10730 W PICO BLVD 90064

Certificate Information: 10730 W PICO BLVD 90064

Application / Permit
17016-10000-28454
Plan Check / Job No.
B17LA17648
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
Commercial
Primary Use
(13) Office
Work Description
CHANGE OF USE RETAIL AND GARAGE BUILDING TO MIXED USED OFFICE/RESTAURANT AND GARAGE. CORE AND SHEEL. BUILDING ALTERATION WITH FLOOR OPENINGS EACH LEVEL AND COSMETIC IMPROVEMENTS INCLUDING LANDSCAPE AND FACADE UPGRADES. STRUCTURAL UPGRADE FOR OFFICE/RETAIL PORTION FULL COMPLIANCE OF NDC ORDINANCE ORD183893 WITH 100% OF THE BASE SHEAR.
Permit Issued
Issued on 4/25/2018
Issuing Office
Metro
Current Status
CofO Issued on 6/13/2022
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 9/28/2017 APPLICANT
Assigned to Plan Check Engineer 10/25/2017 XIAOZHE ZHANG
Plans on Hold 10/25/2017 SIAVOSH POURSABAHIAN
Hold Released 11/1/2017 WING SUEN
Disabled Access Plans Picked Up 11/2/2017 APPLICANT
Green Plans Picked Up 11/14/2017 APPLICANT
Corrections Issued 12/8/2017 XIAOZHE ZHANG
Quality Review Completed 12/13/2017 BILL STUTSMAN
Building Plans Picked Up 12/15/2017 APPLICANT
Applicant returned to address corrections 1/18/2018 XIAOZHE ZHANG
Applicant returned to address corrections 2/8/2018 XIAOZHE ZHANG
Applicant returned to address corrections 2/21/2018 XIAOZHE ZHANG
Applicant returned to address corrections 2/27/2018 XIAOZHE ZHANG
Applicant returned to address corrections 3/7/2018 XIAOZHE ZHANG
Plan Check Approved 4/25/2018 XIAOZHE ZHANG
Issued 4/25/2018 LADBS
CofO in Progress 6/13/2022 DERRICK SPENCER
Permit Finaled 6/13/2022 DAVID TSAU
CofO Issued 6/13/2022 DAVID TSAU
Permit Finaled 6/13/2022 DAVID TSAU

Permit Application Clearance Information

Eng Process Fee Ord 176,300 Cleared 12/19/2017 FATIMA GUERRA
ZA Case Cleared 12/21/2017 IVORY CHAMBESHI
Sewer availability Cleared 12/22/2017 NAZILA NOORIFAR
Grading Pre-Inspection Cleared 1/22/2018 PATRICK MISCHLICH
DAS Clearance Cleared 2/27/2018 ELIZABETH TOMS
Green Code Cleared 2/28/2018 KATHRYN BUTTERWORTH
Miscellaneous Cleared 3/5/2018 MARITZA PRZEKOP
Specific Plan Cleared 3/13/2018 CLIVE GRAWE
Fire Marshall Fire Life Safety Cleared 3/15/2018 DOMINIQUE MEDINA
Building over 3-story or 36-ft Cleared 4/6/2018 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 4/6/2018 CALOSHA APPROVED
Low Impact Development Cleared 4/23/2018 AMMAR ELTAWIL
Roof/Waste drainage to street Cleared 4/24/2018 KAREN LE

Contact Information

Architect Swartz, David Louis; Lic. No.: C19729 1556 20TH STREET SUITE B   HLW INTERNATIONAL LLP    SANTA MONICA, CA 90404
Contractor Del Amo Construction Inc; Lic. No.: 744458-B 23840 MADISON STREET      TORRANCE, CA 90505
Engineer Abdi, Abdolreza; Lic. No.: C74458 PO BOX 22291      OAKLAND, CA 94623
Engineer Davis, Richard Hays; Lic. No.: C48082 2015 CANTATA DR      LOS ANGELES, CA 90068
Engineer Low, Yeng-Keong; Lic. No.: S4093 155 N LAKE AVE SUITE 600      PASADENA, CA 91101

Inspector Information

DERRICK SPENCER, (310) 914-3919 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 4/23/2019 Approved DERRICK SPENCER
