Deputy Steel/Welding
|
2/11/2022
|
Approved
|
SORIN CIRSTOIU
|
|
Pre-Inspection
|
3/30/2022
|
Partial Inspection
|
SORIN CIRSTOIU
|
|
Excavation/Setback/Form/Re-Bar
|
3/31/2022
|
Partial Approval
|
SORIN CIRSTOIU
|
|
Footing/Foundation/Slab
|
3/31/2022
|
Partial Approval
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Concrete
|
4/1/2022
|
Approved
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Concrete
|
4/5/2022
|
Approved
|
SORIN CIRSTOIU
|
|
Footing/Foundation/Slab
|
4/5/2022
|
Partial Inspection
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Concrete
|
4/6/2022
|
Approved
|
SORIN CIRSTOIU
|
|
Excavation/Setback/Form/Re-Bar
|
4/6/2022
|
Partial Approval
|
SORIN CIRSTOIU
|
|
Excavation/Setback/Form/Re-Bar
|
4/7/2022
|
Partial Inspection
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Concrete
|
4/8/2022
|
Approved
|
SORIN CIRSTOIU
|
|
Excavation/Setback/Form/Re-Bar
|
4/8/2022
|
Partial Approval
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Concrete
|
4/11/2022
|
Conditional Approval
|
JONATHAN QUACH
|
|
Deputy Reinf. Masonry
|
4/12/2022
|
Conditional Approval
|
JONATHAN QUACH
|
|
Deputy Reinf. Masonry
|
4/13/2022
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Masonry
|
4/14/2022
|
Partial Approval
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Masonry
|
4/15/2022
|
Approved
|
SORIN CIRSTOIU
|
|
Excavation/Setback/Form/Re-Bar
|
4/15/2022
|
Partial Approval
|
SORIN CIRSTOIU
|
|
Green Building Rough
|
4/18/2022
|
Partial Inspection
|
SORIN CIRSTOIU
|
|
MERV13>=Rough
|
4/18/2022
|
Partial Inspection
|
SORIN CIRSTOIU
|
|
Reinforced Concrete Frame
|
4/18/2022
|
Partial Approval
|
SORIN CIRSTOIU
|
|
Verify Sprinkler Sign Off
|
4/18/2022
|
Partial Inspection
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Masonry
|
4/19/2022
|
Approved
|
SORIN CIRSTOIU
|
|
Deputy Shotcrete
|
4/19/2022
|
Approved
|
SORIN CIRSTOIU
|
|
Excavation/Setback/Form/Re-Bar
|
4/19/2022
|
Partial Approval
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Masonry
|
4/20/2022
|
Approved
|
SORIN CIRSTOIU
|
|
Deputy Shotcrete
|
4/20/2022
|
Approved
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Masonry
|
4/21/2022
|
Approved
|
SORIN CIRSTOIU
|
|
Deputy Shotcrete
|
4/21/2022
|
Approved
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Masonry
|
4/22/2022
|
Approved
|
SORIN CIRSTOIU
|
|
Deputy Shotcrete
|
4/22/2022
|
Approved
|
SORIN CIRSTOIU
|
|
Masonry Wall/Backfill
|
4/22/2022
|
Partial Approval
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Masonry
|
4/25/2022
|
Conditional Approval
|
JONATHAN QUACH
|
|
Deputy Shotcrete
|
4/25/2022
|
Conditional Approval
|
JONATHAN QUACH
|
|
Deputy Reinf. Concrete
|
6/7/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Drilled-In Anchors
|
6/8/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Excavation/Setback/Form/Re-Bar
|
6/16/2022
|
Partial Approval
|
TED RIES
|
|
Deputy Reinf. Concrete
|
6/21/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Drilled-In Anchors
|
7/19/2022
|
Conditional Approval
|
WINSTON DUNNING
|
|
Deputy Reinf. Concrete
|
7/19/2022
|
Conditional Approval
|
WINSTON DUNNING
|
|
Deputy Reinf. Masonry
|
7/19/2022
|
Conditional Approval
|
WINSTON DUNNING
|
|
Masonry Wall/Backfill
|
7/20/2022
|
Partial Approval
|
TED RIES
|
|
Footing/Foundation/Slab
|
8/1/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
8/2/2022
|
Conditional Approval
|
WINSTON DUNNING
|
|
Deputy Shotcrete
|
8/12/2022
|
Conditional Approval
|
TED RIES
|
|
Green Building Rough
|
8/15/2022
|
Not Ready for Inspection
|
TED RIES
|
|
MERV13>=Rough
|
8/15/2022
|
Not Ready for Inspection
|
TED RIES
|
|
Pre-Inspection
|
8/15/2022
|
Approved
|
TED RIES
|
|
Reinforced Concrete Frame
|
8/15/2022
|
Partial Approval
|
TED RIES
|
|
Verify Sprinkler Sign Off
|
8/15/2022
|
Not Ready for Inspection
|
TED RIES
|
|
Deputy Reinf. Masonry
|
8/17/2022
|
Conditional Approval
|
TED RIES
|
|
Masonry Wall/Backfill
|
8/18/2022
|
Partial Approval
|
GREGORY POMISH
|
|
Deputy Other (see comments)
|
8/25/2022
|
Conditional Approval
|
WINSTON DUNNING
|
|
Footing/Foundation/Slab
|
9/26/2022
|
Not Ready for Inspection
|
TED RIES
|
|
Pre-Inspection
|
10/7/2022
|
Approved
|
DAVID BURKHEAD
|
|
Wood Frame
|
10/28/2022
|
Corrections Issued
|
RUSSELL BONVOULOIR
|
|
Deputy Drilled-In Anchors
|
11/2/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Floor/Roof Diaphrgm/Shear Wall
|
11/2/2022
|
Partial Inspection
|
TED RIES
|
|
Deputy Wood Construction
|
11/7/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Wood Frame
|
11/23/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Deputy Wood Construction
|
11/29/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
11/29/2022
|
Corrections Issued
|
RAFAEL ESPINOZA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
12/6/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Wood Construction
|
12/23/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Floor/Roof Diaphrgm/Shear Wall
|
12/28/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Wood Construction
|
1/20/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Floor/Roof Diaphrgm/Shear Wall
|
1/20/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Wood Construction
|
2/2/2023
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
2/2/2023
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
2/3/2023
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Deputy Wood Construction
