2 Level 57,249sf grocery store w/ accessory restaurant, coffee shop with 1st floor enclosed parking garage. CPC-2010-1545-ZC-CUB-CU-SPE-SPP-SPPA
Permit Issued
Issued on 9/29/2017
Issuing Office
Metro
Current Status
CofO Issued on 8/31/2021
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 5/22/2017 APPLICANT
Assigned to Plan Check Engineer 5/26/2017 HERNAN ARREOLA
Corrections Issued 6/5/2017 HERNAN ARREOLA
Quality Review Completed 6/15/2017 FELIX FIGUEROA
Disabled Access Plans Picked Up 6/22/2017 APPLICANT
Plan Check Approved 9/25/2017 HERNAN ARREOLA
Issued 9/29/2017 LADBS
TCO Issued (Expire Date: 03-10-2021) 9/11/2020 JEFFREY DURAN
Building Plans Picked Up 9/11/2020 APPLICANT
TCO Issued (Expire Date: 08-23-2021) 2/24/2021 JEFFREY DURAN
CofO in Progress 8/30/2021 JEFFREY DURAN
Permit Finaled 8/31/2021 RICKEY JACKSON
CofO Issued 8/31/2021 RICKEY JACKSON
Permit Finaled 8/31/2021 RICKEY JACKSON

Permit Application Clearance Information

Address approval Cleared 5/23/2017 ROCHELLE DUNGCA
ZA Case Cleared 5/23/2017 FIPE LEILUA
ZA Case Cleared 5/23/2017 FIPE LEILUA
ZA Case Cleared 5/23/2017 FIPE LEILUA
ZA Case Cleared 5/23/2017 FIPE LEILUA
ZA Case Cleared 5/23/2017 FIPE LEILUA
Low Impact Development Cleared 5/30/2017 AMMAR ELTAWIL
Eng Process Fee Ord 176,300 Cleared 6/8/2017 CARLA VALLADARES
Highway dedication Cleared 6/8/2017 CARLA VALLADARES
Roof/Waste drainage to street Cleared 6/8/2017 FATIMA GUERRA
Stormwater Pollution Mitigatn Cleared 6/8/2017 AMMAR ELTAWIL
Driveway location Cleared 6/13/2017 VICENTE CORDERO
Specific Plan Cleared 6/13/2017 VICENTE CORDERO
Sewer availability Cleared 7/6/2017 SEVAK ISAKHAYAN
Comm Cor/Mini-Mall Cleared 8/15/2017 RICK TORRES
Site Plan review Cleared 8/15/2017 RICK TORRES
Food Service Establishment Cleared 8/22/2017 PAWAN VERMA
Comm Cor/Mini-Mall Cleared 8/23/2017 RICK TORRES
Comm Cor/Mini-Mall Cleared 8/23/2017 RICK TORRES
Prkng lot landscape/Water mgmt Cleared 8/23/2017 RICK TORRES
Specific Plan Cleared 8/23/2017 RICK TORRES
ZA Case Cleared 8/23/2017 RICK TORRES
Hydrant and Access approval Cleared 8/24/2017 GILBERT URREA
Green Code Cleared 9/5/2017 CHIHARU SUZUKI
DAS Clearance Cleared 9/7/2017 CHIHARU SUZUKI
"Q" conditions Cleared 9/13/2017 RICK TORRES
"T" removal Cleared 9/20/2017 HERMINIGILDO AGUSTIN
Work Adjacent to Public Way Cleared 9/22/2017 CARLA VALLADARES
Food establishment approval Cleared 9/25/2017 LACDHS APPROVED

Contact Information

Architect Arial, Brian V; Lic. No.: C27582 525 E COLORADO BLVD   FOURTH FLOOR    PASADENA, CA 91101
Contractor Padelford A J & Son Inc; Lic. No.: 222840-B P O BOX 185      ARTESIA, CA 907020185
Engineer Ayoub, Nicholas Sami; Lic. No.: C60846 16 TECHNOLOGY DR 115      IRVINE, CA 92618
Engineer Baroonian, Armen; Lic. No.: S4227 867 N FAIR OAKS AVE 100      PASADENA, CA 91103
Engineer Olson, Christopher Kyle; Lic. No.: S4745 13990 W WOODBRIDGE AVENUE      GOODYEAR, AZ 85338

Inspector Information

ROBERT DAVIS, (818) 374-1125 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Reinf. Concrete 7/5/2018 Conditional Approval JEFFREY DURAN
Pre-Inspection 8/31/2018 Not Ready for Inspection JEFFREY DURAN
Pre-Inspection 9/10/2018 Approved JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 9/25/2018 Partial Inspection JEFFREY DURAN
Deputy Drilled-In Anchors 9/27/2018 Approved JEFFREY DURAN
Deputy Reinf. Concrete 9/27/2018 Approved JEFFREY DURAN
Pre-Inspection 9/27/2018 Approved JEFFREY DURAN
Deputy Drilled-In Anchors 9/28/2018 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 9/28/2018 Conditional Approval JEFFREY DURAN
Deputy Grading 10/1/2018 Conditional Approval JEFFREY DURAN
Deputy Grading 10/2/2018 Conditional Approval JAMES STEPHENS
Deputy Grading 10/3/2018 Conditional Approval JAMES STEPHENS
Deputy Reinf. Concrete 10/3/2018 Conditional Approval JAMES STEPHENS
Deputy Grading 10/4/2018 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 10/4/2018 Conditional Approval JEFFREY DURAN
Deputy Grading 10/9/2018 Conditional Approval JEFFREY DURAN
Deputy Grading 10/10/2018 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 10/10/2018 Conditional Approval JEFFREY DURAN
Deputy Grading 10/11/2018 Approved JEFFREY DURAN
Deputy Reinf. Concrete 10/11/2018 Approved JEFFREY DURAN
Pre-Inspection 10/11/2018 Approved JEFFREY DURAN
Deputy Grading 10/12/2018 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 10/12/2018 Conditional Approval JEFFREY DURAN
Deputy Grading 10/15/2018 Conditional Approval JAMES STEPHENS