Pre-Inspection 10/9/2019 Approved DERRICK SPENCER
Deputy Steel/Welding 1/29/2020 Approved DERRICK SPENCER
Deputy Steel/Welding 1/30/2020 Approved DERRICK SPENCER
Green Building Rough 2/12/2020 Approved DERRICK SPENCER
METHANE-Rough 2/12/2020 Not Ready for Inspection DERRICK SPENCER
Reinforced Concrete Frame 2/12/2020 Partial Approval DERRICK SPENCER
Deputy Shotcrete 2/13/2020 Approved DERRICK SPENCER
Deputy Drilled-In Anchors 2/20/2020 Approved DERRICK SPENCER
Deputy Drilled-In Anchors 2/26/2020 Approved DERRICK SPENCER
Deputy Drilled-In Anchors 2/27/2020 Approved DERRICK SPENCER
Deputy Reinf. Concrete 2/27/2020 Approved DERRICK SPENCER
Footing/Foundation/Slab 2/27/2020 Partial Approval DERRICK SPENCER
Deputy Drilled-In Anchors 3/2/2020 Approved DERRICK SPENCER
Deputy Reinf. Concrete 3/2/2020 Approved DERRICK SPENCER
Deputy Drilled-In Anchors 3/5/2020 Approved DERRICK SPENCER
METHANE-Rough 3/5/2020 Approved DERRICK SPENCER
Reinforced Concrete Frame 3/5/2020 Partial Approval DERRICK SPENCER
Deputy Drilled-In Anchors 3/11/2020 Approved DERRICK SPENCER
Deputy Reinf. Concrete 3/11/2020 Approved DERRICK SPENCER
Footing/Foundation/Slab 3/12/2020 Not Ready for Inspection DERRICK SPENCER
Reinforced Concrete Frame 3/12/2020 Not Ready for Inspection DERRICK SPENCER
Deputy Drilled-In Anchors 3/13/2020 Approved DERRICK SPENCER
Deputy Reinf. Concrete 3/13/2020 Approved DERRICK SPENCER
Deputy Reinf. Concrete 3/17/2020 Approved DERRICK SPENCER
Deputy Wood Construction 3/17/2020 Approved DERRICK SPENCER
Deputy Wood Construction 3/18/2020 Approved DERRICK SPENCER
Deputy Drilled-In Anchors 3/20/2020 Approved DERRICK SPENCER
Deputy Drilled-In Anchors 3/23/2020 Approved DERRICK SPENCER
Deputy Drilled-In Anchors 3/26/2020 Approved DERRICK SPENCER
Deputy Drilled-In Anchors 4/7/2020 Approved DERRICK SPENCER
Footing/Foundation/Slab 4/7/2020 Partial Approval DERRICK SPENCER
Deputy Reinf. Concrete 4/8/2020 Approved DERRICK SPENCER
SWPPP-Const. Storm Water 4/9/2020 Completed DERRICK SPENCER
Excavation/Setback/Form/Re-Bar 4/10/2020 Partial Approval DERRICK SPENCER
Structural Steel Frame 4/13/2020 Partial Approval DERRICK SPENCER
Deputy Drilled-In Anchors 4/16/2020 Approved DERRICK SPENCER
Deputy Drilled-In Anchors 4/17/2020 Approved DERRICK SPENCER
Deputy Drilled-In Anchors 4/20/2020 Approved DERRICK SPENCER
Deputy Shotcrete 4/20/2020 Approved DERRICK SPENCER
Reinforced Concrete Frame 4/20/2020 Partial Approval DERRICK SPENCER
Deputy Drilled-In Anchors 4/21/2020 Approved DERRICK SPENCER
Deputy Shotcrete 4/21/2020 Approved DERRICK SPENCER
Reinforced Masonry Frame 4/21/2020 Partial Approval DERRICK SPENCER
Deputy Drilled-In Anchors 4/22/2020 Approved DERRICK SPENCER
Deputy Shotcrete 4/22/2020 Approved DERRICK SPENCER
Deputy Steel/Welding 4/22/2020 Approved DERRICK SPENCER
Deputy Drilled-In Anchors 4/23/2020 Partial Approval DERRICK SPENCER
Deputy Shotcrete 4/23/2020 Corrections Issued DERRICK SPENCER
Deputy Shotcrete 4/23/2020 Partial Approval DERRICK SPENCER
Deputy Drilled-In Anchors 4/24/2020 Approved DERRICK SPENCER
