100 S GRAND AVE 90012

Certificate Information: 100 S GRAND AVE 90012

Application / Permit
17010-10005-01468
Plan Check / Job No.
B17LA14482
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
Commercial
Primary Use
(52) Foundation Only
Work Description
EARLY START FOUNDATION ONLY UP TO GRADE LEVEL SLAB for New mixed use project consisting of 2 highrise towers over parking (20-story hotel and 39-story residential). 2 LEVELS ABOVE GRADE AT OLIVE ST AND TO GRADE AT GRAND AVE. SINCE THE SITE SLOPES DOWN FROM GRAND TO OLIVE. GRAYWATER READY SYSTEM IS EXEMPT PER LADBS & CITY PLANNING DEVELOPMENT AGREEMENT DATED DEC 5, 2007
Permit Issued
Issued on 1/23/2019
Issuing Office
Metro
Current Status
Permit Finaled on 5/10/2021
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Plan Check Approved 12/20/2018 JOHN VASQUEZ
Issued 1/23/2019 LADBS
Permit Closed-Status Void 3/27/2020 LESLIE TRUJILLO
Re-Activate Permit 3/27/2020 LESLIE TRUJILLO
Permit Finaled 5/7/2021 DANIEL MC AULIFFE

Permit Application Clearance Information

Address approval Cleared 10/16/2017 ADRIAN SANCHEZ
Eng Process Fee Ord 176,300 Cleared 10/16/2017 ADRIAN SANCHEZ
Sewer availability Cleared 12/22/2017 NAZILA NOORIFAR
Hydrant and Access approval Cleared 12/26/2017 JOHN CONNEALLY
GPI Written Notices Cleared 12/27/2017 MINYE PAK
Grading Pre-Inspection Cleared 12/27/2017 MINYE PAK
Metro Rail approval Cleared 1/9/2018 MINYE PAK
Low Impact Development Cleared 1/16/2018 MATTHEW JIMENEZ
Construction near power lines Cleared 2/20/2018 WALTER RAMIREZ
Construction within easement Cleared 2/20/2018 WALTER RAMIREZ
Driveway location Cleared 3/1/2018 MOHAMMAD HASAN
DAS Clearance Cleared 4/27/2018 MINYE PAK
Highway dedication Cleared 7/24/2018 ADRIAN SANCHEZ
Internal circulation Cleared 8/30/2018 WESTON PRINGLE
Roof/Waste drainage to street Cleared 9/12/2018 STEVE MELGAR
Food Service Establishment Cleared 10/17/2018 PAWAN VERMA
DCP conditions approval Cleared 10/22/2018 RICHARD TRUONG
Encroachment in public way Cleared 11/21/2018 KARAN PATEL
Building over 3-story or 36-ft Cleared 11/27/2018 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 11/27/2018 CALOSHA APPROVED
Stormwater Pollution Mitigatn Cleared 12/10/2018 AMMAR ELTAWIL
"D" conditions Cleared 12/18/2018 DANALYNN DOMINGUEZ
"Q" conditions Cleared 12/18/2018 DANALYNN DOMINGUEZ
"T" removal Cleared 12/18/2018 DANALYNN DOMINGUEZ
CPC Cleared 12/18/2018 DANALYNN DOMINGUEZ
Fire Marshall Fire Life Safety Cleared 12/18/2018 ANDREW KO
Miscellaneous Cleared 12/18/2018 DANALYNN DOMINGUEZ
Miscellaneous Cleared 12/18/2018 TERRY PHAN
Miscellaneous Cleared 12/18/2018 TERRY PHAN
Miscellaneous Cleared 12/18/2018 TERRY PHAN
Miscellaneous Cleared 12/18/2018 TERRY PHAN
Permit Cleared 12/18/2018 TERRY PHAN
Site Plan review Cleared 12/18/2018 DANALYNN DOMINGUEZ
Specific Plan Cleared 12/18/2018 DANALYNN DOMINGUEZ
Tract Map conditions Cleared 12/18/2018 DANALYNN DOMINGUEZ
Tract Map conditions Cleared 12/18/2018 DANALYNN DOMINGUEZ
Tract Map conditions Cleared 12/18/2018 DANALYNN DOMINGUEZ
Tract Map conditions Cleared 12/18/2018 DANALYNN DOMINGUEZ
Tract Map conditions Cleared 12/18/2018 DANALYNN DOMINGUEZ
ZA Case Cleared 12/18/2018 DANALYNN DOMINGUEZ
ZI Cleared 12/18/2018 DANALYNN DOMINGUEZ
ZI Cleared 12/18/2018 DANALYNN DOMINGUEZ
Green Code Cleared 12/20/2018 NEGAR NEJAD
Work Adjacent to Public Way Cleared 12/20/2018 BOK GOH

Contact Information

Architect Takemori,, Tensho K; Lic. No.: C26283 12541 BEATRICE STREET      LOS ANGELES, CA 90066
Contractor Tishman Construction Corporation Of California; Lic. No.: 322670-B 300 S GRAND AVE      LOS ANGELES, CA 90071
Engineer Heeringa,, Roger L; Lic. No.: S4536 818 STEWART ST #1000      SEATTLE, WA 98101
Engineer Hershberg,, Mark Aaron; Lic. No.: S5078 6080 CENTER DR STE 300      LOS ANGELES, CA 90045

Inspector Information

DAVID BURKHEAD, (213) 482-7294 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Special/Order Compliance 4/15/2019 Partial Inspection LESLIE TRUJILLO
Special/Order Compliance 4/16/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 4/23/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 4/24/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 4/25/2019 Conditional Approval LESLIE TRUJILLO
Footing/Foundation/Slab 4/26/2019 Partial Inspection LESLIE TRUJILLO
Deputy Reinf. Concrete 5/8/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 5/9/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 5/10/2019 Conditional Approval LESLIE TRUJILLO
Footing/Foundation/Slab 5/10/2019 Partial Inspection LESLIE TRUJILLO
Deputy Reinf. Concrete 5/13/2019 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 5/13/2019 Not Ready for Inspection LESLIE TRUJILLO
Deputy Pre-Stress Concrete 5/14/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 5/14/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 5/15/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 5/15/2019 Conditional Approval ERNESTO CORRAL
Footing/Foundation/Slab 5/15/2019 Not Ready for Inspection JAMES POWERS
Deputy Pre-Stress Concrete 5/16/2019 No Access for Inspection JAMES POWERS
Deputy Reinf. Concrete 5/16/2019 No Access for Inspection JAMES POWERS
Deputy Pre-Stress Concrete 5/17/2019 Partial Approval JAMES POWERS
Footing/Foundation/Slab 5/17/2019 Not Ready for Inspection JAMES POWERS
Deputy Pre-Stress Concrete 5/20/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/20/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/21/2019 Partial Approval JAMES POWERS
Footing/Foundation/Slab 5/21/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/22/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 5/23/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 5/24/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 5/29/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 5/29/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 5/30/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 5/30/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 5/31/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 5/31/2019 Conditional Approval LESLIE TRUJILLO
Footing/Foundation/Slab 5/31/2019 Partial Inspection LESLIE TRUJILLO
Deputy Reinf. Concrete 6/3/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 6/3/2019 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 6/3/2019 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 6/4/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 6/4/2019 Conditional Approval LESLIE TRUJILLO
Footing/Foundation/Slab 6/4/2019 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 6/5/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 6/5/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 6/6/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 6/6/2019 Conditional Approval LESLIE TRUJILLO
Footing/Foundation/Slab 6/6/2019 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 6/7/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 6/7/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 6/10/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 6/11/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 6/12/2019 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 6/12/2019 Partial Approval LESLIE TRUJILLO
Footing/Foundation/Slab 6/12/2019 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 6/13/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 6/14/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 6/17/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 6/18/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 6/19/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 6/20/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 6/21/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 6/24/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 6/25/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 6/26/2019 Conditional Approval LESLIE TRUJILLO
Footing/Foundation/Slab 6/26/2019 Partial Inspection LESLIE TRUJILLO
Deputy Reinf. Concrete 6/27/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 6/28/2019 Conditional Approval LESLIE TRUJILLO
Footing/Foundation/Slab 6/28/2019 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/1/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/2/2019 Conditional Approval LESLIE TRUJILLO
Footing/Foundation/Slab 7/2/2019 Partial Inspection LESLIE TRUJILLO
Deputy Reinf. Concrete 7/3/2019 Conditional Approval LESLIE TRUJILLO
Footing/Foundation/Slab 7/3/2019 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/5/2019 Conditional Approval ERNESTO CORRAL
Footing/Foundation/Slab 7/5/2019 Off-Hour Fees Due
Footing/Foundation/Slab 7/5/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/8/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 7/8/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/9/2019 Partial Approval LESLIE TRUJILLO
Deputy Shotcrete 7/9/2019 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 7/9/2019 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/10/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 7/10/2019 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 7/10/2019 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/11/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 7/11/2019 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 7/11/2019 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/12/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 7/12/2019 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 7/15/2019 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/16/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 7/16/2019 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 7/16/2019 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/17/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 7/17/2019 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 7/17/2019 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/18/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 7/18/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/19/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 7/19/2019 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 7/20/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/22/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 7/22/2019 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 7/22/2019 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/23/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 7/23/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/24/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 7/24/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/25/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 7/25/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/26/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 7/26/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/29/2019 Conditional Approval LESLIE TRUJILLO
