722 S BROADWAY 90014
Certificate Information: 722 S BROADWAY 90014
- Application / Permit
- 17016-10000-14872
- Plan Check / Job No.
- B17LA09490
- Group
- Building
- Type
- Bldg-Alter/Repair
- Sub-Type
- Commercial
- Primary Use
- (13) Office
- Work Description
- CORE AND SHELL ALTERATION OF AN EXISTING HISTORIC, EIGHT STORY URM BUILDING AND FULL COMPLIANCE PER APPENDIX A1. NO CHANGE OF USE.
- Permit Issued
- Issued on 5/6/2019
- Issuing Office
- Metro
- Current Status
- CofO Corrected on 11/18/2024
- Certificate of Occupancy
- CofO Issued More Information
Permit Application Status History
| Submitted | 7/3/2017 | APPLICANT |
| Disabled Access Plans Picked Up | 7/12/2017 | APPLICANT |
| Assigned to Plan Check Engineer | 7/20/2017 | MINYE PAK |
| Green Plans Picked Up | 7/25/2017 | APPLICANT |
| Corrections Issued | 8/18/2017 | MINYE PAK |
| Quality Review Completed | 8/18/2017 | PETER KIM |
| Building Plans Picked Up | 8/22/2017 | APPLICANT |
| Applicant returned to address corrections | 10/10/2017 | MINYE PAK |
| Applicant returned to address corrections | 10/16/2017 | MINYE PAK |
| Applicant returned to address corrections | 12/6/2017 | MINYE PAK |
| Applicant returned to address corrections | 1/17/2018 | MINYE PAK |
| Applicant returned to address corrections | 1/26/2018 | MINYE PAK |
| Applicant returned to address corrections | 2/16/2018 | MINYE PAK |
| Applicant returned to address corrections | 3/30/2018 | MINYE PAK |
| Applicant returned to address corrections | 6/25/2018 | MINYE PAK |
| Applicant returned to address corrections | 7/18/2018 | MINYE PAK |
| Applicant returned to address corrections | 8/2/2018 | MINYE PAK |
| Applicant returned to address corrections | 10/17/2018 | MINYE PAK |
| Applicant returned to address corrections | 4/9/2019 | MINYE PAK |
| Plan Check Approved | 4/23/2019 | MINYE PAK |
| Issued | 5/6/2019 | LADBS |
| CofO in Progress | 11/30/2023 | RAFAEL ESPINOZA |
| CofO Issued-Status Void | 12/1/2023 | ERNESTO CORRAL |
| Permit Finaled-Status Void | 12/1/2023 | ERNESTO CORRAL |
| Re-Activate Permit | 11/18/2024 | ERNESTO CORRAL |
| CofO Corrected | 11/18/2024 | ERNESTO CORRAL |
| Permit Finaled | 11/18/2024 | ERNESTO CORRAL |
Permit Application Clearance Information
| CPC | Cleared | 5/9/2018 | YOVANA PEREZ |
| Eng Process Fee Ord 176,300 | Cleared | 7/20/2018 | NAZILA NOORIFAR |
| Sewer availability | Cleared | 7/20/2018 | NAZILA NOORIFAR |
| Green Code | Cleared | 7/23/2018 | WILLIAM ROSE |
| City Hist. Cultural Monument | Cleared | 2/14/2019 | LAMBERT GIESSINGER |
| Historic monument | Cleared | 2/14/2019 | LAMBERT GIESSINGER |
| Historical monument | Cleared | 2/15/2019 | JIM URQUHART |
| Project located in CRA area | Cleared | 2/15/2019 | JIM URQUHART |
| DAS Clearance | Cleared | 4/10/2019 | WAI LAU |
| "D" conditions | Cleared | 4/17/2019 | NORA DRESSER |
| "Q" conditions | Cleared | 4/17/2019 | NORA DRESSER |
| CPC | Cleared | 4/17/2019 | NORA DRESSER |
| CPC | Cleared | 4/17/2019 | NORA DRESSER |
| ZI | Cleared | 4/17/2019 | NORA DRESSER |
| ZI | Cleared | 4/17/2019 | NORA DRESSER |
| ZI | Cleared | 4/17/2019 | NORA DRESSER |
| Fire Marshall Fire Life Safety | Cleared | 4/22/2019 | MENOA AGHAJANI |
| Building over 3-story or 36-ft | Cleared | 4/23/2019 | CALOSHA APPROVED |
Contact Information
| Architect | Miroglio,, Naomi Okun; Lic. No.: C22990 | 381 ORANGE STREET OAKLAND, CA 94610 |
