Deputy Reinf. Concrete
|
7/20/2021
|
Conditional Approval
|
DANIEL COLLINS
|
Deputy Shotcrete
|
7/20/2021
|
Conditional Approval
|
DANIEL COLLINS
|
Reinforced Concrete Frame
|
7/20/2021
|
Partial Approval
|
DANIEL COLLINS
|
Deputy Reinf. Concrete
|
7/21/2021
|
Conditional Approval
|
DANIEL MC AULIFFE
|
Deputy Shotcrete
|
7/21/2021
|
Conditional Approval
|
DANIEL MC AULIFFE
|
Deputy Reinf. Concrete
|
7/22/2021
|
Conditional Approval
|
DANIEL MC AULIFFE
|
Deputy Shotcrete
|
7/22/2021
|
Conditional Approval
|
DANIEL MC AULIFFE
|
Deputy Reinf. Concrete
|
7/23/2021
|
Approved
|
DANIEL MC AULIFFE
|
Deputy Shotcrete
|
7/23/2021
|
Approved
|
DANIEL MC AULIFFE
|
Excavation/Setback/Form/Re-Bar
|
7/23/2021
|
Partial Approval
|
DANIEL MC AULIFFE
|
Deputy Reinf. Concrete
|
7/26/2021
|
Approved
|
DANIEL MC AULIFFE
|
Deputy Shotcrete
|
7/26/2021
|
Approved
|
DANIEL MC AULIFFE
|
Excavation/Setback/Form/Re-Bar
|
7/26/2021
|
Partial Approval
|
DANIEL MC AULIFFE
|
Excavation/Setback/Form/Re-Bar
|
7/29/2021
|
Partial Inspection
|
DANIEL MC AULIFFE
|
Excavation/Setback/Form/Re-Bar
|
7/30/2021
|
Partial Approval
|
DANIEL MC AULIFFE
|
Excavation/Setback/Form/Re-Bar
|
8/2/2021
|
Partial Approval
|
DANIEL MC AULIFFE
|
Deputy Pre-Stress Concrete
|
8/5/2021
|
Conditional Approval
|
DANIEL MC AULIFFE
|
Deputy Reinf. Concrete
|
8/5/2021
|
Conditional Approval
|
DANIEL MC AULIFFE
|
Deputy Pre-Stress Concrete
|
8/6/2021
|
Conditional Approval
|
DANIEL MC AULIFFE
|
Deputy Reinf. Concrete
|
8/6/2021
|
Conditional Approval
|
DANIEL MC AULIFFE
|
Deputy Pre-Stress Concrete
|
8/9/2021
|
Approved
|
DANIEL MC AULIFFE
|
Deputy Reinf. Concrete
|
8/9/2021
|
Approved
|
DANIEL MC AULIFFE
|
Excavation/Setback/Form/Re-Bar
|
8/9/2021
|
Not Ready for Inspection
|
DANIEL MC AULIFFE
|
Deputy Pre-Stress Concrete
|
8/10/2021
|
Approved
|
DANIEL MC AULIFFE
|
Deputy Reinf. Concrete
|
8/10/2021
|
Approved
|
DANIEL MC AULIFFE
|
Deputy Pre-Stress Concrete
|
8/11/2021
|
Approved
|
DANIEL MC AULIFFE
|
Deputy Reinf. Concrete
|
8/11/2021
|
Approved
|
DANIEL MC AULIFFE
|
Reinforced Concrete Frame
|
8/13/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
Deputy Pre-Stress Concrete
|
8/16/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Deputy Reinf. Concrete
|
8/16/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Deputy Pre-Stress Concrete
|
8/17/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Deputy Reinf. Concrete
|
8/17/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Deputy Pre-Stress Concrete
|
8/18/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Deputy Reinf. Concrete
|
8/18/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Excavation/Setback/Form/Re-Bar
|
8/18/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
Deputy Pre-Stress Concrete
|
8/19/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Deputy Reinf. Concrete
|
8/19/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Excavation/Setback/Form/Re-Bar
|
8/19/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
Deputy Pre-Stress Concrete
|
8/20/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Deputy Reinf. Concrete
|