Footing/Foundation/Slab 7/29/2019 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 7/30/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 7/30/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/30/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 7/30/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 7/30/2019 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 7/30/2019 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 7/31/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 7/31/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/31/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 7/31/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 7/31/2019 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 7/31/2019 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 8/1/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 8/1/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 8/1/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 8/1/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 8/1/2019 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 8/2/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 8/2/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 8/2/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 8/2/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 8/2/2019 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 8/2/2019 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 8/5/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 8/5/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 8/5/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 8/5/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 8/5/2019 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 8/6/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 8/6/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 8/6/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 8/6/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 8/6/2019 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 8/7/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 8/7/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 8/7/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 8/7/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 8/7/2019 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 8/7/2019 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 8/7/2019 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 8/8/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 8/8/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 8/8/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 8/8/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 8/8/2019 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 8/8/2019 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 8/8/2019 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 8/9/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 8/9/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 8/9/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 8/9/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 8/9/2019 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 8/9/2019 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 8/9/2019 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 8/12/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 8/12/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 8/12/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 8/12/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 8/12/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 8/13/2019 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 8/13/2019 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 8/14/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 8/14/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 8/14/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 8/14/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 8/14/2019 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 8/14/2019 Not Ready for Inspection LESLIE TRUJILLO
Deputy Drilled-In Anchors 8/15/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 8/15/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 8/15/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 8/15/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 8/15/2019 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 8/15/2019 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 8/16/2019 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 8/19/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 8/19/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 8/19/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 8/19/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 8/19/2019 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 8/19/2019 Partial Inspection LESLIE TRUJILLO
Deputy Drilled-In Anchors 8/20/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 8/20/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 8/20/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 8/20/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 8/20/2019 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 8/20/2019 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 8/21/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 8/21/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 8/21/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 8/21/2019 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 8/21/2019 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 8/22/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 8/22/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 8/22/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 8/22/2019 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 8/22/2019 Partial Inspection LESLIE TRUJILLO
Deputy Drilled-In Anchors 8/23/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 8/23/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 8/23/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 8/23/2019 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 8/23/2019 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 8/26/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 8/26/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 8/26/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 8/26/2019 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 8/26/2019 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 8/27/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 8/27/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 8/27/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 8/27/2019 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 8/28/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 8/28/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 8/28/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 8/28/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 8/28/2019 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 8/29/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 8/29/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 8/29/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 8/29/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 8/29/2019 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 8/29/2019 Not Ready for Inspection LESLIE TRUJILLO
Deputy Drilled-In Anchors 8/30/2019 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 8/30/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/30/2019 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 8/30/2019 Partial Approval JAMES POWERS
Deputy Shotcrete 8/30/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/3/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 9/3/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 9/3/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 9/3/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 9/3/2019 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 9/4/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 9/4/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 9/4/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 9/4/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 9/4/2019 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 9/4/2019 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 9/5/2019 Conditional Approval LESLIE TRUJILLO
Deputy Grading 9/5/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 9/5/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 9/5/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 9/5/2019 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 9/5/2019 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 9/6/2019 Conditional Approval LESLIE TRUJILLO
Deputy Grading 9/6/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 9/6/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 9/6/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 9/6/2019 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 9/9/2019 Conditional Approval LESLIE TRUJILLO
Deputy Grading 9/9/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 9/9/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 9/9/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 9/9/2019 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 9/9/2019 Not Ready for Inspection LESLIE TRUJILLO
Deputy Drilled-In Anchors 9/10/2019 Conditional Approval LESLIE TRUJILLO
Deputy Grading 9/10/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 9/10/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 9/10/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 9/10/2019 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 9/10/2019 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 9/11/2019 Conditional Approval LESLIE TRUJILLO
