900 N VISTA ST 90046

Certificate Information: 900 N VISTA ST 90046

Application / Permit
17010-20001-00245
Plan Check / Job No.
B18VN08067
Group
Building
Type
Bldg-New
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
Suppl. permit to revsie work description to read "New irregular shape 73'11" x 30'9" NFPA13-D sprinkle throughout 2-story dwelling with attached garage, trellises and 1 level basement (including shoring on East and West side"
Permit Issued
Issued on 8/27/2018
Issuing Office
Metro
Current Status
CofO Issued on 5/20/2024
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 5/11/2018 APPLICANT
Assigned to Plan Check Engineer 5/31/2018 ALDOUS CHIC
Corrections Issued 6/4/2018 ALDOUS CHIC
Quality Review Completed 6/7/2018 CHON CHIO KUO
Building Plans Picked Up 6/12/2018 APPLICANT
Green Plans Picked Up 6/12/2018 APPLICANT
Applicant returned to address corrections 6/20/2018 ALDOUS CHIC
Applicant returned to address corrections 7/10/2018 ALDOUS CHIC
Plan Check Approved 7/17/2018 ALDOUS CHIC
Issued 8/27/2018 LADBS
CofO in Progress 5/9/2024 AMIR NAZARIAN
Permit Finaled 5/20/2024 DEROLD HAUFF
CofO Issued 5/20/2024 DEROLD HAUFF
Permit Finaled 5/20/2024 DEROLD HAUFF

Permit Application Clearance Information

Green Code Cleared 7/5/2018 PARISA ZAHABI

Contact Information

Contractor Owner-Builder       ,
Engineer , ; Lic. No.: C21234 22129 BRYANT STREET      CANOGA PARK, CA 91304
Engineer Hollingsworth, Robert Alan; Lic. No.: GE2022 31129 VIA COLINAS SUITE 707      WESTLAKE VILLAGE, CA 91362

