Ceiling 5/31/2019 Not Ready for Inspection TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 6/3/2019 Conditional Approval TIMOTHY GRIFFITH
Light Gage Steel Frame 6/3/2019 Not Ready for Inspection TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 6/4/2019 Conditional Approval TIMOTHY GRIFFITH
Light Gage Steel Frame 6/4/2019 Not Ready for Inspection TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 6/5/2019 Conditional Approval TIMOTHY GRIFFITH
Light Gage Steel Frame 6/5/2019 Not Ready for Inspection TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 6/6/2019 Conditional Approval JONATHAN ALLEN
Light Gage Steel Frame 6/6/2019 Partial Approval JONATHAN ALLEN
Deputy Drilled-In Anchors 6/7/2019 Conditional Approval JONATHAN ALLEN
Light Gage Steel Frame 6/7/2019 Partial Approval JONATHAN ALLEN
Deputy Drilled-In Anchors 6/10/2019 Conditional Approval TIMOTHY GRIFFITH
T-Bar Ceiling 6/10/2019 Partial Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 6/11/2019 Conditional Approval TIMOTHY GRIFFITH
T-Bar Ceiling 6/11/2019 Partial Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 6/12/2019 Conditional Approval TIMOTHY GRIFFITH
T-Bar Ceiling 6/12/2019 Partial Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 6/13/2019 Conditional Approval TIMOTHY GRIFFITH
T-Bar Ceiling 6/13/2019 Partial Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 6/14/2019 Conditional Approval TIMOTHY GRIFFITH
T-Bar Ceiling 6/14/2019 Partial Approval TIMOTHY GRIFFITH
Interior/Exterior Lathing 6/15/2019 Off-Hour Fees Due
Interior/Exterior Lathing 6/15/2019 Partial Approval NICK LAROCCA
Pre-Inspection 6/15/2019 Approved TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 6/17/2019 Approved JONATHAN ALLEN
T-Bar Ceiling 6/17/2019 Partial Approval JONATHAN ALLEN
Deputy Drilled-In Anchors 6/18/2019 Approved JONATHAN ALLEN
T-Bar Ceiling 6/18/2019 Partial Approval JONATHAN ALLEN
T-Bar Ceiling 6/19/2019 Partial Approval JONATHAN ALLEN
T-Bar Ceiling 6/20/2019 Partial Approval JONATHAN ALLEN
T-Bar Ceiling 6/21/2019 Partial Approval JONATHAN ALLEN
T-Bar Ceiling 6/24/2019 Partial Approval JONATHAN ALLEN
T-Bar Ceiling 6/25/2019 Partial Approval JONATHAN ALLEN
Deputy Reinf. Concrete 6/26/2019 Approved JONATHAN ALLEN
Deputy Reinf. Concrete 6/27/2019 Approved JONATHAN ALLEN
Deputy Reinf. Concrete 6/28/2019 Approved JONATHAN ALLEN
T-Bar Ceiling 7/1/2019 Partial Approval JONATHAN ALLEN
Structural Steel Frame 7/3/2019 Partial Inspection JONATHAN ALLEN
T-Bar Ceiling 7/3/2019 Partial Approval JONATHAN ALLEN
Excavation/Setback/Form/Re-Bar 7/8/2019 Partial Approval ALBERT COMISARI
Drywall Nailing 7/10/2019 Partial Approval JONATHAN ALLEN
Drywall Nailing 7/11/2019 Partial Approval JONATHAN ALLEN
Drywall Nailing 7/12/2019 Partial Approval JONATHAN ALLEN
Drywall Nailing 7/15/2019 Partial Approval JONATHAN ALLEN
Light Gage Steel Frame 7/18/2019 Partial Inspection JONATHAN ALLEN
Light Gage Steel Frame 7/19/2019 Partial Approval JONATHAN ALLEN
Light Gage Steel Frame 7/22/2019 Partial Approval JONATHAN ALLEN