8/20/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Reinforced Concrete Frame
|
8/20/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
Deputy Pre-Stress Concrete
|
8/23/2021
|
Approved
|
DANIEL MC AULIFFE
|
Deputy Reinf. Concrete
|
8/23/2021
|
Approved
|
DANIEL MC AULIFFE
|
Excavation/Setback/Form/Re-Bar
|
8/23/2021
|
Partial Approval
|
DANIEL MC AULIFFE
|
Deputy Pre-Stress Concrete
|
8/24/2021
|
Conditional Approval
|
DANIEL MC AULIFFE
|
Deputy Reinf. Concrete
|
8/24/2021
|
Conditional Approval
|
DANIEL MC AULIFFE
|
Deputy Pre-Stress Concrete
|
8/25/2021
|
Approved
|
DANIEL MC AULIFFE
|
Deputy Reinf. Concrete
|
8/25/2021
|
Conditional Approval
|
DANIEL MC AULIFFE
|
Excavation/Setback/Form/Re-Bar
|
8/26/2021
|
Partial Approval
|
DANIEL MC AULIFFE
|
Excavation/Setback/Form/Re-Bar
|
8/27/2021
|
Partial Approval
|
DANIEL MC AULIFFE
|
Excavation/Setback/Form/Re-Bar
|
8/31/2021
|
Partial Approval
|
DANIEL MC AULIFFE
|
Excavation/Setback/Form/Re-Bar
|
9/1/2021
|
Partial Inspection
|
DANIEL MC AULIFFE
|
Deputy Drilled-In Anchors
|
9/2/2021
|
Approved
|
DANIEL MC AULIFFE
|
Deputy Pre-Stress Concrete
|
9/2/2021
|
Approved
|
DANIEL MC AULIFFE
|
Deputy Reinf. Concrete
|
9/2/2021
|
Approved
|
DANIEL MC AULIFFE
|
Deputy Drilled-In Anchors
|
9/3/2021
|
Approved
|
DANIEL MC AULIFFE
|
Deputy Pre-Stress Concrete
|
9/3/2021
|
Approved
|
DANIEL MC AULIFFE
|
Deputy Reinf. Concrete
|
9/3/2021
|
Approved
|
DANIEL MC AULIFFE
|
Excavation/Setback/Form/Re-Bar
|
9/3/2021
|
Partial Approval
|
DANIEL MC AULIFFE
|
Deputy Drilled-In Anchors
|
9/7/2021
|
Approved
|
DANIEL MC AULIFFE
|
Deputy Pre-Stress Concrete
|
9/7/2021
|
Approved
|
DANIEL MC AULIFFE
|
Deputy Reinf. Concrete
|
9/7/2021
|
Approved
|
DANIEL MC AULIFFE
|
Deputy Drilled-In Anchors
|
9/8/2021
|
Approved
|
DANIEL MC AULIFFE
|
Deputy Pre-Stress Concrete
|
9/8/2021
|
Approved
|
DANIEL MC AULIFFE
|
Deputy Reinf. Concrete
|
9/8/2021
|
Approved
|
DANIEL MC AULIFFE
|
Excavation/Setback/Form/Re-Bar
|
9/8/2021
|
Partial Approval
|
DANIEL MC AULIFFE
|
Deputy Drilled-In Anchors
|
9/9/2021
|
Approved
|
DANIEL MC AULIFFE
|
Deputy Pre-Stress Concrete
|
9/9/2021
|
Approved
|
DANIEL MC AULIFFE
|
Deputy Reinf. Concrete
|
9/9/2021
|
Approved
|
DANIEL MC AULIFFE
|
Deputy Pre-Stress Concrete
|
9/14/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Deputy Reinf. Concrete
|
9/14/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Deputy Pre-Stress Concrete
|
9/15/2021
|
Conditional Approval
|
DANIEL MC AULIFFE
|
Deputy Reinf. Concrete
|
9/15/2021
|
Conditional Approval
|
DANIEL MC AULIFFE
|
Deputy Pre-Stress Concrete
|
9/16/2021
|
Conditional Approval
|
DANIEL MC AULIFFE
|
Deputy Reinf. Concrete
|
9/16/2021
|
Conditional Approval
|
DANIEL MC AULIFFE
|
Deputy Pre-Stress Concrete
|
9/17/2021
|
Approved
|
DANIEL MC AULIFFE
|
Deputy Reinf. Concrete
|
9/17/2021
|
Approved
|
DANIEL MC AULIFFE
|
Deputy Pre-Stress Concrete
|
9/20/2021
|
Approved
|
DANIEL MC AULIFFE
|
Deputy Reinf. Concrete
|
9/20/2021
|
Approved
|
DANIEL MC AULIFFE
|
Excavation/Setback/Form/Re-Bar
|
9/20/2021
|
Partial Approval
|
DANIEL MC AULIFFE
|
Deputy Drilled-In Anchors
|
9/27/2021
|
Approved
|
DANIEL MC AULIFFE
