744 S FIGUEROA ST 90017

Certificate Information: 744 S FIGUEROA ST 90017

Application / Permit
17010-10002-04815
Plan Check / Job No.
B19LA20276
Group
Building
Type
Nonbldg-New
Sub-Type
Commercial
Primary Use
(23) Shoring (Temporary)
Work Description
PROPOSED SHORING FOR A MIXED USE , 41 STORY BUILDING WITH 4 BASEMENT LEVELS. TIED BACK SHORING WITH 4 ROWS OF TIEBACKS. THE N'LY PROPERTY LINE HAS RAKERS WITH TIED BACK SHORING AT THE RAKER FOOTING. THIS PERMIT TO BE ISSUED AS AN EARLY START PERMIT FOR SHORING AND GRADING ONLY. A LETTER FROM THE PEER REVIEWERS DATED OCT 21ST 2019 HAS BEEN COMPLETED BY THE PEER REVIEWERS APPROVING THE REQUIRED DEPTH TO THE BOTTOM OF THE FOOTINGS/EXCAVATIONS.
Permit Issued
Issued on 6/25/2020
Issuing Office
Metro
Current Status
Permit Finaled on 10/1/2024
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 9/24/2019 APPLICANT
Assigned to Plan Check Engineer 10/3/2019 JOHN VASQUEZ
Corrections Issued 10/9/2019 JOHN VASQUEZ
Quality Review Completed 10/15/2019 CHARLES CHANG
Building Plans Picked Up 10/15/2019 APPLICANT
Applicant returned to address corrections 1/21/2020 JOHN VASQUEZ
Plan Check Approved 5/19/2020 JOHN VASQUEZ
Issued 6/25/2020 LADBS
Permit Finaled 10/1/2024 NICK DANERI

Permit Application Clearance Information

Eng Process Fee Ord 176,300 Cleared 1/21/2020 ELAINE LEI
Green Code Cleared 1/22/2020 JOHN VASQUEZ
Address approval Cleared 1/23/2020 ELENA LOPEZ
Bicycle Parking Cleared 1/23/2020 ELENA LOPEZ
Highway dedication Cleared 1/23/2020 ELENA LOPEZ
Highway dedication Cleared 1/23/2020 ELENA LOPEZ
Permit Cleared 1/23/2020 ELENA LOPEZ
Permit Cleared 1/23/2020 ELENA LOPEZ
Sewer availability Cleared 1/23/2020 ELENA LOPEZ
Hydrant and Access approval Cleared 1/24/2020 ROBERT DUFF
Miscellaneous Cleared 1/29/2020 RICHARD LOUIE
DAS Clearance Cleared 2/11/2020 JOHN VASQUEZ
Driveway location Cleared 2/12/2020 EDUARDO HERMOSO
Fire Marshall Fire Life Safety Cleared 2/12/2020 WILLIAM JOHNS
Internal circulation Cleared 2/12/2020 EDUARDO HERMOSO
Low Impact Development Cleared 2/12/2020 AMMAR ELTAWIL
Roof/Waste drainage to street Cleared 2/12/2020 JUAN ASHTON
Stormwater Pollution Mitigatn Cleared 2/12/2020 AMMAR ELTAWIL
Trees in Parkway Cleared 2/18/2020 ADRIAN SANCHEZ
"D" conditions Cleared 4/23/2020 MINDY NGUYEN
CPC Cleared 4/23/2020 MINDY NGUYEN
Miscellaneous Cleared 4/23/2020 MINDY NGUYEN
Opn space landscape/Water mgmt Cleared 4/23/2020 MINDY NGUYEN
Site Plan review Cleared 4/23/2020 MINDY NGUYEN
ZI Cleared 4/23/2020 MINDY NGUYEN
ZI Cleared 4/23/2020 MINDY NGUYEN
Work Adjacent to Public Way Cleared 5/7/2020 BOK GOH
Encroachment in public way Cleared 5/12/2020 ELENA LOPEZ
Excavation more than 5-ft deep Cleared 5/15/2020 CALOSHA APPROVED
Food Service Establishment Cleared 5/15/2020 AMMAR ELTAWIL
Work Adjacent to Public Way Cleared 5/15/2020 BOK GOH

Contact Information

Contractor Lendlease (Us) Construction Inc; Lic. No.: 483550-B 200 PARK AVENUE 9TH FLOOR      NEW YORK, NY 10166
Engineer Cefali,, David Allen; Lic. No.: S3658 4344 LAUREL CANYON BLVD_STE 3      STUDIO CITY, CA 91604
Engineer Powers,, Brian Frederick; Lic. No.: C75902 2090 WEST 31ST STREET      LOS ANGELES, CA 90018
Engineer Tang,, Stanley Siu Kei; Lic. No.: C56178 1105 N AVON STREET      BURBANK, CA 91505

Inspector Information

NICK DANERI, (213) 202-5615 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 7/8/2020 Not Ready for Inspection NICK DANERI
Pre-Inspection 7/10/2020 Conditional Approval NICK DANERI
Deputy Other (see comments) 7/23/2020 Conditional Approval NICK DANERI
Deputy Other (see comments) 7/24/2020 Conditional Approval NICK DANERI
Deputy Steel/Welding 7/24/2020 Conditional Approval NICK DANERI
Piling/Pier/Caisson 7/24/2020 Partial Inspection NICK DANERI
Deputy Reinf. Concrete 7/27/2020 Conditional Approval NICK DANERI
Deputy Steel/Welding 7/27/2020 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 7/28/2020 Conditional Approval NICK DANERI
