Deputy Reinf. Masonry
|
4/6/2021
|
Conditional Approval
|
NICK DANERI
|
Footing/Foundation/Slab
|
4/9/2021
|
Partial Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
4/13/2021
|
Conditional Approval
|
NICK DANERI
|
Deputy Shotcrete
|
4/13/2021
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
4/14/2021
|
Conditional Approval
|
NICK DANERI
|
Deputy Shotcrete
|
4/14/2021
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
4/15/2021
|
Conditional Approval
|
DANIEL COLLINS
|
Deputy Shotcrete
|
4/15/2021
|
Conditional Approval
|
DANIEL COLLINS
|
Deputy Reinf. Concrete
|
4/16/2021
|
Conditional Approval
|
DANIEL COLLINS
|
Deputy Shotcrete
|
4/16/2021
|
Conditional Approval
|
DANIEL COLLINS
|
Deputy Reinf. Concrete
|
4/19/2021
|
Conditional Approval
|
NICK DANERI
|
Deputy Shotcrete
|
4/19/2021
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
4/23/2021
|
Conditional Approval
|
NICK DANERI
|
Deputy Shotcrete
|
4/23/2021
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
4/26/2021
|
Conditional Approval
|
NICK DANERI
|
Deputy Shotcrete
|
4/26/2021
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
4/27/2021
|
Conditional Approval
|
NICK DANERI
|
Deputy Shotcrete
|
4/27/2021
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
4/28/2021
|
Conditional Approval
|
NICK DANERI
|
Deputy Shotcrete
|
4/28/2021
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
4/29/2021
|
Conditional Approval
|
NICK DANERI
|
Deputy Shotcrete
|
4/29/2021
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
4/30/2021
|
Conditional Approval
|
NICK DANERI
|
Deputy Shotcrete
|
4/30/2021
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
5/3/2021
|
Conditional Approval
|
NICK DANERI
|
Deputy Shotcrete
|
5/3/2021
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
5/4/2021
|
Conditional Approval
|
NICK DANERI
|
Deputy Shotcrete
|
5/4/2021
|
Conditional Approval
|
NICK DANERI
|
Deputy Other (see comments)
|
5/5/2021
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
5/5/2021
|
Conditional Approval
|
NICK DANERI
|
Deputy Shotcrete
|
5/5/2021
|
Conditional Approval
|
NICK DANERI
|
Deputy Other (see comments)
|
5/6/2021
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
5/6/2021
|
Conditional Approval
|
NICK DANERI
|
Deputy Shotcrete
|
5/6/2021
|
Conditional Approval
|
NICK DANERI
|
Deputy Other (see comments)
|
5/7/2021
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
5/7/2021
|
Conditional Approval
|
NICK DANERI
|
Deputy Shotcrete
|
5/7/2021
|
Conditional Approval
|
NICK DANERI
|
Deputy Other (see comments)
|
5/10/2021
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
5/10/2021
|
Conditional Approval
|
NICK DANERI
|
Deputy Shotcrete
|
5/10/2021
|
Conditional Approval
|
NICK DANERI
|
Deputy Other (see comments)
|
5/11/2021
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
5/11/2021
|
Conditional Approval
|
NICK DANERI
|
Deputy Shotcrete
|
5/11/2021
|
Conditional Approval
|
NICK DANERI
|
Excavation/Setback/Form/Re-Bar
|
5/11/2021
|
Partial Approval
|
NICK DANERI
|
Footing/Foundation/Slab
|
5/11/2021
|
Partial Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
5/12/2021
|
Conditional Approval
|
NICK DANERI
|
Deputy Shotcrete
|
5/12/2021
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
5/13/2021
|
Conditional Approval
|
NICK DANERI
|
Deputy Shotcrete
|
5/13/2021
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