T-Bar Ceiling 7/25/2019 Partial Approval JONATHAN ALLEN
T-Bar Ceiling 7/26/2019 Not Ready for Inspection JONATHAN ALLEN
Excavation/Setback/Form/Re-Bar 7/29/2019 Partial Approval JONATHAN ALLEN
Light Gage Steel Frame 7/29/2019 Partial Approval JONATHAN ALLEN
Light Gage Steel Frame 8/1/2019 Partial Approval JONATHAN ALLEN
Light Gage Steel Frame 8/2/2019 Partial Approval JONATHAN ALLEN
Light Gage Steel Frame 8/5/2019 Partial Approval JONATHAN ALLEN
Deputy Drilled-In Anchors 8/6/2019 Approved JONATHAN ALLEN
Deputy Fireproofing 8/6/2019 Approved JONATHAN ALLEN
Deputy Reinf. Concrete 8/6/2019 Approved JONATHAN ALLEN
Deputy Reinf. Masonry 8/6/2019 Approved JONATHAN ALLEN
Light Gage Steel Frame 8/6/2019 Partial Approval JONATHAN ALLEN
Deputy Drilled-In Anchors 8/7/2019 Approved JONATHAN ALLEN
Deputy Fireproofing 8/7/2019 Approved JONATHAN ALLEN
Deputy Reinf. Concrete 8/7/2019 Approved JONATHAN ALLEN
Deputy Reinf. Masonry 8/7/2019 Approved JONATHAN ALLEN
Excavation/Setback/Form/Re-Bar 8/7/2019 Partial Approval JONATHAN ALLEN
Deputy Drilled-In Anchors 8/8/2019 Approved JONATHAN ALLEN
Deputy Fireproofing 8/8/2019 Approved JONATHAN ALLEN
Deputy Reinf. Concrete 8/8/2019 Approved JONATHAN ALLEN
Deputy Reinf. Masonry 8/8/2019 Approved JONATHAN ALLEN
Excavation/Setback/Form/Re-Bar 8/8/2019 Partial Approval JONATHAN ALLEN
Deputy Drilled-In Anchors 8/9/2019 Approved JONATHAN ALLEN
Deputy Fireproofing 8/9/2019 Approved JONATHAN ALLEN
Deputy Reinf. Concrete 8/9/2019 Approved JONATHAN ALLEN
Deputy Reinf. Masonry 8/9/2019 Approved JONATHAN ALLEN
Excavation/Setback/Form/Re-Bar 8/9/2019 Partial Approval JONATHAN ALLEN
Light Gage Steel Frame 8/12/2019 Partial Approval JONATHAN ALLEN
T-Bar Ceiling 8/13/2019 Partial Approval JONATHAN ALLEN
Light Gage Steel Frame 8/14/2019 Partial Approval JONATHAN ALLEN
Light Gage Steel Frame 8/15/2019 Partial Approval JONATHAN ALLEN
Light Gage Steel Frame 8/16/2019 Partial Approval JONATHAN ALLEN
T-Bar Ceiling 8/19/2019 Not Ready for Inspection ALBERT COMISARI
Deputy Drilled-In Anchors 8/20/2019 Conditional Approval ALBERT COMISARI
Deputy Fireproofing 8/20/2019 Conditional Approval ALBERT COMISARI
Deputy Reinf. Concrete 8/20/2019 Conditional Approval ALBERT COMISARI
Deputy Reinf. Masonry 8/20/2019 Conditional Approval ALBERT COMISARI
Deputy Drilled-In Anchors 8/21/2019 Conditional Approval ALBERT COMISARI
Deputy Fireproofing 8/21/2019 Conditional Approval ALBERT COMISARI
Deputy Reinf. Concrete 8/21/2019 Conditional Approval ALBERT COMISARI
Deputy Reinf. Masonry 8/21/2019 Conditional Approval ALBERT COMISARI
T-Bar Ceiling 8/21/2019 Not Ready for Inspection ALBERT COMISARI
Deputy Drilled-In Anchors 8/22/2019 Conditional Approval ALBERT COMISARI
Deputy Fireproofing 8/22/2019 Conditional Approval ALBERT COMISARI
Deputy Reinf. Concrete 8/22/2019 Conditional Approval ALBERT COMISARI
Deputy Reinf. Masonry 8/22/2019 Conditional Approval ALBERT COMISARI
T-Bar Ceiling 8/22/2019 Not Ready for Inspection ALBERT COMISARI
Deputy Drilled-In Anchors 8/23/2019 Conditional Approval ALBERT COMISARI
