2641 S LA SALLE AVE 90018

Certificate Information: 2641 S LA SALLE AVE 90018

Application / Permit
17016-10000-09543
Plan Check / Job No.
B17LA06122
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
Soft-story retrofit for an existing 2-story apartment per LAMC Division 93. Install new moment frame.
Permit Issued
Issued on 7/29/2020
Issuing Office
Current Status
CofC Issued on 3/12/2024

Permit Application Status History

Submitted 4/17/2017 APPLICANT
Assigned to Plan Check Engineer 6/2/2017 DEAN RYAN REYES
Corrections Issued 6/7/2017 DEAN RYAN REYES
Quality Review Completed 6/12/2017 CELESTE MORRIS
Building Plans Picked Up 6/19/2017 APPLICANT
Plan Check Approved 9/29/2017 CELESTE NGUYEN
Issued 7/29/2020 APPLICANT
OK for CofC 9/14/2023 VAHE KELEDJIAN
CofC Issued 3/12/2024 WINSTON DUNNING

Permit Application Clearance Information

Housing rent stabilization Cleared 7/27/2020 STEVEN HOFSTAD

Contact Information

Contractor I D C S Corporation; Lic. No.: 995061-B 485 SOUTH ROBERTSON BLVD STE 8      BEVERLY HILLS, CA 90211
Engineer Deihimi, Amir Hossein; Lic. No.: C78194 4400 CAMPUS DR      NEWPORT BEACH, CA 92660

Inspector Information

No Data Available.

Pending Inspections

No Data Available.

Inspection Request History

Deputy Steel/Welding 8/4/2020 Approved JOEY BUCHANAN
Excavation/Setback/Form/Re-Bar 8/7/2020 Approved JOEY BUCHANAN
Footing/Foundation/Slab 8/7/2020 Approved JOEY BUCHANAN
Wood Frame 1/19/2021 Not Ready for Inspection DARRYL ARNOLD
Structural Steel Frame 1/22/2021 Conditional Approval DARRYL ARNOLD
Wood Frame 1/22/2021 Corrections Issued DARRYL ARNOLD
Wood Frame 1/29/2021 Not Ready for Inspection JONATHAN QUACH
Final 3/11/2021 Corrections Issued JOEY BUCHANAN
METHANE-Final 3/11/2021 Approved JOEY BUCHANAN
SGSOV-Seismic Gas S/O Valve 3/11/2021 SGSOV Not Ready JOEY BUCHANAN
Smoke Detectors 3/11/2021 Not Ready for Inspection JOEY BUCHANAN
Wood Frame 3/16/2021 Corrections Issued JOEY BUCHANAN
Wood Frame 4/22/2021 Corrections Issued MARK FERRARI
Floor/Roof Diaphrgm/Shear Wall 11/2/2022 Corrections Issued DARRYL ARNOLD
Structural Steel Frame 11/2/2022 Corrections Issued DARRYL ARNOLD
Wood Frame 11/2/2022 Conditional Approval DARRYL ARNOLD
Wood Frame 1/26/2023 Not Ready for Inspection DARRYL ARNOLD
Interior/Exterior Lathing 2/21/2023 Conditional Approval DARRYL ARNOLD
Final 9/14/2023 OK for CofC VAHE KELEDJIAN
SGSOV-Seismic Gas S/O Valve 9/14/2023 SGSOV Approved VAHE KELEDJIAN
Smoke Detectors 9/14/2023 Approved VAHE KELEDJIAN