Deputy Grading 9/11/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 9/11/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 9/11/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 9/11/2019 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 9/11/2019 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 9/12/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 9/12/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 9/12/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 9/12/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 9/12/2019 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 9/13/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 9/13/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 9/13/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 9/13/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 9/13/2019 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 9/13/2019 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 9/16/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 9/16/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 9/16/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 9/16/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 9/16/2019 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 9/17/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 9/17/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 9/17/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 9/17/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 9/17/2019 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 9/17/2019 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 9/18/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 9/18/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 9/18/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 9/18/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 9/18/2019 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 9/18/2019 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 9/19/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 9/19/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 9/19/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 9/19/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 9/19/2019 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 9/19/2019 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 9/20/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 9/20/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 9/20/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 9/20/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 9/20/2019 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 9/23/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 9/23/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 9/23/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 9/23/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 9/23/2019 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 9/23/2019 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 9/24/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 9/24/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 9/24/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 9/24/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 9/24/2019 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 9/25/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 9/25/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 9/25/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 9/25/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 9/25/2019 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 9/25/2019 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 9/26/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 9/26/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 9/26/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 9/26/2019 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 9/26/2019 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 9/27/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 9/27/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 9/27/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 9/27/2019 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 9/27/2019 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 9/30/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 9/30/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 9/30/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 9/30/2019 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 9/30/2019 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 10/1/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 10/1/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/1/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 10/1/2019 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 10/1/2019 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 10/2/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 10/2/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/2/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 10/2/2019 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 10/2/2019 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 10/3/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 10/3/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/3/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 10/3/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 10/3/2019 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 10/3/2019 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 10/4/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 10/4/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/4/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 10/4/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 10/4/2019 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 10/7/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 10/7/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/7/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 10/7/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 10/7/2019 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 10/7/2019 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 10/8/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 10/8/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/8/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 10/8/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 10/8/2019 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 10/9/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 10/9/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/9/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 10/9/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 10/9/2019 Conditional Approval LESLIE TRUJILLO
Final 10/9/2019 Partial Approval LESLIE TRUJILLO
Pre-Inspection 10/9/2019 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 10/9/2019 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/10/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 10/10/2019 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 10/11/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 10/11/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/11/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 10/11/2019 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 10/11/2019 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 10/15/2019 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 10/15/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/15/2019 Partial Approval JAMES POWERS
Deputy Shotcrete 10/15/2019 Partial Approval JAMES POWERS
Reinforced Concrete Frame 10/15/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 10/16/2019 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 10/16/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/16/2019 Partial Approval JAMES POWERS
Deputy Shotcrete 10/16/2019 Partial Approval JAMES POWERS
Reinforced Concrete Frame 10/16/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 10/17/2019 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 10/17/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/17/2019 Partial Approval JAMES POWERS
Deputy Shotcrete 10/17/2019 Partial Approval JAMES POWERS
Reinforced Concrete Frame 10/17/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 10/18/2019 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 10/18/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/18/2019 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 10/18/2019 Partial Approval JAMES POWERS
Deputy Shotcrete 10/18/2019 Partial Approval JAMES POWERS
Reinforced Concrete Frame 10/18/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 10/21/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/21/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 10/21/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 10/21/2019 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 10/21/2019 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 10/22/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/22/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 10/22/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 10/22/2019 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 10/22/2019 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 10/23/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/23/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 10/23/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 10/23/2019 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 10/23/2019 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 10/24/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/24/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 10/24/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 10/24/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/25/2019 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 10/25/2019 Partial Approval LESLIE TRUJILLO
Reinforced Concrete Frame 10/26/2019 Partial Approval DAVID TSAU
Deputy Reinf. Concrete 10/28/2019 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 10/28/2019 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 10/29/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 10/29/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/29/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 10/29/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 10/29/2019 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 10/29/2019 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 10/30/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 10/30/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/30/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 10/30/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 10/30/2019 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 10/30/2019 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 10/31/2019 Approved LESLIE TRUJILLO
Deputy Pre-Stress Concrete 10/31/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/31/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 10/31/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 10/31/2019 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 10/31/2019 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 11/1/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 11/1/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/1/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 11/1/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 11/1/2019 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 11/1/2019 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 11/4/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 11/4/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/4/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 11/4/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 11/4/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/5/2019 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 11/5/2019 Approved LESLIE TRUJILLO