Deputy Reinf. Concrete 10/15/2018 Conditional Approval JAMES STEPHENS
Deputy Grading 10/16/2018 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 10/16/2018 Conditional Approval JEFFREY DURAN
Deputy Grading 10/17/2018 Conditional Approval JEFFREY DURAN
Deputy Grading 10/18/2018 Conditional Approval JEFFREY DURAN
Deputy Grading 10/19/2018 Conditional Approval JEFFREY DURAN
Deputy Grading 10/22/2018 Conditional Approval JEFFREY DURAN
Deputy Grading 10/23/2018 Conditional Approval JEFFREY DURAN
Special/Order Compliance 10/23/2018 Partial Inspection JEFFREY DURAN
Deputy Grading 10/24/2018 Conditional Approval JEFFREY DURAN
Deputy Grading 10/25/2018 Conditional Approval JEFFREY DURAN
Deputy Grading 10/26/2018 Conditional Approval JEFFREY DURAN
Deputy Steel/Welding 10/26/2018 Conditional Approval JEFFREY DURAN
Deputy Grading 10/29/2018 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 10/29/2018 Conditional Approval JEFFREY DURAN
Deputy Steel/Welding 10/29/2018 Conditional Approval JEFFREY DURAN
Deputy Steel/Welding 10/30/2018 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 10/31/2018 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 11/1/2018 Conditional Approval JAMES STEPHENS
Deputy Grading 11/5/2018 Conditional Approval JEFFREY DURAN
Deputy Grading 11/6/2018 Conditional Approval JEFFREY DURAN
Deputy Steel/Welding 11/6/2018 Conditional Approval JEFFREY DURAN
Deputy Grading 11/7/2018 Approved JEFFREY DURAN
Deputy Steel/Welding 11/7/2018 Conditional Approval JEFFREY DURAN
Pre-Inspection 11/7/2018 Partial Inspection JEFFREY DURAN
Deputy Grading 11/8/2018 Conditional Approval JEFFREY DURAN
Deputy Grading 11/9/2018 Conditional Approval JEFFREY DURAN
Special/Order Compliance 11/29/2018 Partial Inspection JEFFREY DURAN
Pre-Inspection 12/11/2018 Partial Inspection JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 1/2/2019 Partial Inspection JEFFREY DURAN
Deputy Reinf. Concrete 1/23/2019 Conditional Approval JEFFREY DURAN
Pre-Inspection 1/23/2019 Partial Inspection JEFFREY DURAN
Deputy Reinf. Concrete 1/28/2019 Approved JEFFREY DURAN
Footing/Foundation/Slab 1/28/2019 Partial Inspection JEFFREY DURAN
Deputy Reinf. Concrete 1/29/2019 Approved JEFFREY DURAN
Pre-Inspection 1/29/2019 Partial Approval JEFFREY DURAN
Deputy Reinf. Concrete 1/30/2019 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 1/31/2019 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 2/1/2019 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 2/20/2019 Conditional Approval JEFFREY DURAN
Pre-Inspection 2/22/2019 Partial Approval JEFFREY DURAN
Deputy Reinf. Concrete 2/26/2019 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 2/27/2019 Approved JEFFREY DURAN
Footing/Foundation/Slab 2/27/2019 Partial Approval JEFFREY DURAN
Deputy Reinf. Concrete 3/8/2019 Conditional Approval JAMES STEPHENS
Footing/Foundation/Slab 3/13/2019 Partial Approval JEFFREY DURAN
Deputy Reinf. Concrete 3/14/2019 Conditional Approval DANIEL VARNUM
Reinforced Concrete Frame 3/14/2019 Partial Approval DANIEL VARNUM
Deputy Reinf. Concrete 3/18/2019 Approved JEFFREY DURAN
Reinforced Concrete Frame 3/18/2019 Partial Approval JEFFREY DURAN
Deputy Reinf. Concrete 3/19/2019 Approved JEFFREY DURAN
Footing/Foundation/Slab 3/19/2019 Partial Approval JEFFREY DURAN
Deputy Reinf. Concrete 3/22/2019 Approved JEFFREY DURAN
Footing/Foundation/Slab 3/22/2019 Partial Approval JEFFREY DURAN
Deputy Reinf. Concrete 3/27/2019 Conditional Approval CAMERON CHABAN
Footing/Foundation/Slab 3/27/2019 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 3/29/2019 Conditional Approval ROBERT COLE
Footing/Foundation/Slab 3/29/2019 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 4/1/2019 Conditional Approval JAMES STEPHENS
Deputy Reinf. Concrete 4/2/2019 Conditional Approval CAMERON CHABAN
Footing/Foundation/Slab 4/2/2019 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 4/8/2019 Conditional Approval JAMES STEPHENS
Deputy Steel/Welding 4/10/2019 Conditional Approval JEFFREY DURAN
Deputy Steel/Welding 4/11/2019 Conditional Approval JEFFREY DURAN
Deputy Steel/Welding 4/12/2019 Approved JEFFREY DURAN
Footing/Foundation/Slab 4/12/2019 Partial Approval JEFFREY DURAN
Footing/Foundation/Slab 4/17/2019 Partial Approval JEFFREY DURAN
Deputy Reinf. Concrete 4/18/2019 Approved JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 4/18/2019 Not Ready for Inspection JEFFREY DURAN
Deputy Reinf. Concrete 4/19/2019 Approved JEFFREY DURAN
Deputy Reinf. Concrete 4/19/2019 Conditional Approval JEFFREY DURAN