Inspector Information

JOSE MACIAS, (213) 202-3125 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Grading 11/16/2018 Approved ROBERT MINASSIANS
Deputy Grading 11/19/2018 Corrections Issued DANNY TOLENTINO
Deputy Grading 11/20/2018 Conditional Approval DANNY TOLENTINO
Deputy Grading 11/21/2018 Conditional Approval DANNY TOLENTINO
Deputy Grading 11/27/2018 No Access for Inspection DANNY TOLENTINO
Deputy Grading 11/28/2018 Conditional Approval DANNY TOLENTINO
Footing/Foundation/Slab 5/28/2019 No Access for Inspection JOSEPH MCGARRY
Footing/Foundation/Slab 5/31/2019 Partial Approval JOSEPH MCGARRY
Footing/Foundation/Slab 6/28/2019 Partial Approval JOSEPH MCGARRY
PLUMBING-Rough 6/28/2019 Partial Approval JOSEPH MCGARRY
Reinforced Concrete Frame 8/5/2019 Partial Inspection JOSEPH MCGARRY
Reinforced Masonry Frame 8/5/2019 Partial Inspection JOSEPH MCGARRY
Reinforced Concrete Frame 8/12/2019 Not Ready for Inspection JOSEPH MCGARRY
Reinforced Masonry Frame 8/12/2019 Not Ready for Inspection JOSEPH MCGARRY
Reinforced Concrete Frame 8/20/2019 Not Ready for Inspection JOSEPH MCGARRY
Reinforced Masonry Frame 8/20/2019 Not Ready for Inspection JOSEPH MCGARRY
Reinforced Concrete Frame 8/26/2019 Partial Approval JOSEPH MCGARRY
Reinforced Masonry Frame 8/26/2019 Partial Approval JOSEPH MCGARRY
Floor/Roof Diaphrgm/Shear Wall 9/27/2019 Partial Approval JOSEPH MCGARRY
Deputy Steel/Welding 10/17/2019 Partial Approval PIERRE VEGA
Deputy Steel/Welding 10/18/2019 Partial Approval PIERRE VEGA
Floor/Roof Diaphrgm/Shear Wall 11/27/2019 No Access for Inspection JOSEPH MCGARRY
Wood Frame 1/30/2020 Not Ready for Inspection RAUL BARAJAS
Floor/Roof Diaphrgm/Shear Wall 2/27/2020 No Access for Inspection RAUL BARAJAS
BUILDING-Rough-Frame 3/20/2020 Not Ready for Inspection RAUL BARAJAS
Green Building Rough 3/20/2020 Not Ready for Inspection RAUL BARAJAS
Special/Order Compliance 3/20/2020 Not Ready for Inspection RAUL BARAJAS
Verify Sprinkler Sign Off 3/20/2020 Not Ready for Inspection RAUL BARAJAS
Floor/Roof Diaphrgm/Shear Wall 3/24/2020 Partial Approval JOSEPH MCGARRY
Pre-Inspection 4/29/2020 Partial Inspection CHRIS CHRISTENSEN
Deputy Drilled-In Anchors 7/8/2020 Conditional Approval CHRIS CHRISTENSEN
Pre-Inspection 7/21/2020 Corrections Issued HAMIK HARTOUNIAN
Deputy Drilled-In Anchors 9/8/2020 Conditional Approval CHRIS CHRISTENSEN
Floor/Roof Diaphrgm/Shear Wall 1/11/2021 Partial Approval CHRIS CHRISTENSEN
Footing/Foundation/Slab 1/11/2021 Partial Approval CHRIS CHRISTENSEN
ELECTRICAL-Final 6/8/2021 Not Ready for Inspection CHRIS CHRISTENSEN
ELECTRICAL-Rough 6/8/2021 Approved CHRIS CHRISTENSEN
HVAC-Final 6/8/2021 Not Ready for Inspection CHRIS CHRISTENSEN
HVAC-Rough 6/8/2021 Approved CHRIS CHRISTENSEN
PLUMBING-Final 6/8/2021 Not Ready for Inspection CHRIS CHRISTENSEN
PLUMBING-Rough 6/8/2021 Approved CHRIS CHRISTENSEN
BUILDING-Rough-Frame 9/13/2021 Approved CHRIS CHRISTENSEN
Green Building Rough 9/13/2021 Approved CHRIS CHRISTENSEN
Verify Sprinkler Sign Off 9/13/2021 Approved CHRIS CHRISTENSEN
Insulation 10/28/2021 Approved CHRIS CHRISTENSEN
Drywall Nailing 11/16/2021 Approved CHRIS CHRISTENSEN
Interior/Exterior Lathing 11/16/2021 Partial Approval CHRIS CHRISTENSEN
Shower Pan 3/22/2022 Approved ALIZAH MAYAGOITIA
Interior/Exterior Lathing 3/29/2022 Approved ALIZAH MAYAGOITIA
Gas Test 6/16/2022 Approved ADAM ESCOTO
Service/Power Release 6/16/2022 Not Ready for Inspection ADAM ESCOTO
Gas Test 10/4/2022 Approved MICHAEL LEWIS
ELECTRICAL-Final 10/27/2022 Partial Inspection MICHAEL LEWIS
Final 10/27/2022 Partial Inspection MICHAEL LEWIS
Footing/Foundation/Slab 10/27/2022 Approved MICHAEL LEWIS
Green Building Final 10/27/2022 Approved MICHAEL LEWIS
HVAC-Final 10/27/2022 Conditional Approval MICHAEL LEWIS
PLUMBING-Final 10/27/2022 Conditional Approval MICHAEL LEWIS
Service/Power Release 10/27/2022 Partial Inspection MICHAEL LEWIS
Smoke Detectors 10/27/2022 Approved MICHAEL LEWIS
PLUMBING-Final 10/31/2022 Approved MICHAEL LEWIS
Pre-Inspection 5/15/2023 Partial Inspection LILIANA PORTILLO
ELECTRICAL-Final 5/30/2023 Approved LILIANA PORTILLO
Service/Power Release 5/30/2023 Approved LILIANA PORTILLO
HVAC-Final 4/4/2024 Corrections Issued AMIR NAZARIAN
HVAC-Final 4/17/2024 Corrections Issued AMIR NAZARIAN
HVAC-Final 4/24/2024 Approved AMIR NAZARIAN
Final 5/1/2024 Corrections Issued AMIR NAZARIAN
Final 5/8/2024 OK to Issue CofO AMIR NAZARIAN