10542 W WILKINS AVE 90024

Certificate Information: 10542 W WILKINS AVE 90024

Application / Permit
17014-30000-04377
Plan Check / Job No.
B17WL05027
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
Major remodel (keeping portion of wall/foundation) and addition to (E) SFD with attached garage.
Permit Issued
Issued on 2/12/2018
Issuing Office
Metro
Current Status
CofO Issued on 4/27/2021
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 8/30/2017 APPLICANT
Assigned to Plan Check Engineer 9/7/2017 JOSE RODRIGUEZ
Corrections Issued 9/14/2017 DIEGO BAUTISTA
Quality Review Completed 9/15/2017 STEVEN KIM
Building Plans Picked Up 9/18/2017 APPLICANT
Green Plans Picked Up 9/18/2017 APPLICANT
Applicant returned to address corrections 12/5/2017 DIEGO BAUTISTA
Applicant returned to address corrections 1/19/2018 JOSE RODRIGUEZ
Applicant returned to address corrections 1/25/2018 JOSE RODRIGUEZ
Plan Check Approved 1/30/2018 JOSE RODRIGUEZ
Issued 2/12/2018 LADBS
CofO in Progress 4/27/2021 KENNETH NAGLE
Permit Finaled 4/27/2021 KENNETH NAGLE
CofO Issued 4/27/2021 KENNETH NAGLE
Permit Finaled 4/27/2021 KENNETH NAGLE

Permit Application Clearance Information

Green Code Cleared 11/29/2017 BRYAN MEYER
Hydrant and Access approval Cleared 11/29/2017 ROBERT DUFF
Eng Process Fee Ord 176,300 Cleared 1/8/2018 RAVIL MANAPOV
Low Impact Development Cleared 1/8/2018 MITESH PATEL
Permit Cleared 1/8/2018 RAVIL MANAPOV
Roof/Waste drainage to street Cleared 1/8/2018 RAVIL MANAPOV
Sewer availability Cleared 1/8/2018 RAVIL MANAPOV
GPI Written Notices Cleared 1/19/2018 JOSE RODRIGUEZ
Grading Pre-Inspection Cleared 1/19/2018 JOSE RODRIGUEZ

Contact Information

Architect Diaz, Richard E; Lic. No.: C34030 12619 EASTBROOK AVENUE      DOWNEY, CA 90242
Contractor Smith Robert; Lic. No.: 888378-B 1321 BERYL ST #204      REDONDO BEACH, CA 90277
Engineer Irvine, Jon Alan; Lic. No.: GE2891 145 N SIERRA MADRE BLVD      PASADENA, CA 91107
Engineer Mallak, Nabil Michel; Lic. No.: S5351 6385 GREEN VALLEY CIR 218      CULVER CITY, CA 90230
Engineer Miao, Guoxin; Lic. No.: C73059 1966 CHESTNUT CREEK RD      DIAMOND BAR, CA 91765
Geologist Irvine, Jon A; Lic. No.: EG1691 1150 ENCANTO DR      ARCADIA, CA 91007

