100 WORLD WAY 90045
Certificate Information: 100 WORLD WAY 90045
- Application / Permit
- 17014-10004-06579
- Plan Check / Job No.
- B19LA12129
- Group
- Building
- Type
- Bldg-Alter/Repair
- Sub-Type
- Commercial
- Primary Use
- (3) Airport Building
- Work Description
- Supplemental permit (ref. 17014-10000-06579) for deferred design of interor metal stud partitions and ceilings.
- Permit Issued
- Issued on 7/26/2019
- Issuing Office
- West Los Angeles
- Current Status
- Permit Finaled on 10/22/2020
- Certificate of Occupancy
- CofO Issued More Information
Permit Application Status History
| Submitted | 6/12/2019 | APPLICANT |
| Assigned to Plan Check Engineer | 6/13/2019 | RODOLFO ARIAS |
| Corrections Issued | 6/17/2019 | RODOLFO ARIAS |
| Quality Review Completed | 6/17/2019 | LIPING TENG |
| Building Plans Picked Up | 6/18/2019 | APPLICANT |
| Plan Check Approved | 7/24/2019 | RODOLFO ARIAS |
| Issued | 7/26/2019 | LADBS |
| Permit Finaled | 10/22/2020 | JONATHAN ALLEN |
Permit Application Clearance Information
| No Data Available. |
Contact Information
| Architect | Gerber,, Jeffrey P; Lic. No.: C27945 | 14 ESTANCIA PLACE THE WOODLANDS, TX 77309 |
| Contractor | Infinity Drywall Contracting Inc; Lic. No.: 886097-C35 | 225 S LOARA STREET ANAHEIM, CA 92802 |
| Engineer | Bouquet, Thomas Campbell; Lic. No.: S4007 | 155 N LAKE AVE SUITE 600 PASADENA, CA 91101 |
| Engineer | Chou,, Katie Fang-Ju; Lic. No.: C74225 | 770 THE CITY DR S STE 5000 ORANGE, CA 92868 |
| Engineer | Chu, Daniel B; Lic. No.: GE2096 | 87 SPLENDOR IRVINE, CA 92618 |
| Engineer | Donahue,, Matthew Walker; Lic. No.: FP1634 | 4923 INDIAN WOOD ROAD 480 CULVER CITY, CA 90230 |
| Engineer | Mahaffey,, Riley Jay; Lic. No.: C51006 | 201 N MAPLE GROVE RD STE 100 BOISE, ID 83704 |
| Engineer | Mester,, Matthew John; Lic. No.: S5687 | 15 BAUDIN CIRCLE LADERA RANCH, CA 92694 |
| Geologist | Corson, Gregory Mark; Lic. No.: EG2310 | 3024 DIVERNON AVE SIMI VALLEY, CA 93063 |
Inspector Information
| No Data Available. |
Pending Inspections
| No Data Available. |
Inspection Request History
| Pre-Inspection | 7/29/2019 | Approved | JONATHAN ALLEN |
| Drywall Nailing | 8/12/2019 | Conditional Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 8/12/2019 | Partial Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 8/16/2019 | Partial Approval | ALBERT COMISARI |
| Drywall Nailing | 8/20/2019 | Partial Approval | ALBERT COMISARI |
| Drywall Nailing | 8/21/2019 | Partial Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 8/21/2019 | Partial Approval | ALBERT COMISARI |
| Insulation | 8/23/2019 | Conditional Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 8/23/2019 | Partial Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 8/26/2019 | Partial Approval | ALBERT COMISARI |
| Drywall Nailing | 8/28/2019 | Conditional Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 8/28/2019 | Conditional Approval | ALBERT COMISARI |
| Drywall Nailing | 8/29/2019 | Partial Approval | ALBERT COMISARI |
| Insulation | 8/29/2019 | Partial Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 8/29/2019 | Partial Approval | ALBERT COMISARI |
| Drywall Nailing | 9/4/2019 | Conditional Approval | ALBERT COMISARI |
| Drywall Nailing | 9/4/2019 | Partial Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 9/4/2019 | Conditional Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 9/10/2019 | Conditional Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 9/11/2019 | Partial Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 9/12/2019 | Not Ready for Inspection | ALBERT COMISARI |
| Light Gage Steel Frame | 9/13/2019 | Conditional Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 9/16/2019 | Partial Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 9/18/2019 | Partial Approval | ALBERT COMISARI |
| Pre-Inspection | 9/23/2019 | Conditional Approval | ALBERT COMISARI |
| Special/Order Compliance | 9/23/2019 | Partial Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 9/26/2019 | Partial Approval | ALBERT COMISARI |
| Pre-Inspection | 9/26/2019 | Partial Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 10/1/2019 | Partial Approval | ALBERT COMISARI |
