Deputy Steel/Welding
|
5/22/2018
|
Conditional Approval
|
JOEL LAUNCHBAUGH
|
|
Footing/Foundation/Slab
|
6/28/2018
|
Partial Approval
|
JOEL LAUNCHBAUGH
|
|
Footing/Foundation/Slab
|
7/16/2018
|
Partial Approval
|
JOEL LAUNCHBAUGH
|
|
Deputy Steel/Welding
|
7/20/2018
|
Approved
|
MATT KELLERMAN
|
|
Reinforced Concrete Frame
|
7/31/2018
|
Partial Approval
|
JOEL LAUNCHBAUGH
|
|
Structural Steel Frame
|
7/31/2018
|
Partial Approval
|
JOEL LAUNCHBAUGH
|
|
Footing/Foundation/Slab
|
8/21/2018
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Reinforced Concrete Frame
|
8/29/2018
|
Partial Approval
|
JOHN LUMB
|
|
Footing/Foundation/Slab
|
9/17/2018
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Reinforced Concrete Frame
|
9/17/2018
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Deputy Reinf. Concrete
|
9/19/2018
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Deputy Steel/Welding
|
9/20/2018
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Deputy Drilled-In Anchors
|
10/15/2018
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Deputy Drilled-In Anchors
|
10/19/2018
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Deputy Reinf. Concrete
|
10/19/2018
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Footing/Foundation/Slab
|
10/19/2018
|
Partial Approval
|
MATT KELLERMAN
|
|
Deputy Reinf. Concrete
|
10/22/2018
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Deputy Drilled-In Anchors
|
10/25/2018
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Reinforced Concrete Frame
|
10/26/2018
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Reinforced Concrete Frame
|
10/30/2018
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Deputy Reinf. Concrete
|
11/2/2018
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
11/9/2018
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Deputy Steel/Welding
|
11/16/2018
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
12/4/2018
|
Partial Approval
|
CARLOS MATAMOROS
|
|
Deputy Drilled-In Anchors
|
12/13/2018
|
Conditional Approval
|
CARLOS MATAMOROS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
12/18/2018
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Excavation/Setback/Form/Re-Bar
|
1/7/2019
|
Partial Approval
|
MATT KELLERMAN
|
|
Wood Frame
|
1/7/2019
|
Partial Approval
|
MATT KELLERMAN
|
|
Deputy Wood Construction
|
2/19/2019
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Sewer
|
2/19/2019
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Wood Frame
|
2/26/2019
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/14/2019
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Footing/Foundation/Slab
|
3/14/2019
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
Wood Frame
|
3/14/2019
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/18/2019
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Deputy Drilled-In Anchors
|
3/26/2019
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Footing/Foundation/Slab
|
3/26/2019
|
Not Ready for Inspection
|
CARLOS MATAMOROS
|
|
Excavation/Setback/Form/Re-Bar
|
4/1/2019
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Footing/Foundation/Slab
|
4/18/2019
|
Partial Approval
|
MICHAEL TEMPLE
|
|
Deputy Reinf. Concrete
|
4/19/2019
|
Conditional Approval
|
MICHAEL TEMPLE
|
|
Deputy Drilled-In Anchors
|
4/22/2019
|
Conditional Approval
|
MICHAEL TEMPLE
|
|
Footing/Foundation/Slab
|
4/23/2019
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Deputy Drilled-In Anchors
|
4/25/2019
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Footing/Foundation/Slab