Deputy Shotcrete 4/24/2020 Approved DERRICK SPENCER
Deputy Steel/Welding 4/24/2020 Approved DERRICK SPENCER
Deputy Shotcrete 4/27/2020 Approved DERRICK SPENCER
Deputy Steel/Welding 4/27/2020 Approved DERRICK SPENCER
Deputy Drilled-In Anchors 4/28/2020 Approved DERRICK SPENCER
Deputy Shotcrete 4/28/2020 Approved DERRICK SPENCER
Deputy Steel/Welding 4/28/2020 Approved DERRICK SPENCER
Deputy Drilled-In Anchors 4/29/2020 Approved DERRICK SPENCER
Deputy Shotcrete 4/29/2020 Approved DERRICK SPENCER
Deputy Drilled-In Anchors 4/30/2020 Approved DERRICK SPENCER
Deputy Shotcrete 4/30/2020 Approved DERRICK SPENCER
Deputy Drilled-In Anchors 5/1/2020 Approved DERRICK SPENCER
Deputy Shotcrete 5/1/2020 Approved DERRICK SPENCER
Deputy Shotcrete 5/4/2020 Approved DERRICK SPENCER
Reinforced Concrete Frame 5/4/2020 Partial Approval DERRICK SPENCER
Deputy Drilled-In Anchors 5/5/2020 Approved DERRICK SPENCER
Deputy Shotcrete 5/5/2020 Approved DERRICK SPENCER
Reinforced Masonry Frame 5/5/2020 Partial Approval DERRICK SPENCER
Deputy Drilled-In Anchors 5/6/2020 Approved DERRICK SPENCER
Deputy Shotcrete 5/6/2020 Approved DERRICK SPENCER
Deputy Drilled-In Anchors 5/7/2020 Approved DERRICK SPENCER
Deputy Shotcrete 5/7/2020 Approved DERRICK SPENCER
Deputy Drilled-In Anchors 5/8/2020 Approved DERRICK SPENCER
Deputy Shotcrete 5/8/2020 Approved DERRICK SPENCER
Reinforced Concrete Frame 5/8/2020 Partial Approval DERRICK SPENCER
Deputy Drilled-In Anchors 5/12/2020 No Access for Inspection DERRICK SPENCER
Deputy Reinf. Concrete 5/12/2020 No Access for Inspection DERRICK SPENCER
Deputy Shotcrete 5/12/2020 No Access for Inspection DERRICK SPENCER
Deputy Drilled-In Anchors 5/13/2020 Approved DERRICK SPENCER
Deputy Reinf. Concrete 5/13/2020 Approved DERRICK SPENCER
Deputy Shotcrete 5/13/2020 Approved DERRICK SPENCER
Reinforced Concrete Frame 5/13/2020 Partial Approval DERRICK SPENCER
Deputy Drilled-In Anchors 5/14/2020 Approved DERRICK SPENCER
Deputy Reinf. Concrete 5/14/2020 Approved DERRICK SPENCER
Deputy Shotcrete 5/14/2020 Approved DERRICK SPENCER
Footing/Foundation/Slab 5/14/2020 Partial Approval DERRICK SPENCER
Deputy Drilled-In Anchors 5/15/2020 Approved DERRICK SPENCER
Deputy Reinf. Concrete 5/15/2020 Approved DERRICK SPENCER
Deputy Shotcrete 5/15/2020 Approved DERRICK SPENCER
Footing/Foundation/Slab 5/15/2020 Partial Approval DERRICK SPENCER
Reinforced Masonry Frame 5/15/2020 Partial Approval DERRICK SPENCER
Deputy Drilled-In Anchors 5/19/2020 Approved DERRICK SPENCER
Deputy Reinf. Concrete 5/19/2020 Approved DERRICK SPENCER
Deputy Shotcrete 5/19/2020 Approved DERRICK SPENCER
Deputy Drilled-In Anchors 5/20/2020 Approved DERRICK SPENCER
Deputy Reinf. Concrete 5/20/2020 Approved DERRICK SPENCER
Deputy Shotcrete 5/20/2020 Approved DERRICK SPENCER
Reinforced Concrete Frame 5/20/2020 Partial Approval DERRICK SPENCER
Deputy Drilled-In Anchors 5/21/2020 Approved DERRICK SPENCER
Deputy Reinf. Concrete 5/21/2020 Approved DERRICK SPENCER
Deputy Shotcrete 5/21/2020 Approved DERRICK SPENCER
Deputy Drilled-In Anchors 5/22/2020 Approved DERRICK SPENCER
