761 S BROADWAY 90014

Certificate Information: 761 S BROADWAY 90014

Application / Permit
17016-10000-19909
Plan Check / Job No.
B17LA12763
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
Commercial
Primary Use
(13) Office
Work Description
REMODEL TO EXISTING HISTORIC 10 STORY BUILDING PLUS 1-LEVEL OF BASEMENT (9 STORY OFFICE UNITS OVER 1 LEVEL RETAIL ON GROUND FLOOR). NEW AMENITY SPACE ON ROOF. - PROVIDE VOLUNTARY SEISMIC HAZARD MITIGATION.
Permit Issued
Issued on 3/28/2018
Issuing Office
Metro
Current Status
CofO Issued on 4/8/2022
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 7/19/2017 APPLICANT
Assigned to Plan Check Engineer 8/3/2017 YOUNG KIM
Disabled Access Plans Picked Up 8/7/2017 APPLICANT
Green Plans Picked Up 8/7/2017 APPLICANT
Corrections Issued 9/14/2017 YOUNG KIM
Quality Review Completed 9/25/2017 WING SUEN
Building Plans Picked Up 10/2/2017 APPLICANT
Applicant returned to address corrections 11/9/2017 YOUNG KIM
Applicant returned to address corrections 11/13/2017 YOUNG KIM
Applicant returned to address corrections 11/17/2017 YOUNG KIM
Applicant returned to address corrections 12/5/2017 YOUNG KIM
Applicant returned to address corrections 12/12/2017 YOUNG KIM
Applicant returned to address corrections 1/9/2018 YOUNG KIM
Applicant returned to address corrections 1/12/2018 YOUNG KIM
Applicant returned to address corrections 1/18/2018 YOUNG KIM
Plan Check Approved 1/19/2018 YOUNG KIM
Issued 3/28/2018 LADBS
CofO in Progress 4/6/2022 TIMOTHY BUXTON
Permit Finaled 4/8/2022 ERNESTO CORRAL
CofO Issued 4/8/2022 ERNESTO CORRAL
Permit Finaled 4/8/2022 ERNESTO CORRAL

Permit Application Clearance Information

"D" conditions Cleared 10/20/2017 SEAN VEAL
"Q" conditions Cleared 10/20/2017 SEAN VEAL
CPC Cleared 10/20/2017 SEAN VEAL
CPC Cleared 10/20/2017 SEAN VEAL
CPC Cleared 10/20/2017 SEAN VEAL
Eng Process Fee Ord 176,300 Cleared 10/20/2017 AVALYN KAMACHI
Sewer availability Cleared 10/20/2017 AVALYN KAMACHI
ZI Cleared 10/20/2017 SEAN VEAL
City Hist. Cultural Monument Cleared 10/23/2017 LAMBERT GIESSINGER
HPOZ Cleared 10/23/2017 LAMBERT GIESSINGER
Project located in CRA area Cleared 11/8/2017 JIM URQUHART
Miscellaneous Cleared 11/17/2017 NAZILA NOORIFAR
DAS Clearance Cleared 12/8/2017 SHINE LIN
Green Code Cleared 12/8/2017 KATHRYN BUTTERWORTH
Fire Marshall Fire Life Safety Cleared 12/28/2017 DOMINIQUE MEDINA

Contact Information

Contractor M Librush Construction Inc; Lic. No.: 933238-B 541 SOUTH SPRING ST STE 213      LOS ANGELES, CA 90013
Engineer Bouquet, Thomas Campbell; Lic. No.: S4007 155 N LAKE AVE SUITE 600      PASADENA, CA 91101
Engineer Tang, Stanley Siu Kei; Lic. No.: C56178 1105 N AVON STREET      BURBANK, CA 91505

