Footing/Foundation/Slab
|
6/25/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
6/26/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
6/26/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
6/27/2018
|
Partial Approval
|
JOEY BUCHANAN
|
|
Deputy Steel/Welding
|
6/27/2018
|
Partial Approval
|
JOEY BUCHANAN
|
|
Footing/Foundation/Slab
|
6/27/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
6/28/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
6/28/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
6/29/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
6/29/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
7/2/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
7/2/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
7/6/2018
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Steel/Welding
|
7/6/2018
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Reinf. Concrete
|
7/9/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
7/9/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
7/10/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
7/10/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
7/11/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
7/11/2018
|
Partial Approval
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
7/11/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
7/12/2018
|
Partial Approval
|
JOEY BUCHANAN
|
|
Deputy Steel/Welding
|
7/12/2018
|
Partial Approval
|
JOEY BUCHANAN
|
|
Excavation/Setback/Form/Re-Bar
|
7/17/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
7/18/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
7/18/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
7/19/2018
|
Approved
|
JOEY BUCHANAN
|
|
Footing/Foundation/Slab
|
7/19/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
7/20/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
7/23/2018
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
7/23/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
7/24/2018
|
Partial Approval
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/25/2018
|
Partial Approval
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
7/25/2018
|
Partial Approval
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
7/26/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
7/27/2018
|
Partial Approval
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
7/27/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
7/30/2018
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
7/30/2018
|
Approved
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
7/31/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
8/1/2018
|
Partial Approval
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
8/1/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
8/2/2018
|
Partial Approval
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
8/6/2018
|
Partial Approval
|
JOEY BUCHANAN
|
|
Footing/Foundation/Slab
|
8/7/2018
|
Partial Approval
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
8/9/2018
|
Partial Approval
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
8/10/2018
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
8/13/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
8/14/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
8/15/2018
|
Approved
|
JOEY BUCHANAN
|
|
Footing/Foundation/Slab
|
8/15/2018
|
Partial Approval
|
JOEY BUCHANAN
|
|
Deputy Reinf. Concrete
|
8/16/2018
|
Partial Approval
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
8/16/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
8/17/2018
|
Partial Approval
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
8/17/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
8/20/2018
|
Partial Approval
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
8/20/2018
|
Order to Comply Issued
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
8/22/2018
|
Partial Approval
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
8/22/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
8/23/2018
|
Partial Approval
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
8/23/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
8/24/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
8/27/2018
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
8/27/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
8/28/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
8/29/2018
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
8/30/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
8/31/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
9/5/2018
|
Partial Approval
|
JAMES POWERS
|
|
Excavation/Setback/Form/Re-Bar
|
9/5/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
9/6/2018
|
Conditional Approval
|
TED RIES
|
|
Deputy Steel/Welding
|
9/6/2018
|
Conditional Approval
|
TED RIES
|
|
Deputy Reinf. Concrete
|
9/7/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
9/10/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
9/11/2018
|
Partial Approval
|
JAMES POWERS
|
|
Excavation/Setback/Form/Re-Bar
|
9/11/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
9/14/2018
|
Partial Approval
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
9/14/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
9/17/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
9/18/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
9/19/2018
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
9/19/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
9/20/2018
|
Partial Approval
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
9/20/2018
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
9/25/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
9/26/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
9/27/2018
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
9/28/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
9/28/2018
|
Partial Approval
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
9/28/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
10/1/2018
|
Partial Approval
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
10/2/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
10/3/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
10/5/2018
|
Partial Approval
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
10/5/2018
|
Partial Approval
|
JAMES POWERS
|
|
Excavation/Setback/Form/Re-Bar
|
10/8/2018
|
Partial Approval
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
10/8/2018
|
Off-Hour Fees Due
|
|
|
Excavation/Setback/Form/Re-Bar
|
10/10/2018
|
Off-Hour Fees Due
|
|
|
Floor/Roof Diaphrgm/Shear Wall
|
10/10/2018
|
Partial Approval
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
10/12/2018
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
10/17/2018
|
Partial Approval
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
10/18/2018
|
Partial Approval
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
10/24/2018
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
10/24/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
10/25/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
10/25/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
10/26/2018
|
Partial Approval
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
10/26/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
10/29/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
10/30/2018
|
Partial Approval
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
10/30/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
10/31/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
11/1/2018
|
Partial Approval
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
11/1/2018
|
Approved
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
11/2/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
11/5/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
11/5/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
11/6/2018
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Footing/Foundation/Slab
|
11/6/2018
|
Partial Approval
|
LESLIE TRUJILLO
|
|
Deputy Reinf. Concrete
|
11/7/2018
|
Partial Approval
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
11/7/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
11/8/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
11/9/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
11/13/2018
|
Partial Approval
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
11/13/2018
|
Partial Approval
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
11/13/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
11/14/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
11/15/2018
|
Partial Approval
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
11/15/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
11/16/2018
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Footing/Foundation/Slab
|
11/16/2018
|
Partial Approval
|
LESLIE TRUJILLO
|
|
Footing/Foundation/Slab
|
11/19/2018
|
Partial Approval
|
LESLIE TRUJILLO
|
|
Deputy Reinf. Concrete
|
11/20/2018
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Footing/Foundation/Slab
|
11/20/2018
|
Partial Approval
|
LESLIE TRUJILLO
|
|
Deputy Reinf. Concrete
|
11/21/2018
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Reinf. Concrete
|
11/26/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
11/27/2018
|
Partial Approval
