Pre-Inspection
|
4/23/2019
|
Approved
|
DERRICK SPENCER
|
Pre-Inspection
|
10/9/2019
|
Approved
|
DERRICK SPENCER
|
Deputy Steel/Welding
|
1/29/2020
|
Approved
|
DERRICK SPENCER
|
Deputy Steel/Welding
|
1/30/2020
|
Approved
|
DERRICK SPENCER
|
Green Building Rough
|
2/12/2020
|
Approved
|
DERRICK SPENCER
|
METHANE-Rough
|
2/12/2020
|
Not Ready for Inspection
|
DERRICK SPENCER
|
Reinforced Concrete Frame
|
2/12/2020
|
Partial Approval
|
DERRICK SPENCER
|
Deputy Shotcrete
|
2/13/2020
|
Approved
|
DERRICK SPENCER
|
Deputy Drilled-In Anchors
|
2/20/2020
|
Approved
|
DERRICK SPENCER
|
Deputy Drilled-In Anchors
|
2/26/2020
|
Approved
|
DERRICK SPENCER
|
Deputy Drilled-In Anchors
|
2/27/2020
|
Approved
|
DERRICK SPENCER
|
Deputy Reinf. Concrete
|
2/27/2020
|
Approved
|
DERRICK SPENCER
|
Footing/Foundation/Slab
|
2/27/2020
|
Partial Approval
|
DERRICK SPENCER
|
Deputy Drilled-In Anchors
|
3/2/2020
|
Approved
|
DERRICK SPENCER
|
Deputy Reinf. Concrete
|
3/2/2020
|
Approved
|
DERRICK SPENCER
|
Deputy Drilled-In Anchors
|
3/5/2020
|
Approved
|
DERRICK SPENCER
|
METHANE-Rough
|
3/5/2020
|
Approved
|
DERRICK SPENCER
|
Reinforced Concrete Frame
|
3/5/2020
|
Partial Approval
|
DERRICK SPENCER
|
Deputy Drilled-In Anchors
|
3/11/2020
|
Approved
|
DERRICK SPENCER
|
Deputy Reinf. Concrete
|
3/11/2020
|
Approved
|
DERRICK SPENCER
|
Footing/Foundation/Slab
|
3/12/2020
|
Not Ready for Inspection
|
DERRICK SPENCER
|
Reinforced Concrete Frame
|
3/12/2020
|
Not Ready for Inspection
|
DERRICK SPENCER
|
Deputy Drilled-In Anchors
|
3/13/2020
|
Approved
|
DERRICK SPENCER
|
Deputy Reinf. Concrete
|
3/13/2020
|
Approved
|
DERRICK SPENCER
|
Deputy Reinf. Concrete
|
3/17/2020
|
Approved
|
DERRICK SPENCER
|
Deputy Wood Construction
|
3/17/2020
|
Approved
|
DERRICK SPENCER
|
Deputy Wood Construction
|
3/18/2020
|
Approved
|
DERRICK SPENCER
|
Deputy Drilled-In Anchors
|
3/20/2020
|
Approved
|
DERRICK SPENCER
|
Deputy Drilled-In Anchors
|
3/23/2020
|
Approved
|
DERRICK SPENCER
|
Deputy Drilled-In Anchors
|
3/26/2020
|
Approved
|
DERRICK SPENCER
|
Deputy Drilled-In Anchors
|
4/7/2020
|
Approved
|
DERRICK SPENCER
|
Footing/Foundation/Slab
|
4/7/2020
|
Partial Approval
|
DERRICK SPENCER
|
Deputy Reinf. Concrete
|
4/8/2020
|
Approved
|
DERRICK SPENCER
|
SWPPP-Const. Storm Water
|
4/9/2020
|
Completed
|
DERRICK SPENCER
|
Excavation/Setback/Form/Re-Bar
|
4/10/2020
|
Partial Approval
|
DERRICK SPENCER
|
Structural Steel Frame
|
4/13/2020
|
Partial Approval
|
DERRICK SPENCER
|
