Pre-Inspection
|
11/13/2018
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Drilled-In Anchors
|
6/5/2019
|
Approved
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
6/6/2019
|
Approved
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
6/7/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
6/7/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Green Building Rough
|
6/12/2019
|
Not Ready for Inspection
|
JAMES POWERS
|
|
METHANE-Rough
|
6/12/2019
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
6/12/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
6/13/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Shotcrete
|
6/14/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
6/19/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
6/20/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
6/21/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Shotcrete
|
6/24/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Green Building Rough
|
6/27/2019
|
Approved
|
DANIEL COLLINS
|
|
METHANE-Rough
|
6/27/2019
|
Approved
|
DANIEL COLLINS
|
|
Reinforced Concrete Frame
|
6/27/2019
|
Partial Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
7/2/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
7/11/2019
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Drilled-In Anchors
|
7/12/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
7/12/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
7/15/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Reinforced Concrete Frame
|
7/16/2019
|
Partial Approval
|
DANIEL COLLINS
|
|
Deputy Reinf. Concrete
|
7/17/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
7/19/2019
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Drilled-In Anchors
|
7/23/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Reinf. Concrete
|
8/2/2019
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Reinf. Concrete
|
8/6/2019
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Reinf. Concrete
|
8/7/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Reinf. Concrete
|
8/8/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Reinf. Concrete
|
8/9/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Reinf. Concrete
|
8/13/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Reinf. Concrete
|
8/14/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Reinf. Concrete
|
8/15/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
8/15/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Reinf. Concrete
|
8/16/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Reinf. Concrete
|
8/20/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Reinforced Concrete Frame
|
8/22/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Reinf. Concrete
|
8/26/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Shotcrete
|
8/26/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
9/3/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
9/5/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Other (see comments)
|
9/5/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
9/6/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Other (see comments)
|
9/6/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Reinforced Concrete Frame
|
9/17/2019
|
Partial Inspection
|
HAMID PISHEHVAR
|
|
Deputy Steel/Welding
|
10/9/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Reinf. Concrete
|
10/15/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
10/15/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Reinf. Concrete
|
10/16/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
10/16/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Reinf. Concrete
|
10/17/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
10/17/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Reinf. Concrete
|
10/18/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
10/18/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
10/21/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Reinf. Concrete
|
10/22/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
11/1/2019
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Drilled-In Anchors
|
11/6/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Other (see comments)
|
11/26/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Pre-Stress Concrete
|
11/26/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Excavation/Setback/Form/Re-Bar
|
11/26/2019
|
Partial Approval
|
DANIEL COLLINS
|
|
Deputy Reinf. Concrete
|
12/2/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Reinforced Concrete Frame
|
12/5/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Reinf. Concrete
|
12/16/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Reinforced Concrete Frame
|
12/18/2019
|
Partial Approval
|
DANIEL COLLINS
|
|
Reinforced Concrete Frame
|
1/3/2020
|
Partial Approval
|
DANIEL COLLINS
|
|
Deputy Reinf. Concrete
|
1/6/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Reinforced Concrete Frame
|
1/8/2020
|
Partial Approval
|
DANIEL COLLINS
|
|
Deputy Reinf. Concrete
|
1/9/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Reinf. Concrete
|
1/10/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Reinf. Concrete
|
1/14/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Footing/Foundation/Slab
|
1/14/2020
|
Partial Approval
|
DANIEL COLLINS
|
|
Deputy Reinf. Concrete
|
1/15/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Reinf. Concrete
|
1/21/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
1/22/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Reinforced Concrete Frame
|
1/22/2020
|
Partial Approval
|
DANIEL COLLINS
|
|
Deputy Reinf. Concrete
|
1/29/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
1/29/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
1/30/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Reinforced Concrete Frame
|
1/30/2020
|
Partial Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
1/31/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Reinf. Concrete
|
2/4/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
2/4/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
2/5/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
2/5/2020
|
Partial Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
2/6/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
2/10/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Other (see comments)
|
2/12/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Reinf. Concrete
|
2/12/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Reinforced Concrete Frame
|
2/12/2020
|
Partial Approval
|
DANIEL COLLINS
|
|
Deputy Reinf. Concrete
|
2/13/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Reinf. Concrete
|
2/18/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Reinforced Concrete Frame
|
2/20/2020
|
Partial Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
2/25/2020
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Reinf. Concrete
|
2/26/2020
|
Conditional Approval
|
KATY RAMIREZ
|
|
Reinforced Concrete Frame
|
2/26/2020
|
Partial Approval
|
KATY RAMIREZ
|
|
Deputy Steel/Welding
|
2/28/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
3/3/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
3/4/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Reinf. Concrete