Deputy Reinf. Concrete 11/6/2019 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 11/6/2019 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 11/7/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 11/7/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/7/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 11/7/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 11/7/2019 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 11/7/2019 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 11/8/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 11/8/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/8/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 11/8/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 11/8/2019 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 11/8/2019 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 11/12/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 11/12/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/12/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 11/12/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 11/12/2019 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 11/12/2019 Partial Inspection LESLIE TRUJILLO
Deputy Drilled-In Anchors 11/13/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 11/13/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/13/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 11/13/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 11/13/2019 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 11/13/2019 Partial Approval LARRY ARNICK
Reinforced Concrete Frame 11/13/2019 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 11/14/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 11/14/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/14/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 11/14/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 11/14/2019 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 11/14/2019 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 11/15/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 11/15/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/15/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 11/15/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 11/15/2019 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 11/15/2019 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 11/18/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 11/18/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/18/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 11/18/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 11/18/2019 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 11/18/2019 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 11/19/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 11/19/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/19/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 11/19/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 11/19/2019 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 11/19/2019 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 11/20/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 11/20/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/20/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 11/20/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 11/20/2019 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 11/21/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 11/21/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/21/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 11/21/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 11/21/2019 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 11/22/2019 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 12/2/2019 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 12/2/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/2/2019 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 12/2/2019 Partial Approval JAMES POWERS
Deputy Shotcrete 12/2/2019 Partial Approval JAMES POWERS
Reinforced Concrete Frame 12/2/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 12/3/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 12/3/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/3/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 12/3/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 12/3/2019 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 12/3/2019 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 12/4/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 12/4/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/4/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 12/4/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 12/4/2019 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 12/5/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 12/5/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/5/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 12/5/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 12/5/2019 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 12/6/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 12/6/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/6/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 12/6/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 12/6/2019 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 12/6/2019 Conditional Approval LESLIE TRUJILLO
Pre-Inspection 12/7/2019 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 12/9/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 12/9/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/9/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 12/9/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 12/9/2019 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 12/10/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 12/10/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/10/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 12/10/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 12/10/2019 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 12/10/2019 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 12/11/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 12/11/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/11/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 12/11/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 12/11/2019 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 12/11/2019 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 12/12/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 12/12/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/12/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 12/12/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 12/12/2019 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 12/12/2019 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 12/13/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 12/13/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/13/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 12/13/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 12/13/2019 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 12/13/2019 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 12/16/2019 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 12/17/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 12/17/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/17/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 12/17/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 12/17/2019 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 12/17/2019 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 12/18/2019 Conditional Approval LESLIE TRUJILLO
Deputy Grading 12/18/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 12/18/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/18/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 12/18/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 12/18/2019 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 12/18/2019 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 12/19/2019 Conditional Approval LESLIE TRUJILLO
Deputy Grading 12/19/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 12/19/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/19/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 12/19/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 12/19/2019 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 12/19/2019 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 12/20/2019 Conditional Approval LESLIE TRUJILLO
Deputy Grading 12/20/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 12/20/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/20/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 12/20/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 12/20/2019 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 12/20/2019 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 12/23/2019 Conditional Approval LESLIE TRUJILLO
Deputy Grading 12/23/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 12/23/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/23/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 12/23/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 12/23/2019 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 12/24/2019 Conditional Approval LESLIE TRUJILLO
Deputy Grading 12/24/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 12/24/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/24/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 12/24/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 12/24/2019 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 12/24/2019 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 12/26/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 12/26/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/26/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 12/26/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 12/26/2019 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 12/27/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 12/27/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/27/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 12/27/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 12/27/2019 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 12/30/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 12/30/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/30/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 12/30/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 12/30/2019 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 12/31/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 12/31/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/31/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 12/31/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 12/31/2019 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 1/2/2020 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 1/3/2020 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 1/3/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/3/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 1/3/2020 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 1/3/2020 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 1/3/2020 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 1/6/2020 