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
11/27/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
11/28/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
11/29/2018
|
Partial Approval
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
11/29/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
11/30/2018
|
Partial Approval
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
11/30/2018
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
12/6/2018
|
Partial Approval
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
12/14/2018
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
12/21/2018
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
12/26/2018
|
Partial Approval
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
12/28/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
1/3/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Footing/Foundation/Slab
|
1/3/2019
|
Partial Approval
|
LESLIE TRUJILLO
|
|
Footing/Foundation/Slab
|
1/7/2019
|
Partial Approval
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
1/14/2019
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
1/23/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
4/22/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Reinf. Masonry
|
4/24/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Grading
|
5/3/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Grading
|
5/8/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Grading
|
5/9/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
5/13/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
5/14/2019
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Reinf. Concrete
|
5/15/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
5/15/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
5/16/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
5/16/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
5/17/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
5/17/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
5/20/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
5/22/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
5/23/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
5/24/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
5/28/2019
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Reinf. Concrete
|
5/29/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
6/4/2019
|
Conditional Approval
|
WINSTON DUNNING
|
|
Deputy Steel/Welding
|
6/5/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
6/6/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
6/10/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
6/11/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
6/12/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
6/13/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
6/13/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
6/14/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
6/14/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
6/17/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
6/18/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
6/19/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
6/20/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
6/21/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
6/24/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Pre-Stress Concrete
|
6/25/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
6/25/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
6/25/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Pre-Stress Concrete
|
6/26/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
6/26/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Pre-Stress Concrete
|
6/27/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
6/27/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
7/17/2019
|
Partial Approval
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
7/23/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
9/5/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Reinf. Concrete
|
9/6/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Reinf. Masonry
|
9/9/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
9/10/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
9/11/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
9/12/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
9/13/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
9/17/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
9/18/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
9/19/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
9/20/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
9/26/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Other (see comments)
|
10/11/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
10/15/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
10/16/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
10/17/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
10/18/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
10/21/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Pre-Stress Concrete
|
10/21/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
10/21/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
10/21/2019
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Drilled-In Anchors
|
10/22/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Pre-Stress Concrete
|
10/22/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
10/22/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
10/22/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
10/23/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Pre-Stress Concrete
|
10/23/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
10/23/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
10/23/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
10/24/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Pre-Stress Concrete
|
10/24/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
10/24/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
10/24/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
10/25/2019
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Pre-Stress Concrete
|
10/25/2019
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Reinf. Concrete
|
10/25/2019
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Reinf. Masonry
|
10/25/2019
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Reinf. Concrete
|
10/30/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
10/30/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
10/31/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
10/31/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
11/1/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
11/1/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
2/27/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
2/28/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
8/18/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
8/19/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
8/20/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
8/21/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
12/10/2020
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
12/10/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Fireproofing
|
12/29/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Fireproofing
|
12/30/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Fireproofing
|
12/31/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Fireproofing
|
1/13/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Fireproofing
|
1/14/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Fireproofing
|
1/15/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Fireproofing
|
1/19/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Fireproofing
|
1/20/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Fireproofing
|
1/21/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Fireproofing
|
1/22/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Fireproofing
|
1/25/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Fireproofing
|
1/26/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Fireproofing
|
1/27/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Fireproofing
|
1/28/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Fireproofing
|
1/29/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Fireproofing
|
2/1/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Fireproofing
|
2/2/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Fireproofing
|
2/3/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Fireproofing
|
2/10/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Fireproofing
|
2/11/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Fireproofing
|
2/12/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
2/12/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Fireproofing
|
2/16/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Fireproofing
|
2/17/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
5/10/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
11/5/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
11/8/2021
|
Conditional Approval
|
TED RIES
|
|
Deputy Steel/Welding
|
11/9/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
11/10/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
2/3/2022
|
Partial Approval
|
JAMES POWERS
|
|
Final
|
3/6/2023
|
Permit Finaled
|
JAMES POWERS
|