Deputy Reinf. Concrete 5/22/2020 Approved DERRICK SPENCER
Deputy Shotcrete 5/22/2020 Approved DERRICK SPENCER
Reinforced Concrete Frame 5/26/2020 Partial Approval DERRICK SPENCER
Deputy Drilled-In Anchors 5/28/2020 Approved DERRICK SPENCER
Deputy Shotcrete 5/28/2020 Approved DERRICK SPENCER
Deputy Drilled-In Anchors 5/29/2020 Approved DERRICK SPENCER
Deputy Shotcrete 5/29/2020 Approved DERRICK SPENCER
Reinforced Concrete Frame 5/29/2020 Partial Approval DERRICK SPENCER
Deputy Drilled-In Anchors 6/2/2020 Approved DERRICK SPENCER
Deputy Reinf. Concrete 6/2/2020 Approved DERRICK SPENCER
Deputy Shotcrete 6/2/2020 Approved DERRICK SPENCER
Deputy Drilled-In Anchors 6/3/2020 Approved DERRICK SPENCER
Deputy Reinf. Concrete 6/3/2020 Approved DERRICK SPENCER
Deputy Shotcrete 6/3/2020 Approved DERRICK SPENCER
Deputy Drilled-In Anchors 6/4/2020 Approved DERRICK SPENCER
Deputy Reinf. Concrete 6/4/2020 Approved DERRICK SPENCER
Deputy Shotcrete 6/4/2020 Approved DERRICK SPENCER
Reinforced Concrete Frame 6/4/2020 Partial Approval DERRICK SPENCER
Deputy Drilled-In Anchors 6/5/2020 Approved DERRICK SPENCER
Deputy Reinf. Concrete 6/5/2020 Approved DERRICK SPENCER
Deputy Shotcrete 6/5/2020 Approved DERRICK SPENCER
Deputy Steel/Welding 6/8/2020 Approved DERRICK SPENCER
Deputy Steel/Welding 6/9/2020 Approved DERRICK SPENCER
Structural Steel Frame 6/9/2020 Partial Approval DERRICK SPENCER
Deputy Drilled-In Anchors 6/10/2020 Approved DERRICK SPENCER
Deputy Shotcrete 6/10/2020 Approved DERRICK SPENCER
Deputy Drilled-In Anchors 6/11/2020 Approved DERRICK SPENCER
Deputy Shotcrete 6/11/2020 Approved DERRICK SPENCER
Deputy Drilled-In Anchors 6/12/2020 Approved DERRICK SPENCER
Deputy Shotcrete 6/12/2020 Approved DERRICK SPENCER
Light Gage Steel Frame 6/15/2020 Partial Approval DERRICK SPENCER
Deputy Drilled-In Anchors 6/16/2020 Approved DERRICK SPENCER
Deputy Shotcrete 6/16/2020 Approved DERRICK SPENCER
Reinforced Concrete Frame 6/16/2020 Partial Approval DERRICK SPENCER
Deputy Drilled-In Anchors 6/17/2020 Approved DERRICK SPENCER
Deputy Shotcrete 6/17/2020 Approved DERRICK SPENCER
Deputy Drilled-In Anchors 6/18/2020 Approved DERRICK SPENCER
Deputy Shotcrete 6/18/2020 Approved DERRICK SPENCER
Deputy Drilled-In Anchors 6/19/2020 Approved DERRICK SPENCER
Deputy Shotcrete 6/19/2020 Approved DERRICK SPENCER
Light Gage Steel Frame 6/22/2020 Partial Approval DERRICK SPENCER
Deputy Shotcrete 6/25/2020 Approved DERRICK SPENCER
Reinforced Concrete Frame 6/25/2020 Partial Approval DERRICK SPENCER
Deputy Shotcrete 6/26/2020 Approved DERRICK SPENCER
Deputy Shotcrete 6/29/2020 Approved DERRICK SPENCER
Deputy Shotcrete 6/30/2020 Approved DERRICK SPENCER
Deputy Shotcrete 7/1/2020 Approved DERRICK SPENCER
Deputy Shotcrete 7/2/2020 Approved DERRICK SPENCER
Reinforced Concrete Frame 7/2/2020 Partial Approval DERRICK SPENCER
Deputy Fireproofing 7/7/2020 Approved DERRICK SPENCER
Deputy Reinf. Concrete 7/7/2020 Approved DERRICK SPENCER
Deputy Drilled-In Anchors 7/14/2020 Approved DERRICK SPENCER