| Drywall Nailing | 10/2/2019 | Partial Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 10/2/2019 | Partial Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 10/7/2019 | Partial Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 10/10/2019 | Conditional Approval | ALBERT COMISARI |
| Drywall Nailing | 10/15/2019 | Partial Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 10/15/2019 | Not Ready for Inspection | ALBERT COMISARI |
| Light Gage Steel Frame | 10/16/2019 | Not Ready for Inspection | ALBERT COMISARI |
| Light Gage Steel Frame | 10/18/2019 | Conditional Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 10/21/2019 | Partial Approval | JONATHAN ALLEN |
| Insulation | 10/24/2019 | Partial Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 10/25/2019 | Partial Approval | JONATHAN ALLEN |
| Light Gage Steel Frame | 10/30/2019 | Not Ready for Inspection | ALBERT COMISARI |
| Drywall Nailing | 10/31/2019 | Conditional Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 11/1/2019 | Partial Approval | ALBERT COMISARI |
| Insulation | 11/4/2019 | Partial Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 11/4/2019 | Partial Approval | ALBERT COMISARI |
| Drywall Nailing | 11/5/2019 | Conditional Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 11/5/2019 | Conditional Approval | ALBERT COMISARI |
| Drywall Nailing | 11/8/2019 | Partial Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 11/8/2019 | Partial Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 11/18/2019 | Partial Approval | ALBERT COMISARI |
| Insulation | 11/21/2019 | Partial Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 11/25/2019 | Conditional Approval | ALBERT COMISARI |
| Drywall Nailing | 12/3/2019 | Partial Approval | ALBERT COMISARI |
| Drywall Nailing | 12/4/2019 | Partial Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 12/4/2019 | Partial Approval | ALBERT COMISARI |
| Drywall Nailing | 12/6/2019 | Partial Approval | JONATHAN ALLEN |
| Light Gage Steel Frame | 12/6/2019 | Partial Approval | JONATHAN ALLEN |
| Insulation | 12/10/2019 | Partial Approval | JONATHAN ALLEN |
| Light Gage Steel Frame | 12/10/2019 | Partial Approval | JONATHAN ALLEN |
| Drywall Nailing | 12/11/2019 | Partial Approval | JONATHAN ALLEN |
| Drywall Nailing | 12/13/2019 | Conditional Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 12/13/2019 | Partial Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 12/16/2019 | Partial Approval | JONATHAN ALLEN |
| Drywall Nailing | 12/17/2019 | Conditional Approval | ALBERT COMISARI |
| Insulation | 12/17/2019 | Conditional Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 12/17/2019 | Conditional Approval | ALBERT COMISARI |
| Drywall Nailing | 12/19/2019 | Partial Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 12/19/2019 | Partial Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 12/20/2019 | Partial Approval | ALBERT COMISARI |
| Drywall Nailing | 12/24/2019 | Partial Approval | JONATHAN ALLEN |
| Light Gage Steel Frame | 12/24/2019 | Partial Approval | JONATHAN ALLEN |
| Drywall Nailing | 12/27/2019 | Partial Approval | JONATHAN ALLEN |
| Insulation | 12/27/2019 | Partial Approval | JONATHAN ALLEN |
| Light Gage Steel Frame | 12/27/2019 | Partial Approval | JONATHAN ALLEN |
| Drywall Nailing | 12/30/2019 | Partial Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 12/30/2019 | Conditional Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 12/30/2019 | Partial Approval | ALBERT COMISARI |
| Drywall Nailing | 12/31/2019 | Partial Approval | ALBERT COMISARI |
| Drywall Nailing | 1/2/2020 | Partial Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 1/2/2020 | Partial Approval | ALBERT COMISARI |
| Drywall Nailing | 1/3/2020 | Partial Approval | JONATHAN ALLEN |
| Insulation | 1/3/2020 | Partial Approval | JONATHAN ALLEN |
| Light Gage Steel Frame | 1/3/2020 | Partial Approval | JONATHAN ALLEN |
| Drywall Nailing | 1/6/2020 | Conditional Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 1/6/2020 | Conditional Approval | ALBERT COMISARI |
| Drywall Nailing | 1/7/2020 | Conditional Approval | ALBERT COMISARI |
| Insulation | 1/7/2020 | Conditional Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 1/7/2020 | Conditional Approval | ALBERT COMISARI |