Inspector Information

JEROME BLACKWOOD, (213) 213-5353 Office Hours: 7:00-8:00 AM MON-FRI
REGINA MENDEZ, (213) 213-5353 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 11/13/2018 Conditional Approval NICK DANERI
Deputy Drilled-In Anchors 6/5/2019 Approved DANIEL COLLINS
Deputy Drilled-In Anchors 6/6/2019 Approved DANIEL COLLINS
Deputy Drilled-In Anchors 6/7/2019 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 6/7/2019 Conditional Approval DANIEL COLLINS
Green Building Rough 6/12/2019 Not Ready for Inspection JAMES POWERS
METHANE-Rough 6/12/2019 Not Ready for Inspection JAMES POWERS
Reinforced Concrete Frame 6/12/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 6/13/2019 Conditional Approval DANIEL COLLINS
Deputy Shotcrete 6/14/2019 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 6/19/2019 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 6/20/2019 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 6/21/2019 Conditional Approval DANIEL COLLINS
Deputy Shotcrete 6/24/2019 Conditional Approval DANIEL COLLINS
Green Building Rough 6/27/2019 Approved DANIEL COLLINS
METHANE-Rough 6/27/2019 Approved DANIEL COLLINS
Reinforced Concrete Frame 6/27/2019 Partial Approval DANIEL COLLINS
Deputy Drilled-In Anchors 7/2/2019 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 7/11/2019 Conditional Approval KATY RAMIREZ
Deputy Drilled-In Anchors 7/12/2019 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 7/12/2019 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 7/15/2019 Conditional Approval DANIEL COLLINS
Reinforced Concrete Frame 7/16/2019 Partial Approval DANIEL COLLINS
Deputy Reinf. Concrete 7/17/2019 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 7/19/2019 Conditional Approval KATY RAMIREZ
Deputy Drilled-In Anchors 7/23/2019 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 8/2/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 8/6/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 8/7/2019 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 8/8/2019 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 8/9/2019 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 8/13/2019 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 8/14/2019 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 8/15/2019 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 8/15/2019 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 8/16/2019 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 8/20/2019 Conditional Approval DANIEL COLLINS
Reinforced Concrete Frame 8/22/2019 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 8/26/2019 Conditional Approval DANIEL COLLINS
Deputy Shotcrete 8/26/2019 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 9/3/2019 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 9/5/2019 Conditional Approval DANIEL COLLINS
Deputy Other (see comments) 9/5/2019 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 9/6/2019 Conditional Approval DANIEL COLLINS
Deputy Other (see comments) 9/6/2019 Conditional Approval DANIEL COLLINS
Reinforced Concrete Frame 9/17/2019 Partial Inspection HAMID PISHEHVAR
Deputy Steel/Welding 10/9/2019 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 10/15/2019 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 10/15/2019 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 10/16/2019 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 10/16/2019 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 10/17/2019 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 10/17/2019 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 10/18/2019 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 10/18/2019 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 10/21/2019 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 10/22/2019 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 11/1/2019 Conditional Approval KATY RAMIREZ
Deputy Drilled-In Anchors 11/6/2019 Conditional Approval DANIEL COLLINS
Deputy Other (see comments) 11/26/2019 Conditional Approval DANIEL COLLINS
Deputy Pre-Stress Concrete 11/26/2019 Conditional Approval DANIEL COLLINS
Excavation/Setback/Form/Re-Bar 11/26/2019 Partial Approval DANIEL COLLINS
Deputy Reinf. Concrete 12/2/2019 Conditional Approval DANIEL COLLINS
Reinforced Concrete Frame 12/5/2019 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 12/16/2019 Conditional Approval DANIEL COLLINS
Reinforced Concrete Frame 12/18/2019 Partial Approval DANIEL COLLINS