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 1/6/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/6/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 1/6/2020 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 1/6/2020 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 1/7/2020 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 1/7/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/7/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 1/7/2020 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 1/7/2020 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 1/7/2020 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 1/8/2020 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 1/8/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/8/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 1/8/2020 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 1/8/2020 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 1/8/2020 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 1/9/2020 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 1/9/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/9/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 1/9/2020 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 1/9/2020 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 1/9/2020 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 1/10/2020 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 1/10/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/10/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 1/10/2020 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 1/10/2020 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 1/10/2020 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 1/13/2020 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 1/13/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/13/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 1/13/2020 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 1/13/2020 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 1/13/2020 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 1/14/2020 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 1/14/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/14/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 1/14/2020 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 1/14/2020 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 1/15/2020 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 1/15/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/15/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 1/15/2020 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 1/15/2020 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 1/15/2020 Partial Inspection LESLIE TRUJILLO
Deputy Drilled-In Anchors 1/16/2020 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 1/16/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/16/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 1/16/2020 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 1/16/2020 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 1/16/2020 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 1/17/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/17/2020 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 1/17/2020 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 1/21/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/21/2020 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 1/21/2020 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 1/22/2020 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 1/22/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/22/2020 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 1/22/2020 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 1/22/2020 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 1/23/2020 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 1/23/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/23/2020 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 1/23/2020 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 1/24/2020 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 1/24/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/24/2020 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 1/24/2020 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 1/27/2020 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 1/27/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/27/2020 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 1/27/2020 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 1/27/2020 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 1/28/2020 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 1/28/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/28/2020 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 1/28/2020 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 1/29/2020 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 1/30/2020 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 1/30/2020 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 1/31/2020 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 1/31/2020 Partial Approval LESLIE TRUJILLO
Pre-Inspection 2/1/2020 Partial Approval DAVID TSAU
Reinforced Concrete Frame 2/1/2020 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 2/3/2020 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 2/4/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 2/4/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 2/4/2020 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 2/4/2020 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 2/5/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 2/5/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 2/5/2020 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 2/5/2020 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 2/6/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 2/6/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 2/6/2020 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 2/6/2020 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 2/7/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 2/7/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 2/7/2020 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 2/7/2020 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 2/10/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 2/10/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 2/10/2020 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 2/11/2020 Conditional Approval LESLIE TRUJILLO
Drywall Nailing 2/11/2020 Partial Inspection LESLIE TRUJILLO
Reinforced Concrete Frame 2/11/2020 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 2/12/2020 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 2/13/2020 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 2/13/2020 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 2/14/2020 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 2/19/2020 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 2/19/2020 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 2/20/2020 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 2/20/2020 Partial Inspection LESLIE TRUJILLO
Deputy Pre-Stress Concrete 2/21/2020 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 2/21/2020 Partial Inspection LESLIE TRUJILLO
Deputy Pre-Stress Concrete 2/24/2020 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 2/25/2020 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 2/25/2020 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 2/26/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/26/2020 Partial Approval JAMES POWERS
Reinforced Concrete Frame 2/26/2020 Not Ready for Inspection JAMES POWERS
Deputy Pre-Stress Concrete 2/27/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/27/2020 Partial Approval JAMES POWERS
Reinforced Concrete Frame 2/27/2020 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 2/28/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/28/2020 Partial Approval JAMES POWERS
Deputy Shotcrete 2/28/2020 Partial Approval JAMES POWERS
Reinforced Concrete Frame 2/28/2020 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 3/2/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/2/2020 Conditional Approval JONATHAN QUACH
Deputy Reinf. Concrete 3/2/2020 Partial Approval JAMES POWERS
Deputy Shotcrete 3/2/2020 Partial Approval JAMES POWERS
Reinforced Concrete Frame 3/2/2020 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 3/3/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/3/2020 Partial Approval JAMES POWERS
Deputy Shotcrete 3/3/2020 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 3/4/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/4/2020 Partial Approval JAMES POWERS
Deputy Shotcrete 3/4/2020 Partial Approval JAMES POWERS
Reinforced Concrete Frame 3/4/2020 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 3/5/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/5/2020 Partial Approval JAMES POWERS
Deputy Shotcrete 3/5/2020 Partial Approval JAMES POWERS
Reinforced Concrete Frame 3/5/2020 Not Ready for Inspection JAMES POWERS
Deputy Pre-Stress Concrete 3/6/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/6/2020 Partial Approval JAMES POWERS
Reinforced Concrete Frame 3/6/2020 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 3/9/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 3/9/2020 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 3/9/2020 Not Ready for Inspection LESLIE TRUJILLO
