627 N DILLON ST #1-30 90026

Certificate Information: 627 N DILLON ST #1-30 90026

Application / Permit
17010-20000-02602
Plan Check / Job No.
B17VN09680
Group
Building
Type
Bldg-New
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
(N) 3-STORY TYPE V-A 30-UNIT APT BLDG OVER TYPE 1-A 1-LEVEL GARAGE & BASEMENT (NFPA-13 FIRE SPRINKLERS THROUGHOUT)
Permit Issued
Issued on 2/23/2021
Issuing Office
Metro
Current Status
CofO Issued on 5/17/2024
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 7/3/2017 APPLICANT
Assigned to Plan Check Engineer 7/20/2017 NILOOFAR MEHRAIN
Disabled Access Plans Picked Up 7/28/2017 APPLICANT
Green Plans Picked Up 8/4/2017 APPLICANT
Corrections Issued 8/29/2017 NILOOFAR MEHRAIN
Quality Review Completed 9/1/2017 GUANG MIN TUNG
Building Plans Picked Up 9/5/2017 APPLICANT
Applicant returned to address corrections 11/14/2017 NILOOFAR MEHRAIN
Applicant returned to address corrections 5/24/2018 NILOOFAR MEHRAIN
Applicant returned to address corrections 5/30/2018 NILOOFAR MEHRAIN
Applicant returned to address corrections 11/1/2018 NILOOFAR MEHRAIN
Applicant returned to address corrections 12/13/2018 NILOOFAR MEHRAIN
Plan Check Approved 1/29/2021 NILOOFAR MEHRAIN
Issued 2/23/2021 APPLICANT
CofO Issued 5/17/2024 ERNESTO CORRAL
Permit Finaled 5/17/2024 ERNESTO CORRAL

Permit Application Clearance Information

Address approval Cleared 9/15/2017 ROCHELLE DUNGCA
Eng Process Fee Ord 176,300 Cleared 9/15/2017 ROCHELLE DUNGCA
Highway dedication Cleared 9/19/2017 JAMES MORALEZ
Opn space landscape/Water mgmt Cleared 11/3/2017 DANIEL SKOLNICK
Hydrant and Access approval Cleared 11/6/2017 JOHN DALLAS
DAS Clearance Cleared 11/8/2017 OLLIE CARTER
Building over 3-story or 36-ft Cleared 11/14/2017 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 11/14/2017 CALOSHA APPROVED
GPI Written Notices Cleared 11/14/2017 NILOOFAR MEHRAIN
Grading Pre-Inspection Cleared 11/14/2017 NILOOFAR MEHRAIN
Green Code Cleared 12/6/2017 MICHAEL AYERS
Permit Cleared 5/25/2018 MARKOS PEREZ-BRAN
Sewer availability Cleared 5/25/2018 MARKOS PEREZ-BRAN
Fire Marshall Fire Life Safety Cleared 8/8/2018 OSCAR SALGADO JR
Housing rent stabilization Cleared 8/8/2018 DANIEL WILLIAMS
Housing rent stabilization Cleared 8/10/2018 DANIEL WILLIAMS
Low Impact Development Cleared 11/29/2018 ORVAL HERNANDEZ-MARCI
Roof/Waste drainage to street Cleared 11/30/2018 APEKSHYA BAJRACHARYA

Contact Information

Architect Stockton, Kenneth; Lic. No.: C19870 26500 W AGOURA RD. PMB # 844      CALABASAS, CA 91302
Contractor Aram Construction Company; Lic. No.: 934479-B 8500 WILSHIRE BLVD # 509      BEVERLY HILLS, CA 90211
Engineer Fischer, Kurt Mark; Lic. No.: S5432 PO BOX 809      POWAY, CA 92074
Engineer Govil, Sanjay; Lic. No.: GE2382 4 TULAROSA COURT      ALISO VIEJO, CA 92656
Geologist Burrows, Edward Louis; Lic. No.: EG1750 1303 E PALLARES LN      PLACENTIA, CA 92870