| Drywall Nailing | 1/8/2020 | Conditional Approval | ALBERT COMISARI |
| Insulation | 1/8/2020 | Conditional Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 1/8/2020 | Conditional Approval | ALBERT COMISARI |
| Drywall Nailing | 1/9/2020 | Partial Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 1/9/2020 | Partial Approval | ALBERT COMISARI |
| Drywall Nailing | 1/10/2020 | Conditional Approval | ALBERT COMISARI |
| Insulation | 1/10/2020 | Partial Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 1/10/2020 | Partial Approval | ALBERT COMISARI |
| Drywall Nailing | 1/13/2020 | Conditional Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 1/13/2020 | Conditional Approval | ALBERT COMISARI |
| Drywall Nailing | 1/14/2020 | Partial Approval | ALBERT COMISARI |
| Insulation | 1/14/2020 | Partial Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 1/14/2020 | Partial Approval | ALBERT COMISARI |
| Drywall Nailing | 1/15/2020 | Partial Approval | ALBERT COMISARI |
| Insulation | 1/15/2020 | Partial Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 1/15/2020 | Partial Approval | ALBERT COMISARI |
| Drywall Nailing | 1/16/2020 | Partial Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 1/16/2020 | Partial Approval | ALBERT COMISARI |
| Drywall Nailing | 1/17/2020 | Partial Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 1/17/2020 | Partial Approval | ALBERT COMISARI |
| Drywall Nailing | 1/21/2020 | Not Ready for Inspection | ALBERT COMISARI |
| Insulation | 1/21/2020 | Not Ready for Inspection | ALBERT COMISARI |
| Light Gage Steel Frame | 1/21/2020 | Not Ready for Inspection | ALBERT COMISARI |
| Drywall Nailing | 1/22/2020 | Conditional Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 1/22/2020 | Partial Approval | ALBERT COMISARI |
| Drywall Nailing | 1/24/2020 | Partial Approval | JONATHAN ALLEN |
| Light Gage Steel Frame | 1/24/2020 | Partial Approval | JONATHAN ALLEN |
| Drywall Nailing | 1/27/2020 | Conditional Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 1/27/2020 | Partial Approval | ALBERT COMISARI |
| Drywall Nailing | 1/28/2020 | Conditional Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 1/28/2020 | Partial Approval | ALBERT COMISARI |
| Drywall Nailing | 1/29/2020 | Partial Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 1/29/2020 | Partial Approval | ALBERT COMISARI |
| Drywall Nailing | 1/30/2020 | Conditional Approval | ALBERT COMISARI |
| Insulation | 1/30/2020 | Conditional Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 1/30/2020 | Partial Approval | ALBERT COMISARI |
| Drywall Nailing | 2/3/2020 | Partial Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 2/3/2020 | Partial Approval | ALBERT COMISARI |
| Drywall Nailing | 2/4/2020 | Partial Approval | ALBERT COMISARI |
| Insulation | 2/4/2020 | Partial Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 2/4/2020 | Partial Approval | ALBERT COMISARI |
| Drywall Nailing | 2/6/2020 | Partial Approval | ALBERT COMISARI |
| Insulation | 2/6/2020 | Partial Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 2/6/2020 | Partial Approval | ALBERT COMISARI |
| Drywall Nailing | 2/7/2020 | Not Ready for Inspection | ALBERT COMISARI |
| Insulation | 2/7/2020 | Not Ready for Inspection | ALBERT COMISARI |
| Light Gage Steel Frame | 2/7/2020 | Not Ready for Inspection | ALBERT COMISARI |
| Drywall Nailing | 2/10/2020 | Conditional Approval | ALBERT COMISARI |
| Insulation | 2/10/2020 | Conditional Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 2/10/2020 | Partial Approval | ALBERT COMISARI |
| Drywall Nailing | 2/12/2020 | Partial Approval | ALBERT COMISARI |
| Insulation | 2/12/2020 | Partial Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 2/12/2020 | Partial Approval | ALBERT COMISARI |
| Drywall Nailing | 2/13/2020 | Partial Approval | ALBERT COMISARI |
| Insulation | 2/13/2020 | Partial Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 2/13/2020 | Partial Approval | ALBERT COMISARI |
| Drywall Nailing | 2/14/2020 | Partial Approval | JONATHAN ALLEN |
| Insulation | 2/14/2020 | Partial Approval | JONATHAN ALLEN |
| Light Gage Steel Frame | 2/14/2020 | Partial Approval | JONATHAN ALLEN |