Deputy Drilled-In Anchors 3/10/2020 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 3/10/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 3/10/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 3/10/2020 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 3/10/2020 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 3/10/2020 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 3/11/2020 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 3/11/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 3/11/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 3/11/2020 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 3/11/2020 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 3/11/2020 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 3/12/2020 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 3/12/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 3/12/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 3/12/2020 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 3/12/2020 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 3/13/2020 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 3/13/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 3/13/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 3/13/2020 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 3/13/2020 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 3/16/2020 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 3/16/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 3/16/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 3/16/2020 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 3/16/2020 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 3/16/2020 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 3/17/2020 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 3/17/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 3/17/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 3/17/2020 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 3/17/2020 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 3/18/2020 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 3/18/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 3/18/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 3/18/2020 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 3/18/2020 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 3/18/2020 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 3/19/2020 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 3/19/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 3/19/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 3/19/2020 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 3/19/2020 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 3/19/2020 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 3/20/2020 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 3/20/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 3/20/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 3/20/2020 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 3/20/2020 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 3/20/2020 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 3/23/2020 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 3/23/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 3/23/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 3/23/2020 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 3/23/2020 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 3/23/2020 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 3/24/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 3/24/2020 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 3/24/2020 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 3/25/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 3/25/2020 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 3/25/2020 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 3/26/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 3/26/2020 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 3/26/2020 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 3/27/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 3/27/2020 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 3/27/2020 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 3/27/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 3/31/2020 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 3/31/2020 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 4/1/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 4/1/2020 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 4/1/2020 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 4/1/2020 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 4/2/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 4/2/2020 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 4/2/2020 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 4/2/2020 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 4/3/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 4/3/2020 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 4/3/2020 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 4/3/2020 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 4/6/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 4/6/2020 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 4/6/2020 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 4/7/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 4/7/2020 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 4/7/2020 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 4/8/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 4/8/2020 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 4/8/2020 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 4/9/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 4/9/2020 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 4/9/2020 Not Ready for Inspection LESLIE TRUJILLO
Deputy Pre-Stress Concrete 4/10/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 4/10/2020 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 4/10/2020 Partial Inspection LESLIE TRUJILLO
Deputy Pre-Stress Concrete 4/13/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 4/13/2020 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 4/14/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 4/14/2020 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 4/15/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 4/15/2020 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 4/15/2020 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 4/16/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 4/16/2020 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 4/16/2020 Not Ready for Inspection LESLIE TRUJILLO
Deputy Pre-Stress Concrete 4/17/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 4/17/2020 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 4/17/2020 Not Ready for Inspection LESLIE TRUJILLO
Deputy Pre-Stress Concrete 4/20/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 4/20/2020 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 4/20/2020 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 4/21/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 4/21/2020 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 4/21/2020 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 4/22/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 4/22/2020 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 4/22/2020 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 4/23/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 4/23/2020 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 4/24/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 4/24/2020 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 4/24/2020 Partial Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 4/27/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 4/27/2020 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 4/28/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 4/28/2020 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 4/28/2020 Not Ready for Inspection LESLIE TRUJILLO
Deputy Pre-Stress Concrete 4/29/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 4/29/2020 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 4/29/2020 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 4/30/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 4/30/2020 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 4/30/2020 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 5/1/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 5/1/2020 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 5/1/2020 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 5/5/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 5/5/2020 Approved DANIEL MC AULIFFE
Reinforced Concrete Frame 5/5/2020 Not Ready for Inspection DANIEL MC AULIFFE
Reinforced Concrete Frame 5/5/2020 Partial Inspection DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 5/6/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 5/6/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Masonry 5/6/2020 Approved DANIEL MC AULIFFE
Reinforced Concrete Frame 5/6/2020 Partial Approval DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 5/7/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 5/7/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Masonry 5/7/2020 Approved DANIEL MC AULIFFE
Reinforced Concrete Frame 5/7/2020 Not Ready for Inspection DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 5/8/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 5/8/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Masonry 5/8/2020 Approved DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 5/8/2020 Partial Approval DANIEL MC AULIFFE
Reinforced Concrete Frame 5/8/2020 Partial Approval DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 5/11/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 5/11/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Masonry 5/11/2020 Approved DANIEL MC AULIFFE
Reinforced Concrete Frame 5/11/2020 Partial Inspection DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 5/12/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 5/12/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Masonry 5/12/2020 Approved DANIEL MC AULIFFE
Footing/Foundation/Slab 5/12/2020 Partial Approval DANIEL MC AULIFFE
Reinforced Concrete Frame 5/12/2020 Partial Approval DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 5/13/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 5/13/2020 Approved DANIEL MC AULIFFE
Reinforced Concrete Frame 5/13/2020 Partial Inspection DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 5/14/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 5/14/2020 Approved DANIEL MC AULIFFE
Reinforced Concrete Frame 5/14/2020 Partial Approval DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 5/15/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 5/15/2020 Approved DANIEL MC AULIFFE
Reinforced Concrete Frame 5/15/2020 Partial Approval DANIEL MC AULIFFE
Reinforced Concrete Frame 5/18/2020 Partial Approval DANIEL MC AULIFFE
Reinforced Concrete Frame 5/19/2020 Partial Approval DANIEL MC AULIFFE
Reinforced Concrete Frame 5/20/2020 Partial Approval DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 5/21/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 5/21/2020 Approved DANIEL MC AULIFFE
Reinforced Concrete Frame 5/21/2020 Partial Approval DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 5/22/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 5/22/2020 Approved DANIEL MC AULIFFE
Pre-Inspection 5/22/2020 Partial Approval DANIEL MC AULIFFE
Reinforced Concrete Frame 5/22/2020 Partial Approval DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 5/26/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 5/26/2020 Approved DANIEL MC AULIFFE
Reinforced Concrete Frame 5/26/2020 Partial Approval DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 5/27/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 5/27/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Masonry 5/27/2020 Approved DANIEL MC AULIFFE
Reinforced Concrete Frame 5/27/2020 Partial Approval DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 5/28/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 5/28/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Masonry 5/28/2020 Approved DANIEL MC AULIFFE