Reinforced Concrete Frame 1/3/2020 Partial Approval DANIEL COLLINS
Deputy Reinf. Concrete 1/6/2020 Conditional Approval DANIEL COLLINS
Reinforced Concrete Frame 1/8/2020 Partial Approval DANIEL COLLINS
Deputy Reinf. Concrete 1/9/2020 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 1/10/2020 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 1/14/2020 Conditional Approval DANIEL COLLINS
Footing/Foundation/Slab 1/14/2020 Partial Approval DANIEL COLLINS
Deputy Reinf. Concrete 1/15/2020 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 1/21/2020 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 1/22/2020 Conditional Approval DANIEL COLLINS
Reinforced Concrete Frame 1/22/2020 Partial Approval DANIEL COLLINS
Deputy Reinf. Concrete 1/29/2020 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 1/29/2020 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 1/30/2020 Conditional Approval DANIEL COLLINS
Reinforced Concrete Frame 1/30/2020 Partial Approval DANIEL COLLINS
Deputy Steel/Welding 1/31/2020 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 2/4/2020 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 2/4/2020 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 2/5/2020 Conditional Approval DANIEL COLLINS
Floor/Roof Diaphrgm/Shear Wall 2/5/2020 Partial Approval DANIEL COLLINS
Deputy Steel/Welding 2/6/2020 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 2/10/2020 Conditional Approval DANIEL COLLINS
Deputy Other (see comments) 2/12/2020 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 2/12/2020 Conditional Approval DANIEL COLLINS
Reinforced Concrete Frame 2/12/2020 Partial Approval DANIEL COLLINS
Deputy Reinf. Concrete 2/13/2020 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 2/18/2020 Conditional Approval DANIEL COLLINS
Reinforced Concrete Frame 2/20/2020 Partial Approval DANIEL COLLINS
Deputy Steel/Welding 2/25/2020 Conditional Approval KATY RAMIREZ
Deputy Reinf. Concrete 2/26/2020 Conditional Approval KATY RAMIREZ
Reinforced Concrete Frame 2/26/2020 Partial Approval KATY RAMIREZ
Deputy Steel/Welding 2/28/2020 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 3/3/2020 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 3/4/2020 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 3/5/2020 Conditional Approval DANIEL COLLINS
Footing/Foundation/Slab 3/5/2020 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 3/6/2020 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 3/6/2020 Conditional Approval DANIEL COLLINS
Deputy Reinf. Masonry 3/16/2020 Conditional Approval KATY RAMIREZ
Deputy Steel/Welding 3/17/2020 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 3/19/2020 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 3/23/2020 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 3/27/2020 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 3/31/2020 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 3/31/2020 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 4/1/2020 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 4/2/2020 Conditional Approval DANIEL COLLINS
Reinforced Concrete Frame 4/2/2020 Partial Approval DANIEL COLLINS
Deputy Drilled-In Anchors 4/8/2020 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 4/14/2020 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 4/15/2020 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 4/16/2020 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 4/20/2020 Approved DANIEL COLLINS
Deputy Steel/Welding 4/21/2020 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 4/24/2020 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 4/28/2020 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 4/28/2020 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 4/29/2020 Conditional Approval RONALD PACHECO
Deputy Steel/Welding 4/29/2020 Conditional Approval RONALD PACHECO
Deputy Drilled-In Anchors 4/30/2020 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 4/30/2020 Conditional Approval DANIEL COLLINS
Footing/Foundation/Slab 4/30/2020 Partial Approval DANIEL COLLINS
Deputy Drilled-In Anchors 5/1/2020 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 5/1/2020 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 5/5/2020 Conditional Approval DANIEL COLLINS
Footing/Foundation/Slab 5/5/2020 Partial Approval DANIEL COLLINS
Deputy Steel/Welding 5/6/2020 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 5/8/2020 Conditional Approval JONATHAN QUACH