| Drywall Nailing | 2/19/2020 | Conditional Approval | ALBERT COMISARI |
| Insulation | 2/19/2020 | Conditional Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 2/19/2020 | Partial Approval | ALBERT COMISARI |
| Drywall Nailing | 2/21/2020 | Partial Approval | ALBERT COMISARI |
| Insulation | 2/21/2020 | Conditional Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 2/21/2020 | Partial Approval | ALBERT COMISARI |
| Drywall Nailing | 2/25/2020 | Conditional Approval | ALBERT COMISARI |
| Insulation | 2/25/2020 | Partial Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 2/25/2020 | Partial Approval | ALBERT COMISARI |
| Drywall Nailing | 2/26/2020 | Conditional Approval | ALBERT COMISARI |
| Insulation | 2/26/2020 | Partial Approval | ALBERT COMISARI |
| Drywall Nailing | 2/28/2020 | Conditional Approval | ALBERT COMISARI |
| Insulation | 2/28/2020 | Conditional Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 2/28/2020 | Partial Approval | ALBERT COMISARI |
| Drywall Nailing | 3/3/2020 | Partial Approval | ALBERT COMISARI |
| Insulation | 3/3/2020 | Conditional Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 3/3/2020 | Partial Approval | ALBERT COMISARI |
| Drywall Nailing | 3/5/2020 | Partial Approval | ALBERT COMISARI |
| Insulation | 3/5/2020 | Partial Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 3/5/2020 | Partial Approval | ALBERT COMISARI |
| Drywall Nailing | 3/9/2020 | Partial Approval | ALBERT COMISARI |
| Insulation | 3/9/2020 | Partial Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 3/9/2020 | Partial Approval | ALBERT COMISARI |
| Drywall Nailing | 3/10/2020 | Conditional Approval | ALBERT COMISARI |
| Insulation | 3/10/2020 | Partial Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 3/10/2020 | Partial Approval | ALBERT COMISARI |
| Drywall Nailing | 3/11/2020 | Partial Approval | ALBERT COMISARI |
| Insulation | 3/11/2020 | Partial Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 3/11/2020 | Partial Approval | ALBERT COMISARI |
| Drywall Nailing | 3/13/2020 | Conditional Approval | ALBERT COMISARI |
| Insulation | 3/13/2020 | Conditional Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 3/13/2020 | Conditional Approval | ALBERT COMISARI |
| Drywall Nailing | 3/16/2020 | Partial Approval | ALBERT COMISARI |
| Insulation | 3/16/2020 | Partial Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 3/16/2020 | Partial Approval | ALBERT COMISARI |
| Drywall Nailing | 3/17/2020 | Partial Approval | ALBERT COMISARI |
| Insulation | 3/17/2020 | Partial Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 3/17/2020 | Partial Approval | ALBERT COMISARI |
| Drywall Nailing | 3/19/2020 | Conditional Approval | ALBERT COMISARI |
| Insulation | 3/19/2020 | Conditional Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 3/19/2020 | Partial Approval | ALBERT COMISARI |
| Drywall Nailing | 3/20/2020 | Partial Approval | ALBERT COMISARI |
| Insulation | 3/20/2020 | Partial Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 3/20/2020 | Partial Approval | ALBERT COMISARI |
| Drywall Nailing | 3/23/2020 | Conditional Approval | ALBERT COMISARI |
| Insulation | 3/23/2020 | Conditional Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 3/23/2020 | Partial Approval | ALBERT COMISARI |
| Drywall Nailing | 3/24/2020 | Conditional Approval | ALBERT COMISARI |
| Insulation | 3/24/2020 | Conditional Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 3/24/2020 | Conditional Approval | ALBERT COMISARI |
| Drywall Nailing | 3/25/2020 | Partial Approval | ALBERT COMISARI |
| Insulation | 3/25/2020 | Partial Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 3/25/2020 | Partial Approval | ALBERT COMISARI |
| Drywall Nailing | 3/26/2020 | Partial Approval | ALBERT COMISARI |
| Insulation | 3/26/2020 | Partial Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 3/26/2020 | Partial Approval | ALBERT COMISARI |
| Drywall Nailing | 3/27/2020 | Partial Approval | ALBERT COMISARI |
| Insulation | 3/27/2020 | Partial Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 3/27/2020 | Partial Approval | ALBERT COMISARI |
| Drywall Nailing | 3/31/2020 | Partial Approval | ALBERT COMISARI |