|
4/25/2019
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Deputy Drilled-In Anchors
|
5/1/2019
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Footing/Foundation/Slab
|
5/2/2019
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Footing/Foundation/Slab
|
5/3/2019
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
BUILDING-Rough-Frame
|
5/6/2019
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Deputy Drilled-In Anchors
|
5/6/2019
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Deputy Reinf. Concrete
|
5/6/2019
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Footing/Foundation/Slab
|
5/6/2019
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Deputy Drilled-In Anchors
|
5/17/2019
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Footing/Foundation/Slab
|
5/20/2019
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Interior/Exterior Lathing
|
5/20/2019
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Reinforced Concrete Frame
|
5/23/2019
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
Deputy Reinf. Concrete
|
5/24/2019
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Excavation/Setback/Form/Re-Bar
|
5/24/2019
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Footing/Foundation/Slab
|
5/29/2019
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Excavation/Setback/Form/Re-Bar
|
5/30/2019
|
Partial Approval
|
ANTHONY MCDOWALL
|
|
Deputy Reinf. Concrete
|
5/31/2019
|
Conditional Approval
|
ANTHONY MCDOWALL
|
|
BUILDING-Rough-Frame
|
6/3/2019
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Deputy Wood Construction
|
6/3/2019
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Green Building Rough
|
6/3/2019
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
Deputy Drilled-In Anchors
|
6/7/2019
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Deputy Steel/Welding
|
6/7/2019
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Interior/Exterior Lathing
|
6/10/2019
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Deputy Reinf. Concrete
|
6/11/2019
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Footing/Foundation/Slab
|
6/11/2019
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Deputy Reinf. Concrete
|
6/12/2019
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Reinforced Concrete Frame
|
6/12/2019
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/18/2019
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
Footing/Foundation/Slab
|
6/18/2019
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Wood Frame
|
6/19/2019
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Deputy Drilled-In Anchors
|
6/21/2019
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Footing/Foundation/Slab
|
6/26/2019
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Deputy Reinf. Concrete
|
6/27/2019
|
Conditional Approval
|
MICHAEL TEMPLE
|
|
Deputy Drilled-In Anchors
|
6/28/2019
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Deputy Reinf. Concrete
|
6/28/2019
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Reinforced Concrete Frame
|
6/28/2019
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Deputy Drilled-In Anchors
|
7/26/2019
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/29/2019
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
Footing/Foundation/Slab
|
7/29/2019
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Underground Mechanical
|
8/2/2019
|
Partial Approval
|
CARLOS MATAMOROS
|
|
Footing/Foundation/Slab
|
8/8/2019
|
Partial Approval
|
CARLOS MATAMOROS
|
|
Interior/Exterior Lathing
|
8/16/2019