Deputy Drilled-In Anchors
|
4/16/2020
|
Approved
|
DERRICK SPENCER
|
Deputy Drilled-In Anchors
|
4/17/2020
|
Approved
|
DERRICK SPENCER
|
Deputy Drilled-In Anchors
|
4/20/2020
|
Approved
|
DERRICK SPENCER
|
Deputy Shotcrete
|
4/20/2020
|
Approved
|
DERRICK SPENCER
|
Reinforced Concrete Frame
|
4/20/2020
|
Partial Approval
|
DERRICK SPENCER
|
Deputy Drilled-In Anchors
|
4/21/2020
|
Approved
|
DERRICK SPENCER
|
Deputy Shotcrete
|
4/21/2020
|
Approved
|
DERRICK SPENCER
|
Reinforced Masonry Frame
|
4/21/2020
|
Partial Approval
|
DERRICK SPENCER
|
Deputy Drilled-In Anchors
|
4/22/2020
|
Approved
|
DERRICK SPENCER
|
Deputy Shotcrete
|
4/22/2020
|
Approved
|
DERRICK SPENCER
|
Deputy Steel/Welding
|
4/22/2020
|
Approved
|
DERRICK SPENCER
|
Deputy Drilled-In Anchors
|
4/23/2020
|
Partial Approval
|
DERRICK SPENCER
|
Deputy Shotcrete
|
4/23/2020
|
Corrections Issued
|
DERRICK SPENCER
|
Deputy Shotcrete
|
4/23/2020
|
Partial Approval
|
DERRICK SPENCER
|
Deputy Drilled-In Anchors
|
4/24/2020
|
Approved
|
DERRICK SPENCER
|
Deputy Shotcrete
|
4/24/2020
|
Approved
|
DERRICK SPENCER
|
Deputy Steel/Welding
|
4/24/2020
|
Approved
|
DERRICK SPENCER
|
Deputy Shotcrete
|
4/27/2020
|
Approved
|
DERRICK SPENCER
|
Deputy Steel/Welding
|
4/27/2020
|
Approved
|
DERRICK SPENCER
|
Deputy Drilled-In Anchors
|
4/28/2020
|
Approved
|
DERRICK SPENCER
|
Deputy Shotcrete
|
4/28/2020
|
Approved
|
DERRICK SPENCER
|
Deputy Steel/Welding
|
4/28/2020
|
Approved
|
DERRICK SPENCER
|
Deputy Drilled-In Anchors
|
4/29/2020
|
Approved
|
DERRICK SPENCER
|
Deputy Shotcrete
|
4/29/2020
|
Approved
|
DERRICK SPENCER
|
Deputy Drilled-In Anchors
|
4/30/2020
|
Approved
|
DERRICK SPENCER
|
Deputy Shotcrete
|
4/30/2020
|
Approved
|
DERRICK SPENCER
|
Deputy Drilled-In Anchors
|
5/1/2020
|
Approved
|
DERRICK SPENCER
|
Deputy Shotcrete
|
5/1/2020
|
Approved
|
DERRICK SPENCER
|
Deputy Shotcrete
|
5/4/2020
|
Approved
|
DERRICK SPENCER
|
Reinforced Concrete Frame
|
5/4/2020
|
Partial Approval
|
DERRICK SPENCER
|
Deputy Drilled-In Anchors
|
5/5/2020
|
Approved
|
DERRICK SPENCER
|
Deputy Shotcrete
|
5/5/2020
|
Approved
|
DERRICK SPENCER
|
Reinforced Masonry Frame
|
5/5/2020
|
Partial Approval
|
DERRICK SPENCER
|
Deputy Drilled-In Anchors
|
5/6/2020
|
Approved
|
DERRICK SPENCER
|
Deputy Shotcrete
|
5/6/2020
|
Approved
|
DERRICK SPENCER
|
Deputy Drilled-In Anchors
|
5/7/2020
|
Approved
|
DERRICK SPENCER
|
Deputy Shotcrete
|
5/7/2020
|
Approved
|
DERRICK SPENCER
|
Deputy Drilled-In Anchors
|
5/8/2020
