Excavation/Setback/Form/Re-Bar
|
7/22/2021
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Footing/Foundation/Slab
|
7/22/2021
|
Partial Inspection
|
DANIEL MC AULIFFE
|
|
METHANE-Barrier
|
7/22/2021
|
Not Ready for Inspection
|
DANIEL MC AULIFFE
|
|
METHANE-Subgrade
|
7/22/2021
|
Not Ready for Inspection
|
DANIEL MC AULIFFE
|
|
Piling/Pier/Caisson
|
7/22/2021
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Excavation/Setback/Form/Re-Bar
|
7/23/2021
|
Not Ready for Inspection
|
DANIEL MC AULIFFE
|
|
Excavation/Setback/Form/Re-Bar
|
9/20/2021
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Footing/Foundation/Slab
|
9/20/2021
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
METHANE-Barrier
|
9/20/2021
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
METHANE-Subgrade
|
9/20/2021
|
Partial Inspection
|
DANIEL MC AULIFFE
|
|
Excavation/Setback/Form/Re-Bar
|
9/22/2021
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Footing/Foundation/Slab
|
9/22/2021
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
METHANE-Barrier
|
9/22/2021
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
METHANE-Subgrade
|
9/22/2021
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Concrete
|
10/8/2021
|
Conditional Approval
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Concrete
|
10/13/2021
|
Partial Approval
|
JAMES POWERS
|
|
Excavation/Setback/Form/Re-Bar
|
10/13/2021
|
Partial Approval
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
10/13/2021
|
Partial Approval
|
JAMES POWERS
|
|
METHANE-Barrier
|
10/13/2021
|
Partial Approval
|
JAMES POWERS
|
|
METHANE-Rough
|
10/13/2021
|
Partial Approval
|
JAMES POWERS
|
|
METHANE-Subgrade
|
10/13/2021
|
Partial Approval
|
JAMES POWERS
|
|
Excavation/Setback/Form/Re-Bar
|
11/5/2021
|
Partial Inspection
|
DANIEL MC AULIFFE
|
|
Footing/Foundation/Slab
|
11/18/2021
|
Not Ready for Inspection
|
DANIEL MC AULIFFE
|
|
METHANE-Barrier
|
11/18/2021
|
Not Ready for Inspection
|
DANIEL MC AULIFFE
|
|
METHANE-Subgrade
|
11/18/2021
|
Not Ready for Inspection
|
DANIEL MC AULIFFE
|
|
Excavation/Setback/Form/Re-Bar
|
11/19/2021
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Concrete
|
11/22/2021
|
Conditional Approval
|
DANIEL MC AULIFFE
|
|
Footing/Foundation/Slab
|
12/2/2021
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
METHANE-Barrier
|
12/2/2021
|
Partial Inspection
|
DANIEL MC AULIFFE
|
|
METHANE-Rough
|
12/2/2021
|
Partial Inspection
|
DANIEL MC AULIFFE
|
|
METHANE-Subgrade
|
12/2/2021
|
Partial Inspection
|
DANIEL MC AULIFFE
|
|
Deputy Drilled-In Anchors
|
12/7/2021
|
Conditional Approval
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Concrete
|
12/8/2021
|
Conditional Approval
|
DANIEL MC AULIFFE
|
|
Green Building Rough
|
12/9/2021
|
Not Ready for Inspection
|
DANIEL MC AULIFFE
|
|
METHANE-Barrier
|
12/9/2021
|
Not Ready for Inspection
|
DANIEL MC AULIFFE
|
|
METHANE-Rough
|
12/9/2021
|
Not Ready for Inspection
|
DANIEL MC AULIFFE
|
|
METHANE-Subgrade
|
12/9/2021
|
Not Ready for Inspection
|
DANIEL MC AULIFFE
|
|
Reinforced Concrete Frame
|
12/9/2021
|
Not Ready for Inspection
|
DANIEL MC AULIFFE
|
|
Verify Sprinkler Sign Off
|
12/9/2021
|
Not Ready for Inspection
|
DANIEL MC AULIFFE
|
|
Footing/Foundation/Slab
|