| Contractor | Baypost Builders Inc; Lic. No.: 979440-B | 22263 BUENA VENTURA ST WOODLAND HILLS, CA 91634 |
| Engineer | Irvine,, Jon Alan; Lic. No.: GE2891 | 145 N SIERRA MADRE BLVD STE 1 PASADENA, CA 91107 |
| Engineer | Tan,, Charles; Lic. No.: S4758 | 3161 DRIGGS AVENUE ROSEMEAD, CA 91770 |
Inspector Information
| RONALD JIMENEZ, (213) 482-0307 | Office Hours: 7:00-8:00 AM MON-FRI |
| LARRY ARNICK, (213) 482-0307 | Office Hours: 7:00-8:00 AM MON-FRI |
| JOEY BUCHANAN, (213) 482-0307 | Office Hours: 7:00-8:00 AM MON-FRI |
| ERNESTO CORRAL, (213) 482-0307 | Office Hours: 7:00-8:00 AM MON-FRI |
| RAFAEL ESPINOZA, (213) 482-0307 | Office Hours: 7:00-8:00 AM MON-FRI |
Pending Inspections
| No Data Available. |
Inspection Request History
| Footing/Foundation/Slab | 6/14/2019 | Partial Inspection | ERNESTO CORRAL |
| Deputy Drilled-In Anchors | 6/21/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Drilled-In Anchors | 6/25/2019 | Conditional Approval | JEFFREY FULTON |
| Footing/Foundation/Slab | 7/2/2019 | Partial Inspection | ERNESTO CORRAL |
| Deputy Reinf. Concrete | 7/3/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Steel/Welding | 7/3/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Steel/Welding | 7/15/2019 | Conditional Approval | ERNESTO CORRAL |
| Footing/Foundation/Slab | 7/19/2019 | Partial Inspection | ERNESTO CORRAL |
| Deputy Steel/Welding | 7/23/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Steel/Welding | 7/24/2019 | Conditional Approval | JEFFREY FULTON |
| Deputy Steel/Welding | 7/25/2019 | Conditional Approval | JEFFREY FULTON |
| Deputy Steel/Welding | 7/26/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Steel/Welding | 7/29/2019 | Conditional Approval | ERNESTO CORRAL |
| Footing/Foundation/Slab | 7/29/2019 | Partial Inspection | ERNESTO CORRAL |
| Deputy Reinf. Concrete | 7/30/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Steel/Welding | 7/30/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Steel/Welding | 7/31/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Steel/Welding | 8/1/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Steel/Welding | 8/2/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Steel/Welding | 8/14/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Steel/Welding | 8/15/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Steel/Welding | 8/16/2019 | Conditional Approval | ERNESTO CORRAL |
| Footing/Foundation/Slab | 8/16/2019 | Partial Inspection | ERNESTO CORRAL |
| Footing/Foundation/Slab | 8/19/2019 | Partial Inspection | ERNESTO CORRAL |
| Deputy Drilled-In Anchors | 8/20/2019 | Conditional Approval | DANIEL MC AULIFFE |
| Deputy Steel/Welding | 8/20/2019 | Conditional Approval | DANIEL MC AULIFFE |
| Deputy Steel/Welding | 8/23/2019 | Conditional Approval | JEFFREY FULTON |
| Deputy Steel/Welding | 8/26/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Steel/Welding | 8/27/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Steel/Welding | 8/28/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Steel/Welding | 9/4/2019 | Conditional Approval | DANIEL MC AULIFFE |
| Footing/Foundation/Slab | 9/4/2019 | Not Ready for Inspection | DANIEL MC AULIFFE |
| Deputy Steel/Welding | 9/5/2019 | Conditional Approval | ERNESTO CORRAL |
| Footing/Foundation/Slab | 9/5/2019 | Partial Inspection | ERNESTO CORRAL |