Reinforced Concrete Frame 5/28/2020 Partial Approval DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 5/29/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Masonry 5/29/2020 Approved DANIEL MC AULIFFE
Reinforced Concrete Frame 5/29/2020 Partial Inspection DANIEL MC AULIFFE
Pre-Inspection 5/30/2020 Partial Approval LARRY ARNICK
Reinforced Concrete Frame 5/30/2020 Off-Hour Fees Due
Deputy Pre-Stress Concrete 6/1/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Masonry 6/1/2020 Conditional Approval DANIEL MC AULIFFE
Pre-Inspection 6/1/2020 Partial Inspection DANIEL MC AULIFFE
Reinforced Concrete Frame 6/1/2020 Partial Inspection DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 6/2/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 6/2/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Masonry 6/2/2020 Approved DANIEL MC AULIFFE
Reinforced Concrete Frame 6/2/2020 Not Ready for Inspection DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 6/3/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 6/3/2020 Approved DANIEL MC AULIFFE
Reinforced Concrete Frame 6/3/2020 Partial Approval DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 6/4/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 6/4/2020 Approved DANIEL MC AULIFFE
Reinforced Concrete Frame 6/4/2020 Partial Inspection DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 6/5/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 6/5/2020 Approved DANIEL MC AULIFFE
Reinforced Concrete Frame 6/5/2020 Partial Approval DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 6/8/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 6/8/2020 Approved DANIEL MC AULIFFE
Footing/Foundation/Slab 6/8/2020 Partial Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 6/8/2020 Not Ready for Inspection DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 6/9/2020 Approved DANIEL MC AULIFFE
Reinforced Concrete Frame 6/9/2020 Partial Approval DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 6/10/2020 Approved DANIEL MC AULIFFE
Reinforced Concrete Frame 6/10/2020 Partial Approval DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 6/11/2020 Approved DANIEL MC AULIFFE
Reinforced Concrete Frame 6/11/2020 Partial Approval DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 6/12/2020 Approved DANIEL MC AULIFFE
Reinforced Concrete Frame 6/12/2020 Partial Approval DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 6/15/2020 Approved DANIEL MC AULIFFE
Footing/Foundation/Slab 6/15/2020 Partial Inspection DANIEL MC AULIFFE
Reinforced Concrete Frame 6/15/2020 Partial Approval JAMES POWERS
Reinforced Concrete Frame 6/15/2020 Partial Inspection DANIEL MC AULIFFE
Footing/Foundation/Slab 6/16/2020 Partial Inspection DANIEL MC AULIFFE
Reinforced Concrete Frame 6/17/2020 Partial Approval DANIEL MC AULIFFE
Reinforced Concrete Frame 6/18/2020 Partial Inspection DANIEL MC AULIFFE
Reinforced Concrete Frame 6/19/2020 Partial Inspection DANIEL MC AULIFFE
Reinforced Concrete Frame 6/22/2020 Partial Approval DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 6/23/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 6/23/2020 Conditional Approval DANIEL MC AULIFFE
Reinforced Concrete Frame 6/23/2020 Partial Inspection DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 6/24/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 6/24/2020 Approved DANIEL MC AULIFFE
Reinforced Concrete Frame 6/24/2020 Partial Approval DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 6/25/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 6/25/2020 Approved DANIEL MC AULIFFE
Footing/Foundation/Slab 6/25/2020 Partial Approval DAVID BURKHEAD
Reinforced Concrete Frame 6/25/2020 Not Ready for Inspection DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 6/26/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 6/26/2020 Approved DANIEL MC AULIFFE
Reinforced Concrete Frame 6/26/2020 Not Ready for Inspection DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 6/29/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 6/29/2020 Approved DANIEL MC AULIFFE
Footing/Foundation/Slab 6/29/2020 Partial Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 6/29/2020 Not Ready for Inspection DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 6/30/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 6/30/2020 Conditional Approval DANIEL MC AULIFFE
Footing/Foundation/Slab 6/30/2020 Off-Hour Fees Due
Reinforced Concrete Frame 6/30/2020 Not Ready for Inspection DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 7/1/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 7/1/2020 Approved DANIEL MC AULIFFE
Reinforced Concrete Frame 7/1/2020 Partial Inspection DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 7/2/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 7/2/2020 Approved DANIEL MC AULIFFE
Reinforced Concrete Frame 7/2/2020 Not Ready for Inspection DANIEL MC AULIFFE
Reinforced Concrete Frame 7/6/2020 Partial Approval DANIEL MC AULIFFE
Reinforced Concrete Frame 7/7/2020 Partial Approval DANIEL MC AULIFFE
Reinforced Concrete Frame 7/8/2020 Partial Approval DANIEL MC AULIFFE
Reinforced Concrete Frame 7/9/2020 Partial Approval DANIEL MC AULIFFE
Footing/Foundation/Slab 7/10/2020 Partial Inspection DANIEL MC AULIFFE
Reinforced Concrete Frame 7/13/2020 Partial Approval DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 7/14/2020 Conditional Approval DANIEL MC AULIFFE
Reinforced Concrete Frame 7/14/2020 Not Ready for Inspection DANIEL MC AULIFFE
Reinforced Concrete Frame 7/14/2020 Partial Approval DANIEL MC AULIFFE
Reinforced Masonry Frame 7/14/2020 Not Ready for Inspection DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 7/15/2020 Approved DANIEL MC AULIFFE
Insulation 7/15/2020 Partial Approval DANIEL MC AULIFFE
Reinforced Concrete Frame 7/15/2020 Partial Inspection DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 7/16/2020 Conditional Approval DANIEL MC AULIFFE
Reinforced Concrete Frame 7/16/2020 Not Ready for Inspection DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 7/17/2020 Approved DANIEL MC AULIFFE
Reinforced Concrete Frame 7/17/2020 Partial Approval DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 7/20/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 7/20/2020 Approved DANIEL MC AULIFFE
Reinforced Concrete Frame 7/20/2020 Partial Approval DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 7/21/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 7/21/2020 Approved DANIEL MC AULIFFE
Drywall Nailing 7/21/2020 Partial Approval DANIEL MC AULIFFE
Insulation 7/21/2020 Partial Approval DANIEL MC AULIFFE
Reinforced Concrete Frame 7/21/2020 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 7/22/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 7/22/2020 Approved DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 7/22/2020 Partial Approval DANIEL MC AULIFFE
Reinforced Concrete Frame 7/22/2020 Off-Hour Fees Due
Deputy Pre-Stress Concrete 7/23/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 7/23/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 7/24/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 7/24/2020 Approved DANIEL MC AULIFFE
Reinforced Concrete Frame 7/24/2020 Not Ready for Inspection DANIEL MC AULIFFE
Reinforced Masonry Frame 7/24/2020 Partial Inspection DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 7/27/2020 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 7/28/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 7/28/2020 Approved DANIEL MC AULIFFE
Reinforced Concrete Frame 7/28/2020 Partial Approval DANIEL MC AULIFFE
Reinforced Concrete Frame 7/28/2020 Partial Inspection DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 7/29/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 7/29/2020 Approved DANIEL MC AULIFFE
Reinforced Concrete Frame 7/29/2020 Partial Approval LARRY ARNICK
Deputy Pre-Stress Concrete 7/30/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 7/30/2020 Approved DANIEL MC AULIFFE
Reinforced Concrete Frame 7/30/2020 Partial Inspection DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 7/31/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 7/31/2020 Approved DANIEL MC AULIFFE
Reinforced Concrete Frame 7/31/2020 Not Ready for Inspection DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 8/3/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 8/3/2020 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 8/14/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 8/14/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 8/17/2020 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 8/17/2020 Conditional Approval DAVID BURKHEAD
Deputy Pre-Stress Concrete 8/18/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 8/18/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 8/19/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 8/19/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 8/20/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 8/20/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 9/3/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 9/3/2020 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 9/4/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 9/4/2020 Approved DANIEL MC AULIFFE
Drywall Nailing 9/4/2020 Partial Inspection DANIEL MC AULIFFE
Reinforced Concrete Frame 9/4/2020 Partial Approval DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 9/8/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 9/8/2020 Approved DANIEL MC AULIFFE
Drywall Nailing 9/8/2020 Partial Inspection DANIEL MC AULIFFE
Light Gage Steel Frame 9/8/2020 Partial Approval DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 9/9/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 9/9/2020 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 9/10/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 9/10/2020 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 9/11/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 9/11/2020 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 9/14/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 9/14/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 9/15/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 9/15/2020 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 9/16/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 9/17/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 9/18/2020 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 9/21/2020 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 9/22/2020 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 9/23/2020 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 9/24/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 9/25/2020 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 9/28/2020 Approved DANIEL MC AULIFFE
Deputy Fireproofing 10/6/2020 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 10/6/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 10/6/2020 Approved DANIEL MC AULIFFE
Deputy Fireproofing 10/7/2020 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 10/7/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 10/7/2020 Approved DANIEL MC AULIFFE