Deputy Steel/Welding 7/28/2020 Conditional Approval NICK DANERI
Deputy Other (see comments) 7/29/2020 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 7/29/2020 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 7/30/2020 Conditional Approval NICK DANERI
Deputy Steel/Welding 8/11/2020 Conditional Approval NICK DANERI
Deputy Grading 8/19/2020 Conditional Approval NICK DANERI
Deputy Grading 8/20/2020 Conditional Approval NICK DANERI
Deputy Grading 8/26/2020 Conditional Approval NICK DANERI
Deputy Grading 8/27/2020 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 8/27/2020 Conditional Approval NICK DANERI
Deputy Grading 8/28/2020 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 8/28/2020 Conditional Approval NICK DANERI
Deputy Grading 8/31/2020 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 8/31/2020 Conditional Approval NICK DANERI
Deputy Grading 9/1/2020 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 9/1/2020 Conditional Approval NICK DANERI
Deputy Grading 9/2/2020 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 9/2/2020 Conditional Approval NICK DANERI
Deputy Grading 9/3/2020 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 9/3/2020 Conditional Approval NICK DANERI
Deputy Steel/Welding 9/3/2020 Conditional Approval NICK DANERI
Deputy Grading 9/4/2020 Conditional Approval NICK DANERI
Deputy Steel/Welding 9/4/2020 Conditional Approval NICK DANERI
Deputy Grading 9/8/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 9/10/2020 Conditional Approval NICK DANERI
Deputy Steel/Welding 9/11/2020 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 9/14/2020 Conditional Approval NICK DANERI
Deputy Grading 9/15/2020 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 9/15/2020 Conditional Approval NICK DANERI
Deputy Grading 9/16/2020 Conditional Approval NICK DANERI
Deputy Grading 9/17/2020 Conditional Approval NICK DANERI
Deputy Grading 9/18/2020 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 9/18/2020 Conditional Approval NICK DANERI
Deputy Steel/Welding 9/18/2020 Conditional Approval NICK DANERI
Deputy Grading 9/23/2020 Conditional Approval NICK DANERI
Deputy Steel/Welding 9/24/2020 Conditional Approval NICK DANERI
Deputy Steel/Welding 9/25/2020 Conditional Approval NICK DANERI
Deputy Steel/Welding 9/29/2020 Conditional Approval NICK DANERI
Deputy Steel/Welding 9/30/2020 Conditional Approval NICK DANERI
Deputy Steel/Welding 10/1/2020 Conditional Approval NICK DANERI
Deputy Grading 10/6/2020 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 10/6/2020 Conditional Approval NICK DANERI
Deputy Grading 10/8/2020 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 10/8/2020 Conditional Approval NICK DANERI
Deputy Steel/Welding 10/8/2020 Conditional Approval NICK DANERI
Deputy Grading 10/9/2020 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 10/9/2020 Conditional Approval NICK DANERI
Deputy Steel/Welding 10/14/2020 Conditional Approval NICK DANERI
Deputy Grading 10/15/2020 Conditional Approval NICK DANERI
Deputy Steel/Welding 10/16/2020 Conditional Approval NICK DANERI
Deputy Grading 10/22/2020 Conditional Approval NICK DANERI
Deputy Grading 10/23/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 10/23/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Grading 10/26/2020 Conditional Approval NICK DANERI
Deputy Grading 10/27/2020 Conditional Approval NICK DANERI
Deputy Grading 10/28/2020 Conditional Approval NICK DANERI
Deputy Steel/Welding 11/2/2020 Conditional Approval NICK DANERI
Deputy Grading 11/13/2020 Conditional Approval NICK DANERI
Deputy Steel/Welding 11/13/2020 Conditional Approval NICK DANERI
Deputy Grading 11/16/2020 Conditional Approval NICK DANERI
Deputy Grading 11/17/2020 Conditional Approval NICK DANERI
Deputy Grading 11/18/2020 Conditional Approval NICK DANERI
Deputy Grading 12/3/2020 Conditional Approval NICK DANERI
Deputy Steel/Welding 12/11/2020 Conditional Approval NICK DANERI