| Deputy Steel/Welding | 9/6/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Steel/Welding | 9/10/2019 | Conditional Approval | DANIEL MC AULIFFE |
| Deputy Steel/Welding | 9/11/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Steel/Welding | 9/12/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Steel/Welding | 9/13/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Steel/Welding | 9/16/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Steel/Welding | 9/17/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Steel/Welding | 9/18/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Steel/Welding | 9/19/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Steel/Welding | 9/20/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Steel/Welding | 9/25/2019 | Conditional Approval | DANIEL MC AULIFFE |
| Footing/Foundation/Slab | 9/25/2019 | Partial Inspection | DANIEL MC AULIFFE |
| Deputy Steel/Welding | 9/26/2019 | Conditional Approval | ERNESTO CORRAL |
| Footing/Foundation/Slab | 9/26/2019 | Partial Inspection | ERNESTO CORRAL |
| Deputy Steel/Welding | 9/27/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Steel/Welding | 9/30/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Steel/Welding | 10/1/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Steel/Welding | 10/2/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Steel/Welding | 10/3/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Steel/Welding | 10/4/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Steel/Welding | 10/8/2019 | Conditional Approval | LESLIE TRUJILLO |
| Deputy Steel/Welding | 10/9/2019 | Approved | HAMID PISHEHVAR |
| Deputy Steel/Welding | 10/10/2019 | Partial Approval | JAMES POWERS |
| Deputy Steel/Welding | 10/11/2019 | Conditional Approval | DANIEL MC AULIFFE |
| Deputy Steel/Welding | 10/16/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Steel/Welding | 10/17/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Steel/Welding | 10/18/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Steel/Welding | 10/21/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Steel/Welding | 10/22/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Steel/Welding | 10/23/2019 | Partial Approval | JAMES POWERS |
| Footing/Foundation/Slab | 10/23/2019 | Partial Inspection | DANIEL MC AULIFFE |
| Deputy Steel/Welding | 10/24/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Steel/Welding | 10/25/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Steel/Welding | 10/30/2019 | Conditional Approval | DANIEL COLLINS |
| Deputy Steel/Welding | 10/31/2019 | Conditional Approval | DANIEL MC AULIFFE |
| Footing/Foundation/Slab | 10/31/2019 | Not Ready for Inspection | DANIEL MC AULIFFE |
| Deputy Steel/Welding | 11/1/2019 | Conditional Approval | LESLIE TRUJILLO |
| Deputy Steel/Welding | 11/4/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Steel/Welding | 11/6/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Steel/Welding | 11/7/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Steel/Welding | 11/8/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Steel/Welding | 11/12/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Steel/Welding | 11/13/2019 | Approved | DANIEL MC AULIFFE |