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
PLUMBING-Rough
|
8/16/2019
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
8/21/2019
|
Corrections Issued
|
MICHAEL TEMPLE
|
|
Deputy Drilled-In Anchors
|
9/3/2019
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Deputy Steel/Welding
|
9/3/2019
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Footing/Foundation/Slab
|
9/3/2019
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
ELECTRICAL-Rough
|
9/5/2019
|
Partial Approval
|
ANTHONY MCDOWALL
|
|
Interior/Exterior Lathing
|
9/5/2019
|
Partial Approval
|
ANTHONY MCDOWALL
|
|
Deputy Wood Construction
|
9/11/2019
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
9/11/2019
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
ELECTRICAL-Rough
|
9/17/2019
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
PLUMBING-Rough
|
9/17/2019
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
ELECTRICAL-Rough
|
9/18/2019
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
PLUMBING-Rough
|
9/18/2019
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Footing/Foundation/Slab
|
9/19/2019
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
ELECTRICAL-Rough
|
9/25/2019
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
ELECTRICAL-Rough
|
9/26/2019
|
Partial Approval
|
MATT KELLERMAN
|
|
Footing/Foundation/Slab
|
9/27/2019
|
Partial Approval
|
GERMAN RODRIGUEZ MENDOZA
|
|
ELECTRICAL-Rough
|
9/30/2019
|
Partial Approval
|
ANTHONY MCDOWALL
|
|
BUILDING-Rough-Frame
|
10/7/2019
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
ELECTRICAL-Rough
|
10/7/2019
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Green Building Rough
|
10/7/2019
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
ELECTRICAL-Rough
|
10/8/2019
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
10/8/2019
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
HVAC-Rough
|
10/16/2019
|
Not Ready for Inspection
|
MATT KELLERMAN
|
|
PLUMBING-Rough
|
10/16/2019
|
Partial Approval
|
MATT KELLERMAN
|
|
Floor/Roof Diaphrgm/Shear Wall
|
10/18/2019
|
Partial Approval
|
GERMAN RODRIGUEZ MENDOZA
|
|
Interior/Exterior Lathing
|
10/18/2019
|
Partial Approval
|
GERMAN RODRIGUEZ MENDOZA
|
|
HVAC-Rough
|
10/22/2019
|
Not Ready for Inspection
|
MATT KELLERMAN
|
|
Wood Frame
|
10/22/2019
|
Not Ready for Inspection
|
MATT KELLERMAN
|
|
Interior/Exterior Lathing
|
10/28/2019
|
Partial Approval
|
DANNY TOLENTINO
|
|
Insulation
|
10/29/2019
|
Partial Approval
|
ANTHONY MCDOWALL
|
|
Wood Frame
|
10/29/2019
|
Partial Approval
|
ANTHONY MCDOWALL
|
|
Pool Piping
|
10/31/2019
|
Partial Approval
|
ANTHONY MCDOWALL
|
|
Structural Steel Frame
|
10/31/2019
|
Partial Approval
|
ANTHONY MCDOWALL
|
|
Deputy Reinf. Concrete
|
11/1/2019
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Interior/Exterior Lathing
|
11/4/2019
|
Partial Approval
|
GERMAN RODRIGUEZ MENDOZA
|
|
Interior/Exterior Lathing
|
11/6/2019
|
Partial Approval
|
ANTHONY MCDOWALL
|
|
Shower Pan
|
11/6/2019
|
Not Ready for Inspection
|
ANTHONY MCDOWALL
|
|
Shower Pan
|
11/8/2019
|
Partial Approval
|
GERMAN RODRIGUEZ MENDOZA
|
|
Excavation/Setback/Form/Re-Bar
|
11/14/2019
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
PLUMBING-Rough
|
11/14/2019
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Drywall Nailing
|
11/18/2019
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
PLUMBING-Rough
|
11/18/2019
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
11/20/2019
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
PLUMBING-Rough
|
11/20/2019