Deputy Steel/Welding 12/14/2020 Conditional Approval NICK DANERI
Deputy Steel/Welding 12/15/2020 Conditional Approval NICK DANERI
Deputy Steel/Welding 12/16/2020 Conditional Approval NICK DANERI
Deputy Steel/Welding 12/17/2020 Conditional Approval NICK DANERI
Deputy Steel/Welding 12/18/2020 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 12/22/2020 Conditional Approval NICK DANERI
Deputy Steel/Welding 12/23/2020 Conditional Approval NICK DANERI
Deputy Steel/Welding 12/24/2020 Conditional Approval NICK DANERI
Footing/Foundation/Slab 12/29/2020 Partial Inspection NICK DANERI
Excavation/Setback/Form/Re-Bar 1/6/2021 Partial Inspection NICK DANERI
Deputy Steel/Welding 1/21/2021 Conditional Approval NICK DANERI
Deputy Grading 1/22/2021 Conditional Approval NICK DANERI
Deputy Steel/Welding 1/22/2021 Conditional Approval NICK DANERI
Footing/Foundation/Slab 1/22/2021 Partial Approval NICK DANERI
Deputy Grading 1/25/2021 Conditional Approval NICK DANERI
Deputy Steel/Welding 1/27/2021 Conditional Approval NICK DANERI
Deputy Steel/Welding 1/28/2021 Conditional Approval NICK DANERI
Deputy Steel/Welding 1/29/2021 Conditional Approval NICK DANERI
Deputy Steel/Welding 2/1/2021 Conditional Approval NICK DANERI
Deputy Steel/Welding 2/2/2021 Conditional Approval NICK DANERI
Deputy Steel/Welding 2/3/2021 Conditional Approval NICK DANERI
Deputy Steel/Welding 2/4/2021 Conditional Approval NICK DANERI
Footing/Foundation/Slab 2/12/2021 Partial Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 2/23/2021 Partial Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 2/26/2021 Partial Approval NICK DANERI
Grading Pre-Inspection 2/26/2021 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 3/1/2021 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 3/2/2021 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 3/3/2021 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 3/4/2021 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 3/5/2021 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 3/15/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 3/15/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 3/16/2021 Partial Approval JAMES POWERS
Deputy Shotcrete 3/16/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/17/2021 Conditional Approval NICK DANERI
Deputy Shotcrete 3/17/2021 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 3/18/2021 Conditional Approval NICK DANERI
Deputy Shotcrete 3/18/2021 Conditional Approval NICK DANERI
Footing/Foundation/Slab 3/18/2021 Partial Approval NICK DANERI
Deputy Reinf. Concrete 3/19/2021 Conditional Approval NICK DANERI
Deputy Shotcrete 3/19/2021 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 3/24/2021 Conditional Approval NICK DANERI
Footing/Foundation/Slab 3/24/2021 Partial Approval NICK DANERI
Deputy Reinf. Concrete 3/25/2021 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 3/26/2021 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 3/30/2021 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 3/31/2021 Conditional Approval NICK DANERI
Footing/Foundation/Slab 4/1/2021 Partial Approval NICK DANERI
Floor/Roof Diaphrgm/Shear Wall 4/8/2021 Partial Approval NICK DANERI
Deputy Reinf. Concrete 4/9/2021 Conditional Approval NICK DANERI
Deputy Shotcrete 4/9/2021 Conditional Approval NICK DANERI
Footing/Foundation/Slab 4/9/2021 Partial Approval NICK DANERI
Deputy Reinf. Concrete 4/12/2021 Conditional Approval NICK DANERI
Deputy Shotcrete 4/12/2021 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 4/13/2021 Conditional Approval NICK DANERI
Deputy Shotcrete 4/13/2021 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 4/14/2021 Conditional Approval NICK DANERI
Deputy Shotcrete 4/14/2021 Conditional Approval NICK DANERI
Footing/Foundation/Slab 4/14/2021 Partial Approval NICK DANERI
Deputy Reinf. Concrete 4/15/2021 Conditional Approval DANIEL COLLINS
Deputy Shotcrete 4/15/2021 Conditional Approval DANIEL COLLINS
