325 N ROBINSON ST 1-5 90026

Certificate Information: 325 N ROBINSON ST 1-5 90026

Application / Permit
17010-10000-05059
Plan Check / Job No.
B17LA23540
Group
Building
Type
Bldg-New
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
CONSTRUCT 4,457 SF TWO STORY, FIVE UNIT HOUSING COMPLEX W/SUBTERRANEAN PARKING
Permit Issued
Issued on 3/1/2019
Issuing Office
South Los Angeles
Current Status
Issued on 3/1/2019
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 12/22/2017 APPLICANT
Green Plans Picked Up 1/16/2018 APPLICANT
Assigned to Plan Check Engineer 1/18/2018 ZAW HAN
Disabled Access Plans Picked Up 1/25/2018 APPLICANT
Corrections Issued 2/7/2018 ZAW HAN
Quality Review Completed 2/20/2018 ARMEN JIVALAGIAN
Building Plans Picked Up 2/22/2018 APPLICANT
Applicant returned to address corrections 4/3/2018 ZAW HAN
Applicant returned to address corrections 5/17/2018 ZAW HAN
Applicant returned to address corrections 6/22/2018 ZAW HAN
Applicant returned to address corrections 8/3/2018 ZAW HAN
Applicant returned to address corrections 8/16/2018 ZAW HAN
Applicant returned to address corrections 8/28/2018 ZAW HAN
Applicant returned to address corrections 9/12/2018 ZAW HAN
Plan Check Approved 1/18/2019 ZAW HAN
Issued 3/1/2019 LADBS

Permit Application Clearance Information

Address approval Cleared 3/2/2018 NAZILA NOORIFAR
CPC Cleared 3/2/2018 DIANA JIMENEZ
Eng Process Fee Ord 176,300 Cleared 3/2/2018 NAZILA NOORIFAR
Opn space landscape/Water mgmt Cleared 3/2/2018 DIANA JIMENEZ
Permit Cleared 3/2/2018 NAZILA NOORIFAR
Prkng lot landscape/Water mgmt Cleared 3/2/2018 DIANA JIMENEZ
Landscape for retaining wall Cleared 3/15/2018 SOPHIE GABEL-SCHEINBAU
Highway dedication Cleared 3/21/2018 JAMES MORALEZ
Green Code Cleared 5/23/2018 PARISA ZAHABI
Sewer availability Cleared 8/16/2018 JAMES MORALEZ
Encroachment in public way Cleared 8/29/2018 KARAN PATEL
DAS Clearance Cleared 9/4/2018 SHINE LIN
Hydrant and Access approval Cleared 9/12/2018 ROBERT DUFF
Building over 3-story or 36-ft Cleared 9/27/2018 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 9/27/2018 CALOSHA APPROVED
GPI Written Notices Cleared 9/27/2018 ROBERT HUGHES
Grading Pre-Inspection Cleared 9/27/2018 ROBERT HUGHES
Low Impact Development Cleared 9/27/2018 MARTIN FRAGOSO
Roof/Waste drainage to street Cleared 9/27/2018 MICHAEL CASTILLO

Contact Information

Architect Song, Michael; Lic. No.: C32566 5608 E PEABODY STREET      LONG BEACH, CA 90808
Engineer Irvine, Jon Alan; Lic. No.: GE2891 145 N SIERRA MADRE BLVD      PASADENA, CA 91107
Engineer Labib, Youhanna T; Lic. No.: S4549 209 E EL SEGUNDO BLVD      EL SEGUNDO, CA 90245
Engineer Nester, Melvin Russell Jr; Lic. No.: C26324 2902 TYLER CT      SIMI VALLEY, CA 93063
Geologist Irvine, Jon A; Lic. No.: EG1691 1150 ENCANTO DR      ARCADIA, CA 91007

