4847 W BEVERLY BLVD 90004

Certificate Information: 4847 W BEVERLY BLVD 90004

Application / Permit
17010-30000-05074
Plan Check / Job No.
B17WL07528
Group
Building
Type
Bldg-New
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
(N) 4 STORY APARTMENT BUILDING (16-UNITS) OVER A BASEMENT PARKING GARAGE
Permit Issued
Issued on 8/30/2018
Issuing Office
West Los Angeles
Current Status
CofO Issued on 5/10/2021
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 12/22/2017 APPLICANT
Assigned to Plan Check Engineer 1/18/2018 TARIK SAOUD
Disabled Access Plans Picked Up 1/25/2018 APPLICANT
Corrections Issued 1/31/2018 TARIK SAOUD
Quality Review Completed 2/8/2018 KAMRAN GHOTBI RAVANDI
Building Plans Picked Up 2/8/2018 APPLICANT
Plan Check Approved 8/29/2018 TARIK SAOUD
Issued 8/30/2018 LADBS
TCO Issued (Expire Date: 10-27-2021) 4/30/2021 DAVID TSAU
CofO in Progress 5/10/2021 DANIEL MC AULIFFE
Permit Finaled 5/10/2021 TERRY HERR
CofO Issued 5/10/2021 TERRY HERR
Permit Finaled 5/10/2021 TERRY HERR

Permit Application Clearance Information

Hydrant and Access approval Cleared 4/25/2018 GEORGE SUCHAND
Address approval Cleared 5/3/2018 KAREN LE
Eng Process Fee Ord 176,300 Cleared 5/3/2018 KAREN LE
Permit Cleared 5/3/2018 KAREN LE
DAS Clearance Cleared 5/7/2018 SHINE LIN
Bicycle Parking Cleared 5/11/2018 FATIMA GUERRA
Highway dedication Cleared 5/11/2018 ADRIAN SANCHEZ
Frnt yard landscape/Water mgmt Cleared 5/14/2018 SOPHIE GABEL-SCHEINBAU
Opn space landscape/Water mgmt Cleared 5/14/2018 SOPHIE GABEL-SCHEINBAU
Fire Marshall Fire Life Safety Cleared 5/30/2018 ANDREW KO
Construction near power lines Cleared 8/7/2018 RIDWAN HARDY
Low Impact Development Cleared 8/16/2018 AMMAR ELTAWIL
Roof/Waste drainage to street Cleared 8/17/2018 ADRIAN SANCHEZ
Green Code Cleared 8/22/2018 BRYAN MEYER
Sewer availability Cleared 8/27/2018 KRISTEN LY
Building over 3-story or 36-ft Cleared 8/29/2018 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 8/29/2018 CALOSHA APPROVED

Contact Information

Architect Bittoni, Mark Christopher; Lic. No.: C34136 434 N GREENCRAIG ROAD      LOS ANGELES, CA 90049
Contractor Owner-Builder       ,
Engineer Eden, Joseph Taki; Lic. No.: C39955 14416 FRIAR ST STE A      VAN NUYS, CA 91401
Engineer Melnyk, Matthew John; Lic. No.: S5853 2100 N MAIN STREET, SUITE A1      LOS ANGELES, CA 90031
Engineer Tucker, Keith D; Lic. No.: GE841 PO BOX 8133      HUNTINGTON BEACH, CA 92615