Footing/Foundation/Slab 4/15/2021 Partial Approval DANIEL COLLINS
Footing/Foundation/Slab 4/19/2021 Partial Approval NICK DANERI
Footing/Foundation/Slab 4/20/2021 Partial Approval NICK DANERI
Footing/Foundation/Slab 4/22/2021 Partial Approval NICK DANERI
Reinforced Concrete Frame 4/29/2021 Partial Approval NICK DANERI
Floor/Roof Diaphrgm/Shear Wall 5/3/2021 Partial Approval NICK DANERI
Reinforced Concrete Frame 5/4/2021 Partial Approval NICK DANERI
Masonry Wall/Backfill 5/5/2021 Partial Approval NICK DANERI
Floor/Roof Diaphrgm/Shear Wall 5/6/2021 Partial Approval NICK DANERI
Footing/Foundation/Slab 5/14/2021 Partial Approval JAMES POWERS
Floor/Roof Diaphrgm/Shear Wall 5/20/2021 Partial Approval NICK DANERI
Floor/Roof Diaphrgm/Shear Wall 5/26/2021 Partial Approval NICK DANERI
Floor/Roof Diaphrgm/Shear Wall 7/13/2021 Partial Approval DANIEL MC AULIFFE
Reinforced Masonry Frame 7/14/2021 Partial Approval DANIEL MC AULIFFE
Reinforced Concrete Frame 9/9/2021 Not Ready for Inspection DANIEL MC AULIFFE
Reinforced Concrete Frame 9/13/2021 Partial Approval DANIEL MC AULIFFE
Reinforced Concrete Frame 9/17/2021 Partial Approval DANIEL MC AULIFFE
Pre-Inspection 9/20/2021 Partial Approval DANIEL MC AULIFFE
Reinforced Concrete Frame 9/20/2021 Partial Approval DANIEL MC AULIFFE
Reinforced Concrete Frame 9/22/2021 Partial Approval DANIEL MC AULIFFE
Reinforced Masonry Frame 9/27/2021 Partial Approval DANIEL MC AULIFFE
Masonry Wall/Backfill 9/29/2021 Partial Approval DANIEL MC AULIFFE
Reinforced Masonry Frame 9/29/2021 Partial Approval DANIEL MC AULIFFE
Reinforced Concrete Frame 10/1/2021 Partial Approval DANIEL MC AULIFFE
Reinforced Concrete Frame 10/5/2021 Not Ready for Inspection DANIEL MC AULIFFE
Reinforced Concrete Frame 10/7/2021 Partial Approval DANIEL MC AULIFFE
Reinforced Concrete Frame 10/8/2021 Partial Approval DANIEL MC AULIFFE
Reinforced Masonry Frame 10/8/2021 Partial Approval DANIEL MC AULIFFE
Reinforced Concrete Frame 10/11/2021 Partial Approval DANIEL MC AULIFFE
Light Gage Steel Frame 10/13/2021 Partial Approval JAMES POWERS
Reinforced Concrete Frame 10/20/2021 Partial Approval DANIEL MC AULIFFE
Reinforced Concrete Frame 10/22/2021 Partial Approval DANIEL MC AULIFFE
Reinforced Concrete Frame 10/27/2021 Partial Approval DANIEL MC AULIFFE
Reinforced Concrete Frame 11/3/2021 Partial Approval DANIEL MC AULIFFE
Reinforced Masonry Frame 11/3/2021 Partial Approval DANIEL MC AULIFFE
Reinforced Concrete Frame 11/4/2021 Partial Approval DANIEL MC AULIFFE
Reinforced Concrete Frame 11/5/2021 Partial Approval DANIEL MC AULIFFE
Reinforced Concrete Frame 11/10/2021 Partial Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 11/12/2021 Partial Approval DANIEL MC AULIFFE
Reinforced Concrete Frame 11/15/2021 Partial Approval DANIEL MC AULIFFE
Reinforced Concrete Frame 11/19/2021 Partial Approval DANIEL MC AULIFFE
Reinforced Concrete Frame 11/20/2021 Partial Approval EDWIN GREGORYONA
Reinforced Concrete Frame 11/23/2021 Not Ready for Inspection SORIN CIRSTOIU
Reinforced Concrete Frame 11/30/2021 Partial Approval NICK DANERI
Reinforced Concrete Frame 12/1/2021 Partial Approval NICK DANERI
Reinforced Concrete Frame 12/9/2021 Partial Approval NICK DANERI
Reinforced Masonry Frame 12/9/2021 Partial Approval NICK DANERI
Light Gage Steel Frame 12/13/2021 Conditional Approval NICK DANERI
Structural Steel Frame 12/13/2021 Not Ready for Inspection NICK DANERI
Reinforced Concrete Frame 12/14/2021 Partial Approval NICK DANERI
Light Gage Steel Frame 12/15/2021 Conditional Approval NICK DANERI
Reinforced Concrete Frame 12/15/2021 Partial Approval NICK DANERI
Structural Steel Frame 12/15/2021 Conditional Approval NICK DANERI
Reinforced Masonry Frame 12/17/2021 Partial Approval NICK DANERI
Reinforced Concrete Frame 12/22/2021 Partial Approval NICK DANERI
Reinforced Concrete Frame 12/27/2021 Partial Approval NICK DANERI