|
2/8/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Floor/Roof Diaphrgm/Shear Wall
|
2/8/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
2/10/2023
|
Corrections Issued
|
RAFAEL ESPINOZA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/2/2023
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Special/Order Compliance
|
3/2/2023
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Wood Frame
|
3/2/2023
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Deputy Wood Construction
|
3/7/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/8/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Special/Order Compliance
|
3/8/2023
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/9/2023
|
Partial Approval
|
GREGORY POMISH
|
|
Wood Frame
|
3/9/2023
|
Partial Approval
|
GREGORY POMISH
|
|
Deputy Wood Construction
|
3/10/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Wood Construction
|
3/17/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/22/2023
|
Partial Inspection
|
GREGORY POMISH
|
|
Wood Frame
|
3/22/2023
|
Partial Approval
|
GREGORY POMISH
|
|
Deputy Wood Construction
|
3/23/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Drywall Nailing
|
4/5/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Wood Construction
|
4/10/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Wood Construction
|
4/14/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Green Building Rough
|
4/24/2023
|
Approved
|
RAFAEL ESPINOZA
|
|
MERV13>=Rough
|
4/24/2023
|
Approved
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
4/24/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Verify Sprinkler Sign Off
|
4/24/2023
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
4/25/2023
|
Conditional Approval
|
LARRY ARNICK
|
|
Insulation
|
4/28/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Wood Frame
|
4/28/2023
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Deputy Wood Construction
|
5/1/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Wood Construction
|
5/2/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Wood Construction
|
5/12/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/12/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Wood Frame
|
5/12/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Wood Construction
|
5/17/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Insulation
|
5/19/2023
|
Partial Approval
|
LARRY ARNICK
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/23/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/25/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Drywall Nailing
|
5/26/2023
|
Partial Approval
|
LARRY ARNICK
|
|
Insulation
|
5/26/2023
|
Partial Approval
|
LARRY ARNICK
|
|
Special/Order Compliance
|
5/26/2023
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Deputy Wood Construction
|
5/30/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/31/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Wood Frame
|
5/31/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Insulation
|
6/6/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Insulation
|
6/8/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Drywall Nailing
|
6/12/2023
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Verify Rec and Parks Fee Memo
|
6/12/2023
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Wood Frame
|
6/12/2023
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Drywall Nailing
|
6/14/2023
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Wood Frame
|
6/14/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Drywall Nailing
|
6/16/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Drywall Nailing
|
6/26/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Wood Frame
|
6/26/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Wood Frame
|
6/30/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Wood Frame
|
7/5/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Insulation
|
7/11/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Insulation
|
7/12/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Wood Frame
|
7/12/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Drywall Nailing
|
7/18/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Insulation
|
7/19/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Interior/Exterior Lathing
|
7/20/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Drywall Nailing
|
7/21/2023
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
8/4/2023
|
Partial Approval
|
LARRY ARNICK
|
|
Wood Frame
|
8/30/2023
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Insulation
|
9/6/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
9/14/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Drywall Nailing
|
9/22/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Drywall Nailing
|
9/28/2023
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Light Gage Steel Frame
|
11/16/2023
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Light Gage Steel Frame
|
11/20/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Light Gage Steel Frame
|
12/4/2023
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Light Gage Steel Frame
|
12/6/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Light Gage Steel Frame
|
12/7/2023
|
Partial Approval
|
LARRY ARNICK
|
|
Drywall Nailing
|
12/11/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Wood Construction