| Deputy Steel/Welding | 11/14/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Steel/Welding | 11/15/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Steel/Welding | 11/25/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Steel/Welding | 11/26/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Steel/Welding | 11/27/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Steel/Welding | 12/2/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Steel/Welding | 12/3/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Steel/Welding | 12/4/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Steel/Welding | 12/5/2019 | Conditional Approval | DANIEL MC AULIFFE |
| Deputy Steel/Welding | 12/6/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Steel/Welding | 12/10/2019 | Conditional Approval | ERNESTO CORRAL |
| Wood Frame | 12/10/2019 | Partial Inspection | ERNESTO CORRAL |
| Deputy Steel/Welding | 12/11/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Steel/Welding | 12/12/2019 | Conditional Approval | ERNESTO CORRAL |
| Footing/Foundation/Slab | 12/12/2019 | Partial Inspection | ERNESTO CORRAL |
| Green Building Rough | 12/12/2019 | Approved | ERNESTO CORRAL |
| METHANE-Rough | 12/12/2019 | Approved | ERNESTO CORRAL |
| Structural Steel Frame | 12/12/2019 | Partial Inspection | ERNESTO CORRAL |
| Deputy Steel/Welding | 12/13/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Steel/Welding | 12/17/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Steel/Welding | 12/18/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Steel/Welding | 12/19/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Steel/Welding | 12/20/2019 | Conditional Approval | ERNESTO CORRAL |
| Structural Steel Frame | 12/23/2019 | Partial Inspection | ERNESTO CORRAL |
| Footing/Foundation/Slab | 12/30/2019 | Partial Inspection | ERNESTO CORRAL |
| Deputy Steel/Welding | 2/7/2020 | Conditional Approval | DANIEL MC AULIFFE |
| Deputy Steel/Welding | 2/10/2020 | Conditional Approval | ERNESTO CORRAL |
| Deputy Steel/Welding | 2/11/2020 | Conditional Approval | ERNESTO CORRAL |
| Wood Frame | 2/11/2020 | Partial Inspection | ERNESTO CORRAL |
| Deputy Steel/Welding | 2/12/2020 | Conditional Approval | ERNESTO CORRAL |
| Deputy Steel/Welding | 2/13/2020 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Steel/Welding | 2/14/2020 | Conditional Approval | ERNESTO CORRAL |
| Deputy Steel/Welding | 2/19/2020 | Conditional Approval | ERNESTO CORRAL |
| Deputy Steel/Welding | 2/20/2020 | Conditional Approval | ERNESTO CORRAL |
| Wood Frame | 2/20/2020 | Partial Inspection | ERNESTO CORRAL |
| Deputy Steel/Welding | 2/21/2020 | Conditional Approval | ERNESTO CORRAL |
| Deputy Steel/Welding | 4/22/2020 | Conditional Approval | ERNESTO CORRAL |
| Deputy Steel/Welding | 4/23/2020 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Steel/Welding | 4/24/2020 | Conditional Approval | RAFAEL ESPINOZA |
| Wood Frame | 9/17/2020 | Partial Approval | NICK DANERI |
| Light Gage Steel Frame | 9/23/2020 | Partial Inspection | DANIEL COLLINS |
| Special/Order Compliance | 10/27/2020 | Conditional Approval | NICK DANERI |
| Excavation/Setback/Form/Re-Bar | 12/15/2020 | Partial Approval | NICK DANERI |
| Light Gage Steel Frame | 5/17/2021 | Partial Approval | NICK DANERI |
| Wood Frame | 5/17/2021 | Not Ready for Inspection | NICK DANERI |
| Wood Frame | 8/16/2021 | Partial Approval | RAFAEL ESPINOZA |
| Drywall Nailing | 9/9/2021 | Not Ready for Inspection | JAMES POWERS |