Reinforced Masonry Frame 1/3/2022 Partial Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 1/4/2022 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Concrete Frame 1/5/2022 Partial Approval NICK DANERI
Reinforced Concrete Frame 1/6/2022 Partial Approval NICK DANERI
Reinforced Concrete Frame 1/11/2022 Partial Approval DAVID BURKHEAD
Reinforced Concrete Frame 1/20/2022 Partial Approval DANIEL MC AULIFFE
Reinforced Masonry Frame 1/24/2022 Not Ready for Inspection NICK DANERI
Reinforced Concrete Frame 1/26/2022 Partial Approval NICK DANERI
Reinforced Concrete Frame 1/27/2022 Partial Approval NICK DANERI
Reinforced Concrete Frame 2/2/2022 Partial Approval NICK DANERI
Reinforced Masonry Frame 2/2/2022 Partial Approval NICK DANERI
Reinforced Concrete Frame 2/3/2022 Partial Approval NICK DANERI
Reinforced Concrete Frame 2/9/2022 Partial Approval NICK DANERI
Reinforced Concrete Frame 2/10/2022 Partial Approval NICK DANERI
Reinforced Concrete Frame 2/16/2022 Partial Approval NICK DANERI
Reinforced Concrete Frame 2/17/2022 Partial Approval NICK DANERI
Reinforced Concrete Frame 2/18/2022 Partial Approval NICK DANERI
Reinforced Concrete Frame 2/23/2022 Partial Approval NICK DANERI
Reinforced Concrete Frame 2/24/2022 Partial Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 3/2/2022 Partial Approval NICK DANERI
Reinforced Concrete Frame 3/3/2022 Partial Approval NICK DANERI
Reinforced Concrete Frame 3/9/2022 Partial Approval NICK DANERI
Reinforced Concrete Frame 3/10/2022 Partial Approval NICK DANERI
Reinforced Concrete Frame 3/16/2022 Partial Approval NICK DANERI
Reinforced Concrete Frame 3/17/2022 Partial Approval NICK DANERI
Reinforced Concrete Frame 4/1/2022 Partial Approval NICK DANERI
Pre-Inspection 4/7/2022 Partial Approval NICK DANERI
Reinforced Concrete Frame 4/20/2022 Partial Approval NICK DANERI
Light Gage Steel Frame 4/21/2022 Partial Approval NICK DANERI
Reinforced Concrete Frame 4/22/2022 Partial Approval JONATHAN QUACH
Reinforced Concrete Frame 4/28/2022 Partial Approval NICK DANERI
Reinforced Concrete Frame 4/29/2022 Partial Approval NICK DANERI
Reinforced Concrete Frame 5/4/2022 Partial Approval NICK DANERI
Insulation 5/5/2022 Partial Approval NICK DANERI
Reinforced Concrete Frame 5/6/2022 Partial Approval NICK DANERI
Reinforced Concrete Frame 5/11/2022 Partial Approval NICK DANERI
Reinforced Concrete Frame 5/13/2022 Partial Approval NICK DANERI
Reinforced Concrete Frame 5/18/2022 Partial Approval JAMES POWERS
Reinforced Concrete Frame 5/20/2022 Partial Approval JAMES POWERS
Reinforced Concrete Frame 5/25/2022 Partial Approval NICK DANERI
Reinforced Concrete Frame 5/27/2022 Partial Approval JAMES POWERS
Reinforced Concrete Frame 6/2/2022 Partial Approval NICK DANERI
Pre-Inspection 6/3/2022 Partial Approval NICK DANERI
Reinforced Concrete Frame 6/3/2022 Partial Approval NICK DANERI
Reinforced Concrete Frame 6/8/2022 Partial Approval NICK DANERI
Reinforced Concrete Frame 6/9/2022 Partial Approval NICK DANERI
Drywall Nailing 6/13/2022 Partial Approval NICK DANERI
Light Gage Steel Frame 6/13/2022 Partial Approval NICK DANERI
Reinforced Concrete Frame 6/15/2022 Partial Approval NICK DANERI
Reinforced Concrete Frame 6/16/2022 Partial Approval NICK DANERI
Reinforced Concrete Frame 6/21/2022 Partial Approval NICK DANERI
Reinforced Concrete Frame 6/22/2022 Partial Approval NICK DANERI
Insulation 6/24/2022 Partial Approval NICK DANERI
Light Gage Steel Frame 6/24/2022 Corrections Issued NICK DANERI
Pre-Inspection 6/27/2022 Partial Approval NICK DANERI
Pre-Inspection 6/28/2022 Off-Hour Fees Due
Reinforced Concrete Frame 6/28/2022 Partial Approval NICK DANERI
Reinforced Masonry Frame 6/28/2022 Conditional Approval NICK DANERI
Light Gage Steel Frame 7/1/2022 Partial Approval NICK DANERI
Reinforced Concrete Frame 7/1/2022 Partial Approval NICK DANERI
Reinforced Concrete Frame 7/5/2022 Partial Approval RAFAEL ESPINOZA
Drywall Nailing 7/7/2022 Partial Approval NICK DANERI
Reinforced Concrete Frame 7/9/2022 Off-Hour Fees Due
