428 S SHERBOURNE DR 1-9 90048

Certificate Information: 428 S SHERBOURNE DR 1-9 90048

Application / Permit
17016-10000-28328
Plan Check / Job No.
B17LA17561
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
Soft-story seismic retrofit per LAMC 93: (1) Special Cantilever Column and (1) Shear wall
Permit Issued
Issued on 3/24/2022
Issuing Office
Current Status
Issued on 3/24/2022

Permit Application Status History

Submitted 9/27/2017 APPLICANT
Assigned to Plan Check Engineer 10/5/2017 HERNAN ARREOLA
Corrections Issued 10/9/2017 HERNAN ARREOLA
Quality Review Completed 10/16/2017 CELESTE MORRIS
Building Plans Picked Up 10/24/2017 APPLICANT
Plan Check Approved 11/17/2017 HERNAN ARREOLA
Issued 3/24/2022 APPLICANT

Permit Application Clearance Information

Housing rent stabilization Cleared 3/9/2022 MICHAEL SOTO

Contact Information

Contractor U S Home Pros Inc; Lic. No.: 1022167-B 19528 VENTURA BLVD #300      TARZANA, CA 91356
Engineer Puliyadi, Senthilnath Surendran; Lic. No.: C71630 114 SHADOWHILL CIRCLE      SAN RAMON, CA 94583

Inspector Information

DARRYL ARNOLD, (213) 482-0341 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 4/6/2022 Approved DARRYL ARNOLD
Deputy Drilled-In Anchors 7/11/2022 Approved DARRYL ARNOLD
Deputy Reinf. Concrete 7/11/2022 Conditional Approval DARRYL ARNOLD
Deputy Steel/Welding 7/11/2022 Conditional Approval DARRYL ARNOLD
Footing/Foundation/Slab 7/29/2022 Conditional Approval DARRYL ARNOLD
Structural Steel Frame 7/29/2022 Conditional Approval DARRYL ARNOLD
Wood Frame 7/29/2022 Conditional Approval DARRYL ARNOLD
Deputy Reinf. Concrete 8/1/2022 Conditional Approval DARRYL ARNOLD
Wood Frame 8/10/2022 Corrections Issued DARRYL ARNOLD
Deputy Wood Construction 8/11/2022 Conditional Approval BRUCE CAMPBELL
Wood Frame 9/1/2022 Corrections Issued DARRYL ARNOLD
Deputy Wood Construction 9/7/2022 Conditional Approval DARRYL ARNOLD
Wood Frame 9/21/2022 Not Ready for Inspection DARRYL ARNOLD
Interior/Exterior Lathing 9/26/2022 Approved DARRYL ARNOLD
Final 10/12/2022 Not Ready for Inspection DARRYL ARNOLD
METHANE-Final 10/12/2022 Conditional Approval DARRYL ARNOLD
SGSOV-Seismic Gas S/O Valve 10/12/2022 SGSOV Not Ready DARRYL ARNOLD
Smoke Detectors 10/12/2022 Conditional Approval DARRYL ARNOLD
Final 2/25/2026 Not Ready for Inspection DARRYL ARNOLD
METHANE-Final 2/25/2026 Not Ready for Inspection DARRYL ARNOLD
SGSOV-Seismic Gas S/O Valve 2/25/2026 SGSOV Not Ready DARRYL ARNOLD
Smoke Detectors 2/25/2026 Corrections Issued DARRYL ARNOLD