Footing/Foundation/Slab 4/19/2019 Partial Approval JEFFREY DURAN
Deputy Reinf. Concrete 4/23/2019 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 5/2/2019 Approved JEFFREY DURAN
Footing/Foundation/Slab 5/2/2019 Not Ready for Inspection JEFFREY DURAN
Footing/Foundation/Slab 5/6/2019 Partial Approval JEFFREY DURAN
Deputy Reinf. Concrete 5/7/2019 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 5/10/2019 Conditional Approval JEFFREY DURAN
Deputy Steel/Welding 5/14/2019 Conditional Approval JEFFREY DURAN
Deputy Reinf. Masonry 5/15/2019 Conditional Approval JEFFREY DURAN
Deputy Steel/Welding 5/15/2019 Conditional Approval JEFFREY DURAN
Deputy Steel/Welding 5/16/2019 Conditional Approval JEFFREY DURAN
Deputy Steel/Welding 5/17/2019 Conditional Approval JEFFREY DURAN
Deputy Reinf. Masonry 5/21/2019 Approved JEFFREY DURAN
Footing/Foundation/Slab 5/21/2019 Partial Approval JEFFREY DURAN
Deputy Reinf. Masonry 5/22/2019 Conditional Approval JEFFREY DURAN
Deputy Reinf. Masonry 5/28/2019 Conditional Approval CAMERON CHABAN
Green Building Rough 5/28/2019 Not Ready for Inspection CAMERON CHABAN
Reinforced Masonry Frame 5/28/2019 Conditional Approval CAMERON CHABAN
Verify Sprinkler Sign Off 5/28/2019 Not Ready for Inspection CAMERON CHABAN
Deputy Reinf. Masonry 5/29/2019 Approved JEFFREY DURAN
Footing/Foundation/Slab 5/29/2019 Partial Approval JEFFREY DURAN
Deputy Reinf. Masonry 5/30/2019 Conditional Approval JEFFREY DURAN
Deputy Reinf. Masonry 5/31/2019 Approved JEFFREY DURAN
Footing/Foundation/Slab 5/31/2019 Partial Approval JEFFREY DURAN
Deputy Reinf. Concrete 6/4/2019 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 6/5/2019 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 6/6/2019 Approved JEFFREY DURAN
Deputy Reinf. Masonry 6/6/2019 Approved JEFFREY DURAN
Deputy Steel/Welding 6/6/2019 Conditional Approval JEFFREY DURAN
Footing/Foundation/Slab 6/6/2019 Partial Approval JEFFREY DURAN
Deputy Reinf. Concrete 6/7/2019 Conditional Approval ROBERT COLE
Deputy Reinf. Masonry 6/7/2019 Conditional Approval ROBERT COLE
Deputy Steel/Welding 6/7/2019 Conditional Approval ROBERT COLE
Pre-Inspection 6/7/2019 Not Ready for Inspection CAMERON CHABAN
Deputy Reinf. Concrete 6/10/2019 Approved JEFFREY DURAN
Footing/Foundation/Slab 6/10/2019 Partial Inspection JEFFREY DURAN
Deputy Reinf. Concrete 6/11/2019 Approved JEFFREY DURAN
Pre-Inspection 6/11/2019 Partial Approval JEFFREY DURAN
Deputy Reinf. Concrete 6/12/2019 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 6/17/2019 Conditional Approval ROBERT COLE
Footing/Foundation/Slab 6/17/2019 Partial Approval DANIEL VARNUM
Deputy Reinf. Concrete 6/18/2019 Conditional Approval ROBERT COLE
Deputy Reinf. Concrete 6/19/2019 Conditional Approval ROBERT COLE
Footing/Foundation/Slab 6/19/2019 Off-Hour Fees Due
Pre-Inspection 6/19/2019 Partial Approval ROBERT COLE
Deputy Reinf. Concrete 6/21/2019 Conditional Approval ROBERT COLE
Footing/Foundation/Slab 6/21/2019 Not Ready for Inspection ROBERT COLE
Pre-Inspection 6/21/2019 Not Ready for Inspection ROBERT COLE
Deputy Reinf. Concrete 6/24/2019 Approved JEFFREY DURAN
Masonry Wall/Backfill 6/24/2019 Partial Approval JEFFREY DURAN
Deputy Steel/Welding 6/28/2019 Conditional Approval JEFFREY DURAN
Footing/Foundation/Slab 7/1/2019 Partial Approval JEFFREY DURAN
Deputy Steel/Welding 7/2/2019 Conditional Approval JEFFREY DURAN
Pre-Inspection 7/2/2019 Partial Approval JEFFREY DURAN
Deputy Steel/Welding 7/3/2019 Conditional Approval JEFFREY DURAN
Deputy Steel/Welding 7/8/2019 Conditional Approval JEFFREY DURAN
Deputy Steel/Welding 7/10/2019 Conditional Approval JAMES STEPHENS
Deputy Steel/Welding 7/11/2019 Conditional Approval JAMES STEPHENS
Deputy Steel/Welding 7/12/2019 Conditional Approval JAMES STEPHENS
Deputy Reinf. Masonry 7/15/2019 Conditional Approval JAMES STEPHENS
Deputy Steel/Welding 7/15/2019 Conditional Approval JAMES STEPHENS
Masonry Wall/Backfill 7/15/2019 Partial Approval JAMES STEPHENS
Deputy Reinf. Masonry 7/16/2019 Conditional Approval JEFFREY DURAN
Deputy Steel/Welding 7/16/2019 Conditional Approval JEFFREY DURAN
Deputy Steel/Welding 7/17/2019 Conditional Approval JEFFREY DURAN
Deputy Reinf. Masonry 7/18/2019 Conditional Approval JEFFREY DURAN
Deputy Steel/Welding 7/18/2019 Conditional Approval JEFFREY DURAN
Green Building Rough 7/18/2019 Not Ready for Inspection JEFFREY DURAN
Pre-Inspection 7/18/2019 Conditional Approval JEFFREY DURAN
Reinforced Concrete Frame 7/18/2019 Partial Inspection JEFFREY DURAN
