12750 W CASWELL AVE 90066

Certificate Information: 12750 W CASWELL AVE 90066

Application / Permit
17016-10000-30660
Plan Check / Job No.
B17LA18931
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
SOFT STORY RETROGIT AS PER LAMC DIVISION 93 USING STEEL MOMENT FRAME AND WOOD SHEAR WALL OF THE TUCK UNDER PARKING REGION OF A 2 STORY APARTMENT BLDG.
Permit Issued
Issued on 9/28/2023
Issuing Office
Metro
Current Status
CofC Issued on 12/15/2023

Permit Application Status History

Submitted 10/17/2017 APPLICANT
Assigned to Plan Check Engineer 11/2/2017 HANS SANTIAGO
Corrections Issued 11/8/2017 HANS SANTIAGO
Quality Review Completed 11/9/2017 CELESTE MORRIS
Building Plans Picked Up 11/28/2017 APPLICANT
Plan Check Approved 1/9/2018 Andrew Santiago
No Progress 9/20/2023 VARAND SARKISIAN
Plan Check Approved 9/20/2023 VARAND SARKISIAN
Issued 9/28/2023 APPLICANT
OK for CofC 12/4/2023 MICHAEL PETRUSKO
CofC Issued 12/15/2023 DAVID TSAU

Permit Application Clearance Information

Housing rent stabilization Cleared 9/21/2023 RICARDO BOHORQUEZ

Contact Information

Contractor Tatum Hill Construction; Lic. No.: 1035535-B 5142 VENICE BLVD      LOS ANGELES, CA 90019
Engineer Zargari, Ramin; Lic. No.: S4119 23632 CALABASAS RD. UNIT 107A      CALABASAS, CA 91302

Inspector Information

No Data Available.

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 10/12/2023 Approved MICHAEL PETRUSKO
Deputy Drilled-In Anchors 10/25/2023 Conditional Approval ALAN NOVAK
Wood Frame 10/26/2023 Approved MICHAEL PETRUSKO
Deputy Drilled-In Anchors 11/1/2023 Conditional Approval MICHAEL PETRUSKO
Floor/Roof Diaphrgm/Shear Wall 11/2/2023 Approved MICHAEL PETRUSKO
Deputy Steel/Welding 11/9/2023 Conditional Approval MICHAEL PETRUSKO
Reinforced Concrete Frame 11/14/2023 Approved MICHAEL PETRUSKO
Structural Steel Frame 11/14/2023 Approved MICHAEL PETRUSKO
Deputy Reinf. Concrete 11/15/2023 Conditional Approval ALAN NOVAK
Interior/Exterior Lathing 11/17/2023 Approved MICHAEL PETRUSKO
Final 11/27/2023 Not Ready for Inspection FARHAD DADBIN
SGSOV-Seismic Gas S/O Valve 11/27/2023 SGSOV Not Ready FARHAD DADBIN
Smoke Detectors 11/27/2023 Not Ready for Inspection FARHAD DADBIN
Final 12/4/2023 OK for CofC MICHAEL PETRUSKO
SGSOV-Seismic Gas S/O Valve 12/4/2023 SGSOV Approved MICHAEL PETRUSKO
Smoke Detectors 12/4/2023 Approved MICHAEL PETRUSKO