5/14/2021
|
Partial Approval
|
JAMES POWERS
|
Deputy Shotcrete
|
5/14/2021
|
Partial Approval
|
JAMES POWERS
|
Footing/Foundation/Slab
|
5/24/2021
|
Partial Approval
|
NICK DANERI
|
Reinforced Concrete Frame
|
5/28/2021
|
Partial Approval
|
JAMES POWERS
|
Excavation/Setback/Form/Re-Bar
|
6/1/2021
|
Not Ready for Inspection
|
NICK DANERI
|
Excavation/Setback/Form/Re-Bar
|
6/2/2021
|
Partial Approval
|
NICK DANERI
|
Excavation/Setback/Form/Re-Bar
|
6/4/2021
|
Partial Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
6/7/2021
|
Conditional Approval
|
NICK DANERI
|
Excavation/Setback/Form/Re-Bar
|
6/7/2021
|
Partial Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
6/10/2021
|
Conditional Approval
|
NICK DANERI
|
Deputy Shotcrete
|
6/10/2021
|
Conditional Approval
|
NICK DANERI
|
Excavation/Setback/Form/Re-Bar
|
6/10/2021
|
Not Ready for Inspection
|
NICK DANERI
|
Deputy Reinf. Concrete
|
6/11/2021
|
Partial Approval
|
JAMES POWERS
|
Deputy Shotcrete
|
6/11/2021
|
Partial Approval
|
JAMES POWERS
|
Reinforced Concrete Frame
|
6/11/2021
|
Partial Approval
|
JAMES POWERS
|
Deputy Other (see comments)
|
6/14/2021
|
Conditional Approval
|
DANIEL MC AULIFFE
|
Deputy Reinf. Concrete
|
6/14/2021
|
Conditional Approval
|
DANIEL MC AULIFFE
|
Deputy Shotcrete
|
6/14/2021
|
Conditional Approval
|
DANIEL MC AULIFFE
|
Deputy Other (see comments)
|
6/15/2021
|
Approved
|
DANIEL MC AULIFFE
|
Deputy Reinf. Concrete
|
6/15/2021
|
Approved
|
DANIEL MC AULIFFE
|
Deputy Shotcrete
|
6/15/2021
|
Approved
|
DANIEL MC AULIFFE
|
Excavation/Setback/Form/Re-Bar
|
6/15/2021
|
Partial Approval
|
DANIEL MC AULIFFE
|
Deputy Other (see comments)
|
6/16/2021
|
Conditional Approval
|
DANIEL MC AULIFFE
|
Deputy Reinf. Concrete
|
6/16/2021
|
Conditional Approval
|
DANIEL MC AULIFFE
|
Deputy Shotcrete
|
6/16/2021
|
Approved
|
DANIEL MC AULIFFE
|
Deputy Shotcrete
|
6/16/2021
|
Conditional Approval
|
DANIEL MC AULIFFE
|
Excavation/Setback/Form/Re-Bar
|
6/16/2021
|
Partial Approval
|
DANIEL MC AULIFFE
|
Deputy Other (see comments)
|
6/17/2021
|
Partial Approval
|
JAMES POWERS
|
Deputy Reinf. Concrete
|
6/17/2021
|
Partial Approval
|
JAMES POWERS
|
Deputy Shotcrete
|
6/17/2021
|
Order to Comply Issued
|
JAMES POWERS
|
Deputy Shotcrete
|
6/17/2021
|
Partial Approval
|
JAMES POWERS
|
Reinforced Concrete Frame
|
6/17/2021
|
Partial Approval
|
JAMES POWERS
|
Deputy Other (see comments)
|
6/18/2021
|
Partial Approval
|
JAMES POWERS
|
Deputy Reinf. Concrete
|
6/18/2021
|
Partial Approval
|
JAMES POWERS
|
Deputy Shotcrete
|
6/18/2021
|
Partial Approval
|
JAMES POWERS
|
Deputy Reinf. Concrete
|
6/21/2021
|
Conditional Approval
|
DANIEL MC AULIFFE
|
Deputy Reinf. Masonry
|
6/21/2021
|
Approved
|
DANIEL MC AULIFFE
|
Deputy Shotcrete
|
6/21/2021
|
Approved
|
DANIEL MC AULIFFE
|
Reinforced Masonry Frame
|
6/21/2021
|
Partial Approval
|
DANIEL MC AULIFFE
|
Deputy Other (see comments)
|
6/22/2021
|
Approved
|
DANIEL MC AULIFFE
|
Deputy Reinf. Concrete
|
6/22/2021
|
Approved
|
DANIEL MC AULIFFE
|
Deputy Reinf. Masonry
|
6/22/2021
|
Approved
|
DANIEL MC AULIFFE
|
Deputy Shotcrete
|
6/22/2021
|
Approved
|
DANIEL MC AULIFFE
|
Excavation/Setback/Form/Re-Bar
|
6/22/2021
|
Partial Approval
|
DANIEL MC AULIFFE
|
Deputy Other (see comments)
|
6/23/2021
|
Approved
|
DANIEL MC AULIFFE
|
Deputy Reinf. Concrete
|
6/23/2021
|
Approved
|
DANIEL MC AULIFFE