Verify Sprinkler Sign Off 7/18/2019 Not Ready for Inspection JEFFREY DURAN
Deputy Steel/Welding 7/19/2019 Conditional Approval ROBERT COLE
Deputy Reinf. Concrete 7/22/2019 Approved JEFFREY DURAN
Deputy Reinf. Masonry 7/22/2019 Approved JEFFREY DURAN
Deputy Steel/Welding 7/22/2019 Conditional Approval JEFFREY DURAN
Masonry Wall/Backfill 7/22/2019 Partial Approval JEFFREY DURAN
Deputy Reinf. Concrete 7/23/2019 Conditional Approval JAMES STEPHENS
Deputy Reinf. Masonry 7/23/2019 Conditional Approval JAMES STEPHENS
Deputy Steel/Welding 7/23/2019 Conditional Approval JAMES STEPHENS
Deputy Reinf. Concrete 7/24/2019 Conditional Approval JAMES STEPHENS
Deputy Reinf. Masonry 7/24/2019 Conditional Approval JAMES STEPHENS
Deputy Steel/Welding 7/24/2019 Conditional Approval JAMES STEPHENS
Deputy Reinf. Concrete 7/25/2019 Conditional Approval JEFFREY DURAN
Deputy Reinf. Masonry 7/25/2019 Conditional Approval JEFFREY DURAN
Deputy Steel/Welding 7/25/2019 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 7/26/2019 Approved JEFFREY DURAN
Deputy Reinf. Masonry 7/26/2019 Approved JEFFREY DURAN
Deputy Steel/Welding 7/26/2019 Conditional Approval JEFFREY DURAN
Green Building Rough 7/26/2019 Not Ready for Inspection JEFFREY DURAN
Reinforced Masonry Frame 7/26/2019 Partial Approval JEFFREY DURAN
Verify Sprinkler Sign Off 7/26/2019 Not Ready for Inspection JEFFREY DURAN
Deputy Reinf. Concrete 7/29/2019 Approved JEFFREY DURAN
Deputy Reinf. Masonry 7/29/2019 Approved JEFFREY DURAN
Deputy Steel/Welding 7/29/2019 Conditional Approval JEFFREY DURAN
Special/Order Compliance 7/29/2019 Partial Approval JEFFREY DURAN
Deputy Reinf. Concrete 7/30/2019 Approved JEFFREY DURAN
Deputy Reinf. Masonry 7/30/2019 Approved JEFFREY DURAN
Deputy Steel/Welding 7/30/2019 Conditional Approval JEFFREY DURAN
Masonry Wall/Backfill 7/30/2019 Partial Approval JEFFREY DURAN
Deputy Reinf. Concrete 7/31/2019 Conditional Approval JEFFREY DURAN
Deputy Reinf. Masonry 7/31/2019 Conditional Approval JEFFREY DURAN
Deputy Steel/Welding 7/31/2019 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 8/1/2019 Conditional Approval JEFFREY DURAN
Deputy Reinf. Masonry 8/1/2019 Conditional Approval JEFFREY DURAN
Deputy Steel/Welding 8/1/2019 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 8/2/2019 Approved JEFFREY DURAN
Deputy Reinf. Masonry 8/2/2019 Approved JEFFREY DURAN
Deputy Steel/Welding 8/2/2019 Conditional Approval JEFFREY DURAN
Floor/Roof Diaphrgm/Shear Wall 8/2/2019 Partial Approval JEFFREY DURAN
Deputy Reinf. Concrete 8/6/2019 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 8/8/2019 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 8/9/2019 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 8/12/2019 Conditional Approval ROBERT COLE
Excavation/Setback/Form/Re-Bar 8/12/2019 Partial Approval ROBERT COLE
Pre-Inspection 8/12/2019 Not Ready for Inspection ROBERT COLE
Deputy Reinf. Concrete 8/13/2019 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 8/14/2019 Conditional Approval JEFFREY DURAN
Deputy Steel/Welding 8/15/2019 Conditional Approval JAMES STEPHENS
Green Building Rough 8/15/2019 Not Ready for Inspection JAMES STEPHENS
Reinforced Concrete Frame 8/15/2019 Partial Approval JAMES STEPHENS
Verify Sprinkler Sign Off 8/15/2019 Not Ready for Inspection JAMES STEPHENS
Deputy Steel/Welding 8/16/2019 Approved MILLARD ARDOIN
Pre-Inspection 8/19/2019 Partial Inspection JEFFREY DURAN
Deputy Reinf. Masonry 8/20/2019 Conditional Approval JEFFREY DURAN
Deputy Steel/Welding 8/21/2019 Conditional Approval JEFFREY DURAN
Deputy Reinf. Masonry 8/22/2019 Conditional Approval JEFFREY DURAN
Deputy Steel/Welding 8/22/2019 Conditional Approval JEFFREY DURAN
Deputy Reinf. Masonry 8/23/2019 Conditional Approval JEFFREY DURAN
Deputy Steel/Welding 8/23/2019 Conditional Approval JEFFREY DURAN
Deputy Reinf. Masonry 8/26/2019 Approved JEFFREY DURAN
Deputy Reinf. Masonry 8/27/2019 Conditional Approval JEFFREY DURAN
Deputy Steel/Welding 8/27/2019 Conditional Approval JEFFREY DURAN
Deputy Reinf. Masonry 8/28/2019 Conditional Approval JEFFREY DURAN
Deputy Steel/Welding 8/28/2019 Conditional Approval JEFFREY DURAN
Deputy Drilled-In Anchors 8/29/2019 Conditional Approval JEFFREY DURAN
Deputy Reinf. Masonry 8/29/2019 Conditional Approval JEFFREY DURAN
Deputy Steel/Welding 8/29/2019 Conditional Approval JEFFREY DURAN
Deputy Reinf. Masonry 8/30/2019 Conditional Approval ROBERT COLE
Deputy Steel/Welding 8/30/2019 Conditional Approval ROBERT COLE
Masonry Wall/Backfill 8/30/2019 Partial Approval ROBERT COLE