| Insulation | 3/31/2020 | Partial Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 3/31/2020 | Partial Approval | ALBERT COMISARI |
| Drywall Nailing | 4/1/2020 | Partial Approval | ALBERT COMISARI |
| Insulation | 4/1/2020 | Partial Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 4/1/2020 | Partial Approval | ALBERT COMISARI |
| Drywall Nailing | 4/2/2020 | Partial Approval | JONATHAN ALLEN |
| Insulation | 4/2/2020 | Partial Approval | JONATHAN ALLEN |
| Light Gage Steel Frame | 4/2/2020 | Partial Approval | JONATHAN ALLEN |
| Drywall Nailing | 4/3/2020 | Partial Approval | ALBERT COMISARI |
| Insulation | 4/3/2020 | Partial Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 4/3/2020 | Partial Approval | ALBERT COMISARI |
| Drywall Nailing | 4/6/2020 | Partial Approval | JONATHAN ALLEN |
| Insulation | 4/6/2020 | Partial Approval | JONATHAN ALLEN |
| Light Gage Steel Frame | 4/6/2020 | Partial Approval | JONATHAN ALLEN |
| Drywall Nailing | 4/7/2020 | Partial Approval | ALBERT COMISARI |
| Insulation | 4/7/2020 | Partial Approval | ALBERT COMISARI |
| Drywall Nailing | 4/8/2020 | Partial Approval | ALBERT COMISARI |
| Insulation | 4/8/2020 | Conditional Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 4/8/2020 | Partial Approval | ALBERT COMISARI |
| Drywall Nailing | 4/9/2020 | Conditional Approval | ALBERT COMISARI |
| Insulation | 4/9/2020 | Conditional Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 4/9/2020 | Conditional Approval | ALBERT COMISARI |
| Drywall Nailing | 4/10/2020 | Conditional Approval | ALBERT COMISARI |
| Insulation | 4/10/2020 | Partial Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 4/10/2020 | Partial Approval | ALBERT COMISARI |
| Drywall Nailing | 4/13/2020 | Conditional Approval | ALBERT COMISARI |
| Insulation | 4/13/2020 | Conditional Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 4/13/2020 | Partial Approval | ALBERT COMISARI |
| Drywall Nailing | 4/14/2020 | Partial Approval | ALBERT COMISARI |
| Insulation | 4/14/2020 | Partial Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 4/14/2020 | Partial Approval | ALBERT COMISARI |
| Drywall Nailing | 4/15/2020 | Partial Approval | ALBERT COMISARI |
| Insulation | 4/15/2020 | Partial Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 4/15/2020 | Partial Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 4/16/2020 | Conditional Approval | ALBERT COMISARI |
| Drywall Nailing | 4/20/2020 | Partial Approval | JONATHAN ALLEN |
| Insulation | 4/20/2020 | Partial Approval | JONATHAN ALLEN |
| Light Gage Steel Frame | 4/20/2020 | Partial Approval | JONATHAN ALLEN |
| Drywall Nailing | 4/21/2020 | Partial Approval | ALBERT COMISARI |
| Insulation | 4/21/2020 | Conditional Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 4/21/2020 | Partial Approval | ALBERT COMISARI |
| Drywall Nailing | 4/22/2020 | Partial Approval | ALBERT COMISARI |
| Insulation | 4/22/2020 | Partial Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 4/22/2020 | Partial Approval | ALBERT COMISARI |
| Insulation | 4/23/2020 | Conditional Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 4/23/2020 | Partial Approval | ALBERT COMISARI |
| Drywall Nailing | 4/24/2020 | Conditional Approval | ALBERT COMISARI |
| Insulation | 4/24/2020 | Conditional Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 4/24/2020 | Conditional Approval | ALBERT COMISARI |
| Drywall Nailing | 4/27/2020 | Conditional Approval | ALBERT COMISARI |
| Insulation | 4/27/2020 | Conditional Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 4/27/2020 | Conditional Approval | ALBERT COMISARI |
| Drywall Nailing | 4/28/2020 | Conditional Approval | ALBERT COMISARI |
| Insulation | 4/28/2020 | Conditional Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 4/28/2020 | Not Ready for Inspection | ALBERT COMISARI |
| Drywall Nailing | 4/29/2020 | Partial Approval | ALBERT COMISARI |
| Insulation | 4/29/2020 | Partial Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 4/29/2020 | Partial Approval | ALBERT COMISARI |
| Drywall Nailing | 4/30/2020 | Partial Approval | ALBERT COMISARI |
| Insulation | 4/30/2020 | Partial Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 4/30/2020 | Partial Approval | ALBERT COMISARI |