|
Approved
|
DERRICK SPENCER
|
Deputy Shotcrete
|
5/8/2020
|
Approved
|
DERRICK SPENCER
|
Reinforced Concrete Frame
|
5/8/2020
|
Partial Approval
|
DERRICK SPENCER
|
Deputy Drilled-In Anchors
|
5/12/2020
|
No Access for Inspection
|
DERRICK SPENCER
|
Deputy Reinf. Concrete
|
5/12/2020
|
No Access for Inspection
|
DERRICK SPENCER
|
Deputy Shotcrete
|
5/12/2020
|
No Access for Inspection
|
DERRICK SPENCER
|
Deputy Drilled-In Anchors
|
5/13/2020
|
Approved
|
DERRICK SPENCER
|
Deputy Reinf. Concrete
|
5/13/2020
|
Approved
|
DERRICK SPENCER
|
Deputy Shotcrete
|
5/13/2020
|
Approved
|
DERRICK SPENCER
|
Reinforced Concrete Frame
|
5/13/2020
|
Partial Approval
|
DERRICK SPENCER
|
Deputy Drilled-In Anchors
|
5/14/2020
|
Approved
|
DERRICK SPENCER
|
Deputy Reinf. Concrete
|
5/14/2020
|
Approved
|
DERRICK SPENCER
|
Deputy Shotcrete
|
5/14/2020
|
Approved
|
DERRICK SPENCER
|
Footing/Foundation/Slab
|
5/14/2020
|
Partial Approval
|
DERRICK SPENCER
|
Deputy Drilled-In Anchors
|
5/15/2020
|
Approved
|
DERRICK SPENCER
|
Deputy Reinf. Concrete
|
5/15/2020
|
Approved
|
DERRICK SPENCER
|
Deputy Shotcrete
|
5/15/2020
|
Approved
|
DERRICK SPENCER
|
Footing/Foundation/Slab
|
5/15/2020
|
Partial Approval
|
DERRICK SPENCER
|
Reinforced Masonry Frame
|
5/15/2020
|
Partial Approval
|
DERRICK SPENCER
|
Deputy Drilled-In Anchors
|
5/19/2020
|
Approved
|
DERRICK SPENCER
|
Deputy Reinf. Concrete
|
5/19/2020
|
Approved
|
DERRICK SPENCER
|
Deputy Shotcrete
|
5/19/2020
|
Approved
|
DERRICK SPENCER
|
Deputy Drilled-In Anchors
|
5/20/2020
|
Approved
|
DERRICK SPENCER
|
Deputy Reinf. Concrete
|
5/20/2020
|
Approved
|
DERRICK SPENCER
|
Deputy Shotcrete
|
5/20/2020
|
Approved
|
DERRICK SPENCER
|
Reinforced Concrete Frame
|
5/20/2020
|
Partial Approval
|
DERRICK SPENCER
|
Deputy Drilled-In Anchors
|
5/21/2020
|
Approved
|
DERRICK SPENCER
|
Deputy Reinf. Concrete
|
5/21/2020
|
Approved
|
DERRICK SPENCER
|
Deputy Shotcrete
|
5/21/2020
|
Approved
|
DERRICK SPENCER
|
Deputy Drilled-In Anchors
|
5/22/2020
|
Approved
|
DERRICK SPENCER
|
Deputy Reinf. Concrete
|
5/22/2020
|
Approved
|
DERRICK SPENCER
|
Deputy Shotcrete
|
5/22/2020
|
Approved
|
DERRICK SPENCER
|
Reinforced Concrete Frame
|
5/26/2020
|
Partial Approval
|
DERRICK SPENCER
|
Deputy Drilled-In Anchors
|
5/28/2020
|
Approved
|
DERRICK SPENCER
|
Deputy Shotcrete
|
5/28/2020
|
Approved
|
DERRICK SPENCER
|
Deputy Drilled-In Anchors
|
5/29/2020
|
Approved
|
DERRICK SPENCER
|
Deputy Shotcrete
|
5/29/2020
|
Approved
|
DERRICK SPENCER