Inspector Information

ANTHONY EGSON, (310) 914-3893 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 3/16/2018 Corrections Issued MICHAEL PELHAM
Excavation/Setback/Form/Re-Bar 5/30/2018 No Access for Inspection MICHAEL PELHAM
Footing/Foundation/Slab 5/30/2018 No Access for Inspection MICHAEL PELHAM
METHANE-Barrier 5/30/2018 No Access for Inspection MICHAEL PELHAM
METHANE-Subgrade 5/30/2018 No Access for Inspection MICHAEL PELHAM
Excavation/Setback/Form/Re-Bar 5/31/2018 Partial Approval MICHAEL PELHAM
Footing/Foundation/Slab 5/31/2018 Partial Approval MICHAEL PELHAM
Deputy Methane Barrier 10/15/2018 Conditional Approval ANTHONY MCDOWALL
Deputy Drilled-In Anchors 11/2/2018 Conditional Approval ANTHONY MCDOWALL
Deputy Other (see comments) 11/2/2018 Conditional Approval ANTHONY MCDOWALL
PLUMBING-Rough 12/6/2018 No Access for Inspection ANTHONY MCDOWALL
PLUMBING-Rough 12/24/2018 Corrections Issued ROBERT VORHIS
Sewer 12/24/2018 No Access for Inspection ROBERT VORHIS
Underground Mechanical 12/27/2018 Approved ANTHONY MCDOWALL
Floor/Roof Diaphrgm/Shear Wall 1/4/2019 Approved ANTHONY MCDOWALL
Floor/Roof Diaphrgm/Shear Wall 3/8/2019 Partial Approval EVAN COOPER
Floor/Roof Diaphrgm/Shear Wall 3/28/2019 Partial Approval EVAN COOPER
Floor/Roof Diaphrgm/Shear Wall 4/26/2019 Partial Inspection EVAN COOPER
PLUMBING-Rough 8/9/2019 Corrections Issued ROBERT SHELLY
Deputy Drilled-In Anchors 8/15/2019 Partial Approval EVAN COOPER
Deputy Other (see comments) 8/15/2019 Partial Approval EVAN COOPER
Deputy Wood Construction 8/15/2019 Partial Approval EVAN COOPER
ELECTRICAL-Rough 8/15/2019 Approved EVAN COOPER
PLUMBING-Rough 8/15/2019 Approved EVAN COOPER
BUILDING-Rough-Frame 11/7/2019 Not Ready for Inspection OGANES TARAKHCHYAN
Green Building Rough 11/7/2019 Not Ready for Inspection OGANES TARAKHCHYAN
HVAC-Rough 11/7/2019 Approved OGANES TARAKHCHYAN
METHANE-Rough 11/7/2019 Not Ready for Inspection OGANES TARAKHCHYAN
BUILDING-Rough-Frame 11/14/2019 Corrections Issued ROBERT SHELLY
Floor/Roof Diaphrgm/Shear Wall 11/14/2019 Partial Approval ROBERT SHELLY
Green Building Rough 11/14/2019 Approved ROBERT SHELLY
METHANE-Rough 11/14/2019 Approved ROBERT SHELLY
Floor/Roof Diaphrgm/Shear Wall 11/18/2019 Corrections Issued ROBERT SHELLY
Interior/Exterior Lathing 1/6/2020 Partial Approval OGANES TARAKHCHYAN
Drywall Nailing 2/5/2020 Approved OGANES TARAKHCHYAN
Special/Order Compliance 2/5/2020 Corrections Issued OGANES TARAKHCHYAN
Interior/Exterior Lathing 4/20/2020 Partial Approval OGANES TARAKHCHYAN
Special/Order Compliance 6/25/2020 Not Ready for Inspection OGANES TARAKHCHYAN
ELECTRICAL-Final 8/3/2020 Corrections Issued OGANES TARAKHCHYAN
Gas Test 9/23/2020 Approved OGANES TARAKHCHYAN
PLUMBING-Final 9/23/2020 Partial Approval OGANES TARAKHCHYAN
ELECTRICAL-Final 9/24/2020 Not Ready for Inspection OGANES TARAKHCHYAN
Service/Power Release 9/24/2020 Approved OGANES TARAKHCHYAN
Pre-Inspection 10/20/2020 Partial Approval OGANES TARAKHCHYAN
ELECTRICAL-Final 10/27/2020 Approved OGANES TARAKHCHYAN
ELECTRICAL-Rough 10/27/2020 Approved OGANES TARAKHCHYAN
HVAC-Final 10/27/2020 Not Ready for Inspection OGANES TARAKHCHYAN
HVAC-Rough 10/27/2020 Approved OGANES TARAKHCHYAN
PLUMBING-Final 10/27/2020 Approved OGANES TARAKHCHYAN
PLUMBING-Rough 10/27/2020 Approved OGANES TARAKHCHYAN
HVAC-Final 11/4/2020 Not Ready for Inspection OGANES TARAKHCHYAN
HVAC-Final 11/16/2020 Approved OGANES TARAKHCHYAN
SGSOV-Seismic Gas S/O Valve 11/23/2020 SGSOV Not Ready OGANES TARAKHCHYAN
Gas Test 11/25/2020 Corrections Issued KEVIN SARGSYAN
BUILDING-Rough-Frame 1/28/2021 Not Ready for Inspection OGANES TARAKHCHYAN
Final 1/28/2021 Not Ready for Inspection OGANES TARAKHCHYAN
Footing/Foundation/Slab 1/28/2021 Not Ready for Inspection OGANES TARAKHCHYAN
Green Building Final 1/28/2021 Not Ready for Inspection OGANES TARAKHCHYAN
METHANE-Barrier 1/28/2021 Approved OGANES TARAKHCHYAN
METHANE-Subgrade 1/28/2021 Approved OGANES TARAKHCHYAN
SGSOV-Seismic Gas S/O Valve 1/28/2021 SGSOV Approved OGANES TARAKHCHYAN
Smoke Detectors 1/28/2021 Not Ready for Inspection OGANES TARAKHCHYAN
BUILDING-Rough-Frame 3/16/2021 Approved OGANES TARAKHCHYAN
Final 3/16/2021 Not Ready for Inspection OGANES TARAKHCHYAN
Footing/Foundation/Slab 3/16/2021 Approved OGANES TARAKHCHYAN
Green Building Final 3/16/2021 Approved OGANES TARAKHCHYAN
Smoke Detectors 3/16/2021 Approved OGANES TARAKHCHYAN
Final 4/6/2021 Partial Approval OGANES TARAKHCHYAN