Deputy Steel/Welding 5/8/2020 Conditional Approval JONATHAN QUACH
Deputy Steel/Welding 5/11/2020 Partial Approval LANNY MERRICK
Deputy Steel/Welding 5/12/2020 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 5/13/2020 Partial Approval LANNY MERRICK
Deputy Steel/Welding 5/14/2020 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 5/15/2020 Conditional Approval KATY RAMIREZ
Footing/Foundation/Slab 5/20/2020 Partial Approval DANIEL COLLINS
Deputy Steel/Welding 5/21/2020 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 5/22/2020 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 5/27/2020 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 5/28/2020 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 5/29/2020 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 6/2/2020 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 6/3/2020 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 6/4/2020 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 6/5/2020 Conditional Approval KATY RAMIREZ
Deputy Other (see comments) 6/9/2020 Conditional Approval DANIEL COLLINS
Reinforced Concrete Frame 6/9/2020 Partial Approval DANIEL COLLINS
Footing/Foundation/Slab 6/11/2020 Partial Approval DANIEL COLLINS
Deputy Reinf. Concrete 6/17/2020 Conditional Approval DANIEL COLLINS
Floor/Roof Diaphrgm/Shear Wall 7/1/2020 Partial Approval DANIEL COLLINS
Footing/Foundation/Slab 7/1/2020 Partial Approval DANIEL COLLINS
Deputy Steel/Welding 7/17/2020 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 7/21/2020 Conditional Approval KATY RAMIREZ
Deputy Steel/Welding 7/21/2020 Conditional Approval KATY RAMIREZ
Deputy Steel/Welding 7/23/2020 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 7/24/2020 Conditional Approval DANIEL COLLINS
Light Gage Steel Frame 7/24/2020 Partial Approval DANIEL COLLINS
Deputy Steel/Welding 7/28/2020 Conditional Approval KATY RAMIREZ
Deputy Steel/Welding 7/30/2020 Conditional Approval KATY RAMIREZ
Deputy Steel/Welding 9/1/2020 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 9/3/2020 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 9/8/2020 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 9/25/2020 Conditional Approval DANIEL COLLINS
Structural Steel Frame 9/28/2020 Partial Approval DANIEL COLLINS
Drywall Nailing 10/6/2020 Partial Approval DANIEL COLLINS
Drywall Nailing 11/4/2020 Approved DANIEL COLLINS
Interior/Exterior Lathing 11/4/2020 Partial Approval DANIEL COLLINS
Light Gage Steel Frame 11/4/2020 Partial Approval DANIEL COLLINS
Deputy Steel/Welding 11/10/2020 Conditional Approval DANIEL COLLINS
Light Gage Steel Frame 11/30/2020 Partial Approval DANIEL COLLINS
Light Gage Steel Frame 12/23/2020 Partial Approval DANIEL COLLINS
Pre-Inspection 1/28/2021 Not Ready for Inspection DANIEL COLLINS
Pre-Inspection 2/1/2021 Not Ready for Inspection DANIEL COLLINS
Pre-Inspection 2/2/2021 Partial Approval DANIEL COLLINS
Insulation 2/5/2021 Partial Approval DANIEL COLLINS
Pre-Inspection 2/5/2021 Partial Approval DANIEL COLLINS
Light Gage Steel Frame 2/9/2021 Partial Approval DANIEL COLLINS
Pre-Inspection 2/9/2021 Partial Approval DANIEL COLLINS
Drywall Nailing 2/16/2021 Partial Approval DANIEL COLLINS
Insulation 2/16/2021 Partial Approval DANIEL COLLINS
Drywall Nailing 3/1/2021 Partial Approval DANIEL COLLINS
Light Gage Steel Frame 3/1/2021 Partial Approval DANIEL COLLINS
Drywall Nailing 3/15/2021 Partial Approval DANIEL COLLINS
Light Gage Steel Frame 3/15/2021 Partial Approval DANIEL COLLINS
Drywall Nailing 4/12/2021 Partial Inspection DANIEL COLLINS
Deputy Drilled-In Anchors 6/3/2021 Conditional Approval DANIEL COLLINS
Floor/Roof Diaphrgm/Shear Wall 6/7/2021 Partial Approval KATY RAMIREZ
Deputy Reinf. Concrete 6/15/2021 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 7/27/2021 Conditional Approval DANIEL COLLINS
Excavation/Setback/Form/Re-Bar 8/2/2021 Partial Approval KATY RAMIREZ
Special/Order Compliance 10/19/2021 Approved DANIEL COLLINS
Drywall Nailing 1/10/2022 Approved TIMOTHY BUXTON
Final 1/10/2022 Not Ready for Inspection TIMOTHY BUXTON
Green Building Final 1/10/2022 Not Ready for Inspection TIMOTHY BUXTON
Reinforced Concrete Frame 1/10/2022 Approved TIMOTHY BUXTON
SGSOV-Seismic Gas S/O Valve 1/10/2022 SGSOV No Gas TIMOTHY BUXTON
Smoke Detectors 1/10/2022 Approved TIMOTHY BUXTON
Structural Steel Frame 1/10/2022 Approved TIMOTHY BUXTON
Final 3/31/2022 Conditional Approval TIMOTHY BUXTON
Green Building Final 3/31/2022 Approved TIMOTHY BUXTON