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Deputy Drilled-In Anchors
|
11/26/2019
|
Conditional Approval
|
ANTHONY MCDOWALL
|
|
HVAC-Rough
|
11/26/2019
|
Not Ready for Inspection
|
ANTHONY MCDOWALL
|
|
Structural Steel Frame
|
11/26/2019
|
Partial Approval
|
ANTHONY MCDOWALL
|
|
HVAC-Rough
|
12/3/2019
|
Corrections Issued
|
GERMAN RODRIGUEZ MENDOZA
|
|
Interior/Exterior Lathing
|
12/5/2019
|
Not Ready for Inspection
|
GERMAN RODRIGUEZ MENDOZA
|
|
Interior/Exterior Lathing
|
12/9/2019
|
Partial Approval
|
ANTHONY MCDOWALL
|
|
PLUMBING-Rough
|
12/9/2019
|
Partial Approval
|
ANTHONY MCDOWALL
|
|
Drywall Nailing
|
12/11/2019
|
Partial Approval
|
GERMAN RODRIGUEZ MENDOZA
|
|
ELECTRICAL-Rough
|
12/16/2019
|
Partial Approval
|
GERMAN RODRIGUEZ MENDOZA
|
|
Footing/Foundation/Slab
|
12/16/2019
|
Not Ready for Inspection
|
GERMAN RODRIGUEZ MENDOZA
|
|
Excavation/Setback/Form/Re-Bar
|
12/18/2019
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
Drywall Nailing
|
12/19/2019
|
Partial Approval
|
GERMAN RODRIGUEZ MENDOZA
|
|
Footing/Foundation/Slab
|
12/19/2019
|
Partial Approval
|
GERMAN RODRIGUEZ MENDOZA
|
|
Drywall Nailing
|
1/3/2020
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Insulation
|
1/6/2020
|
Partial Approval
|
ANTHONY MCDOWALL
|
|
Deputy Steel/Welding
|
1/7/2020
|
Conditional Approval
|
ANTHONY MCDOWALL
|
|
ELECTRICAL-Rough
|
1/9/2020
|
Corrections Issued
|
ANTHONY MCDOWALL
|
|
PLUMBING-Rough
|
1/9/2020
|
Not Ready for Inspection
|
ANTHONY MCDOWALL
|
|
PLUMBING-Rough
|
1/13/2020
|
Corrections Issued
|
GERMAN RODRIGUEZ MENDOZA
|
|
Deputy Steel/Welding
|
1/16/2020
|
Approved
|
MATT KELLERMAN
|
|
Deputy Steel/Welding
|
1/16/2020
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
ELECTRICAL-Rough
|
1/16/2020
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
1/16/2020
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Interior/Exterior Lathing
|
1/16/2020
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
PLUMBING-Rough
|
1/16/2020
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Reinforced Concrete Frame
|
1/27/2020
|
Partial Approval
|
MATT KELLERMAN
|
|
Deputy Drilled-In Anchors
|
1/31/2020
|
Conditional Approval
|
MATT KELLERMAN
|
|
Drywall Nailing
|
1/31/2020
|
No Access for Inspection
|
MATT KELLERMAN
|
|
Drywall Nailing
|
2/5/2020
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Footing/Foundation/Slab
|
2/5/2020
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
HVAC-Rough
|
2/7/2020
|
Corrections Issued
|
ANTHONY MCDOWALL
|
|
HVAC-Rough
|
2/11/2020
|
Partial Approval
|
GERMAN RODRIGUEZ MENDOZA
|
|
Insulation
|
2/11/2020
|
Partial Inspection
|
GERMAN RODRIGUEZ MENDOZA
|
|
Rough-Elec/Plmb/HVAC
|
2/11/2020
|
Partial Inspection
|
GERMAN RODRIGUEZ MENDOZA
|
|
Wood Frame
|
2/11/2020
|
Partial Approval
|
GERMAN RODRIGUEZ MENDOZA
|
|
Insulation
|
2/13/2020
|
Not Ready for Inspection
|
MATT KELLERMAN
|
|
Insulation
|
2/18/2020
|
Partial Approval
|
GERMAN RODRIGUEZ MENDOZA
|
|
Deputy Drilled-In Anchors
|
2/20/2020
|
Conditional Approval
|
GERMAN RODRIGUEZ MENDOZA
|
|
Drywall Nailing
|
2/21/2020
|
Partial Approval
|
GERMAN RODRIGUEZ MENDOZA
|
|
Excavation/Setback/Form/Re-Bar
|
2/21/2020
|
Partial Approval
|
GERMAN RODRIGUEZ MENDOZA
|
|
Rough-Elec/Plmb/HVAC
|
2/28/2020
|
Corrections Issued
|
GERMAN RODRIGUEZ MENDOZA
|
|
HVAC-Rough
|
3/2/2020
|
Corrections Issued
|
GERMAN RODRIGUEZ MENDOZA
|
|
Drywall Nailing
|
3/3/2020
|
Partial Approval
|
GERMAN RODRIGUEZ MENDOZA
|
|
HVAC-Rough
|
3/5/2020
|
Partial Approval
|
GERMAN RODRIGUEZ MENDOZA
|
|
Insulation
|
3/9/2020
|
Approved
|