Inspector Information

DAVID BURKHEAD, (213) 482-7294 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Excavation/Setback/Form/Re-Bar 7/22/2021 Partial Approval DANIEL MC AULIFFE
Footing/Foundation/Slab 7/22/2021 Partial Inspection DANIEL MC AULIFFE
METHANE-Barrier 7/22/2021 Not Ready for Inspection DANIEL MC AULIFFE
METHANE-Subgrade 7/22/2021 Not Ready for Inspection DANIEL MC AULIFFE
Piling/Pier/Caisson 7/22/2021 Partial Approval DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 7/23/2021 Not Ready for Inspection DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 9/20/2021 Partial Approval DANIEL MC AULIFFE
Footing/Foundation/Slab 9/20/2021 Partial Approval DANIEL MC AULIFFE
METHANE-Barrier 9/20/2021 Partial Approval DANIEL MC AULIFFE
METHANE-Subgrade 9/20/2021 Partial Inspection DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 9/22/2021 Partial Approval DANIEL MC AULIFFE
Footing/Foundation/Slab 9/22/2021 Partial Approval DANIEL MC AULIFFE
METHANE-Barrier 9/22/2021 Partial Approval DANIEL MC AULIFFE
METHANE-Subgrade 9/22/2021 Partial Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 10/8/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 10/13/2021 Partial Approval JAMES POWERS
Excavation/Setback/Form/Re-Bar 10/13/2021 Partial Approval JAMES POWERS
Footing/Foundation/Slab 10/13/2021 Partial Approval JAMES POWERS
METHANE-Barrier 10/13/2021 Partial Approval JAMES POWERS
METHANE-Rough 10/13/2021 Partial Approval JAMES POWERS
METHANE-Subgrade 10/13/2021 Partial Approval JAMES POWERS
Excavation/Setback/Form/Re-Bar 11/5/2021 Partial Inspection DANIEL MC AULIFFE
Footing/Foundation/Slab 11/18/2021 Not Ready for Inspection DANIEL MC AULIFFE
METHANE-Barrier 11/18/2021 Not Ready for Inspection DANIEL MC AULIFFE
METHANE-Subgrade 11/18/2021 Not Ready for Inspection DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 11/19/2021 Partial Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 11/22/2021 Conditional Approval DANIEL MC AULIFFE
Footing/Foundation/Slab 12/2/2021 Partial Approval DANIEL MC AULIFFE
METHANE-Barrier 12/2/2021 Partial Inspection DANIEL MC AULIFFE
METHANE-Rough 12/2/2021 Partial Inspection DANIEL MC AULIFFE
METHANE-Subgrade 12/2/2021 Partial Inspection DANIEL MC AULIFFE
Deputy Drilled-In Anchors 12/7/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 12/8/2021 Conditional Approval DANIEL MC AULIFFE
Green Building Rough 12/9/2021 Not Ready for Inspection DANIEL MC AULIFFE
METHANE-Barrier 12/9/2021 Not Ready for Inspection DANIEL MC AULIFFE
METHANE-Rough 12/9/2021 Not Ready for Inspection DANIEL MC AULIFFE
METHANE-Subgrade 12/9/2021 Not Ready for Inspection DANIEL MC AULIFFE
Reinforced Concrete Frame 12/9/2021 Not Ready for Inspection DANIEL MC AULIFFE
Verify Sprinkler Sign Off 12/9/2021 Not Ready for Inspection DANIEL MC AULIFFE
Footing/Foundation/Slab 12/10/2021 Partial Approval DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 12/15/2021 Not Ready for Inspection DANIEL MC AULIFFE
Green Building Rough 12/15/2021 Not Ready for Inspection DANIEL MC AULIFFE
METHANE-Rough 12/15/2021 Not Ready for Inspection DANIEL MC AULIFFE
Reinforced Concrete Frame 12/15/2021 Not Ready for Inspection DANIEL MC AULIFFE
Verify Sprinkler Sign Off 12/15/2021 Not Ready for Inspection DANIEL MC AULIFFE
Footing/Foundation/Slab 12/16/2021 Partial Approval DANIEL MC AULIFFE
METHANE-Barrier 12/16/2021 Partial Inspection DANIEL MC AULIFFE
METHANE-Subgrade 12/16/2021 Partial Inspection DANIEL MC AULIFFE
Deputy Shotcrete 12/17/2021 Approved DANIEL MC AULIFFE
Deputy Shotcrete 12/21/2021 Approved DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 1/5/2022 Partial Approval DANIEL MC AULIFFE