| Drywall Nailing | 9/29/2021 | Partial Approval | JAMES POWERS |
| Drywall Nailing | 10/12/2021 | Partial Approval | JAMES POWERS |
| Drywall Nailing | 10/28/2021 | Partial Approval | JAMES POWERS |
| Insulation | 2/10/2022 | Partial Approval | JAMES POWERS |
| Drywall Nailing | 3/4/2022 | Partial Approval | JAMES POWERS |
| Drywall Nailing | 3/24/2022 | Partial Approval | JAMES POWERS |
| Insulation | 3/24/2022 | Partial Approval | JAMES POWERS |
| Wood Frame | 4/4/2022 | Partial Approval | JAMES POWERS |
| Drywall Nailing | 6/21/2022 | Partial Approval | RAFAEL ESPINOZA |
| Special/Order Compliance | 8/26/2022 | Not Ready for Inspection | RAFAEL ESPINOZA |
| Special/Order Compliance | 8/29/2022 | Not Ready for Inspection | RAFAEL ESPINOZA |
| Special/Order Compliance | 8/30/2022 | Approved | RAFAEL ESPINOZA |
| Drywall Nailing | 11/7/2022 | Partial Approval | RAFAEL ESPINOZA |
| Drywall Nailing | 11/15/2022 | Partial Approval | MARK FERRARI |
| Drywall Nailing | 2/2/2023 | Partial Approval | RAFAEL ESPINOZA |
| Pre-Inspection | 2/2/2023 | Partial Inspection | RAFAEL ESPINOZA |
| Drywall Nailing | 2/10/2023 | Partial Inspection | RAFAEL ESPINOZA |
| Special/Order Compliance | 2/10/2023 | Partial Inspection | RAFAEL ESPINOZA |
| Special/Order Compliance | 4/13/2023 | Partial Inspection | RAFAEL ESPINOZA |
| Special/Order Compliance | 4/19/2023 | Partial Inspection | RAFAEL ESPINOZA |
| Special/Order Compliance | 4/27/2023 | Partial Inspection | RAFAEL ESPINOZA |
| Special/Order Compliance | 5/2/2023 | Partial Inspection | RAFAEL ESPINOZA |
| Special/Order Compliance | 5/26/2023 | Partial Inspection | LARRY ARNICK |
| Final | 6/5/2023 | Not Ready for Inspection | RAFAEL ESPINOZA |
| Special/Order Compliance | 6/5/2023 | Partial Inspection | RAFAEL ESPINOZA |
| Special/Order Compliance | 6/7/2023 | Approved | RAFAEL ESPINOZA |
| Drywall Nailing | 8/21/2023 | Partial Inspection | RAFAEL ESPINOZA |
| Drywall Nailing | 10/24/2023 | Corrections Issued | RAFAEL ESPINOZA |
| Special/Order Compliance | 10/25/2023 | Partial Inspection | RAFAEL ESPINOZA |
| Special/Order Compliance | 11/3/2023 | Partial Inspection | RAFAEL ESPINOZA |
| Special/Order Compliance | 11/6/2023 | Corrections Issued | RAFAEL ESPINOZA |
| Drywall Nailing | 11/8/2023 | Partial Approval | RAFAEL ESPINOZA |
| Special/Order Compliance | 11/8/2023 | Corrections Issued | RAFAEL ESPINOZA |
| Special/Order Compliance | 11/13/2023 | Partial Inspection | RAFAEL ESPINOZA |
| Drywall Nailing | 11/15/2023 | Approved | RAFAEL ESPINOZA |
| Final | 11/15/2023 | Corrections Issued | RAFAEL ESPINOZA |
| Green Building Final | 11/15/2023 | Approved | RAFAEL ESPINOZA |
| Reinforced Masonry Frame | 11/15/2023 | Approved | RAFAEL ESPINOZA |
| SGSOV-Seismic Gas S/O Valve | 11/15/2023 | SGSOV Approved | RAFAEL ESPINOZA |
| Smoke Detectors | 11/15/2023 | Not Ready for Inspection | RAFAEL ESPINOZA |
| Structural Steel Frame | 11/15/2023 | Approved | RAFAEL ESPINOZA |
| Special/Order Compliance | 11/16/2023 | Not Ready for Inspection | RAFAEL ESPINOZA |
| Final | 11/17/2023 | Partial Inspection | RAFAEL ESPINOZA |
| Smoke Detectors | 11/17/2023 | Approved | RAFAEL ESPINOZA |
| Special/Order Compliance | 11/17/2023 | Partial Approval | RAFAEL ESPINOZA |
| Special/Order Compliance | 11/21/2023 | Approved | RAFAEL ESPINOZA |
| Final | 11/30/2023 | OK to Issue CofO | RAFAEL ESPINOZA |