| Drywall Nailing | 5/4/2020 | Partial Approval | JONATHAN ALLEN |
| Insulation | 5/4/2020 | Partial Approval | JONATHAN ALLEN |
| Light Gage Steel Frame | 5/4/2020 | Partial Approval | JONATHAN ALLEN |
| Drywall Nailing | 5/5/2020 | Partial Approval | ALBERT COMISARI |
| Insulation | 5/5/2020 | Partial Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 5/5/2020 | Partial Approval | ALBERT COMISARI |
| Drywall Nailing | 5/6/2020 | Partial Approval | ALBERT COMISARI |
| Insulation | 5/6/2020 | Partial Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 5/6/2020 | Partial Approval | ALBERT COMISARI |
| Drywall Nailing | 5/7/2020 | Partial Approval | ALBERT COMISARI |
| Insulation | 5/7/2020 | Partial Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 5/7/2020 | Partial Approval | ALBERT COMISARI |
| Drywall Nailing | 5/8/2020 | Conditional Approval | ALBERT COMISARI |
| Insulation | 5/8/2020 | Conditional Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 5/8/2020 | Conditional Approval | ALBERT COMISARI |
| Drywall Nailing | 5/11/2020 | Partial Approval | JONATHAN ALLEN |
| Insulation | 5/11/2020 | Partial Approval | JONATHAN ALLEN |
| Light Gage Steel Frame | 5/11/2020 | Partial Approval | JONATHAN ALLEN |
| Drywall Nailing | 5/14/2020 | Partial Approval | JONATHAN ALLEN |
| Insulation | 5/14/2020 | Partial Approval | JONATHAN ALLEN |
| Light Gage Steel Frame | 5/14/2020 | Partial Approval | JONATHAN ALLEN |
| Drywall Nailing | 5/15/2020 | Partial Approval | JONATHAN ALLEN |
| Insulation | 5/15/2020 | Partial Approval | JONATHAN ALLEN |
| Light Gage Steel Frame | 5/15/2020 | Partial Approval | JONATHAN ALLEN |
| Drywall Nailing | 5/18/2020 | Partial Approval | ALBERT COMISARI |
| Insulation | 5/18/2020 | Partial Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 5/18/2020 | Partial Approval | ALBERT COMISARI |
| Drywall Nailing | 5/20/2020 | Conditional Approval | ALBERT COMISARI |
| Insulation | 5/20/2020 | Conditional Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 5/20/2020 | Partial Approval | ALBERT COMISARI |
| Drywall Nailing | 5/21/2020 | Partial Approval | ALBERT COMISARI |
| Insulation | 5/21/2020 | Partial Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 5/21/2020 | Partial Approval | ALBERT COMISARI |
| Drywall Nailing | 5/22/2020 | Partial Approval | ALBERT COMISARI |
| Insulation | 5/22/2020 | Partial Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 5/22/2020 | Partial Approval | ALBERT COMISARI |
| Drywall Nailing | 5/26/2020 | Conditional Approval | ALBERT COMISARI |
| Insulation | 5/26/2020 | Partial Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 5/26/2020 | Partial Approval | ALBERT COMISARI |
| Drywall Nailing | 5/27/2020 | Partial Approval | ALBERT COMISARI |
| Insulation | 5/27/2020 | Partial Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 5/27/2020 | Partial Approval | ALBERT COMISARI |
| Drywall Nailing | 5/28/2020 | Partial Approval | ALBERT COMISARI |
| Insulation | 5/28/2020 | Partial Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 5/28/2020 | Partial Approval | ALBERT COMISARI |
| Drywall Nailing | 5/29/2020 | Partial Approval | ALBERT COMISARI |
| Insulation | 5/29/2020 | Partial Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 5/29/2020 | Partial Approval | ALBERT COMISARI |
| Drywall Nailing | 6/2/2020 | Conditional Approval | ALBERT COMISARI |
| Insulation | 6/2/2020 | Conditional Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 6/2/2020 | Conditional Approval | ALBERT COMISARI |
| Drywall Nailing | 6/4/2020 | Partial Approval | ALBERT COMISARI |
| Insulation | 6/4/2020 | Partial Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 6/4/2020 | Partial Approval | ALBERT COMISARI |
| Drywall Nailing | 6/5/2020 | Conditional Approval | ALBERT COMISARI |
| Insulation | 6/5/2020 | Conditional Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 6/5/2020 | Partial Approval | ALBERT COMISARI |
| Drywall Nailing | 6/8/2020 | Conditional Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 6/8/2020 | Conditional Approval | ALBERT COMISARI |
| Drywall Nailing | 6/9/2020 | Partial Approval | ALBERT COMISARI |