Green Building Rough 1/5/2022 Partial Approval DANIEL MC AULIFFE
METHANE-Rough 1/5/2022 Not Ready for Inspection DANIEL MC AULIFFE
Reinforced Masonry Frame 1/5/2022 Partial Approval DANIEL MC AULIFFE
Verify Sprinkler Sign Off 1/5/2022 Not Ready for Inspection DANIEL MC AULIFFE
METHANE-Barrier 3/4/2022 Partial Approval DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 3/10/2022 Partial Approval DANIEL MC AULIFFE
Footing/Foundation/Slab 3/10/2022 Partial Approval DANIEL MC AULIFFE
METHANE-Barrier 3/10/2022 Approved DANIEL MC AULIFFE
METHANE-Subgrade 3/10/2022 Approved DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 3/11/2022 Partial Approval DANIEL MC AULIFFE
Pre-Inspection 3/11/2022 Partial Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 4/8/2022 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 4/18/2022 Conditional Approval DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 4/21/2022 Partial Approval DANIEL MC AULIFFE
Footing/Foundation/Slab 4/21/2022 Partial Approval DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 5/3/2022 Partial Approval TED RIES
Green Building Rough 5/3/2022 Not Ready for Inspection TED RIES
Reinforced Concrete Frame 5/3/2022 Partial Approval TED RIES
Verify Sprinkler Sign Off 5/3/2022 Not Ready for Inspection TED RIES
Deputy Shotcrete 5/5/2022 Conditional Approval TED RIES
Deputy Reinf. Concrete 5/6/2022 Conditional Approval TED RIES
Footing/Foundation/Slab 5/24/2022 Partial Approval TED RIES
Masonry Wall/Backfill 5/24/2022 Partial Approval TED RIES
Green Building Rough 5/25/2022 Not Ready for Inspection TED RIES
METHANE-Rough 5/25/2022 Approved TED RIES
Masonry Wall/Backfill 5/25/2022 Partial Approval TED RIES
Reinforced Masonry Frame 5/25/2022 Partial Approval TED RIES
Verify Sprinkler Sign Off 5/25/2022 Not Ready for Inspection TED RIES
Deputy Reinf. Concrete 5/26/2022 No Result Entered DANIEL MC AULIFFE
Deputy Drilled-In Anchors 6/1/2022 Conditional Approval ERNESTO CORRAL
Footing/Foundation/Slab 6/2/2022 Partial Approval TED RIES
Deputy Reinf. Concrete 6/3/2022 Conditional Approval ERNESTO CORRAL
Excavation/Setback/Form/Re-Bar 6/16/2022 Partial Approval TED RIES
Masonry Wall/Backfill 6/16/2022 Partial Approval TED RIES
Wall Anchors 6/16/2022 Partial Approval TED RIES
Deputy Wood Construction 7/7/2022 Conditional Approval ERNESTO CORRAL
Green Building Rough 7/7/2022 Not Ready for Inspection DAVID BURKHEAD
Verify Sprinkler Sign Off 7/7/2022 Not Ready for Inspection DAVID BURKHEAD
Wood Frame 7/7/2022 Partial Inspection DAVID BURKHEAD
Deputy Wood Construction 7/20/2022 Conditional Approval TED RIES
Green Building Rough 7/20/2022 Not Ready for Inspection TED RIES
Verify Sprinkler Sign Off 7/20/2022 Not Ready for Inspection TED RIES
Wood Frame 7/20/2022 Partial Approval TED RIES
Deputy Wood Construction 8/10/2022 Conditional Approval ERNESTO CORRAL
Floor/Roof Diaphrgm/Shear Wall 8/19/2022 Partial Approval TED RIES
Green Building Rough 8/19/2022 Not Ready for Inspection TED RIES
Verify Sprinkler Sign Off 8/19/2022 Approved TED RIES
Wood Frame 8/19/2022 Partial Approval TED RIES
Deputy Wood Construction 9/8/2022 Conditional Approval DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 9/9/2022 Partial Approval GREGORY POMISH
Green Building Rough 9/9/2022 Not Ready for Inspection GREGORY POMISH
Insulation 9/9/2022 Partial Approval GREGORY POMISH
Wood Frame 9/9/2022 Not Ready for Inspection GREGORY POMISH
Deputy Wood Construction 9/16/2022 Conditional Approval MICHAEL ROSENBERG
Floor/Roof Diaphrgm/Shear Wall 9/19/2022 Not Ready for Inspection TED RIES
Green Building Rough 9/19/2022 Conditional Approval TED RIES
Wood Frame 9/19/2022 Partial Approval TED RIES