Inspector Information

DAVID BURKHEAD, (213) 482-7294 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 9/6/2018 Approved TED RIES
Footing/Foundation/Slab 12/27/2018 Partial Approval TED RIES
Footing/Foundation/Slab 1/3/2019 Partial Approval TED RIES
Deputy Reinf. Concrete 1/4/2019 Approved TED RIES
Deputy Shotcrete 1/25/2019 Approved TED RIES
Deputy Shotcrete 1/28/2019 Approved JEFF BYTHEWAY
Footing/Foundation/Slab 1/30/2019 Partial Approval TED RIES
Deputy Shotcrete 2/25/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 2/26/2019 Approved TED RIES
Deputy Reinf. Concrete 3/14/2019 Approved JEFF BYTHEWAY
Footing/Foundation/Slab 3/19/2019 Conditional Approval TED RIES
Footing/Foundation/Slab 3/20/2019 Partial Approval TED RIES
Footing/Foundation/Slab 4/3/2019 Partial Inspection ERNESTO CORRAL
Deputy Reinf. Concrete 4/5/2019 Approved TED RIES
Footing/Foundation/Slab 4/16/2019 Corrections Issued TED RIES
Deputy Reinf. Concrete 4/17/2019 Approved TED RIES
Footing/Foundation/Slab 4/19/2019 Partial Approval TED RIES
Footing/Foundation/Slab 5/3/2019 Partial Approval TED RIES
Reinforced Masonry Frame 5/9/2019 Partial Approval TED RIES
Footing/Foundation/Slab 5/13/2019 Partial Approval TED RIES
Footing/Foundation/Slab 6/11/2019 Partial Inspection TED RIES
Reinforced Masonry Frame 7/9/2019 Partial Approval DANIEL MC AULIFFE
Footing/Foundation/Slab 7/10/2019 Not Ready for Inspection DANIEL MC AULIFFE
Piling/Pier/Caisson 7/11/2019 Partial Approval DANIEL MC AULIFFE
Footing/Foundation/Slab 7/12/2019 Not Ready for Inspection DANIEL MC AULIFFE
Deputy Steel/Welding 8/12/2019 Conditional Approval DANIEL MC AULIFFE
Green Building Rough 8/29/2019 Not Ready for Inspection DANIEL MC AULIFFE
Verify Sprinkler Sign Off 8/29/2019 Not Ready for Inspection DANIEL MC AULIFFE
Wood Frame 8/29/2019 Partial Approval DANIEL MC AULIFFE
Green Building Rough 9/13/2019 Approved DANIEL MC AULIFFE
Verify Sprinkler Sign Off 9/13/2019 Not Ready for Inspection DANIEL MC AULIFFE
Wood Frame 9/13/2019 Partial Approval DANIEL MC AULIFFE
Deputy Steel/Welding 9/25/2019 Conditional Approval DANIEL MC AULIFFE
Verify Sprinkler Sign Off 9/25/2019 Not Ready for Inspection DANIEL MC AULIFFE
Wood Frame 9/25/2019 Partial Approval DANIEL MC AULIFFE
Verify Sprinkler Sign Off 10/4/2019 Partial Approval DANIEL MC AULIFFE
Wood Frame 10/4/2019 Partial Approval DANIEL MC AULIFFE
Verify Sprinkler Sign Off 10/18/2019 Approved DANIEL MC AULIFFE
Wood Frame 10/18/2019 Partial Approval DANIEL MC AULIFFE
Deputy Steel/Welding 10/28/2019 Conditional Approval DANIEL MC AULIFFE
Wood Frame 11/4/2019 Partial Approval DANIEL MC AULIFFE
Wood Frame 12/17/2019 Partial Approval DANIEL MC AULIFFE
Deputy Steel/Welding 12/31/2019 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 1/8/2020 Conditional Approval DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 1/9/2020 Partial Inspection DANIEL MC AULIFFE
Deputy Wood Construction 2/5/2020 Conditional Approval DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 2/5/2020 Partial Inspection DANIEL MC AULIFFE
Deputy Steel/Welding 2/11/2020 Conditional Approval DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 2/11/2020 Not Ready for Inspection DANIEL MC AULIFFE
Deputy Wood Construction 2/18/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 2/19/2020 Conditional Approval DANIEL MC AULIFFE
Insulation 2/19/2020 Partial Approval DANIEL MC AULIFFE
Deputy Steel/Welding 2/21/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 3/2/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Wood Construction 3/3/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 3/4/2020 Conditional Approval DANIEL MC AULIFFE
Wood Frame 3/4/2020 Partial Approval DANIEL MC AULIFFE
Deputy Wood Construction 3/5/2020 Conditional Approval DANIEL MC AULIFFE
Insulation 3/20/2020 Partial Approval DANIEL MC AULIFFE
Interior/Exterior Lathing 3/27/2020 Partial Approval DANIEL MC AULIFFE
Insulation 4/16/2020 Partial Approval DANIEL MC AULIFFE
Drywall Nailing 5/1/2020 Partial Approval DANIEL MC AULIFFE
Wood Frame 5/4/2020 Not Ready for Inspection DANIEL MC AULIFFE
Deputy Wood Construction 5/5/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Wood Construction 5/7/2020 Conditional Approval DANIEL MC AULIFFE
Wood Frame 6/11/2020 Partial Approval DANIEL MC AULIFFE
Insulation 6/15/2020 Partial Approval DANIEL MC AULIFFE
Wood Frame 6/24/2020 Approved DANIEL MC AULIFFE
Drywall Nailing 6/26/2020 Partial Approval DANIEL MC AULIFFE
Insulation 7/1/2020 Partial Approval DANIEL MC AULIFFE
Drywall Nailing 7/13/2020 Approved DANIEL MC AULIFFE
Interior/Exterior Lathing 7/27/2020 Partial Inspection DANIEL MC AULIFFE
Interior/Exterior Lathing 8/3/2020 Partial Approval DANIEL MC AULIFFE
Interior/Exterior Lathing 8/10/2020 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 9/21/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 10/8/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 10/13/2020 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 10/13/2020 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 10/19/2020 No Access for Inspection DANIEL MC AULIFFE
Structural Steel Frame 10/21/2020 Partial Inspection DANIEL MC AULIFFE
Pre-Inspection 11/10/2020 Partial Inspection DANIEL MC AULIFFE
Deputy Steel/Welding 2/1/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 2/2/2021 Conditional Approval DANIEL MC AULIFFE
Reinforced Concrete Frame 2/4/2021 Partial Approval DANIEL MC AULIFFE
Special/Order Compliance 2/12/2021 Off-Hour Fees Due
Pre-Inspection 2/16/2021 Partial Inspection DANIEL MC AULIFFE
Final 4/16/2021 Conditional Approval DANIEL MC AULIFFE
Footing/Foundation/Slab 4/16/2021 Approved DANIEL MC AULIFFE
Green Building Final 4/16/2021 Approved DANIEL MC AULIFFE
Reinforced Concrete Frame 4/16/2021 Approved DANIEL MC AULIFFE
SGSOV-Seismic Gas S/O Valve 4/16/2021 SGSOV Approved DANIEL MC AULIFFE
Smoke Detectors 4/16/2021 Approved DANIEL MC AULIFFE
Structural Steel Frame 4/16/2021 Approved DANIEL MC AULIFFE
Final 4/20/2021 Conditional Approval DANIEL MC AULIFFE