|
12/12/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Drywall Nailing
|
12/22/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Drywall Nailing
|
1/5/2024
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Interior/Exterior Lathing
|
1/16/2024
|
Partial Approval
|
GREGORY POMISH
|
|
Light Gage Steel Frame
|
1/22/2024
|
Partial Approval
|
GREGORY POMISH
|
|
Drywall Nailing
|
2/6/2024
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Pre-Inspection
|
2/20/2024
|
Partial Approval
|
GREGORY POMISH
|
|
Drywall Nailing
|
2/28/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Pre-Inspection
|
3/4/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Drywall Nailing
|
3/6/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Drywall Nailing
|
3/12/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Drywall Nailing
|
3/15/2024
|
Partial Approval
|
RONALD JIMENEZ
|
|
Interior/Exterior Lathing
|
3/18/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Reinforced Masonry Frame
|
5/13/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Verify Sprinkler Sign Off
|
5/13/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Deputy Drilled-In Anchors
|
5/17/2024
|
Conditional Approval
|
JEFFREY FULTON
|
|
Reinforced Concrete Frame
|
5/17/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Verify Sprinkler Sign Off
|
5/17/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Excavation/Setback/Form/Re-Bar
|
5/21/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Reinforced Concrete Frame
|
5/22/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Verify Sprinkler Sign Off
|
5/22/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Excavation/Setback/Form/Re-Bar
|
5/30/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Pre-Inspection
|
10/10/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Light Gage Steel Frame
|
2/21/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Drywall Nailing
|
3/6/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Final
|
3/19/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Footing/Foundation/Slab
|
3/19/2025
|
Approved
|
JEFFREY FULTON
|
|
Green Building Final
|
3/19/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
MERV13>=Final
|
3/19/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Reinforced Concrete Frame
|
3/19/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Reinforced Masonry Frame
|
3/19/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
SGSOV-Seismic Gas S/O Valve
|
3/19/2025
|
SGSOV Approved
|
JEFFREY FULTON
|
|
Smoke Detectors
|
3/19/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Verify Sprinkler Sign Off
|
3/19/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Final
|
3/21/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Green Building Final
|
3/21/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
MERV13>=Final
|
3/21/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Reinforced Concrete Frame
|
3/21/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Reinforced Masonry Frame
|
3/21/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Smoke Detectors
|
3/21/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Verify Sprinkler Sign Off
|
3/21/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Final
|
3/25/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Pre-Inspection
|
3/25/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Pre-Inspection
|
4/2/2025
|
Partial Approval
|
LARRY ARNICK
|
|
Special/Order Compliance
|
4/2/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Final
|
5/30/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Green Building Final
|
5/30/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
MERV13>=Final
|
5/30/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Reinforced Concrete Frame
|
5/30/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Reinforced Masonry Frame
|
5/30/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Smoke Detectors
|
5/30/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Verify Sprinkler Sign Off
|
5/30/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Final
|
6/10/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Green Building Final
|
6/10/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
MERV13>=Final
|
6/10/2025
|
Approved
|
JEFFREY FULTON
|
|
Reinforced Concrete Frame
|
6/10/2025
|
Approved
|
JEFFREY FULTON
|
|
Reinforced Masonry Frame
|
6/10/2025
|
Approved
|
JEFFREY FULTON
|
|
Smoke Detectors
|
6/10/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Verify Sprinkler Sign Off
|
6/10/2025
|
Approved
|
JEFFREY FULTON
|
|
Final
|
6/16/2025
|
Corrections Issued
|
JEFFREY FULTON
|
|
Green Building Final
|
6/16/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Smoke Detectors
|
6/16/2025
|
Approved
|
JEFFREY FULTON
|
|
Final
|
6/23/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Green Building Final
|
6/23/2025
|
Approved
|
JEFFREY FULTON
|
|
Final
|
6/30/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Drywall Nailing
|
7/2/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Final
|
8/11/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Final
|
10/15/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Final
|
10/28/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Final
|
12/17/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Final
|
12/19/2025
|
OK to Issue CofO
|
JEFFREY FULTON
|