Deputy Drilled-In Anchors 9/3/2019 Approved JEFFREY DURAN
Deputy Reinf. Masonry 9/3/2019 Approved JEFFREY DURAN
Drywall Nailing 9/3/2019 Not Ready for Inspection JEFFREY DURAN
Deputy Drilled-In Anchors 9/4/2019 Conditional Approval JEFFREY DURAN
Deputy Reinf. Masonry 9/4/2019 Conditional Approval JEFFREY DURAN
Deputy Drilled-In Anchors 9/5/2019 Conditional Approval JAMES STEPHENS
Deputy Reinf. Concrete 9/5/2019 Conditional Approval JAMES STEPHENS
Deputy Reinf. Masonry 9/5/2019 Conditional Approval JAMES STEPHENS
Deputy Drilled-In Anchors 9/6/2019 Conditional Approval JEFFREY DURAN
Deputy Reinf. Masonry 9/6/2019 Conditional Approval JEFFREY DURAN
Deputy Drilled-In Anchors 9/9/2019 Conditional Approval JAMES STEPHENS
Deputy Reinf. Masonry 9/9/2019 Conditional Approval JAMES STEPHENS
Deputy Drilled-In Anchors 9/10/2019 Approved JEFFREY DURAN
Deputy Reinf. Concrete 9/10/2019 Approved JEFFREY DURAN
Deputy Reinf. Masonry 9/10/2019 Approved JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 9/10/2019 Partial Approval JEFFREY DURAN
Masonry Wall/Backfill 9/10/2019 Partial Approval JEFFREY DURAN
Deputy Drilled-In Anchors 9/11/2019 Conditional Approval JEFFREY DURAN
Deputy Reinf. Masonry 9/11/2019 Conditional Approval JEFFREY DURAN
Deputy Drilled-In Anchors 9/12/2019 Approved JEFFREY DURAN
Deputy Reinf. Masonry 9/12/2019 Approved JEFFREY DURAN
Masonry Wall/Backfill 9/12/2019 Partial Approval JEFFREY DURAN
Deputy Drilled-In Anchors 9/13/2019 Conditional Approval RICKEY JACKSON
Deputy Reinf. Masonry 9/13/2019 Conditional Approval RICKEY JACKSON
Deputy Drilled-In Anchors 9/16/2019 Conditional Approval JEFFREY DURAN
Deputy Reinf. Masonry 9/16/2019 Conditional Approval JEFFREY DURAN
Deputy Drilled-In Anchors 9/17/2019 Approved JEFFREY DURAN
Deputy Reinf. Masonry 9/17/2019 Approved JEFFREY DURAN
Masonry Wall/Backfill 9/17/2019 Partial Approval JEFFREY DURAN
Deputy Drilled-In Anchors 9/18/2019 Conditional Approval JEFFREY DURAN
Deputy Reinf. Masonry 9/18/2019 Approved JEFFREY DURAN
Masonry Wall/Backfill 9/18/2019 Partial Approval JEFFREY DURAN
Deputy Drilled-In Anchors 9/19/2019 Conditional Approval JEFFREY DURAN
Deputy Reinf. Masonry 9/19/2019 Conditional Approval JEFFREY DURAN
Deputy Steel/Welding 9/19/2019 Conditional Approval JEFFREY DURAN
Deputy Drilled-In Anchors 9/20/2019 Conditional Approval JEFFREY DURAN
Deputy Reinf. Masonry 9/20/2019 Conditional Approval JEFFREY DURAN
Deputy Steel/Welding 9/20/2019 Conditional Approval JEFFREY DURAN
Deputy Reinf. Masonry 9/23/2019 Conditional Approval JEFFREY DURAN
Deputy Steel/Welding 9/23/2019 Conditional Approval JEFFREY DURAN
Light Gage Steel Frame 9/23/2019 Partial Inspection JEFFREY DURAN
Deputy Reinf. Masonry 9/24/2019 Conditional Approval JEFFREY DURAN
Deputy Steel/Welding 9/24/2019 Conditional Approval JEFFREY DURAN
Deputy Reinf. Masonry 9/25/2019 Conditional Approval JEFFREY DURAN
Deputy Steel/Welding 9/25/2019 Conditional Approval JEFFREY DURAN
Deputy Reinf. Masonry 9/26/2019 Conditional Approval JEFFREY DURAN
Deputy Steel/Welding 9/26/2019 Conditional Approval JEFFREY DURAN
Deputy Reinf. Masonry 9/27/2019 Approved JEFFREY DURAN
Deputy Steel/Welding 9/27/2019 Conditional Approval JEFFREY DURAN
Footing/Foundation/Slab 9/27/2019 Conditional Approval JEFFREY DURAN
Masonry Wall/Backfill 9/27/2019 Partial Approval JEFFREY DURAN
Deputy Reinf. Masonry 9/30/2019 Conditional Approval JAMES STEPHENS
Deputy Steel/Welding 9/30/2019 Conditional Approval JAMES STEPHENS
Deputy Reinf. Masonry 10/1/2019 Conditional Approval JEFFREY DURAN
Deputy Steel/Welding 10/1/2019 Conditional Approval JEFFREY DURAN
Deputy Reinf. Masonry 10/2/2019 Approved JEFFREY DURAN
Deputy Steel/Welding 10/2/2019 Conditional Approval JEFFREY DURAN
Masonry Wall/Backfill 10/2/2019 Partial Approval JEFFREY DURAN
Deputy Reinf. Masonry 10/3/2019 Conditional Approval JEFFREY DURAN
Deputy Steel/Welding 10/3/2019 Conditional Approval JEFFREY DURAN
Green Building Rough 10/3/2019 Not Ready for Inspection JEFFREY DURAN
Pre-Inspection 10/3/2019 Not Ready for Inspection JEFFREY DURAN
Reinforced Masonry Frame 10/3/2019 Not Ready for Inspection JEFFREY DURAN
Verify Sprinkler Sign Off 10/3/2019 Not Ready for Inspection JEFFREY DURAN
Deputy Reinf. Masonry 10/4/2019 Approved JEFFREY DURAN
Deputy Steel/Welding 10/4/2019 Conditional Approval JEFFREY DURAN
Masonry Wall/Backfill 10/4/2019 Partial Approval JEFFREY DURAN
Deputy Reinf. Masonry 10/7/2019 Approved JEFFREY DURAN
Masonry Wall/Backfill 10/7/2019 Partial Approval JEFFREY DURAN