|
Reinforced Concrete Frame
|
5/29/2020
|
Partial Approval
|
DERRICK SPENCER
|
Deputy Drilled-In Anchors
|
6/2/2020
|
Approved
|
DERRICK SPENCER
|
Deputy Reinf. Concrete
|
6/2/2020
|
Approved
|
DERRICK SPENCER
|
Deputy Shotcrete
|
6/2/2020
|
Approved
|
DERRICK SPENCER
|
Deputy Drilled-In Anchors
|
6/3/2020
|
Approved
|
DERRICK SPENCER
|
Deputy Reinf. Concrete
|
6/3/2020
|
Approved
|
DERRICK SPENCER
|
Deputy Shotcrete
|
6/3/2020
|
Approved
|
DERRICK SPENCER
|
Deputy Drilled-In Anchors
|
6/4/2020
|
Approved
|
DERRICK SPENCER
|
Deputy Reinf. Concrete
|
6/4/2020
|
Approved
|
DERRICK SPENCER
|
Deputy Shotcrete
|
6/4/2020
|
Approved
|
DERRICK SPENCER
|
Reinforced Concrete Frame
|
6/4/2020
|
Partial Approval
|
DERRICK SPENCER
|
Deputy Drilled-In Anchors
|
6/5/2020
|
Approved
|
DERRICK SPENCER
|
Deputy Reinf. Concrete
|
6/5/2020
|
Approved
|
DERRICK SPENCER
|
Deputy Shotcrete
|
6/5/2020
|
Approved
|
DERRICK SPENCER
|
Deputy Steel/Welding
|
6/8/2020
|
Approved
|
DERRICK SPENCER
|
Deputy Steel/Welding
|
6/9/2020
|
Approved
|
DERRICK SPENCER
|
Structural Steel Frame
|
6/9/2020
|
Partial Approval
|
DERRICK SPENCER
|
Deputy Drilled-In Anchors
|
6/10/2020
|
Approved
|
DERRICK SPENCER
|
Deputy Shotcrete
|
6/10/2020
|
Approved
|
DERRICK SPENCER
|
Deputy Drilled-In Anchors
|
6/11/2020
|
Approved
|
DERRICK SPENCER
|
Deputy Shotcrete
|
6/11/2020
|
Approved
|
DERRICK SPENCER
|
Deputy Drilled-In Anchors
|
6/12/2020
|
Approved
|
DERRICK SPENCER
|
Deputy Shotcrete
|
6/12/2020
|
Approved
|
DERRICK SPENCER
|
Light Gage Steel Frame
|
6/15/2020
|
Partial Approval
|
DERRICK SPENCER
|
Deputy Drilled-In Anchors
|
6/16/2020
|
Approved
|
DERRICK SPENCER
|
Deputy Shotcrete
|
6/16/2020
|
Approved
|
DERRICK SPENCER
|
Reinforced Concrete Frame
|
6/16/2020
|
Partial Approval
|
DERRICK SPENCER
|
Deputy Drilled-In Anchors
|
6/17/2020
|
Approved
|
DERRICK SPENCER
|
Deputy Shotcrete
|
6/17/2020
|
Approved
|
DERRICK SPENCER
|
Deputy Drilled-In Anchors
|
6/18/2020
|
Approved
|
DERRICK SPENCER
|
Deputy Shotcrete
|
6/18/2020
|
Approved
|
DERRICK SPENCER
|
Deputy Drilled-In Anchors
|
6/19/2020
|
Approved
|
DERRICK SPENCER
|
Deputy Shotcrete
|
6/19/2020
|
Approved
|
DERRICK SPENCER
|
Light Gage Steel Frame
|
6/22/2020
|
Partial Approval
|
DERRICK SPENCER
|
Deputy Shotcrete
|
6/25/2020
|
Approved
|
DERRICK SPENCER
|
Reinforced Concrete Frame
|
6/25/2020
|
Partial Approval
|
DERRICK SPENCER
|
Deputy Shotcrete
|
6/26/2020
|
Approved
|
DERRICK SPENCER
|
Deputy Shotcrete
|
6/29/2020