| Insulation | 6/9/2020 | Partial Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 6/9/2020 | Partial Approval | ALBERT COMISARI |
| Drywall Nailing | 6/10/2020 | Conditional Approval | ALBERT COMISARI |
| Insulation | 6/10/2020 | Conditional Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 6/10/2020 | Conditional Approval | ALBERT COMISARI |
| Drywall Nailing | 6/11/2020 | Partial Approval | ALBERT COMISARI |
| Insulation | 6/11/2020 | Partial Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 6/11/2020 | Partial Approval | ALBERT COMISARI |
| Drywall Nailing | 6/12/2020 | Partial Approval | JONATHAN ALLEN |
| Insulation | 6/12/2020 | Partial Approval | JONATHAN ALLEN |
| Light Gage Steel Frame | 6/12/2020 | Partial Approval | JONATHAN ALLEN |
| Drywall Nailing | 6/15/2020 | Partial Approval | ALBERT COMISARI |
| Insulation | 6/15/2020 | Partial Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 6/15/2020 | Partial Approval | ALBERT COMISARI |
| Drywall Nailing | 6/16/2020 | Partial Approval | ALBERT COMISARI |
| Insulation | 6/16/2020 | Partial Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 6/16/2020 | Partial Approval | ALBERT COMISARI |
| Drywall Nailing | 6/17/2020 | Conditional Approval | ALBERT COMISARI |
| Insulation | 6/17/2020 | Conditional Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 6/17/2020 | Partial Approval | ALBERT COMISARI |
| Drywall Nailing | 6/18/2020 | Partial Approval | JONATHAN ALLEN |
| Insulation | 6/18/2020 | Partial Approval | JONATHAN ALLEN |
| Light Gage Steel Frame | 6/18/2020 | Partial Approval | JONATHAN ALLEN |
| Drywall Nailing | 6/19/2020 | Partial Approval | JONATHAN ALLEN |
| Insulation | 6/19/2020 | Partial Approval | JONATHAN ALLEN |
| Light Gage Steel Frame | 6/19/2020 | Partial Approval | JONATHAN ALLEN |
| Drywall Nailing | 6/22/2020 | Conditional Approval | ALBERT COMISARI |
| Insulation | 6/22/2020 | Conditional Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 6/22/2020 | Partial Approval | ALBERT COMISARI |
| Drywall Nailing | 6/23/2020 | Partial Approval | ALBERT COMISARI |
| Insulation | 6/23/2020 | Partial Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 6/23/2020 | Partial Approval | ALBERT COMISARI |
| Drywall Nailing | 6/24/2020 | Partial Approval | ALBERT COMISARI |
| Insulation | 6/24/2020 | Partial Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 6/24/2020 | Partial Approval | ALBERT COMISARI |
| Drywall Nailing | 6/25/2020 | Conditional Approval | ALBERT COMISARI |
| Insulation | 6/25/2020 | Conditional Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 6/25/2020 | Conditional Approval | ALBERT COMISARI |
| Drywall Nailing | 6/26/2020 | Partial Approval | ALBERT COMISARI |
| Insulation | 6/26/2020 | Partial Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 6/26/2020 | Partial Approval | ALBERT COMISARI |
| Drywall Nailing | 6/29/2020 | Partial Approval | ALBERT COMISARI |
| Insulation | 6/29/2020 | Partial Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 6/29/2020 | Partial Approval | ALBERT COMISARI |
| Drywall Nailing | 6/30/2020 | Partial Approval | ALBERT COMISARI |
| Insulation | 6/30/2020 | Partial Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 6/30/2020 | Partial Approval | ALBERT COMISARI |
| Drywall Nailing | 7/1/2020 | Conditional Approval | ALBERT COMISARI |
| Insulation | 7/1/2020 | Conditional Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 7/1/2020 | Conditional Approval | ALBERT COMISARI |
| Drywall Nailing | 7/2/2020 | Not Ready for Inspection | ALBERT COMISARI |
| Insulation | 7/2/2020 | Not Ready for Inspection | ALBERT COMISARI |
| Light Gage Steel Frame | 7/2/2020 | Not Ready for Inspection | ALBERT COMISARI |
| Drywall Nailing | 7/6/2020 | Partial Approval | JONATHAN ALLEN |
| Insulation | 7/6/2020 | Partial Approval | JONATHAN ALLEN |
| Light Gage Steel Frame | 7/6/2020 | Partial Approval | JONATHAN ALLEN |
| Drywall Nailing | 7/7/2020 | Partial Approval | ALBERT COMISARI |
| Insulation | 7/7/2020 | Partial Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 7/7/2020 | Partial Approval | ALBERT COMISARI |
| Drywall Nailing | 7/8/2020 | Partial Approval | JONATHAN ALLEN |
| Insulation | 7/8/2020 | Partial Approval | JONATHAN ALLEN |