|
Deputy Pre-Stress Concrete
|
9/27/2021
|
Approved
|
DANIEL MC AULIFFE
|
Deputy Reinf. Concrete
|
9/27/2021
|
Approved
|
DANIEL MC AULIFFE
|
Deputy Drilled-In Anchors
|
9/29/2021
|
Approved
|
DANIEL MC AULIFFE
|
Deputy Pre-Stress Concrete
|
9/29/2021
|
Approved
|
DANIEL MC AULIFFE
|
Deputy Reinf. Concrete
|
9/29/2021
|
Approved
|
DANIEL MC AULIFFE
|
Deputy Drilled-In Anchors
|
9/30/2021
|
Approved
|
DANIEL MC AULIFFE
|
Deputy Pre-Stress Concrete
|
9/30/2021
|
Approved
|
DANIEL MC AULIFFE
|
Deputy Reinf. Concrete
|
9/30/2021
|
Approved
|
DANIEL MC AULIFFE
|
Excavation/Setback/Form/Re-Bar
|
9/30/2021
|
Partial Inspection
|
DANIEL MC AULIFFE
|
Deputy Drilled-In Anchors
|
10/1/2021
|
Approved
|
DANIEL MC AULIFFE
|
Deputy Pre-Stress Concrete
|
10/1/2021
|
Approved
|
DANIEL MC AULIFFE
|
Deputy Reinf. Concrete
|
10/1/2021
|
Approved
|
DANIEL MC AULIFFE
|
Excavation/Setback/Form/Re-Bar
|
10/1/2021
|
Partial Approval
|
DANIEL MC AULIFFE
|
Excavation/Setback/Form/Re-Bar
|
10/4/2021
|
Partial Approval
|
DANIEL MC AULIFFE
|
Deputy Drilled-In Anchors
|
10/5/2021
|
Approved
|
DANIEL MC AULIFFE
|
Deputy Pre-Stress Concrete
|
10/5/2021
|
Approved
|
DANIEL MC AULIFFE
|
Deputy Reinf. Concrete
|
10/5/2021
|
Approved
|
DANIEL MC AULIFFE
|
Deputy Reinf. Concrete
|
10/5/2021
|
Conditional Approval
|
DANIEL MC AULIFFE
|
Deputy Drilled-In Anchors
|
10/6/2021
|
Conditional Approval
|
DANIEL MC AULIFFE
|
Deputy Pre-Stress Concrete
|
10/6/2021
|
Conditional Approval
|
DANIEL MC AULIFFE
|
Deputy Reinf. Concrete
|
10/6/2021
|
Conditional Approval
|
DANIEL MC AULIFFE
|
Deputy Drilled-In Anchors
|
10/7/2021
|
Approved
|
DANIEL MC AULIFFE
|
Deputy Pre-Stress Concrete
|
10/7/2021
|
Approved
|
DANIEL MC AULIFFE
|
Deputy Reinf. Concrete
|
10/7/2021
|
Approved
|
DANIEL MC AULIFFE
|
Deputy Drilled-In Anchors
|
10/8/2021
|
Approved
|
DANIEL MC AULIFFE
|
Deputy Pre-Stress Concrete
|
10/8/2021
|
Approved
|
DANIEL MC AULIFFE
|
Deputy Reinf. Concrete
|
10/8/2021
|
Approved
|
DANIEL MC AULIFFE
|
Deputy Drilled-In Anchors
|
10/12/2021
|
Partial Approval
|
JAMES POWERS
|
Deputy Pre-Stress Concrete
|
10/12/2021
|
Partial Approval
|
JAMES POWERS
|
Deputy Reinf. Concrete
|
10/12/2021
|
Partial Approval
|
JAMES POWERS
|
Deputy Drilled-In Anchors
|
10/14/2021
|
Partial Approval
|
JAMES POWERS
|
Deputy Pre-Stress Concrete
|
10/14/2021
|
Partial Approval
|
JAMES POWERS
|
Deputy Reinf. Concrete
|
10/14/2021
|
Partial Approval
|
JAMES POWERS
|
Deputy Reinf. Masonry
|
10/14/2021
|
Partial Approval
|
JAMES POWERS
|
Deputy Drilled-In Anchors
|
10/15/2021
|
Partial Approval
|
JAMES POWERS
|
Deputy Pre-Stress Concrete
|
10/15/2021
|
Partial Approval
|
JAMES POWERS
|
Deputy Reinf. Concrete
|
10/15/2021
|
Partial Approval
|
JAMES POWERS
|
Deputy Reinf. Masonry
|
10/15/2021
|
Partial Approval
|
JAMES POWERS
|
Deputy Drilled-In Anchors
|
10/18/2021
|
Conditional Approval
|
DANIEL MC AULIFFE
|
Deputy Pre-Stress Concrete
|
10/18/2021
|
Conditional Approval
|
DANIEL MC AULIFFE
|
Deputy Reinf. Concrete
|
10/18/2021
|
Approved
|
DANIEL MC AULIFFE
|
Deputy Drilled-In Anchors
|
10/19/2021
|
Conditional Approval
|
DANIEL MC AULIFFE
|