Reinforced Concrete Frame 7/9/2022 Partial Approval RAFAEL ESPINOZA
Insulation 7/11/2022 Partial Approval NICK DANERI
Reinforced Concrete Frame 7/11/2022 Partial Approval NICK DANERI
Drywall Nailing 7/14/2022 Partial Approval NICK DANERI
Insulation 7/14/2022 Partial Approval NICK DANERI
Reinforced Concrete Frame 7/14/2022 Partial Approval NICK DANERI
Reinforced Concrete Frame 7/15/2022 Partial Approval NICK DANERI
Drywall Nailing 7/20/2022 Partial Approval NICK DANERI
Light Gage Steel Frame 7/20/2022 Partial Approval NICK DANERI
Reinforced Concrete Frame 7/20/2022 Partial Approval NICK DANERI
Reinforced Concrete Frame 7/21/2022 Partial Approval NICK DANERI
Insulation 7/26/2022 Partial Approval NICK DANERI
Light Gage Steel Frame 7/26/2022 Partial Approval NICK DANERI
Reinforced Concrete Frame 7/26/2022 Partial Approval NICK DANERI
Reinforced Concrete Frame 7/27/2022 Partial Approval NICK DANERI
Light Gage Steel Frame 7/28/2022 Partial Approval NICK DANERI
Light Gage Steel Frame 7/29/2022 Partial Approval NICK DANERI
Insulation 8/2/2022 Partial Approval NICK DANERI
Reinforced Concrete Frame 8/2/2022 Partial Approval NICK DANERI
Reinforced Concrete Frame 8/3/2022 Partial Approval NICK DANERI
Insulation 8/4/2022 Partial Approval NICK DANERI
Light Gage Steel Frame 8/4/2022 Partial Approval NICK DANERI
Reinforced Concrete Frame 8/8/2022 Partial Approval NICK DANERI
Drywall Nailing 8/9/2022 Partial Approval NICK DANERI
Reinforced Concrete Frame 8/9/2022 Partial Approval NICK DANERI
Insulation 8/11/2022 Not Ready for Inspection NICK DANERI
Reinforced Concrete Frame 8/12/2022 Partial Approval NICK DANERI
Reinforced Concrete Frame 8/15/2022 Partial Approval GREGORY POMISH
Light Gage Steel Frame 8/16/2022 Partial Approval NICK DANERI
Light Gage Steel Frame 8/18/2022 Partial Approval NICK DANERI
Reinforced Concrete Frame 8/18/2022 Partial Approval NICK DANERI
Reinforced Concrete Frame 8/19/2022 Partial Approval NICK DANERI
Drywall Nailing 8/23/2022 Partial Approval NICK DANERI
Insulation 8/23/2022 Partial Approval NICK DANERI
Light Gage Steel Frame 8/23/2022 Partial Approval NICK DANERI
Reinforced Concrete Frame 8/24/2022 Partial Approval NICK DANERI
Reinforced Concrete Frame 8/25/2022 Partial Approval NICK DANERI
Drywall Nailing 8/30/2022 Partial Approval NICK DANERI
Insulation 8/30/2022 Partial Approval NICK DANERI
Light Gage Steel Frame 8/30/2022 Partial Approval NICK DANERI
Reinforced Concrete Frame 9/2/2022 Partial Approval NICK DANERI
Reinforced Concrete Frame 9/6/2022 Partial Approval GREGORY POMISH
Drywall Nailing 9/8/2022 Partial Approval NICK DANERI
Insulation 9/8/2022 Partial Approval NICK DANERI
Light Gage Steel Frame 9/8/2022 Partial Approval NICK DANERI
Drywall Nailing 9/12/2022 Partial Approval NICK DANERI
Insulation 9/12/2022 Partial Approval NICK DANERI
Light Gage Steel Frame 9/12/2022 Partial Approval NICK DANERI
Reinforced Concrete Frame 9/14/2022 Partial Approval NICK DANERI
Light Gage Steel Frame 9/15/2022 Partial Approval NICK DANERI
Drywall Nailing 9/20/2022 Partial Approval NICK DANERI
Insulation 9/20/2022 Partial Approval NICK DANERI
Light Gage Steel Frame 9/20/2022 Partial Approval NICK DANERI
Reinforced Concrete Frame 9/20/2022 Partial Approval NICK DANERI
Drywall Nailing 9/23/2022 Not Ready for Inspection NICK DANERI
Insulation 9/23/2022 Conditional Approval NICK DANERI
Light Gage Steel Frame 9/23/2022 Partial Approval NICK DANERI
Drywall Nailing 9/27/2022 Partial Inspection ERNESTO CORRAL
Insulation 9/27/2022 Partial Inspection ERNESTO CORRAL
Reinforced Concrete Frame 9/27/2022 Partial Inspection ERNESTO CORRAL
Reinforced Concrete Frame 9/28/2022 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Concrete Frame 9/29/2022 Partial Approval RAFAEL ESPINOZA
Drywall Nailing 10/3/2022 Partial Approval RAFAEL ESPINOZA
Insulation 10/3/2022 Partial Approval RAFAEL ESPINOZA
Light Gage Steel Frame 10/5/2022 Partial Approval TED RIES