Deputy Reinf. Masonry 10/8/2019 Approved JEFFREY DURAN
Deputy Steel/Welding 10/8/2019 Conditional Approval JEFFREY DURAN
Masonry Wall/Backfill 10/8/2019 Partial Approval JEFFREY DURAN
Deputy Reinf. Masonry 10/9/2019 Approved JEFFREY DURAN
Deputy Steel/Welding 10/9/2019 Conditional Approval JEFFREY DURAN
Masonry Wall/Backfill 10/9/2019 Partial Approval JEFFREY DURAN
Deputy Reinf. Masonry 10/10/2019 Conditional Approval JEFFREY DURAN
Deputy Steel/Welding 10/10/2019 Conditional Approval JEFFREY DURAN
Deputy Reinf. Masonry 10/15/2019 Approved JEFFREY DURAN
Deputy Steel/Welding 10/15/2019 Approved JEFFREY DURAN
Masonry Wall/Backfill 10/15/2019 Partial Approval JEFFREY DURAN
Deputy Reinf. Masonry 10/16/2019 Conditional Approval JEFFREY DURAN
Pre-Inspection 10/16/2019 Partial Approval JEFFREY DURAN
Deputy Reinf. Masonry 10/17/2019 Approved JEFFREY DURAN
Deputy Steel/Welding 10/17/2019 Conditional Approval JEFFREY DURAN
Footing/Foundation/Slab 10/17/2019 Partial Approval JEFFREY DURAN
Deputy Steel/Welding 10/18/2019 Conditional Approval JEFFREY DURAN
Pre-Inspection 10/21/2019 Not Ready for Inspection JEFFREY DURAN
Deputy Reinf. Masonry 10/22/2019 Approved JEFFREY DURAN
Deputy Steel/Welding 10/22/2019 Conditional Approval JEFFREY DURAN
Masonry Wall/Backfill 10/22/2019 Partial Approval JEFFREY DURAN
Deputy Reinf. Masonry 10/23/2019 Approved JEFFREY DURAN
Deputy Steel/Welding 10/23/2019 Conditional Approval JEFFREY DURAN
Masonry Wall/Backfill 10/23/2019 Partial Approval JEFFREY DURAN
Deputy Reinf. Masonry 10/24/2019 Approved JEFFREY DURAN
Deputy Steel/Welding 10/24/2019 Conditional Approval JEFFREY DURAN
Masonry Wall/Backfill 10/24/2019 Partial Approval JEFFREY DURAN
Deputy Reinf. Masonry 10/25/2019 Conditional Approval JEFFREY DURAN
Deputy Steel/Welding 10/25/2019 Conditional Approval JEFFREY DURAN
Deputy Reinf. Masonry 10/28/2019 Approved JEFFREY DURAN
Deputy Steel/Welding 10/28/2019 Conditional Approval JEFFREY DURAN
Masonry Wall/Backfill 10/28/2019 Partial Approval JEFFREY DURAN
Deputy Reinf. Masonry 10/29/2019 Conditional Approval JEFFREY DURAN
Deputy Steel/Welding 10/29/2019 Conditional Approval JEFFREY DURAN
Deputy Reinf. Masonry 10/30/2019 Approved JEFFREY DURAN
Deputy Steel/Welding 10/30/2019 Conditional Approval JEFFREY DURAN
Masonry Wall/Backfill 10/30/2019 Partial Approval JEFFREY DURAN
Deputy Reinf. Masonry 10/31/2019 Conditional Approval JEFFREY DURAN
Deputy Steel/Welding 10/31/2019 Conditional Approval JEFFREY DURAN
Deputy Reinf. Masonry 11/1/2019 Conditional Approval JAMES STEPHENS
Deputy Steel/Welding 11/1/2019 Conditional Approval JAMES STEPHENS
Masonry Wall/Backfill 11/1/2019 Partial Approval JOHN KITCKO
Deputy Reinf. Masonry 11/4/2019 Conditional Approval JEFFREY DURAN
Deputy Steel/Welding 11/4/2019 Conditional Approval JEFFREY DURAN
Deputy Reinf. Masonry 11/5/2019 Conditional Approval ROBERT COLE
Deputy Steel/Welding 11/5/2019 Conditional Approval ROBERT COLE
Green Building Rough 11/5/2019 Not Ready for Inspection ROBERT COLE
Reinforced Masonry Frame 11/5/2019 Partial Approval ROBERT COLE
Verify Sprinkler Sign Off 11/5/2019 Not Ready for Inspection ROBERT COLE
Deputy Reinf. Masonry 11/6/2019 Conditional Approval JEFFREY DURAN
Deputy Steel/Welding 11/6/2019 Conditional Approval JEFFREY DURAN
Deputy Reinf. Masonry 11/7/2019 Approved JEFFREY DURAN
Deputy Steel/Welding 11/7/2019 Conditional Approval JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 11/7/2019 Partial Approval JEFFREY DURAN
Masonry Wall/Backfill 11/7/2019 Partial Approval JEFFREY DURAN
Deputy Reinf. Masonry 11/8/2019 Conditional Approval JEFFREY DURAN
Deputy Steel/Welding 11/8/2019 Partial Approval JEFFREY DURAN
Deputy Reinf. Masonry 11/12/2019 Conditional Approval JEFFREY DURAN
Deputy Steel/Welding 11/12/2019 Conditional Approval JEFFREY DURAN
Deputy Reinf. Masonry 11/13/2019 Approved JEFFREY DURAN
Deputy Steel/Welding 11/13/2019 Conditional Approval JEFFREY DURAN
Green Building Rough 11/13/2019 Not Ready for Inspection JEFFREY DURAN
Masonry Wall/Backfill 11/13/2019 Partial Approval JEFFREY DURAN
Reinforced Masonry Frame 11/13/2019 Partial Approval JEFFREY DURAN
Verify Sprinkler Sign Off 11/13/2019 Not Ready for Inspection JEFFREY DURAN
Deputy Reinf. Masonry 11/14/2019 Conditional Approval JEFFREY DURAN
Deputy Steel/Welding 11/14/2019 Conditional Approval JEFFREY DURAN
Deputy Reinf. Masonry 11/15/2019 Approved JEFFREY DURAN
Deputy Steel/Welding 11/15/2019 Approved JEFFREY DURAN
Masonry Wall/Backfill 11/15/2019 Partial Approval JEFFREY DURAN