| Light Gage Steel Frame | 7/8/2020 | Partial Approval | JONATHAN ALLEN |
| Drywall Nailing | 7/9/2020 | Conditional Approval | ALBERT COMISARI |
| Insulation | 7/9/2020 | Conditional Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 7/9/2020 | Conditional Approval | ALBERT COMISARI |
| Drywall Nailing | 7/10/2020 | Partial Approval | ALBERT COMISARI |
| Insulation | 7/10/2020 | Partial Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 7/10/2020 | Partial Approval | ALBERT COMISARI |
| Drywall Nailing | 7/13/2020 | Conditional Approval | ALBERT COMISARI |
| Insulation | 7/13/2020 | Conditional Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 7/13/2020 | Partial Approval | ALBERT COMISARI |
| Drywall Nailing | 7/14/2020 | Partial Approval | ALBERT COMISARI |
| Insulation | 7/14/2020 | Partial Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 7/14/2020 | Partial Approval | ALBERT COMISARI |
| Wall Anchors | 7/14/2020 | Partial Approval | ALBERT COMISARI |
| Drywall Nailing | 7/15/2020 | Conditional Approval | ALBERT COMISARI |
| Insulation | 7/15/2020 | Conditional Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 7/15/2020 | Partial Approval | ALBERT COMISARI |
| Drywall Nailing | 7/16/2020 | Partial Approval | ALBERT COMISARI |
| Insulation | 7/16/2020 | Conditional Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 7/16/2020 | Partial Approval | ALBERT COMISARI |
| Insulation | 7/17/2020 | Partial Approval | JONATHAN ALLEN |
| Light Gage Steel Frame | 7/17/2020 | Partial Approval | JONATHAN ALLEN |
| Drywall Nailing | 7/23/2020 | Conditional Approval | ALBERT COMISARI |
| Insulation | 7/23/2020 | Conditional Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 7/23/2020 | Partial Approval | ALBERT COMISARI |
| Insulation | 7/30/2020 | Partial Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 7/30/2020 | Partial Approval | ALBERT COMISARI |
| Drywall Nailing | 7/31/2020 | Partial Approval | ALBERT COMISARI |
| Insulation | 7/31/2020 | Partial Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 7/31/2020 | Partial Approval | ALBERT COMISARI |
| Drywall Nailing | 8/4/2020 | Partial Approval | ALBERT COMISARI |
| Insulation | 8/4/2020 | Conditional Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 8/4/2020 | Partial Approval | ALBERT COMISARI |
| Drywall Nailing | 8/10/2020 | Partial Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 8/10/2020 | Partial Approval | ALBERT COMISARI |
| Drywall Nailing | 8/11/2020 | Conditional Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 8/11/2020 | Partial Approval | ALBERT COMISARI |
| Drywall Nailing | 8/12/2020 | Partial Approval | ALBERT COMISARI |
| Insulation | 8/12/2020 | Partial Approval | ALBERT COMISARI |
| Structural Steel Frame | 8/12/2020 | Partial Approval | ALBERT COMISARI |
| Drywall Nailing | 8/14/2020 | Conditional Approval | ALBERT COMISARI |
| Insulation | 8/14/2020 | Conditional Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 8/14/2020 | Partial Approval | ALBERT COMISARI |
| Insulation | 8/20/2020 | Partial Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 8/20/2020 | Partial Approval | ALBERT COMISARI |
| Drywall Nailing | 8/24/2020 | Partial Approval | JONATHAN ALLEN |
| Insulation | 8/24/2020 | Partial Approval | JONATHAN ALLEN |
| Light Gage Steel Frame | 8/24/2020 | Partial Approval | JONATHAN ALLEN |
| Drywall Nailing | 8/26/2020 | Partial Approval | ALBERT COMISARI |
| Insulation | 8/26/2020 | Partial Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 8/26/2020 | Conditional Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 9/15/2020 | Conditional Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 9/22/2020 | Conditional Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 9/23/2020 | Conditional Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 9/24/2020 | Conditional Approval | ALBERT COMISARI |
| Drywall Nailing | 9/29/2020 | Conditional Approval | ALBERT COMISARI |
| Insulation | 9/29/2020 | Conditional Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 9/29/2020 | Conditional Approval | ALBERT COMISARI |
| Light Gage Steel Frame | 9/30/2020 | Conditional Approval | ALBERT COMISARI |