Deputy Fireproofing 10/8/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 10/8/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 10/8/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Fireproofing 10/9/2020 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 10/9/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/9/2020 Partial Approval JAMES POWERS
Deputy Fireproofing 10/13/2020 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 10/13/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/13/2020 Partial Approval JAMES POWERS
Deputy Fireproofing 10/15/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 10/15/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Fireproofing 10/16/2020 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 10/16/2020 Approved DANIEL MC AULIFFE
Deputy Fireproofing 10/19/2020 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 10/19/2020 Approved DANIEL MC AULIFFE
Deputy Fireproofing 10/20/2020 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 10/20/2020 Approved DANIEL MC AULIFFE
Deputy Fireproofing 10/21/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 10/21/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Fireproofing 10/27/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 10/27/2020 Approved DANIEL MC AULIFFE
Deputy Fireproofing 10/28/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 10/28/2020 Approved DANIEL MC AULIFFE
Deputy Fireproofing 10/29/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 10/29/2020 Approved DANIEL MC AULIFFE
Deputy Fireproofing 10/30/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 10/30/2020 Approved DANIEL MC AULIFFE
Deputy Fireproofing 11/2/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 11/2/2020 Approved DANIEL MC AULIFFE
Deputy Fireproofing 11/4/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 11/4/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Fireproofing 11/5/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 11/5/2020 Approved DANIEL MC AULIFFE
Deputy Fireproofing 11/6/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 11/6/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Fireproofing 11/9/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 11/9/2020 Approved DANIEL MC AULIFFE
Deputy Fireproofing 11/10/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 11/10/2020 Approved DANIEL MC AULIFFE
Deputy Fireproofing 11/13/2020 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 11/13/2020 Approved DANIEL MC AULIFFE
Deputy Fireproofing 11/16/2020 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 11/16/2020 Approved DANIEL MC AULIFFE
Deputy Fireproofing 11/17/2020 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 11/17/2020 Approved DANIEL MC AULIFFE
Deputy Fireproofing 11/18/2020 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 11/18/2020 Approved DANIEL MC AULIFFE
Deputy Fireproofing 11/19/2020 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 11/19/2020 Approved DANIEL MC AULIFFE
Deputy Fireproofing 11/23/2020 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 11/23/2020 Approved DANIEL MC AULIFFE
Deputy Fireproofing 11/24/2020 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 11/24/2020 Approved DANIEL MC AULIFFE
Deputy Fireproofing 11/25/2020 Conditional Approval NICK DANERI
Deputy Pre-Stress Concrete 11/25/2020 Conditional Approval NICK DANERI
Deputy Fireproofing 11/30/2020 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 11/30/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 11/30/2020 Approved DANIEL MC AULIFFE
Deputy Fireproofing 12/1/2020 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 12/1/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 12/1/2020 Approved DANIEL MC AULIFFE
Deputy Fireproofing 12/2/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 12/2/2020 Approved DANIEL MC AULIFFE
Deputy Fireproofing 12/3/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 12/3/2020 Approved DANIEL MC AULIFFE
Deputy Fireproofing 12/4/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 12/4/2020 Approved DANIEL MC AULIFFE
Deputy Fireproofing 12/8/2020 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 12/8/2020 Approved DANIEL MC AULIFFE
Deputy Fireproofing 12/9/2020 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 12/9/2020 Approved DANIEL MC AULIFFE
Deputy Fireproofing 12/10/2020 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 12/10/2020 Approved DANIEL MC AULIFFE
Deputy Fireproofing 12/11/2020 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 12/11/2020 Approved DANIEL MC AULIFFE
Deputy Fireproofing 12/14/2020 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 12/14/2020 Approved DANIEL MC AULIFFE
Deputy Fireproofing 12/15/2020 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 12/15/2020 Approved DANIEL MC AULIFFE
Deputy Fireproofing 12/16/2020 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 12/16/2020 Approved DANIEL MC AULIFFE
Deputy Fireproofing 12/17/2020 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 12/17/2020 Approved DANIEL MC AULIFFE
Deputy Fireproofing 12/18/2020 Conditional Approval DAVID BURKHEAD
Deputy Pre-Stress Concrete 12/18/2020 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 12/21/2020 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 12/21/2020 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 1/5/2021 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 1/5/2021 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 1/6/2021 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 1/6/2021 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 1/7/2021 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 1/7/2021 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 1/8/2021 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 1/8/2021 Conditional Approval NICK DANERI
Deputy Pre-Stress Concrete 1/11/2021 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 1/11/2021 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 1/20/2021 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 1/20/2021 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 1/21/2021 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 1/21/2021 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 1/22/2021 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 1/22/2021 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 1/25/2021 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 1/25/2021 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 1/26/2021 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 1/26/2021 Approved DANIEL MC AULIFFE
Light Gage Steel Frame 1/26/2021 Partial Approval DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 1/27/2021 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 1/27/2021 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 1/28/2021 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 1/28/2021 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 1/29/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 1/29/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Fireproofing 2/3/2021 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 2/3/2021 Approved DANIEL MC AULIFFE
Deputy Fireproofing 2/4/2021 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 2/4/2021 Approved DANIEL MC AULIFFE
Deputy Fireproofing 2/5/2021 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 2/5/2021 Approved DANIEL MC AULIFFE
Deputy Fireproofing 2/8/2021 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 2/8/2021 Approved DANIEL MC AULIFFE
Deputy Fireproofing 2/17/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 2/17/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Fireproofing 2/18/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 2/18/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Fireproofing 2/19/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 2/19/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Fireproofing 2/22/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 2/22/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Fireproofing 2/23/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 2/23/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Fireproofing 2/26/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 2/26/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Fireproofing 3/1/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 3/1/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 3/2/2021 Approved DANIEL MC AULIFFE
Deputy Fireproofing 3/2/2021 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 3/2/2021 Approved DANIEL MC AULIFFE
Deputy Drilled-In Anchors 3/3/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Fireproofing 3/3/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 3/3/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 3/4/2021 Approved DANIEL MC AULIFFE
Deputy Fireproofing 3/4/2021 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 3/4/2021 Approved DANIEL MC AULIFFE
Deputy Drilled-In Anchors 3/5/2021 Approved DANIEL MC AULIFFE
Deputy Fireproofing 3/5/2021 Approved DANIEL MC AULIFFE
Deputy Drilled-In Anchors 3/8/2021 Approved DANIEL MC AULIFFE
Deputy Fireproofing 3/8/2021 Approved DANIEL MC AULIFFE
Deputy Drilled-In Anchors 3/10/2021 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 3/10/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 3/11/2021 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 3/11/2021 Approved DANIEL MC AULIFFE
Deputy Drilled-In Anchors 3/12/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 3/12/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 3/15/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 3/15/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 3/16/2021 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 3/16/2021 Approved DANIEL MC AULIFFE
Deputy Fireproofing 3/17/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Fireproofing 3/18/2021 Approved DANIEL MC AULIFFE
Deputy Fireproofing 3/19/2021 Approved DANIEL MC AULIFFE
Deputy Fireproofing 3/22/2021 Approved DANIEL MC AULIFFE
Deputy Drilled-In Anchors 3/23/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Fireproofing 3/23/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 3/24/2021 Approved DANIEL MC AULIFFE
Deputy Drilled-In Anchors 3/25/2021 Approved DANIEL MC AULIFFE
Deputy Drilled-In Anchors 3/26/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 3/30/2021 Approved DANIEL MC AULIFFE
Deputy Fireproofing 3/31/2021 Approved DANIEL MC AULIFFE
Deputy Fireproofing 4/1/2021 Approved DANIEL MC AULIFFE
Deputy Fireproofing 4/5/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Fireproofing 4/6/2021 Approved DANIEL MC AULIFFE
Deputy Fireproofing 4/7/2021 Approved DANIEL MC AULIFFE
Final 5/7/2021 Permit Finaled DANIEL MC AULIFFE
SUSMP-Std. Urban Storm Water 5/7/2021 Approved DANIEL MC AULIFFE
SWPPP-Const. Storm Water 5/7/2021 Completed DANIEL MC AULIFFE
Smoke Detectors 5/7/2021 Approved DANIEL MC AULIFFE