ANTHONY MCDOWALL
|
|
Drywall Nailing
|
3/20/2020
|
Partial Approval
|
GERMAN RODRIGUEZ MENDOZA
|
|
HVAC-Rough
|
3/20/2020
|
Not Ready for Inspection
|
GERMAN RODRIGUEZ MENDOZA
|
|
PLUMBING-Rough
|
3/20/2020
|
Not Ready for Inspection
|
GERMAN RODRIGUEZ MENDOZA
|
|
Rough-Elec/Plmb/HVAC
|
4/1/2020
|
Partial Inspection
|
ANTHONY MCDOWALL
|
|
ELECTRICAL-Rough
|
4/7/2020
|
Partial Inspection
|
GERMAN RODRIGUEZ MENDOZA
|
|
PLUMBING-Rough
|
4/7/2020
|
Partial Approval
|
GERMAN RODRIGUEZ MENDOZA
|
|
HVAC-Rough
|
4/9/2020
|
Not Ready for Inspection
|
ANTHONY MCDOWALL
|
|
ELECTRICAL-Rough
|
4/10/2020
|
No Access for Inspection
|
CHRISTOPHER WILSON
|
|
ELECTRICAL-Rough
|
4/14/2020
|
Not Ready for Inspection
|
ANTHONY MCDOWALL
|
|
HVAC-Rough
|
4/14/2020
|
Partial Inspection
|
ANTHONY MCDOWALL
|
|
Special/Order Compliance
|
4/14/2020
|
Approved
|
MATTHEW NUCKOLLS
|
|
Special/Order Compliance
|
4/15/2020
|
Corrections Issued
|
ANTHONY MCDOWALL
|
|
Pre-Inspection
|
4/28/2020
|
Partial Approval
|
MATT KELLERMAN
|
|
ELECTRICAL-Rough
|
5/11/2020
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Drywall Nailing
|
5/14/2020
|
Partial Approval
|
CARLOS MATAMOROS
|
|
ELECTRICAL-Rough
|
5/14/2020
|
Partial Approval
|
CARLOS MATAMOROS
|
|
Interior/Exterior Lathing
|
5/28/2020
|
Partial Approval
|
CARLOS MATAMOROS
|
|
Drywall Nailing
|
6/18/2020
|
Partial Approval
|
GERMAN RODRIGUEZ MENDOZA
|
|
Underground Mechanical
|
6/22/2020
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Gas Test
|
7/10/2020
|
Partial Approval
|
CARLOS MATAMOROS
|
|
PLUMBING-Rough
|
7/10/2020
|
Corrections Issued
|
CARLOS MATAMOROS
|
|
Drywall Nailing
|
7/23/2020
|
Partial Approval
|
ANTHONY MCDOWALL
|
|
Insulation
|
7/29/2020
|
Partial Approval
|
GERMAN RODRIGUEZ MENDOZA
|
|
Drywall Nailing
|
7/30/2020
|
Partial Approval
|
ANTHONY MCDOWALL
|
|
Drywall Nailing
|
9/9/2020
|
Not Ready for Inspection
|
ANTHONY MCDOWALL
|
|
Drywall Nailing
|
9/25/2020
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Interior/Exterior Lathing
|
9/25/2020
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
HVAC-Rough
|
10/6/2020
|
Not Ready for Inspection
|
GERMAN RODRIGUEZ MENDOZA
|
|
HVAC-Rough
|
10/8/2020
|
Partial Approval
|
GERMAN RODRIGUEZ MENDOZA
|
|
HVAC-Rough
|
10/13/2020
|
Partial Approval
|
GERMAN RODRIGUEZ MENDOZA
|
|
Drywall Nailing
|
10/30/2020
|
Partial Approval
|
GERMAN RODRIGUEZ MENDOZA
|
|
Drywall Nailing
|
1/21/2021
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Masonry Wall/Backfill
|
2/5/2021
|
Not Ready for Inspection
|
GERMAN RODRIGUEZ MENDOZA
|
|
Drywall Nailing
|
2/18/2021
|
Conditional Approval
|
MATT KELLERMAN
|
|
Drywall Nailing
|
2/22/2021
|
Partial Approval
|
GERMAN RODRIGUEZ MENDOZA
|
|
Interior/Exterior Lathing
|
2/22/2021
|
Not Ready for Inspection
|
GERMAN RODRIGUEZ MENDOZA
|
|
Drywall Nailing
|
2/25/2021
|
Partial Approval
|
GERMAN RODRIGUEZ MENDOZA
|
|
Underground Mechanical
|
3/17/2021
|
Partial Approval
|
GERMAN RODRIGUEZ MENDOZA
|
|
Interior/Exterior Lathing
|
4/19/2021
|
Not Ready for Inspection
|
GERMAN RODRIGUEZ MENDOZA
|
|
Interior/Exterior Lathing
|
4/21/2021
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Interior/Exterior Lathing
|
5/4/2021
|
Partial Approval
|
GERMAN RODRIGUEZ MENDOZA
|
|
ELECTRICAL-Rough
|
5/11/2021
|
Not Ready for Inspection
|
GERMAN RODRIGUEZ MENDOZA
|
|
BUILDING-Rough-Frame
|
5/18/2021
|
Not Ready for Inspection
|
CARLOS MATAMOROS
|
|
Green Building Rough
|
5/18/2021
|
Not Ready for Inspection
|
CARLOS MATAMOROS
|
|
ELECTRICAL-Rough
|
5/19/2021
|
Partial Approval
|
GERMAN RODRIGUEZ MENDOZA