Deputy Wood Construction 9/20/2022 Conditional Approval MICHAEL ROSENBERG
Floor/Roof Diaphrgm/Shear Wall 9/22/2022 Partial Approval TED RIES
Green Building Rough 9/22/2022 Approved TED RIES
Wood Frame 9/22/2022 Partial Approval TED RIES
Drywall Nailing 10/4/2022 Partial Approval TED RIES
Insulation 10/4/2022 Partial Approval TED RIES
Drywall Nailing 11/21/2022 Partial Approval TED RIES
Light Gage Steel Frame 11/21/2022 Partial Approval TED RIES
Drywall Nailing 12/9/2022 Partial Approval TED RIES
Insulation 12/9/2022 Partial Approval TED RIES
Drywall Nailing 12/16/2022 Partial Approval TED RIES
Interior/Exterior Lathing 12/16/2022 Partial Approval TED RIES
Drywall Nailing 12/21/2022 Partial Approval RAFAEL ESPINOZA
Interior/Exterior Lathing 12/22/2022 Not Ready for Inspection DAVID BURKHEAD
Wood Frame 12/22/2022 Partial Approval DAVID BURKHEAD
Deputy Steel/Welding 1/13/2023 Conditional Approval TED RIES
Interior/Exterior Lathing 1/13/2023 Partial Approval TED RIES
Wood Frame 1/20/2023 Not Ready for Inspection DAVID BURKHEAD
Wood Frame 1/25/2023 Partial Approval TED RIES
Insulation 1/30/2023 Partial Approval TED RIES
Insulation 2/1/2023 Partial Approval TED RIES
Interior/Exterior Lathing 2/1/2023 Approved TED RIES
Wood Frame 2/1/2023 Approved TED RIES
Drywall Nailing 2/9/2023 Partial Approval DAVID BURKHEAD
Insulation 2/9/2023 Partial Approval DAVID BURKHEAD
Drywall Nailing 2/22/2023 Partial Approval DAVID BURKHEAD
Interior/Exterior Lathing 2/22/2023 Partial Approval DAVID BURKHEAD
Drywall Nailing 3/2/2023 Partial Approval EDWIN GREGORYONA
Drywall Nailing 3/21/2023 Partial Approval MARTIN TAVITIAN
Interior/Exterior Lathing 3/21/2023 Partial Approval MARTIN TAVITIAN
Light Gage Steel Frame 5/19/2023 Partial Approval DAVID BURKHEAD
Drywall Nailing 5/25/2023 Partial Approval EDWIN GREGORYONA
Pre-Inspection 9/7/2023 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 9/19/2023 Conditional Approval DAVID BURKHEAD
Reinforced Concrete Frame 9/20/2023 Partial Approval DAVID BURKHEAD
Drywall Nailing 2/26/2024 Approved DAVID BURKHEAD
Final 2/26/2024 Corrections Issued DAVID BURKHEAD
Footing/Foundation/Slab 2/26/2024 Approved DAVID BURKHEAD
Green Building Final 2/26/2024 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 2/26/2024 Approved DAVID BURKHEAD
Reinforced Masonry Frame 2/26/2024 Approved DAVID BURKHEAD
SGSOV-Seismic Gas S/O Valve 2/26/2024 SGSOV Approved DAVID BURKHEAD
SUSMP-Std. Urban Storm Water 2/26/2024 Not Ready for Inspection DAVID BURKHEAD
Smoke Detectors 2/26/2024 Not Ready for Inspection DAVID BURKHEAD
Structural Steel Frame 2/26/2024 Not Ready for Inspection DAVID BURKHEAD
Final 3/1/2024 Not Ready for Inspection DAVID BURKHEAD
Green Building Final 3/1/2024 Not Ready for Inspection DAVID BURKHEAD
SUSMP-Std. Urban Storm Water 3/1/2024 Approved DAVID BURKHEAD
Smoke Detectors 3/1/2024 Partial Inspection DAVID BURKHEAD
Structural Steel Frame 3/1/2024 Not Ready for Inspection DAVID BURKHEAD
Final 3/12/2024 Partial Inspection DAVID BURKHEAD
Green Building Final 3/12/2024 Not Ready for Inspection DAVID BURKHEAD
Smoke Detectors 3/12/2024 Approved DAVID BURKHEAD
Structural Steel Frame 3/12/2024 Not Ready for Inspection DAVID BURKHEAD
Final 3/15/2024 Partial Inspection DAVID BURKHEAD
Green Building Final 3/15/2024 Not Ready for Inspection DAVID BURKHEAD
Structural Steel Frame 3/15/2024 Not Ready for Inspection DAVID BURKHEAD
Final 3/26/2024 Partial Inspection DAVID BURKHEAD
Green Building Final 3/26/2024 Approved DAVID BURKHEAD
Structural Steel Frame 3/26/2024 Approved DAVID BURKHEAD
Final 4/9/2024 Conditional Approval DAVID BURKHEAD
Final 4/19/2024 Partial Inspection DAVID BURKHEAD