12/10/2021
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Excavation/Setback/Form/Re-Bar
|
12/15/2021
|
Not Ready for Inspection
|
DANIEL MC AULIFFE
|
|
Green Building Rough
|
12/15/2021
|
Not Ready for Inspection
|
DANIEL MC AULIFFE
|
|
METHANE-Rough
|
12/15/2021
|
Not Ready for Inspection
|
DANIEL MC AULIFFE
|
|
Reinforced Concrete Frame
|
12/15/2021
|
Not Ready for Inspection
|
DANIEL MC AULIFFE
|
|
Verify Sprinkler Sign Off
|
12/15/2021
|
Not Ready for Inspection
|
DANIEL MC AULIFFE
|
|
Footing/Foundation/Slab
|
12/16/2021
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
METHANE-Barrier
|
12/16/2021
|
Partial Inspection
|
DANIEL MC AULIFFE
|
|
METHANE-Subgrade
|
12/16/2021
|
Partial Inspection
|
DANIEL MC AULIFFE
|
|
Deputy Shotcrete
|
12/17/2021
|
Approved
|
DANIEL MC AULIFFE
|
|
Deputy Shotcrete
|
12/21/2021
|
Approved
|
DANIEL MC AULIFFE
|
|
Excavation/Setback/Form/Re-Bar
|
1/5/2022
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Green Building Rough
|
1/5/2022
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
METHANE-Rough
|
1/5/2022
|
Not Ready for Inspection
|
DANIEL MC AULIFFE
|
|
Reinforced Masonry Frame
|
1/5/2022
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Verify Sprinkler Sign Off
|
1/5/2022
|
Not Ready for Inspection
|
DANIEL MC AULIFFE
|
|
METHANE-Barrier
|
3/4/2022
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Excavation/Setback/Form/Re-Bar
|
3/10/2022
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Footing/Foundation/Slab
|
3/10/2022
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
METHANE-Barrier
|
3/10/2022
|
Approved
|
DANIEL MC AULIFFE
|
|
METHANE-Subgrade
|
3/10/2022
|
Approved
|
DANIEL MC AULIFFE
|
|
Excavation/Setback/Form/Re-Bar
|
3/11/2022
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Pre-Inspection
|
3/11/2022
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Concrete
|
4/8/2022
|
Conditional Approval
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Concrete
|
4/18/2022
|
Conditional Approval
|
DANIEL MC AULIFFE
|
|
Excavation/Setback/Form/Re-Bar
|
4/21/2022
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Footing/Foundation/Slab
|
4/21/2022
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Excavation/Setback/Form/Re-Bar
|
5/3/2022
|
Partial Approval
|
TED RIES
|
|
Green Building Rough
|
5/3/2022
|
Not Ready for Inspection
|
TED RIES
|
|
Reinforced Concrete Frame
|
5/3/2022
|
Partial Approval
|
TED RIES
|
|
Verify Sprinkler Sign Off
|
5/3/2022
|
Not Ready for Inspection
|
TED RIES
|
|
Deputy Shotcrete
|
5/5/2022
|
Conditional Approval
|
TED RIES
|
|
Deputy Reinf. Concrete
|
5/6/2022
|
Conditional Approval
|
TED RIES
|
|
Footing/Foundation/Slab
|
5/24/2022
|
Partial Approval
|
TED RIES
|
|
Masonry Wall/Backfill
|
5/24/2022
|
Partial Approval
|
TED RIES
|
|
Green Building Rough
|
5/25/2022
|
Not Ready for Inspection
|
TED RIES
|
|
METHANE-Rough
|
5/25/2022
|
Approved
|
TED RIES
|
|
Masonry Wall/Backfill
|
5/25/2022
|
Partial Approval
|
TED RIES
|
|
Reinforced Masonry Frame
|
5/25/2022
|
Partial Approval
|
TED RIES
|
|
Verify Sprinkler Sign Off
|
5/25/2022
|
Not Ready for Inspection
|
TED RIES
|
|
Deputy Reinf. Concrete
|
5/26/2022
|
No Result Entered
|
DANIEL MC AULIFFE
|
|
Deputy Drilled-In Anchors
|