Inspector Information

DAVID BURKHEAD, (213) 482-7294 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 2/4/2021 Not Ready for Inspection DANIEL MC AULIFFE
Pre-Inspection 2/8/2021 Not Ready for Inspection DANIEL MC AULIFFE
Pre-Inspection 2/11/2021 Not Ready for Inspection DANIEL MC AULIFFE
Pre-Inspection 1/31/2022 Partial Inspection DANIEL MC AULIFFE
Pre-Inspection 3/3/2022 Partial Approval DANIEL MC AULIFFE
Piling/Pier/Caisson 3/7/2022 Partial Inspection DANIEL MC AULIFFE
Pre-Inspection 8/15/2022 No Access for Inspection TED RIES
Pre-Inspection 8/18/2022 Partial Approval GREGORY POMISH
Footing/Foundation/Slab 8/25/2022 Conditional Approval TED RIES
METHANE-Barrier 8/25/2022 Not Ready for Inspection TED RIES
METHANE-Subgrade 8/25/2022 Not Ready for Inspection TED RIES
Footing/Foundation/Slab 8/29/2022 Not Ready for Inspection TED RIES
METHANE-Barrier 8/29/2022 Not Ready for Inspection TED RIES
METHANE-Subgrade 8/29/2022 Not Ready for Inspection TED RIES
Footing/Foundation/Slab 9/1/2022 Not Ready for Inspection TED RIES
METHANE-Barrier 9/1/2022 Conditional Approval TED RIES
METHANE-Subgrade 9/1/2022 Conditional Approval TED RIES
Piling/Pier/Caisson 9/1/2022 Conditional Approval TED RIES
Excavation/Setback/Form/Re-Bar 11/14/2022 Not Ready for Inspection DAVID BURKHEAD
Footing/Foundation/Slab 11/30/2022 Partial Approval TED RIES
METHANE-Barrier 11/30/2022 Conditional Approval TED RIES
METHANE-Subgrade 11/30/2022 Conditional Approval TED RIES
Deputy Reinf. Concrete 12/2/2022 Conditional Approval MICHAEL ROSENBERG
Footing/Foundation/Slab 12/14/2022 Partial Approval TED RIES
METHANE-Barrier 12/14/2022 Partial Inspection TED RIES
METHANE-Subgrade 12/14/2022 Conditional Approval TED RIES
Deputy Reinf. Concrete 12/15/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 1/3/2023 Conditional Approval TED RIES
Green Building Rough 1/9/2023 Not Ready for Inspection DAVID BURKHEAD
METHANE-Rough 1/9/2023 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 1/9/2023 Partial Approval DAVID BURKHEAD
Verify Sprinkler Sign Off 1/9/2023 Not Ready for Inspection DAVID BURKHEAD
Deputy Shotcrete 1/12/2023 Conditional Approval MICHAEL ROSENBERG
Footing/Foundation/Slab 3/8/2023 Not Ready for Inspection TED RIES
METHANE-Barrier 3/8/2023 Not Ready for Inspection TED RIES
METHANE-Subgrade 3/8/2023 Corrections Issued TED RIES
Pre-Inspection 3/9/2023 Partial Approval TED RIES
Deputy Reinf. Concrete 4/11/2023 Conditional Approval TED RIES
Footing/Foundation/Slab 4/11/2023 Corrections Issued TED RIES
METHANE-Barrier 4/11/2023 Conditional Approval TED RIES
METHANE-Subgrade 4/11/2023 Conditional Approval TED RIES
Deputy Steel/Welding 5/1/2023 Conditional Approval GREGORY POMISH
Green Building Rough 5/1/2023 Partial Inspection GREGORY POMISH
METHANE-Rough 5/1/2023 Not Ready for Inspection GREGORY POMISH
Verify Sprinkler Sign Off 5/1/2023 Not Ready for Inspection GREGORY POMISH
Wood Frame 5/1/2023 Partial Inspection GREGORY POMISH
Green Building Rough 5/5/2023 Not Ready for Inspection TED RIES
METHANE-Rough 5/5/2023 Conditional Approval TED RIES
Structural Steel Frame 5/5/2023 Partial Approval TED RIES
Verify Sprinkler Sign Off 5/5/2023 Not Ready for Inspection TED RIES
Wood Frame 5/5/2023 Partial Approval TED RIES
Deputy Wood Construction 5/18/2023 Conditional Approval MICHAEL ROSENBERG
Floor/Roof Diaphrgm/Shear Wall 5/22/2023 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 8/8/2023 Conditional Approval DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 8/17/2023 Not Ready for Inspection RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 8/24/2023 Corrections Issued TED RIES
Green Building Rough 8/30/2023 Partial Inspection TED RIES
METHANE-Rough 8/30/2023 Partial Inspection TED RIES
Verify Sprinkler Sign Off 8/30/2023 Partial Inspection TED RIES
Wood Frame 8/30/2023 Corrections Issued TED RIES
Wood Frame 8/31/2023 Partial Inspection EDWIN GREGORYONA
Wood Frame 9/19/2023 Partial Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 9/27/2023 Partial Approval RAFAEL ESPINOZA
Wood Frame 9/27/2023 Partial Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 10/11/2023 Partial Inspection RAFAEL ESPINOZA
Wood Frame 10/13/2023 Partial Inspection RAFAEL ESPINOZA
Green Building Rough 10/20/2023 Not Ready for Inspection RAFAEL ESPINOZA
Insulation 10/20/2023 Not Ready for Inspection RAFAEL ESPINOZA
METHANE-Rough 10/20/2023 Not Ready for Inspection RAFAEL ESPINOZA
Verify Sprinkler Sign Off 10/20/2023 Approved RAFAEL ESPINOZA
Wood Frame 10/20/2023 Partial Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 10/30/2023 Partial Approval RAFAEL ESPINOZA
Green Building Rough 10/30/2023 Not Ready for Inspection RAFAEL ESPINOZA
METHANE-Rough 10/30/2023 Conditional Approval RAFAEL ESPINOZA
Wood Frame 10/30/2023 Not Ready for Inspection RAFAEL ESPINOZA
Wood Frame 11/29/2023 Partial Approval RAFAEL ESPINOZA
Insulation 12/13/2023 Partial Approval RAFAEL ESPINOZA
Insulation 12/27/2023 Approved RAFAEL ESPINOZA
Interior/Exterior Lathing 12/27/2023 Approved RAFAEL ESPINOZA
Drywall Nailing 1/12/2024 Approved DAVID BURKHEAD
Green Building Rough 1/12/2024 Approved DAVID BURKHEAD
Interior/Exterior Lathing 1/12/2024 Approved DAVID BURKHEAD
Final 12/30/2024 Not Ready for Inspection JEFFREY FULTON
Footing/Foundation/Slab 12/30/2024 Not Ready for Inspection JEFFREY FULTON
Green Building Final 12/30/2024 Not Ready for Inspection JEFFREY FULTON
METHANE-Barrier 12/30/2024 Not Ready for Inspection JEFFREY FULTON
METHANE-Final 12/30/2024 Not Ready for Inspection JEFFREY FULTON
METHANE-Rough 12/30/2024 Not Ready for Inspection JEFFREY FULTON
METHANE-Subgrade 12/30/2024 Not Ready for Inspection JEFFREY FULTON
Reinforced Concrete Frame 12/30/2024 Not Ready for Inspection JEFFREY FULTON
SGSOV-Seismic Gas S/O Valve 12/30/2024 SGSOV Not Ready JEFFREY FULTON
Smoke Detectors 12/30/2024 Not Ready for Inspection JEFFREY FULTON
Wood Frame 12/30/2024 Not Ready for Inspection JEFFREY FULTON