|
|
Shower Pan
|
5/20/2021
|
Partial Approval
|
GERMAN RODRIGUEZ MENDOZA
|
|
Gas Test
|
6/17/2021
|
Not Ready for Inspection
|
GERMAN RODRIGUEZ MENDOZA
|
|
Gas Test
|
6/24/2021
|
Approved
|
GERMAN RODRIGUEZ MENDOZA
|
|
Service/Power Release
|
7/13/2021
|
Corrections Issued
|
GERMAN RODRIGUEZ MENDOZA
|
|
Service/Power Release
|
7/13/2021
|
Partial Approval
|
ANTHONY MCDOWALL
|
|
Insulation
|
7/29/2021
|
Approved
|
DANIEL ORRANTE
|
|
Drywall Nailing
|
8/10/2021
|
Partial Approval
|
GERMAN RODRIGUEZ MENDOZA
|
|
ELECTRICAL-Rough
|
8/16/2021
|
Not Ready for Inspection
|
GERMAN RODRIGUEZ MENDOZA
|
|
Sewer
|
8/16/2021
|
Partial Approval
|
GERMAN RODRIGUEZ MENDOZA
|
|
Rough-Elec/Plmb/HVAC
|
8/19/2021
|
Corrections Issued
|
GERMAN RODRIGUEZ MENDOZA
|
|
Drywall Nailing
|
8/25/2021
|
Partial Approval
|
GERMAN RODRIGUEZ MENDOZA
|
|
Rough-Elec/Plmb/HVAC
|
8/25/2021
|
Partial Approval
|
GERMAN RODRIGUEZ MENDOZA
|
|
Drywall Nailing
|
8/31/2021
|
Partial Approval
|
GERMAN RODRIGUEZ MENDOZA
|
|
ELECTRICAL-Rough
|
10/6/2021
|
Partial Approval
|
MATT KELLERMAN
|
|
Service/Power Release
|
10/7/2021
|
Approved
|
MATT KELLERMAN
|
|
Pre-Inspection
|
10/26/2021
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
HVAC-Rough
|
11/23/2021
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Pre-Inspection
|
12/1/2021
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
HVAC-Final
|
12/6/2021
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Drywall Nailing
|
12/8/2021
|
Partial Approval
|
DEANDRE HOFFMAN
|
|
HVAC-Final
|
1/24/2022
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
PLUMBING-Final
|
1/27/2022
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Interior/Exterior Lathing
|
2/11/2022
|
Partial Approval
|
GERMAN RODRIGUEZ MENDOZA
|
|
PLUMBING-Final
|
2/11/2022
|
Corrections Issued
|
BRENDAN LOONEY
|
|
ELECTRICAL-Final
|
2/14/2022
|
Corrections Issued
|
BRENDAN LOONEY
|
|
ELECTRICAL-Final
|
2/16/2022
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Gas Test
|
2/16/2022
|
Approved
|
CHRISTOPHER WILSON
|
|
PLUMBING-Final
|
2/16/2022
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
ELECTRICAL-Final
|
2/17/2022
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
ELECTRICAL-Final
|
2/25/2022
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
PLUMBING-Final
|
2/25/2022
|
Approved
|
CHRISTOPHER WILSON
|
|
ELECTRICAL-Final
|
3/2/2022
|
Approved
|
CHRISTOPHER WILSON
|
|
HVAC-Final
|
3/3/2022
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
BUILDING-Rough-Frame
|
3/17/2022
|
Approved
|
CHRISTOPHER WILSON
|
|
Final
|
3/17/2022
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Footing/Foundation/Slab
|
3/17/2022
|
Approved
|
CHRISTOPHER WILSON
|
|
Green Building Rough
|
3/17/2022
|
Approved
|
CHRISTOPHER WILSON
|
|
HVAC-Final
|
3/17/2022
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
SGSOV-Seismic Gas S/O Valve
|
3/17/2022
|
SGSOV Not Ready
|
CHRISTOPHER WILSON
|
|
Smoke Detectors
|
3/17/2022
|
Approved
|
CHRISTOPHER WILSON
|
|
HVAC-Final
|
3/21/2022
|
Approved
|
CHRISTOPHER WILSON
|
|
Final
|
5/17/2022
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Green Building Final
|
5/17/2022
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
SGSOV-Seismic Gas S/O Valve
|
5/17/2022
|
SGSOV Approved
|
CHRISTOPHER WILSON
|
|
Final
|
5/19/2022
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Green Building Final
|
5/19/2022
|
Approved
|
CHRISTOPHER WILSON
|
|
Final
|
6/13/2022
|
OK to Issue CofO
|
CHRISTOPHER WILSON
|
|
Green Building Final
|
6/13/2022
|
Approved
|
CHRISTOPHER WILSON
|