Deputy Fireproofing 8/23/2019 Conditional Approval ALBERT COMISARI
Deputy Reinf. Concrete 8/23/2019 Conditional Approval ALBERT COMISARI
Deputy Reinf. Masonry 8/23/2019 Conditional Approval ALBERT COMISARI
T-Bar Ceiling 8/23/2019 Not Ready for Inspection ALBERT COMISARI
Deputy Drilled-In Anchors 8/26/2019 Approved JONATHAN ALLEN
Deputy Fireproofing 8/26/2019 Approved JONATHAN ALLEN
Deputy Reinf. Concrete 8/26/2019 Approved JONATHAN ALLEN
Deputy Reinf. Masonry 8/26/2019 Approved JONATHAN ALLEN
T-Bar Ceiling 8/26/2019 Partial Approval JONATHAN ALLEN
T-Bar Ceiling 8/27/2019 Not Ready for Inspection JONATHAN ALLEN
T-Bar Ceiling 8/28/2019 Not Ready for Inspection JONATHAN ALLEN
T-Bar Ceiling 8/29/2019 Partial Approval JONATHAN ALLEN
T-Bar Ceiling 8/30/2019 Not Ready for Inspection JONATHAN ALLEN
Light Gage Steel Frame 9/3/2019 Partial Approval JONATHAN ALLEN
Light Gage Steel Frame 9/4/2019 Partial Inspection JONATHAN ALLEN
Light Gage Steel Frame 9/5/2019 Partial Approval JONATHAN ALLEN
Structural Steel Frame 9/6/2019 Partial Inspection JONATHAN ALLEN
Light Gage Steel Frame 9/9/2019 Conditional Approval ALBERT COMISARI
T-Bar Ceiling 9/11/2019 Partial Approval JONATHAN ALLEN
Light Gage Steel Frame 9/12/2019 Partial Approval JONATHAN ALLEN
Light Gage Steel Frame 9/17/2019 Partial Approval JONATHAN ALLEN
Light Gage Steel Frame 9/18/2019 Partial Approval JONATHAN ALLEN
Excavation/Setback/Form/Re-Bar 9/19/2019 Not Ready for Inspection JONATHAN ALLEN
Excavation/Setback/Form/Re-Bar 9/20/2019 Partial Approval JONATHAN ALLEN
T-Bar Ceiling 9/23/2019 Partial Approval JONATHAN ALLEN
T-Bar Ceiling 9/24/2019 Partial Approval JONATHAN ALLEN
T-Bar Ceiling 9/25/2019 Partial Approval JONATHAN ALLEN
Excavation/Setback/Form/Re-Bar 9/27/2019 Corrections Issued JONATHAN ALLEN
Light Gage Steel Frame 9/27/2019 Partial Approval JONATHAN ALLEN
T-Bar Ceiling 9/30/2019 Partial Approval JONATHAN ALLEN
Deputy Drilled-In Anchors 10/1/2019 Approved JONATHAN ALLEN
Deputy Fireproofing 10/1/2019 Approved JONATHAN ALLEN
Deputy Reinf. Concrete 10/1/2019 Approved JONATHAN ALLEN
Deputy Reinf. Masonry 10/1/2019 Approved JONATHAN ALLEN
Deputy Drilled-In Anchors 10/2/2019 Approved JONATHAN ALLEN
Deputy Fireproofing 10/2/2019 Approved JONATHAN ALLEN
Deputy Reinf. Concrete 10/2/2019 Approved JONATHAN ALLEN
Deputy Reinf. Masonry 10/2/2019 Approved JONATHAN ALLEN
Deputy Drilled-In Anchors 10/3/2019 Approved JONATHAN ALLEN
Deputy Fireproofing 10/3/2019 Approved JONATHAN ALLEN
Deputy Reinf. Concrete 10/3/2019 Approved JONATHAN ALLEN
Deputy Reinf. Masonry 10/3/2019 Approved JONATHAN ALLEN
T-Bar Ceiling 10/3/2019 Partial Approval JONATHAN ALLEN
Deputy Drilled-In Anchors 10/4/2019 Approved JONATHAN ALLEN
Deputy Fireproofing 10/4/2019 Approved JONATHAN ALLEN
Deputy Reinf. Concrete 10/4/2019 Approved JONATHAN ALLEN
Deputy Reinf. Masonry 10/4/2019 Approved JONATHAN ALLEN
Deputy Steel/Welding 10/4/2019 Approved JONATHAN ALLEN
T-Bar Ceiling 10/4/2019 Partial Approval JONATHAN ALLEN
Deputy Drilled-In Anchors 10/7/2019 Approved JONATHAN ALLEN
Deputy Fireproofing 10/7/2019 Approved JONATHAN ALLEN