6/1/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Footing/Foundation/Slab
|
6/2/2022
|
Partial Approval
|
TED RIES
|
|
Deputy Reinf. Concrete
|
6/3/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Excavation/Setback/Form/Re-Bar
|
6/16/2022
|
Partial Approval
|
TED RIES
|
|
Masonry Wall/Backfill
|
6/16/2022
|
Partial Approval
|
TED RIES
|
|
Wall Anchors
|
6/16/2022
|
Partial Approval
|
TED RIES
|
|
Deputy Wood Construction
|
7/7/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Green Building Rough
|
7/7/2022
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Verify Sprinkler Sign Off
|
7/7/2022
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Wood Frame
|
7/7/2022
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Deputy Wood Construction
|
7/20/2022
|
Conditional Approval
|
TED RIES
|
|
Green Building Rough
|
7/20/2022
|
Not Ready for Inspection
|
TED RIES
|
|
Verify Sprinkler Sign Off
|
7/20/2022
|
Not Ready for Inspection
|
TED RIES
|
|
Wood Frame
|
7/20/2022
|
Partial Approval
|
TED RIES
|
|
Deputy Wood Construction
|
8/10/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Floor/Roof Diaphrgm/Shear Wall
|
8/19/2022
|
Partial Approval
|
TED RIES
|
|
Green Building Rough
|
8/19/2022
|
Not Ready for Inspection
|
TED RIES
|
|
Verify Sprinkler Sign Off
|
8/19/2022
|
Approved
|
TED RIES
|
|
Wood Frame
|
8/19/2022
|
Partial Approval
|
TED RIES
|
|
Deputy Wood Construction
|
9/8/2022
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Floor/Roof Diaphrgm/Shear Wall
|
9/9/2022
|
Partial Approval
|
GREGORY POMISH
|
|
Green Building Rough
|
9/9/2022
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Insulation
|
9/9/2022
|
Partial Approval
|
GREGORY POMISH
|
|
Wood Frame
|
9/9/2022
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Deputy Wood Construction
|
9/16/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Floor/Roof Diaphrgm/Shear Wall
|
9/19/2022
|
Not Ready for Inspection
|
TED RIES
|
|
Green Building Rough
|
9/19/2022
|
Conditional Approval
|
TED RIES
|
|
Wood Frame
|
9/19/2022
|
Partial Approval
|
TED RIES
|
|
Deputy Wood Construction
|
9/20/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Floor/Roof Diaphrgm/Shear Wall
|
9/22/2022
|
Partial Approval
|
TED RIES
|
|
Green Building Rough
|
9/22/2022
|
Approved
|
TED RIES
|
|
Wood Frame
|
9/22/2022
|
Partial Approval
|
TED RIES
|
|
Drywall Nailing
|
10/4/2022
|
Partial Approval
|
TED RIES
|
|
Insulation
|
10/4/2022
|
Partial Approval
|
TED RIES
|
|
Drywall Nailing
|
11/21/2022
|
Partial Approval
|
TED RIES
|
|
Light Gage Steel Frame
|
11/21/2022
|
Partial Approval
|
TED RIES
|
|
Drywall Nailing
|
12/9/2022
|
Partial Approval
|
TED RIES
|
|
Insulation
|
12/9/2022
|
Partial Approval
|
TED RIES
|
|
Drywall Nailing
|
12/16/2022
|
Partial Approval
|
TED RIES
|
|
Interior/Exterior Lathing
|
12/16/2022
|
Partial Approval
|
TED RIES
|
|
Drywall Nailing
|
12/21/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Interior/Exterior Lathing
|
12/22/2022
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Wood Frame
|
12/22/2022
|
Partial Approval
|
DAVID BURKHEAD
|
|
Deputy Steel/Welding
|
1/13/2023
|
Conditional Approval
|
TED RIES
|
|
Interior/Exterior Lathing
|
1/13/2023
|
Partial Approval
|
TED RIES
|
|
Wood Frame