Insulation 10/6/2022 Partial Approval RAFAEL ESPINOZA
Drywall Nailing 10/12/2022 Partial Approval TED RIES
Insulation 10/12/2022 Partial Approval TED RIES
Light Gage Steel Frame 10/12/2022 Partial Approval TED RIES
Reinforced Concrete Frame 10/12/2022 Not Ready for Inspection TED RIES
Reinforced Concrete Frame 10/14/2022 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Concrete Frame 10/15/2022 Partial Approval RAFAEL ESPINOZA
Drywall Nailing 10/17/2022 Corrections Issued TED RIES
Insulation 10/17/2022 Partial Approval TED RIES
Light Gage Steel Frame 10/17/2022 Not Ready for Inspection TED RIES
Light Gage Steel Frame 10/20/2022 Partial Approval GREGORY POMISH
Drywall Nailing 10/24/2022 Partial Approval GREGORY POMISH
Floor/Roof Diaphrgm/Shear Wall 10/24/2022 Not Ready for Inspection GREGORY POMISH
Insulation 10/24/2022 Partial Approval GREGORY POMISH
Light Gage Steel Frame 10/24/2022 Partial Approval GREGORY POMISH
Drywall Nailing 10/27/2022 Partial Approval GREGORY POMISH
Drywall Nailing 10/31/2022 Partial Approval NICK DANERI
Insulation 10/31/2022 Not Ready for Inspection NICK DANERI
Light Gage Steel Frame 10/31/2022 Partial Approval NICK DANERI
Insulation 11/2/2022 Partial Approval NICK DANERI
Drywall Nailing 11/7/2022 Partial Approval NICK DANERI
Floor/Roof Diaphrgm/Shear Wall 11/7/2022 Partial Approval NICK DANERI
Insulation 11/7/2022 Partial Approval NICK DANERI
Light Gage Steel Frame 11/7/2022 Partial Approval NICK DANERI
Light Gage Steel Frame 11/8/2022 Partial Approval NICK DANERI
Drywall Nailing 11/15/2022 Partial Approval NICK DANERI
Insulation 11/15/2022 Partial Approval NICK DANERI
Light Gage Steel Frame 11/15/2022 Partial Approval NICK DANERI
Structural Steel Frame 11/15/2022 Conditional Approval NICK DANERI
Drywall Nailing 11/21/2022 Not Ready for Inspection NICK DANERI
Insulation 11/21/2022 Partial Approval NICK DANERI
Light Gage Steel Frame 11/21/2022 Partial Approval NICK DANERI
Insulation 11/23/2022 Partial Approval NICK DANERI
Drywall Nailing 11/30/2022 Partial Approval NICK DANERI
Insulation 11/30/2022 Partial Approval NICK DANERI
Light Gage Steel Frame 11/30/2022 Partial Approval NICK DANERI
Reinforced Concrete Frame 12/6/2022 Partial Approval NICK DANERI
Drywall Nailing 12/7/2022 Partial Approval NICK DANERI
Insulation 12/7/2022 Partial Approval NICK DANERI
Light Gage Steel Frame 12/7/2022 Partial Approval NICK DANERI
Drywall Nailing 12/14/2022 Partial Approval GREGORY POMISH
Insulation 12/14/2022 Partial Approval GREGORY POMISH
Light Gage Steel Frame 12/14/2022 Partial Approval GREGORY POMISH
Drywall Nailing 12/21/2022 Partial Approval NICK DANERI
Insulation 12/21/2022 Partial Approval NICK DANERI
Light Gage Steel Frame 12/21/2022 Partial Approval NICK DANERI
Drywall Nailing 12/29/2022 Not Ready for Inspection NICK DANERI
Insulation 12/29/2022 Partial Approval NICK DANERI
Light Gage Steel Frame 12/29/2022 Partial Approval NICK DANERI
Drywall Nailing 1/3/2023 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 1/9/2023 Partial Approval GREGORY POMISH
Reinforced Concrete Frame 1/9/2023 Not Ready for Inspection GREGORY POMISH
Reinforced Masonry Frame 1/9/2023 Partial Approval GREGORY POMISH
Drywall Nailing 1/18/2023 Partial Approval NICK DANERI
Insulation 1/18/2023 Partial Approval NICK DANERI
Light Gage Steel Frame 1/18/2023 Partial Approval NICK DANERI
Drywall Nailing 1/19/2023 Partial Approval NICK DANERI
Light Gage Steel Frame 1/25/2023 Partial Approval NICK DANERI
Drywall Nailing 1/27/2023 Partial Approval NICK DANERI
Insulation 1/27/2023 Partial Approval NICK DANERI
Light Gage Steel Frame 1/27/2023 Partial Approval NICK DANERI
Light Gage Steel Frame 2/2/2023 Partial Approval NICK DANERI
Light Gage Steel Frame 2/6/2023 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 2/8/2023 Partial Approval TED RIES
Interior/Exterior Lathing 2/15/2023 Partial Approval NICK DANERI
Light Gage Steel Frame 2/15/2023 Partial Approval NICK DANERI