Deputy Reinf. Concrete 7/14/2020 Approved DERRICK SPENCER
Deputy Shotcrete 7/14/2020 Approved DERRICK SPENCER
Deputy Drilled-In Anchors 7/15/2020 Approved DERRICK SPENCER
Deputy Reinf. Concrete 7/15/2020 Approved DERRICK SPENCER
Deputy Shotcrete 7/15/2020 Approved DERRICK SPENCER
Deputy Drilled-In Anchors 7/16/2020 Approved DERRICK SPENCER
Deputy Reinf. Concrete 7/16/2020 Approved DERRICK SPENCER
Deputy Shotcrete 7/16/2020 Approved DERRICK SPENCER
Deputy Drilled-In Anchors 7/17/2020 Approved DERRICK SPENCER
Deputy Reinf. Concrete 7/17/2020 Approved DERRICK SPENCER
Deputy Shotcrete 7/17/2020 Approved DERRICK SPENCER
Reinforced Concrete Frame 7/17/2020 Partial Approval DERRICK SPENCER
Deputy Shotcrete 7/20/2020 Approved DERRICK SPENCER
Excavation/Setback/Form/Re-Bar 7/20/2020 Partial Approval DERRICK SPENCER
Deputy Shotcrete 7/21/2020 Approved DERRICK SPENCER
Deputy Shotcrete 7/22/2020 Approved DERRICK SPENCER
Deputy Shotcrete 7/24/2020 Approved DERRICK SPENCER
Insulation 7/28/2020 Partial Approval DERRICK SPENCER
Deputy Fireproofing 7/29/2020 Approved DERRICK SPENCER
Deputy Shotcrete 7/30/2020 Approved DERRICK SPENCER
Reinforced Masonry Frame 8/4/2020 Partial Approval DERRICK SPENCER
Deputy Reinf. Masonry 8/5/2020 Approved DERRICK SPENCER
Light Gage Steel Frame 8/10/2020 Partial Approval DERRICK SPENCER
Reinforced Concrete Frame 8/10/2020 Partial Approval DERRICK SPENCER
Deputy Drilled-In Anchors 8/11/2020 Approved DERRICK SPENCER
Deputy Shotcrete 8/11/2020 Approved DERRICK SPENCER
Deputy Drilled-In Anchors 8/12/2020 Approved DERRICK SPENCER
Deputy Shotcrete 8/12/2020 Approved DERRICK SPENCER
Deputy Drilled-In Anchors 8/13/2020 Approved DERRICK SPENCER
Deputy Shotcrete 8/13/2020 Approved DERRICK SPENCER
Reinforced Concrete Frame 8/13/2020 Partial Approval DERRICK SPENCER
Deputy Drilled-In Anchors 8/14/2020 Approved DERRICK SPENCER
Deputy Reinf. Concrete 8/14/2020 Approved DERRICK SPENCER
Deputy Shotcrete 8/14/2020 Approved DERRICK SPENCER
Reinforced Concrete Frame 8/19/2020 Partial Approval DERRICK SPENCER
Deputy Reinf. Concrete 8/21/2020 Approved DERRICK SPENCER
Light Gage Steel Frame 8/27/2020 Partial Approval DERRICK SPENCER
Reinforced Concrete Frame 9/4/2020 Approved DERRICK SPENCER
Light Gage Steel Frame 9/8/2020 Partial Approval DERRICK SPENCER
Footing/Foundation/Slab 9/11/2020 Conditional Approval DERRICK SPENCER
Deputy Reinf. Concrete 9/25/2020 Approved DERRICK SPENCER
Light Gage Steel Frame 10/6/2020 Partial Approval DERRICK SPENCER
Deputy Reinf. Masonry 10/8/2020 Approved DERRICK SPENCER
Reinforced Masonry Frame 10/8/2020 Partial Approval DERRICK SPENCER
Wood Frame 10/8/2020 Partial Approval DERRICK SPENCER
Deputy Reinf. Masonry 10/9/2020 Approved DERRICK SPENCER
Masonry Wall/Backfill 10/9/2020 Approved DERRICK SPENCER
Deputy Other (see comments) 10/15/2020 Approved DERRICK SPENCER
Reinforced Masonry Frame 10/15/2020 Partial Approval DERRICK SPENCER
Deputy Fireproofing 10/20/2020 Approved DERRICK SPENCER
Deputy Wood Construction 10/20/2020 Approved DERRICK SPENCER
Light Gage Steel Frame 10/20/2020 Partial Approval DERRICK SPENCER