|
1/20/2023
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Wood Frame
|
1/25/2023
|
Partial Approval
|
TED RIES
|
|
Insulation
|
1/30/2023
|
Partial Approval
|
TED RIES
|
|
Insulation
|
2/1/2023
|
Partial Approval
|
TED RIES
|
|
Interior/Exterior Lathing
|
2/1/2023
|
Approved
|
TED RIES
|
|
Wood Frame
|
2/1/2023
|
Approved
|
TED RIES
|
|
Drywall Nailing
|
2/9/2023
|
Partial Approval
|
DAVID BURKHEAD
|
|
Insulation
|
2/9/2023
|
Partial Approval
|
DAVID BURKHEAD
|
|
Drywall Nailing
|
2/22/2023
|
Partial Approval
|
DAVID BURKHEAD
|
|
Interior/Exterior Lathing
|
2/22/2023
|
Partial Approval
|
DAVID BURKHEAD
|
|
Drywall Nailing
|
3/2/2023
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Drywall Nailing
|
3/21/2023
|
Partial Approval
|
MARTIN TAVITIAN
|
|
Interior/Exterior Lathing
|
3/21/2023
|
Partial Approval
|
MARTIN TAVITIAN
|
|
Light Gage Steel Frame
|
5/19/2023
|
Partial Approval
|
DAVID BURKHEAD
|
|
Drywall Nailing
|
5/25/2023
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Pre-Inspection
|
9/7/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
9/19/2023
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Reinforced Concrete Frame
|
9/20/2023
|
Partial Approval
|
DAVID BURKHEAD
|
|
Drywall Nailing
|
2/26/2024
|
Approved
|
DAVID BURKHEAD
|
|
Final
|
2/26/2024
|
Corrections Issued
|
DAVID BURKHEAD
|
|
Footing/Foundation/Slab
|
2/26/2024
|
Approved
|
DAVID BURKHEAD
|
|
Green Building Final
|
2/26/2024
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Reinforced Concrete Frame
|
2/26/2024
|
Approved
|
DAVID BURKHEAD
|
|
Reinforced Masonry Frame
|
2/26/2024
|
Approved
|
DAVID BURKHEAD
|
|
SGSOV-Seismic Gas S/O Valve
|
2/26/2024
|
SGSOV Approved
|
DAVID BURKHEAD
|
|
SUSMP-Std. Urban Storm Water
|
2/26/2024
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Smoke Detectors
|
2/26/2024
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Structural Steel Frame
|
2/26/2024
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Final
|
3/1/2024
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Green Building Final
|
3/1/2024
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
SUSMP-Std. Urban Storm Water
|
3/1/2024
|
Approved
|
DAVID BURKHEAD
|
|
Smoke Detectors
|
3/1/2024
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Structural Steel Frame
|
3/1/2024
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Final
|
3/12/2024
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Green Building Final
|
3/12/2024
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Smoke Detectors
|
3/12/2024
|
Approved
|
DAVID BURKHEAD
|
|
Structural Steel Frame
|
3/12/2024
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Final
|
3/15/2024
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Green Building Final
|
3/15/2024
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Structural Steel Frame
|
3/15/2024
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Final
|
3/26/2024
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Green Building Final
|
3/26/2024
|
Approved
|
DAVID BURKHEAD
|
|
Structural Steel Frame
|
3/26/2024
|
Approved
|
DAVID BURKHEAD
|
|
Final
|
4/9/2024
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Final
|
4/19/2024
|
Partial Inspection
|
DAVID BURKHEAD
|