Deputy Reinf. Concrete 10/7/2019 Approved JONATHAN ALLEN
Deputy Reinf. Masonry 10/7/2019 Approved JONATHAN ALLEN
Deputy Steel/Welding 10/7/2019 Approved JONATHAN ALLEN
T-Bar Ceiling 10/7/2019 Partial Approval JONATHAN ALLEN
Deputy Steel/Welding 10/8/2019 Approved JONATHAN ALLEN
T-Bar Ceiling 10/8/2019 Partial Approval JONATHAN ALLEN
Deputy Steel/Welding 10/9/2019 Conditional Approval JONATHAN ALLEN
Deputy Steel/Welding 10/10/2019 Approved JONATHAN ALLEN
Deputy Steel/Welding 10/11/2019 Approved JONATHAN ALLEN
T-Bar Ceiling 10/11/2019 Partial Approval JONATHAN ALLEN
T-Bar Ceiling 10/15/2019 Partial Approval JONATHAN ALLEN
T-Bar Ceiling 10/17/2019 Partial Approval JONATHAN ALLEN
T-Bar Ceiling 10/18/2019 Partial Approval JONATHAN ALLEN
Light Gage Steel Frame 10/24/2019 Partial Approval JONATHAN ALLEN
Light Gage Steel Frame 10/25/2019 Partial Approval JONATHAN ALLEN
T-Bar Ceiling 11/1/2019 Partial Approval JONATHAN ALLEN
Light Gage Steel Frame 11/25/2019 Partial Approval JONATHAN ALLEN
Footing/Foundation/Slab 12/17/2019 Partial Approval JONATHAN ALLEN
Structural Steel Frame 12/18/2019 Partial Approval JONATHAN ALLEN
T-Bar Ceiling 12/30/2019 Partial Approval JONATHAN ALLEN
Light Gage Steel Frame 1/6/2020 Partial Approval JONATHAN ALLEN
Special/Order Compliance 1/17/2020 Approved JONATHAN ALLEN
T-Bar Ceiling 2/11/2020 Partial Approval JONATHAN ALLEN
T-Bar Ceiling 2/19/2020 Partial Approval JONATHAN ALLEN
Deputy Drilled-In Anchors 2/20/2020 Approved JONATHAN ALLEN
Deputy Reinf. Concrete 2/20/2020 Approved JONATHAN ALLEN
T-Bar Ceiling 2/21/2020 Partial Approval JONATHAN ALLEN
Deputy Reinf. Concrete 2/24/2020 Conditional Approval JONATHAN ALLEN
Light Gage Steel Frame 3/27/2020 Partial Approval JONATHAN ALLEN
Drywall Nailing 4/6/2020 Partial Approval JONATHAN ALLEN
T-Bar Ceiling 4/9/2020 Not Ready for Inspection JONATHAN ALLEN
T-Bar Ceiling 4/13/2020 Partial Approval JONATHAN ALLEN
T-Bar Ceiling 4/20/2020 Not Ready for Inspection JONATHAN ALLEN
T-Bar Ceiling 4/21/2020 Partial Approval JONATHAN ALLEN
Drywall Nailing 4/23/2020 Partial Approval JONATHAN ALLEN
T-Bar Ceiling 4/27/2020 Partial Approval JONATHAN ALLEN
T-Bar Ceiling 4/29/2020 Partial Approval JONATHAN ALLEN
T-Bar Ceiling 5/4/2020 Partial Approval JONATHAN ALLEN
Light Gage Steel Frame 5/6/2020 Partial Approval JONATHAN ALLEN
T-Bar Ceiling 5/21/2020 Partial Approval JONATHAN ALLEN
T-Bar Ceiling 5/22/2020 Not Ready for Inspection JONATHAN ALLEN
Drywall Nailing 6/18/2020 Approved JONATHAN ALLEN
T-Bar Ceiling 7/29/2020 Not Ready for Inspection ALBERT COMISARI
Final 8/17/2020 Conditional Approval JONATHAN ALLEN
Footing/Foundation/Slab 8/17/2020 Approved JONATHAN ALLEN
Green Building Final 8/17/2020 Approved JONATHAN ALLEN
Green Building Rough 8/17/2020 Approved JONATHAN ALLEN
METHANE-Final 8/17/2020 Approved JONATHAN ALLEN
METHANE-Rough 8/17/2020 Approved JONATHAN ALLEN
Reinforced Concrete Frame 8/17/2020 Approved JONATHAN ALLEN
SGSOV-Seismic Gas S/O Valve 8/17/2020 SGSOV Approved JONATHAN ALLEN
Smoke Detectors 8/17/2020 Approved JONATHAN ALLEN