Deputy Pre-Stress Concrete
|
10/19/2021
|
Conditional Approval
|
DANIEL MC AULIFFE
|
Deputy Reinf. Concrete
|
10/19/2021
|
Conditional Approval
|
DANIEL MC AULIFFE
|
Deputy Drilled-In Anchors
|
10/20/2021
|
Conditional Approval
|
DANIEL MC AULIFFE
|
Deputy Pre-Stress Concrete
|
10/20/2021
|
Approved
|
DANIEL MC AULIFFE
|
Deputy Reinf. Concrete
|
10/20/2021
|
Conditional Approval
|
DANIEL MC AULIFFE
|
Deputy Drilled-In Anchors
|
11/12/2021
|
Approved
|
DANIEL MC AULIFFE
|
Deputy Reinf. Concrete
|
11/12/2021
|
Approved
|
DANIEL MC AULIFFE
|
Deputy Reinf. Masonry
|
11/12/2021
|
Approved
|
DANIEL MC AULIFFE
|
Deputy Drilled-In Anchors
|
11/15/2021
|
Approved
|
DANIEL MC AULIFFE
|
Deputy Reinf. Concrete
|
11/15/2021
|
Approved
|
DANIEL MC AULIFFE
|
Deputy Reinf. Masonry
|
11/15/2021
|
Approved
|
DANIEL MC AULIFFE
|
Deputy Drilled-In Anchors
|
11/16/2021
|
Approved
|
DANIEL MC AULIFFE
|
Deputy Reinf. Concrete
|
11/16/2021
|
Approved
|
DANIEL MC AULIFFE
|
Deputy Reinf. Masonry
|
11/16/2021
|
Approved
|
DANIEL MC AULIFFE
|
Deputy Drilled-In Anchors
|
11/17/2021
|
Conditional Approval
|
DANIEL MC AULIFFE
|
Deputy Reinf. Concrete
|
11/17/2021
|
Conditional Approval
|
DANIEL MC AULIFFE
|
Deputy Reinf. Masonry
|
11/17/2021
|
Conditional Approval
|
DANIEL MC AULIFFE
|
Deputy Drilled-In Anchors
|
11/18/2021
|
Conditional Approval
|
DANIEL MC AULIFFE
|
Deputy Reinf. Concrete
|
11/18/2021
|
Conditional Approval
|
DANIEL MC AULIFFE
|
Deputy Reinf. Masonry
|
11/18/2021
|
Conditional Approval
|
DANIEL MC AULIFFE
|
Deputy Reinf. Masonry
|
12/10/2021
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Masonry
|
12/13/2021
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Masonry
|
12/14/2021
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Masonry
|
12/15/2021
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Masonry
|
12/16/2021
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Masonry
|
12/17/2021
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Masonry
|
1/20/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
Deputy Reinf. Masonry
|
1/21/2022
|
Approved
|
DANIEL MC AULIFFE
|
Reinforced Masonry Frame
|
1/21/2022
|
Partial Approval
|
DANIEL MC AULIFFE
|
Deputy Reinf. Masonry
|
1/24/2022
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Masonry
|
1/25/2022
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Masonry
|
1/26/2022
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Masonry
|
2/10/2022
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Masonry
|
2/11/2022
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Masonry
|
2/14/2022
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Masonry
|
2/15/2022
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Masonry
|
2/16/2022
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Masonry
|
2/18/2022
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Masonry
|
2/22/2022
|
Conditional Approval
|
TED RIES
|
Deputy Reinf. Masonry
|
2/23/2022
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Masonry
|
2/24/2022
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Masonry
|
2/25/2022
|
Conditional Approval
|
NICK DANERI
|