|
Approved
|
DERRICK SPENCER
|
Deputy Shotcrete
|
6/30/2020
|
Approved
|
DERRICK SPENCER
|
Deputy Shotcrete
|
7/1/2020
|
Approved
|
DERRICK SPENCER
|
Deputy Shotcrete
|
7/2/2020
|
Approved
|
DERRICK SPENCER
|
Reinforced Concrete Frame
|
7/2/2020
|
Partial Approval
|
DERRICK SPENCER
|
Deputy Fireproofing
|
7/7/2020
|
Approved
|
DERRICK SPENCER
|
Deputy Reinf. Concrete
|
7/7/2020
|
Approved
|
DERRICK SPENCER
|
Deputy Drilled-In Anchors
|
7/14/2020
|
Approved
|
DERRICK SPENCER
|
Deputy Reinf. Concrete
|
7/14/2020
|
Approved
|
DERRICK SPENCER
|
Deputy Shotcrete
|
7/14/2020
|
Approved
|
DERRICK SPENCER
|
Deputy Drilled-In Anchors
|
7/15/2020
|
Approved
|
DERRICK SPENCER
|
Deputy Reinf. Concrete
|
7/15/2020
|
Approved
|
DERRICK SPENCER
|
Deputy Shotcrete
|
7/15/2020
|
Approved
|
DERRICK SPENCER
|
Deputy Drilled-In Anchors
|
7/16/2020
|
Approved
|
DERRICK SPENCER
|
Deputy Reinf. Concrete
|
7/16/2020
|
Approved
|
DERRICK SPENCER
|
Deputy Shotcrete
|
7/16/2020
|
Approved
|
DERRICK SPENCER
|
Deputy Drilled-In Anchors
|
7/17/2020
|
Approved
|
DERRICK SPENCER
|
Deputy Reinf. Concrete
|
7/17/2020
|
Approved
|
DERRICK SPENCER
|
Deputy Shotcrete
|
7/17/2020
|
Approved
|
DERRICK SPENCER
|
Reinforced Concrete Frame
|
7/17/2020
|
Partial Approval
|
DERRICK SPENCER
|
Deputy Shotcrete
|
7/20/2020
|
Approved
|
DERRICK SPENCER
|
Excavation/Setback/Form/Re-Bar
|
7/20/2020
|
Partial Approval
|
DERRICK SPENCER
|
Deputy Shotcrete
|
7/21/2020
|
Approved
|
DERRICK SPENCER
|
Deputy Shotcrete
|
7/22/2020
|
Approved
|
DERRICK SPENCER
|
Deputy Shotcrete
|
7/24/2020
|
Approved
|
DERRICK SPENCER
|
Insulation
|
7/28/2020
|
Partial Approval
|
DERRICK SPENCER
|
Deputy Fireproofing
|
7/29/2020
|
Approved
|
DERRICK SPENCER
|
Deputy Shotcrete
|
7/30/2020
|
Approved
|
DERRICK SPENCER
|
Reinforced Masonry Frame
|
8/4/2020
|
Partial Approval
|
DERRICK SPENCER
|
Deputy Reinf. Masonry
|
8/5/2020
|
Approved
|
DERRICK SPENCER
|
Light Gage Steel Frame
|
8/10/2020
|
Partial Approval
|
DERRICK SPENCER
|
Reinforced Concrete Frame
|
8/10/2020
|
Partial Approval
|
DERRICK SPENCER
|
Deputy Drilled-In Anchors
|
8/11/2020
|
Approved
|
DERRICK SPENCER
|
Deputy Shotcrete
|
8/11/2020
|
Approved
|
DERRICK SPENCER
|
Deputy Drilled-In Anchors
|
8/12/2020
|
Approved
|
DERRICK SPENCER
|
Deputy Shotcrete
|
8/12/2020
|
Approved
|
DERRICK SPENCER
|
Deputy Drilled-In Anchors
|
8/13/2020
|
Approved
|
DERRICK SPENCER
|
Deputy Shotcrete
|
8/13/2020
|
Approved
|
DERRICK SPENCER
|
Reinforced Concrete Frame