|
3/5/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Footing/Foundation/Slab
|
3/5/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Reinf. Concrete
|
3/6/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
3/6/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Reinf. Masonry
|
3/16/2020
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Steel/Welding
|
3/17/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
3/19/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
3/23/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
3/27/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Reinf. Concrete
|
3/31/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
3/31/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Reinf. Concrete
|
4/1/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Reinf. Concrete
|
4/2/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Reinforced Concrete Frame
|
4/2/2020
|
Partial Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
4/8/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
4/14/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
4/15/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
4/16/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
4/20/2020
|
Approved
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
4/21/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
4/24/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
4/28/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
4/28/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
4/29/2020
|
Conditional Approval
|
RONALD PACHECO
|
|
Deputy Steel/Welding
|
4/29/2020
|
Conditional Approval
|
RONALD PACHECO
|
|
Deputy Drilled-In Anchors
|
4/30/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
4/30/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Footing/Foundation/Slab
|
4/30/2020
|
Partial Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
5/1/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
5/1/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
5/5/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Footing/Foundation/Slab
|
5/5/2020
|
Partial Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
5/6/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
5/8/2020
|
Conditional Approval
|
JONATHAN QUACH
|
|
Deputy Steel/Welding
|
5/8/2020
|
Conditional Approval
|
JONATHAN QUACH
|
|
Deputy Steel/Welding
|
5/11/2020
|
Partial Approval
|
LANNY MERRICK
|
|
Deputy Steel/Welding
|
5/12/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
5/13/2020
|
Partial Approval
|
LANNY MERRICK
|
|
Deputy Steel/Welding
|
5/14/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
5/15/2020
|
Conditional Approval
|
KATY RAMIREZ
|
|
Footing/Foundation/Slab
|
5/20/2020
|
Partial Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
5/21/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
5/22/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
5/27/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
5/28/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
5/29/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
6/2/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
6/3/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
6/4/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
6/5/2020
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Other (see comments)
|
6/9/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Reinforced Concrete Frame
|
6/9/2020
|
Partial Approval
|
DANIEL COLLINS
|
|
Footing/Foundation/Slab
|
6/11/2020
|
Partial Approval
|
DANIEL COLLINS
|
|
Deputy Reinf. Concrete
|
6/17/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/1/2020
|
Partial Approval
|
DANIEL COLLINS
|
|
Footing/Foundation/Slab
|
7/1/2020
|
Partial Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
7/17/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
7/21/2020
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Steel/Welding
|
7/21/2020
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Steel/Welding
|
7/23/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
7/24/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Light Gage Steel Frame
|
7/24/2020
|
Partial Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
7/28/2020
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Steel/Welding
|
7/30/2020
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Steel/Welding
|
9/1/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
9/3/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
9/8/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
9/25/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Structural Steel Frame
|
9/28/2020
|
Partial Approval
|
DANIEL COLLINS
|
|
Drywall Nailing
|
10/6/2020
|
Partial Approval
|
DANIEL COLLINS
|
|
Drywall Nailing
|
11/4/2020
|
Approved
|
DANIEL COLLINS
|
|
Interior/Exterior Lathing
|
11/4/2020
|
Partial Approval
|
DANIEL COLLINS
|
|
Light Gage Steel Frame
|
11/4/2020
|
Partial Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
11/10/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Light Gage Steel Frame
|
11/30/2020
|
Partial Approval
|
DANIEL COLLINS
|
|
Light Gage Steel Frame
|
12/23/2020
|
Partial Approval
|
DANIEL COLLINS
|
|
Pre-Inspection
|
1/28/2021
|
Not Ready for Inspection
|
DANIEL COLLINS
|
|
Pre-Inspection
|
2/1/2021
|
Not Ready for Inspection
|
DANIEL COLLINS
|
|
Pre-Inspection
|
2/2/2021
|
Partial Approval
|
DANIEL COLLINS
|
|
Insulation
|
2/5/2021
|
Partial Approval
|
DANIEL COLLINS
|
|
Pre-Inspection
|
2/5/2021
|
Partial Approval
|
DANIEL COLLINS
|
|
Light Gage Steel Frame
|
2/9/2021
|
Partial Approval
|
DANIEL COLLINS
|
|
Pre-Inspection
|
2/9/2021
|
Partial Approval
|
DANIEL COLLINS
|
|
Drywall Nailing
|
2/16/2021
|
Partial Approval
|
DANIEL COLLINS
|
|
Insulation
|
2/16/2021
|
Partial Approval
|
DANIEL COLLINS
|
|
Drywall Nailing
|
3/1/2021
|
Partial Approval
|
DANIEL COLLINS
|
|
Light Gage Steel Frame
|
3/1/2021
|
Partial Approval
|
DANIEL COLLINS
|
|
Drywall Nailing
|
3/15/2021
|
Partial Approval
|
DANIEL COLLINS
|
|
Light Gage Steel Frame
|
3/15/2021
|
Partial Approval
|
DANIEL COLLINS
|
|
Drywall Nailing
|
4/12/2021
|
Partial Inspection
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
6/3/2021
|
Conditional Approval
|
DANIEL COLLINS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/7/2021
|
Partial Approval
|
KATY RAMIREZ
|
|
Deputy Reinf. Concrete
|
6/15/2021
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
7/27/2021
|
Conditional Approval
|
DANIEL COLLINS
|
|
Excavation/Setback/Form/Re-Bar
|
8/2/2021
|
Partial Approval
|
KATY RAMIREZ
|
|
Special/Order Compliance
|
10/19/2021
|
Approved
|
DANIEL COLLINS
|
|
Drywall Nailing
|
1/10/2022
|
Approved
|
TIMOTHY BUXTON
|
|
Final
|
1/10/2022
|
Not Ready for Inspection
|
TIMOTHY BUXTON
|
|
Green Building Final
|
1/10/2022
|
Not Ready for Inspection
|
TIMOTHY BUXTON
|
|
Reinforced Concrete Frame
|
1/10/2022
|
Approved
|
TIMOTHY BUXTON
|
|
SGSOV-Seismic Gas S/O Valve
|
1/10/2022
|
SGSOV No Gas
|
TIMOTHY BUXTON
|
|
Smoke Detectors
|
1/10/2022
|
Approved
|
TIMOTHY BUXTON
|
|
Structural Steel Frame
|
1/10/2022
|
Approved
|
TIMOTHY BUXTON
|
|
Final
|
3/31/2022
|
Conditional Approval
|
TIMOTHY BUXTON
|
|
Green Building Final
|
3/31/2022
|
Approved
|
TIMOTHY BUXTON
|