Pre-Inspection 11/15/2019 Partial Approval JEFFREY DURAN
Deputy Reinf. Masonry 11/18/2019 Conditional Approval JEFFREY DURAN
Deputy Steel/Welding 11/18/2019 Conditional Approval JEFFREY DURAN
Deputy Reinf. Masonry 11/19/2019 Conditional Approval ROBERT COLE
Deputy Steel/Welding 11/19/2019 Conditional Approval ROBERT COLE
Masonry Wall/Backfill 11/19/2019 Partial Approval ROBERT COLE
Deputy Reinf. Masonry 11/20/2019 Conditional Approval JEFFREY DURAN
Deputy Steel/Welding 11/20/2019 Conditional Approval JEFFREY DURAN
Deputy Reinf. Masonry 11/21/2019 Approved JEFFREY DURAN
Deputy Steel/Welding 11/21/2019 Conditional Approval JEFFREY DURAN
Drywall Nailing 11/21/2019 Partial Approval JEFFREY DURAN
Deputy Steel/Welding 11/22/2019 Approved JOHN KITCKO
Wood Frame 11/22/2019 Partial Approval JOHN KITCKO
Green Building Rough 11/26/2019 Not Ready for Inspection DANIEL VARNUM
Structural Steel Frame 11/26/2019 Partial Approval DANIEL VARNUM
Verify Sprinkler Sign Off 11/26/2019 Not Ready for Inspection DANIEL VARNUM
Light Gage Steel Frame 11/27/2019 Partial Inspection HAMID PISHEHVAR
Deputy Steel/Welding 12/5/2019 Conditional Approval JEFFREY DURAN
Deputy Steel/Welding 12/6/2019 Conditional Approval JEFFREY DURAN
Deputy Steel/Welding 12/10/2019 Conditional Approval JEFFREY DURAN
Deputy Steel/Welding 12/11/2019 Conditional Approval JEFFREY DURAN
Deputy Steel/Welding 12/12/2019 Approved JEFFREY DURAN
Wood Frame 12/12/2019 Partial Approval JEFFREY DURAN
Deputy Steel/Welding 12/13/2019 Conditional Approval JEFFREY DURAN
Wood Frame 12/16/2019 Partial Inspection ANDREW DORSO
Deputy Steel/Welding 12/17/2019 Conditional Approval JEFFREY DURAN
Deputy Steel/Welding 12/18/2019 Conditional Approval JEFFREY DURAN
Light Gage Steel Frame 12/18/2019 Conditional Approval JEFFREY DURAN
Deputy Steel/Welding 12/19/2019 Conditional Approval JEFFREY DURAN
Drywall Nailing 12/24/2019 Partial Approval JEFFREY DURAN
Pre-Inspection 12/24/2019 Partial Inspection JEFFREY DURAN
Drywall Nailing 1/2/2020 Partial Approval JEFFREY DURAN
Green Building Rough 1/2/2020 Partial Approval JEFFREY DURAN
Verify Sprinkler Sign Off 1/2/2020 Partial Approval JEFFREY DURAN
Floor/Roof Diaphrgm/Shear Wall 1/7/2020 Partial Approval ROBERT COLE
Drywall Nailing 1/8/2020 Partial Approval DANIEL VARNUM
Light Gage Steel Frame 1/9/2020 Partial Approval JEFFREY DURAN
Drywall Nailing 1/13/2020 Partial Approval JEFFREY DURAN
Green Building Rough 1/13/2020 Partial Approval JEFFREY DURAN
Deputy Steel/Welding 1/14/2020 Approved JEFFREY DURAN
Interior/Exterior Lathing 1/14/2020 Partial Approval JEFFREY DURAN
Deputy Steel/Welding 1/15/2020 Approved JEFFREY DURAN
Footing/Foundation/Slab 1/15/2020 Partial Approval JEFFREY DURAN
Light Gage Steel Frame 1/15/2020 Partial Approval JEFFREY DURAN
Deputy Steel/Welding 1/16/2020 Conditional Approval JEFFREY DURAN
Drywall Nailing 1/16/2020 Partial Approval JEFFREY DURAN
Light Gage Steel Frame 1/16/2020 Partial Approval JEFFREY DURAN
Deputy Steel/Welding 1/17/2020 Conditional Approval JEFFREY DURAN
Footing/Foundation/Slab 1/17/2020 Conditional Approval JEFFREY DURAN
Light Gage Steel Frame 1/17/2020 Partial Approval JEFFREY DURAN
Deputy Steel/Welding 1/22/2020 Conditional Approval JEFFREY DURAN
Deputy Steel/Welding 1/23/2020 Conditional Approval JAMES STEPHENS
Pre-Inspection 1/23/2020 Partial Approval JAMES STEPHENS
Deputy Steel/Welding 1/24/2020 Conditional Approval JEFFREY DURAN
Drywall Nailing 1/24/2020 Partial Approval JEFFREY DURAN
Light Gage Steel Frame 1/24/2020 Partial Approval JEFFREY DURAN
Interior/Exterior Lathing 1/28/2020 Partial Approval JEFFREY DURAN
Light Gage Steel Frame 1/28/2020 Partial Approval JEFFREY DURAN
Drywall Nailing 1/29/2020 Partial Approval JEFFREY DURAN
Footing/Foundation/Slab 1/29/2020 Partial Approval JEFFREY DURAN
Insulation 1/29/2020 Partial Approval JEFFREY DURAN
Drywall Nailing 1/30/2020 Partial Approval JEFFREY DURAN
Green Building Rough 1/30/2020 Partial Approval JEFFREY DURAN
Interior/Exterior Lathing 2/3/2020 Partial Approval JEFFREY DURAN
Deputy Steel/Welding 2/4/2020 Conditional Approval JEFFREY DURAN
Deputy Steel/Welding 2/5/2020 Conditional Approval JEFFREY DURAN
Deputy Steel/Welding 2/6/2020 Conditional Approval JEFFREY DURAN
Deputy Steel/Welding 2/7/2020 Conditional Approval JEFFREY DURAN
Drywall Nailing 2/7/2020 Partial Approval JEFFREY DURAN
Drywall Nailing 2/11/2020 Partial Approval JEFFREY DURAN
Deputy Steel/Welding 2/12/2020 Conditional Approval JEFFREY DURAN
Drywall Nailing 2/12/2020 Partial Approval JEFFREY DURAN