Interior/Exterior Lathing 10/21/2020 Partial Approval DERRICK SPENCER
Deputy Fireproofing 10/22/2020 Approved DERRICK SPENCER
Deputy Drilled-In Anchors 10/26/2020 Approved DERRICK SPENCER
Deputy Reinf. Concrete 10/26/2020 Approved DERRICK SPENCER
Interior/Exterior Lathing 10/26/2020 Partial Approval DERRICK SPENCER
Structural Steel Frame 10/29/2020 Partial Approval DERRICK SPENCER
Structural Steel Frame 10/30/2020 Not Ready for Inspection DERRICK SPENCER
Deputy Fireproofing 11/2/2020 Approved DERRICK SPENCER
Deputy Reinf. Concrete 11/4/2020 Approved DERRICK SPENCER
Deputy Fireproofing 11/10/2020 Approved DERRICK SPENCER
Light Gage Steel Frame 11/13/2020 Partial Approval DERRICK SPENCER
Deputy Fireproofing 11/16/2020 Approved DERRICK SPENCER
Deputy Fireproofing 11/19/2020 Approved DERRICK SPENCER
Deputy Reinf. Concrete 11/24/2020 Approved DERRICK SPENCER
Light Gage Steel Frame 12/4/2020 Partial Approval JOHN DODGE
Deputy Fireproofing 12/7/2020 Approved DERRICK SPENCER
Deputy Fireproofing 12/8/2020 Approved DERRICK SPENCER
Deputy Fireproofing 12/22/2020 Approved DERRICK SPENCER
Light Gage Steel Frame 12/23/2020 Partial Approval DERRICK SPENCER
Light Gage Steel Frame 1/14/2021 Partial Approval DERRICK SPENCER
Pre-Inspection 1/25/2021 Approved DERRICK SPENCER
Final 1/28/2021 Not Ready for Inspection DERRICK SPENCER
Green Building Final 1/28/2021 Not Ready for Inspection DERRICK SPENCER
SGSOV-Seismic Gas S/O Valve 1/28/2021 SGSOV Approved DERRICK SPENCER
Smoke Detectors 1/28/2021 Approved DERRICK SPENCER
Excavation/Setback/Form/Re-Bar 2/18/2021 Partial Approval DERRICK SPENCER
Drywall Nailing 2/26/2021 Partial Approval DERRICK SPENCER
Interior/Exterior Lathing 3/9/2021 Partial Approval DERRICK SPENCER
Footing/Foundation/Slab 3/16/2021 Partial Approval DERRICK SPENCER
Deputy Drilled-In Anchors 4/19/2021 Approved DERRICK SPENCER
Deputy Drilled-In Anchors 4/20/2021 Approved DERRICK SPENCER
Interior/Exterior Lathing 6/8/2021 Approved DERRICK SPENCER
Light Gage Steel Frame 6/22/2021 Approved DERRICK SPENCER
Pre-Inspection 7/19/2021 Approved DERRICK SPENCER
Footing/Foundation/Slab 8/31/2021 Partial Approval DERRICK SPENCER
Footing/Foundation/Slab 9/14/2021 Partial Approval DERRICK SPENCER
Light Gage Steel Frame 9/22/2021 Approved DERRICK SPENCER
Drywall Nailing 9/23/2021 Approved DERRICK SPENCER
Insulation 9/23/2021 Approved DERRICK SPENCER
Masonry Wall/Backfill 9/27/2021 Approved DERRICK SPENCER
Reinforced Masonry Frame 9/27/2021 Approved DERRICK SPENCER
Final 10/14/2021 Not Ready for Inspection DERRICK SPENCER
Green Building Final 10/14/2021 Approved DERRICK SPENCER
Final 11/10/2021 Not Ready for Inspection DERRICK SPENCER
Special/Order Compliance 11/29/2021 Approved DERRICK SPENCER
Pre-Inspection 11/30/2021 Approved DERRICK SPENCER
Pre-Inspection 12/3/2021 Approved DERRICK SPENCER
Pre-Inspection 12/6/2021 Approved DERRICK SPENCER
Final 3/30/2022 Not Ready for Inspection DERRICK SPENCER
Final 6/1/2022 Not Ready for Inspection SORIN CIRSTOIU
Final 6/7/2022 OK to Issue CofO DERRICK SPENCER