Light Gage Steel Frame 2/17/2023 Partial Approval NICK DANERI
Insulation 2/22/2023 Partial Approval NICK DANERI
Light Gage Steel Frame 2/23/2023 Partial Approval NICK DANERI
Light Gage Steel Frame 2/24/2023 Partial Approval NICK DANERI
Reinforced Masonry Frame 2/24/2023 Conditional Approval NICK DANERI
Light Gage Steel Frame 3/1/2023 Partial Approval NICK DANERI
Light Gage Steel Frame 3/3/2023 Not Ready for Inspection NICK DANERI
Light Gage Steel Frame 3/6/2023 Partial Approval NICK DANERI
Light Gage Steel Frame 3/8/2023 Partial Approval NICK DANERI
Light Gage Steel Frame 3/13/2023 Partial Approval NICK DANERI
Drywall Nailing 3/17/2023 Partial Approval NICK DANERI
Light Gage Steel Frame 3/31/2023 Partial Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 4/5/2023 Partial Approval NICK DANERI
Insulation 4/10/2023 Partial Approval NICK DANERI
Light Gage Steel Frame 4/19/2023 Partial Approval LARRY ARNICK
Light Gage Steel Frame 4/27/2023 Partial Approval NICK DANERI
Light Gage Steel Frame 4/28/2023 Partial Approval NICK DANERI
Light Gage Steel Frame 5/1/2023 Partial Approval NICK DANERI
Light Gage Steel Frame 5/4/2023 Partial Approval NICK DANERI
Light Gage Steel Frame 5/8/2023 Partial Inspection NICK DANERI
Light Gage Steel Frame 5/15/2023 Not Ready for Inspection LARRY ARNICK
Light Gage Steel Frame 5/16/2023 Partial Approval GREGORY POMISH
Light Gage Steel Frame 5/23/2023 Not Ready for Inspection NICK DANERI
Structural Steel Frame 5/24/2023 Not Ready for Inspection NICK DANERI
Light Gage Steel Frame 5/25/2023 Partial Approval NICK DANERI
Reinforced Concrete Frame 5/25/2023 Partial Approval NICK DANERI
Light Gage Steel Frame 5/26/2023 Partial Approval NICK DANERI
Insulation 6/2/2023 Partial Approval NICK DANERI
Light Gage Steel Frame 6/2/2023 Partial Approval NICK DANERI
Light Gage Steel Frame 6/6/2023 Partial Approval NICK DANERI
Insulation 6/8/2023 Partial Approval GREGORY POMISH
Drywall Nailing 6/13/2023 Partial Approval GREGORY POMISH
Light Gage Steel Frame 6/13/2023 Partial Approval GREGORY POMISH
Drywall Nailing 6/29/2023 Partial Approval NICK DANERI
Light Gage Steel Frame 7/11/2023 Partial Approval GREGORY POMISH
Light Gage Steel Frame 7/18/2023 Partial Approval NICK DANERI
Light Gage Steel Frame 7/20/2023 Partial Approval LARRY ARNICK
Deputy Drilled-In Anchors 8/9/2023 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 8/9/2023 Conditional Approval NICK DANERI
Deputy Drilled-In Anchors 8/10/2023 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 8/10/2023 Conditional Approval NICK DANERI
Light Gage Steel Frame 8/10/2023 Partial Approval NICK DANERI
Deputy Drilled-In Anchors 8/11/2023 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 8/11/2023 Conditional Approval NICK DANERI
Light Gage Steel Frame 8/21/2023 Partial Approval MARTIN TAVITIAN
Light Gage Steel Frame 8/25/2023 Partial Approval NICK DANERI
Structural Steel Frame 8/25/2023 Partial Inspection NICK DANERI
Light Gage Steel Frame 8/28/2023 Not Ready for Inspection NICK DANERI
Light Gage Steel Frame 8/29/2023 Not Ready for Inspection NICK DANERI
Light Gage Steel Frame 8/30/2023 Partial Approval NICK DANERI
Masonry Wall/Backfill 9/1/2023 Partial Approval NICK DANERI
Pre-Inspection 9/15/2023 Partial Inspection NICK DANERI
Deputy Drilled-In Anchors 9/21/2023 Conditional Approval GREGORY POMISH
Light Gage Steel Frame 9/25/2023 Partial Approval GREGORY POMISH
Light Gage Steel Frame 10/12/2023 Partial Approval NICK DANERI
Reinforced Concrete Frame 10/26/2023 Partial Approval NICK DANERI
Pre-Inspection 11/3/2023 Not Ready for Inspection NICK DANERI
Final 11/14/2023 Not Ready for Inspection NICK DANERI
Final 11/29/2023 Partial Approval NICK DANERI
Special/Order Compliance 11/30/2023 Partial Approval NICK DANERI
Final 12/6/2023 Not Ready for Inspection NICK DANERI
Final 12/26/2023 Not Ready for Inspection NICK DANERI
Final 3/5/2024 Not Ready for Inspection NICK DANERI
Final 10/1/2024 Permit Finaled NICK DANERI