|
8/13/2020
|
Partial Approval
|
DERRICK SPENCER
|
Deputy Drilled-In Anchors
|
8/14/2020
|
Approved
|
DERRICK SPENCER
|
Deputy Reinf. Concrete
|
8/14/2020
|
Approved
|
DERRICK SPENCER
|
Deputy Shotcrete
|
8/14/2020
|
Approved
|
DERRICK SPENCER
|
Reinforced Concrete Frame
|
8/19/2020
|
Partial Approval
|
DERRICK SPENCER
|
Deputy Reinf. Concrete
|
8/21/2020
|
Approved
|
DERRICK SPENCER
|
Light Gage Steel Frame
|
8/27/2020
|
Partial Approval
|
DERRICK SPENCER
|
Reinforced Concrete Frame
|
9/4/2020
|
Approved
|
DERRICK SPENCER
|
Light Gage Steel Frame
|
9/8/2020
|
Partial Approval
|
DERRICK SPENCER
|
Footing/Foundation/Slab
|
9/11/2020
|
Conditional Approval
|
DERRICK SPENCER
|
Deputy Reinf. Concrete
|
9/25/2020
|
Approved
|
DERRICK SPENCER
|
Light Gage Steel Frame
|
10/6/2020
|
Partial Approval
|
DERRICK SPENCER
|
Deputy Reinf. Masonry
|
10/8/2020
|
Approved
|
DERRICK SPENCER
|
Reinforced Masonry Frame
|
10/8/2020
|
Partial Approval
|
DERRICK SPENCER
|
Wood Frame
|
10/8/2020
|
Partial Approval
|
DERRICK SPENCER
|
Deputy Reinf. Masonry
|
10/9/2020
|
Approved
|
DERRICK SPENCER
|
Masonry Wall/Backfill
|
10/9/2020
|
Approved
|
DERRICK SPENCER
|
Deputy Other (see comments)
|
10/15/2020
|
Approved
|
DERRICK SPENCER
|
Reinforced Masonry Frame
|
10/15/2020
|
Partial Approval
|
DERRICK SPENCER
|
Deputy Fireproofing
|
10/20/2020
|
Approved
|
DERRICK SPENCER
|
Deputy Wood Construction
|
10/20/2020
|
Approved
|
DERRICK SPENCER
|
Light Gage Steel Frame
|
10/20/2020
|
Partial Approval
|
DERRICK SPENCER
|
Interior/Exterior Lathing
|
10/21/2020
|
Partial Approval
|
DERRICK SPENCER
|
Deputy Fireproofing
|
10/22/2020
|
Approved
|
DERRICK SPENCER
|
Deputy Drilled-In Anchors
|
10/26/2020
|
Approved
|
DERRICK SPENCER
|
Deputy Reinf. Concrete
|
10/26/2020
|
Approved
|
DERRICK SPENCER
|
Interior/Exterior Lathing
|
10/26/2020
|
Partial Approval
|
DERRICK SPENCER
|
Structural Steel Frame
|
10/29/2020
|
Partial Approval
|
DERRICK SPENCER
|
Structural Steel Frame
|
10/30/2020
|
Not Ready for Inspection
|
DERRICK SPENCER
|
Deputy Fireproofing
|
11/2/2020
|
Approved
|
DERRICK SPENCER
|
Deputy Reinf. Concrete
|
11/4/2020
|
Approved
|
DERRICK SPENCER
|
Deputy Fireproofing
|
11/10/2020
|
Approved
|
DERRICK SPENCER
|
Light Gage Steel Frame
|
11/13/2020
|
Partial Approval
|
DERRICK SPENCER
|
Deputy Fireproofing
|
11/16/2020
|
Approved
|
DERRICK SPENCER
|
Deputy Fireproofing
|
11/19/2020
|
Approved
|
DERRICK SPENCER
|
Deputy Reinf. Concrete
|
11/24/2020
|
Approved
|