Green Building Rough 2/12/2020 Not Ready for Inspection JEFFREY DURAN
Wood Frame 2/12/2020 Partial Approval JEFFREY DURAN
Deputy Steel/Welding 2/13/2020 Conditional Approval JEFFREY DURAN
Drywall Nailing 2/13/2020 Partial Approval JEFFREY DURAN
Insulation 2/13/2020 Partial Approval JEFFREY DURAN
Deputy Steel/Welding 2/14/2020 Conditional Approval ROBERT COLE
Masonry Wall/Backfill 2/18/2020 Partial Approval JEFFREY DURAN
Deputy Drilled-In Anchors 2/19/2020 Approved JEFFREY DURAN
Deputy Reinf. Masonry 2/19/2020 Approved JEFFREY DURAN
Special/Order Compliance 2/19/2020 Partial Approval JEFFREY DURAN
Special/Order Compliance 2/21/2020 Partial Inspection JEFFREY DURAN
Light Gage Steel Frame 2/26/2020 Partial Approval JEFFREY DURAN
Special/Order Compliance 2/26/2020 Partial Approval JEFFREY DURAN
Drywall Nailing 3/2/2020 Partial Approval JEFFREY DURAN
Interior/Exterior Lathing 3/2/2020 Partial Approval JEFFREY DURAN
T-Bar Ceiling 3/6/2020 Not Ready for Inspection JEFFREY DURAN
Wood Frame 3/11/2020 Partial Approval JEFFREY DURAN
Deputy Steel/Welding 3/13/2020 Conditional Approval JEFFREY DURAN
Special/Order Compliance 3/13/2020 Partial Inspection JEFFREY DURAN
Green Building Rough 3/17/2020 Partial Approval JEFFREY DURAN
Structural Steel Frame 3/17/2020 Partial Approval JEFFREY DURAN
T-Bar Ceiling 3/17/2020 Conditional Approval JEFFREY DURAN
Deputy Drilled-In Anchors 3/18/2020 Conditional Approval JEFFREY DURAN
Pre-Inspection 3/19/2020 Not Ready for Inspection DANNY RODRIGUEZ
Deputy Drilled-In Anchors 3/20/2020 Conditional Approval JEFFREY DURAN
Light Gage Steel Frame 4/1/2020 Partial Approval JEFFREY DURAN
T-Bar Ceiling 4/1/2020 Partial Approval JEFFREY DURAN
Deputy Steel/Welding 4/15/2020 Conditional Approval JEFFREY DURAN
Pre-Inspection 4/15/2020 Approved HAMID PISHEHVAR
Pre-Inspection 4/20/2020 Partial Approval HAMID PISHEHVAR
Special/Order Compliance 4/24/2020 Partial Inspection JEFFREY DURAN
Pre-Inspection 5/5/2020 Partial Inspection HAMID PISHEHVAR
Pre-Inspection 5/7/2020 Partial Inspection JEFFREY DURAN
Deputy Steel/Welding 5/12/2020 Conditional Approval JEFFREY FULTON
Pre-Inspection 5/26/2020 Partial Approval JEFFREY DURAN
Green Building Final 6/3/2020 Partial Inspection ROBERT COLE
Pre-Inspection 6/9/2020 Partial Approval HAMID PISHEHVAR
Green Building Final 6/11/2020 Not Ready for Inspection ROBERT COLE
Green Building Rough 6/11/2020 Approved ROBERT COLE
Pre-Inspection 6/11/2020 Partial Inspection ROBERT COLE
Pre-Inspection 6/12/2020 Partial Inspection ROBERT COLE
Special/Order Compliance 6/12/2020 Partial Inspection ROBERT COLE
Verify Sprinkler Sign Off 6/12/2020 Not Ready for Inspection ROBERT COLE
Pre-Inspection 6/15/2020 Partial Approval HAMID PISHEHVAR
Pre-Inspection 6/22/2020 Partial Inspection JEFFREY DURAN
Pre-Inspection 6/25/2020 Corrections Issued ROBERT DAVIS
Drywall Nailing 7/27/2020 Not Ready for Inspection DAVID BURKHEAD
Final 7/27/2020 Not Ready for Inspection DAVID BURKHEAD
Green Building Final 7/27/2020 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 7/27/2020 Not Ready for Inspection DAVID BURKHEAD
Reinforced Masonry Frame 7/27/2020 Not Ready for Inspection DAVID BURKHEAD
SGSOV-Seismic Gas S/O Valve 7/27/2020 SGSOV Approved DAVID BURKHEAD
Smoke Detectors 7/27/2020 Partial Approval DAVID BURKHEAD
Structural Steel Frame 7/27/2020 Not Ready for Inspection DAVID BURKHEAD
Verify Sprinkler Sign Off 7/27/2020 Not Ready for Inspection DAVID BURKHEAD
Pre-Inspection 8/26/2020 Not Ready for Inspection HAMID PISHEHVAR
Pre-Inspection 9/4/2020 Partial Inspection JEFFREY FULTON
Special/Order Compliance 9/5/2020 Partial Inspection JEFFREY DURAN
Drywall Nailing 9/10/2020 Approved JEFFREY DURAN
Final 9/10/2020 Not Ready for Inspection JEFFREY DURAN
Green Building Final 9/10/2020 Approved JEFFREY DURAN
Reinforced Concrete Frame 9/10/2020 Approved JEFFREY DURAN
Reinforced Masonry Frame 9/10/2020 Approved JEFFREY DURAN
Smoke Detectors 9/10/2020 Approved JEFFREY DURAN
Structural Steel Frame 9/10/2020 Approved JEFFREY DURAN
Verify Sprinkler Sign Off 9/10/2020 Approved JEFFREY DURAN
Special/Order Compliance 9/14/2020 Not Ready for Inspection JEFFREY DURAN
Drywall Nailing 9/16/2020 Partial Approval ROBERT DAVIS
Special/Order Compliance 2/10/2021 Approved HAMID PISHEHVAR
Special/Order Compliance 7/28/2021 Conditional Approval JEFFREY DURAN
Drywall Nailing 8/30/2021 Approved JEFFREY DURAN
Final 8/30/2021 OK to Issue CofO JEFFREY DURAN
Footing/Foundation/Slab 8/30/2021 Approved JEFFREY DURAN