417 N IRVING BLVD 90004

Certificate Information: 417 N IRVING BLVD 90004

Application / Permit
17014-10000-06674
Plan Check / Job No.
B17LA23721
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
NEW 185 SF, TYPE VB, R3-OCC GROUND FLOOR AND SECOND STORY ADDITION AND MAJOR REMODEL TO EXISTING SINGLE FAMILY DWELLING (1 OF 2)
Permit Issued
Issued on 8/8/2019
Issuing Office
West Los Angeles
Current Status
Issued on 8/8/2019
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 12/28/2017 APPLICANT
Assigned to Plan Check Engineer 1/11/2018 DEVIN GORDON
Corrections Issued 1/13/2018 DEVIN GORDON
Green Plans Picked Up 1/16/2018 APPLICANT
Quality Review Completed 1/24/2018 ARMEN JIVALAGIAN
Building Plans Picked Up 1/26/2018 APPLICANT
Plan Check Approved 5/11/2018 DEVIN GORDON
Issued 8/8/2019 LADBS

Permit Application Clearance Information

CPC Cleared 1/30/2018 EDBER MACEDO
CPC Cleared 1/30/2018 EDBER MACEDO
Construction near power lines Cleared 3/15/2018 OSCAR CASTRO
Low Impact Development Cleared 4/26/2018 SAM NAVID
Green Code Cleared 5/4/2018 NEGAR NEJAD
Eng Process Fee Ord 176,300 Cleared 5/7/2018 LEE GUILBEAUX
Roof/Waste drainage to street Cleared 5/7/2018 LEE GUILBEAUX

Contact Information

Architect Guban, Steven; Lic. No.: C33046 2608 BEACH AVENUE      VENICE, CA 90291
Contractor S A Construction; Lic. No.: 964105-B 1620 SOUTH BUNDY DRIVE      LOS ANGELES, CA 90025
Engineer , ; Lic. No.: S6000 15233 VENTURA BLVD   1130    SHERMAN OAKS, CA 91403

Inspector Information

JEFFREY MEAD, (213) 202-3240 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Footing/Foundation/Slab 11/26/2019 Conditional Approval RAUL BARAJAS
ELECTRICAL-Rough 12/2/2019 Partial Approval LUIS BARRALES
HVAC-Rough 12/2/2019 Partial Approval LUIS BARRALES
PLUMBING-Rough 12/2/2019 Approved LUIS BARRALES
BUILDING-Rough-Frame 2/4/2020 Approved LUIS BARRALES
Floor/Roof Diaphrgm/Shear Wall 2/4/2020 Approved LUIS BARRALES
Green Building Rough 2/4/2020 Approved LUIS BARRALES
Insulation 2/4/2020 Approved LUIS BARRALES
Drywall Nailing 3/3/2020 Approved BRAD BESCOS
Interior/Exterior Lathing 3/3/2020 Approved BRAD BESCOS
SGSOV-Seismic Gas S/O Valve 7/29/2020 SGSOV Not Ready CHRIS CHRISTENSEN
ELECTRICAL-Final 8/10/2020 Approved CHRIS CHRISTENSEN
Final 8/10/2020 Conditional Approval CHRIS CHRISTENSEN
Footing/Foundation/Slab 8/10/2020 Approved CHRIS CHRISTENSEN
Green Building Final 8/10/2020 Approved CHRIS CHRISTENSEN
HVAC-Final 8/10/2020 Approved CHRIS CHRISTENSEN
PLUMBING-Final 8/10/2020 Approved CHRIS CHRISTENSEN
SGSOV-Seismic Gas S/O Valve 8/10/2020 SGSOV Approved CHRIS CHRISTENSEN
Smoke Detectors 8/10/2020 Approved CHRIS CHRISTENSEN