DERRICK SPENCER
|
Light Gage Steel Frame
|
12/4/2020
|
Partial Approval
|
JOHN DODGE
|
Deputy Fireproofing
|
12/7/2020
|
Approved
|
DERRICK SPENCER
|
Deputy Fireproofing
|
12/8/2020
|
Approved
|
DERRICK SPENCER
|
Deputy Fireproofing
|
12/22/2020
|
Approved
|
DERRICK SPENCER
|
Light Gage Steel Frame
|
12/23/2020
|
Partial Approval
|
DERRICK SPENCER
|
Light Gage Steel Frame
|
1/14/2021
|
Partial Approval
|
DERRICK SPENCER
|
Pre-Inspection
|
1/25/2021
|
Approved
|
DERRICK SPENCER
|
Final
|
1/28/2021
|
Not Ready for Inspection
|
DERRICK SPENCER
|
Green Building Final
|
1/28/2021
|
Not Ready for Inspection
|
DERRICK SPENCER
|
SGSOV-Seismic Gas S/O Valve
|
1/28/2021
|
SGSOV Approved
|
DERRICK SPENCER
|
Smoke Detectors
|
1/28/2021
|
Approved
|
DERRICK SPENCER
|
Excavation/Setback/Form/Re-Bar
|
2/18/2021
|
Partial Approval
|
DERRICK SPENCER
|
Drywall Nailing
|
2/26/2021
|
Partial Approval
|
DERRICK SPENCER
|
Interior/Exterior Lathing
|
3/9/2021
|
Partial Approval
|
DERRICK SPENCER
|
Footing/Foundation/Slab
|
3/16/2021
|
Partial Approval
|
DERRICK SPENCER
|
Deputy Drilled-In Anchors
|
4/19/2021
|
Approved
|
DERRICK SPENCER
|
Deputy Drilled-In Anchors
|
4/20/2021
|
Approved
|
DERRICK SPENCER
|
Interior/Exterior Lathing
|
6/8/2021
|
Approved
|
DERRICK SPENCER
|
Light Gage Steel Frame
|
6/22/2021
|
Approved
|
DERRICK SPENCER
|
Pre-Inspection
|
7/19/2021
|
Approved
|
DERRICK SPENCER
|
Footing/Foundation/Slab
|
8/31/2021
|
Partial Approval
|
DERRICK SPENCER
|
Footing/Foundation/Slab
|
9/14/2021
|
Partial Approval
|
DERRICK SPENCER
|
Light Gage Steel Frame
|
9/22/2021
|
Approved
|
DERRICK SPENCER
|
Drywall Nailing
|
9/23/2021
|
Approved
|
DERRICK SPENCER
|
Insulation
|
9/23/2021
|
Approved
|
DERRICK SPENCER
|
Masonry Wall/Backfill
|
9/27/2021
|
Approved
|
DERRICK SPENCER
|
Reinforced Masonry Frame
|
9/27/2021
|
Approved
|
DERRICK SPENCER
|
Final
|
10/14/2021
|
Not Ready for Inspection
|
DERRICK SPENCER
|
Green Building Final
|
10/14/2021
|
Approved
|
DERRICK SPENCER
|
Final
|
11/10/2021
|
Not Ready for Inspection
|
DERRICK SPENCER
|
Special/Order Compliance
|
11/29/2021
|
Approved
|
DERRICK SPENCER
|
Pre-Inspection
|
11/30/2021
|
Approved
|
DERRICK SPENCER
|
Pre-Inspection
|
12/3/2021
|
Approved
|
DERRICK SPENCER
|
Pre-Inspection
|
12/6/2021
|
Approved
|
DERRICK SPENCER
|
Final
|
3/30/2022
|
Not Ready for Inspection
|
DERRICK SPENCER
|
Final
|
6/1/2022
|
Not Ready for Inspection
|
SORIN CIRSTOIU
|
Final
|
6/7/2022
|
OK to Issue CofO
|
DERRICK SPENCER
|