|
Deputy Shotcrete
|
6/23/2021
|
Approved
|
DANIEL MC AULIFFE
|
Excavation/Setback/Form/Re-Bar
|
6/23/2021
|
Partial Approval
|
DANIEL MC AULIFFE
|
Deputy Other (see comments)
|
6/24/2021
|
Conditional Approval
|
DANIEL MC AULIFFE
|
Deputy Reinf. Concrete
|
6/24/2021
|
Conditional Approval
|
DANIEL MC AULIFFE
|
Deputy Shotcrete
|
6/24/2021
|
Conditional Approval
|
DANIEL MC AULIFFE
|
Deputy Other (see comments)
|
6/25/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Deputy Reinf. Concrete
|
6/25/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Deputy Shotcrete
|
6/25/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Deputy Other (see comments)
|
6/28/2021
|
Conditional Approval
|
DANIEL MC AULIFFE
|
Deputy Reinf. Concrete
|
6/28/2021
|
Approved
|
DANIEL MC AULIFFE
|
Deputy Reinf. Concrete
|
6/28/2021
|
Conditional Approval
|
DANIEL MC AULIFFE
|
Deputy Shotcrete
|
6/28/2021
|
Approved
|
DANIEL MC AULIFFE
|
Deputy Shotcrete
|
6/28/2021
|
Conditional Approval
|
DANIEL MC AULIFFE
|
Excavation/Setback/Form/Re-Bar
|
6/28/2021
|
Partial Approval
|
DANIEL MC AULIFFE
|
Deputy Reinf. Concrete
|
6/29/2021
|
Approved
|
DANIEL MC AULIFFE
|
Deputy Shotcrete
|
6/29/2021
|
Approved
|
DANIEL MC AULIFFE
|
Excavation/Setback/Form/Re-Bar
|
6/29/2021
|
Partial Approval
|
DANIEL MC AULIFFE
|
Deputy Reinf. Concrete
|
6/30/2021
|
Approved
|
DANIEL MC AULIFFE
|
Deputy Reinf. Concrete
|
6/30/2021
|
Conditional Approval
|
DANIEL MC AULIFFE
|
Deputy Shotcrete
|
6/30/2021
|
Conditional Approval
|
DANIEL MC AULIFFE
|
Deputy Reinf. Concrete
|
7/1/2021
|
Approved
|
DANIEL MC AULIFFE
|
Deputy Shotcrete
|
7/1/2021
|
Approved
|
DANIEL MC AULIFFE
|
Excavation/Setback/Form/Re-Bar
|
7/1/2021
|
Partial Inspection
|
DANIEL MC AULIFFE
|
Deputy Reinf. Concrete
|
7/2/2021
|
Conditional Approval
|
DANIEL MC AULIFFE
|
Deputy Shotcrete
|
7/2/2021
|
Approved
|
DANIEL MC AULIFFE
|
Excavation/Setback/Form/Re-Bar
|
7/2/2021
|
Partial Inspection
|
DANIEL MC AULIFFE
|
Deputy Reinf. Concrete
|
7/6/2021
|
Conditional Approval
|
DANIEL MC AULIFFE
|
Deputy Shotcrete
|
7/6/2021
|
Approved
|
DANIEL MC AULIFFE
|
Deputy Other (see comments)
|
7/7/2021
|
Conditional Approval
|
DANIEL MC AULIFFE
|
Deputy Reinf. Concrete
|
7/7/2021
|
Conditional Approval
|
DANIEL MC AULIFFE
|
Deputy Shotcrete
|
7/7/2021
|
Conditional Approval
|
DANIEL MC AULIFFE
|
Excavation/Setback/Form/Re-Bar
|
7/7/2021
|
Partial Inspection
|
DANIEL MC AULIFFE
|
Deputy Other (see comments)
|
7/8/2021
|
Approved
|
DANIEL MC AULIFFE
|
Deputy Reinf. Concrete
|
7/8/2021
|
Approved
|
DANIEL MC AULIFFE
|
Deputy Shotcrete
|
7/8/2021
|
Approved
|
DANIEL MC AULIFFE
|
Excavation/Setback/Form/Re-Bar
|
7/8/2021
|
Partial Approval
|
DANIEL MC AULIFFE
|
Deputy Other (see comments)
|
7/9/2021
|
Conditional Approval
|
DANIEL MC AULIFFE
|
Deputy Reinf. Concrete
|
7/9/2021
|
Conditional Approval
|
DANIEL MC AULIFFE
|
Deputy Shotcrete
|
7/9/2021
|
Conditional Approval
|
DANIEL MC AULIFFE
|
Deputy Other (see comments)
|
7/12/2021
|
Approved
|
DANIEL MC AULIFFE
|
Deputy Reinf. Concrete
|
7/12/2021
|
Approved
|
DANIEL MC AULIFFE
|
Deputy Shotcrete
|
7/12/2021
|
Approved
|
DANIEL MC AULIFFE
|
Deputy Other (see comments)
|
7/13/2021
|
Conditional Approval
|
DANIEL MC AULIFFE
|
Deputy Reinf. Concrete
|
7/13/2021
|
Conditional Approval
|
DANIEL MC AULIFFE
|
Deputy Reinf. Masonry
|
7/13/2021
|
Conditional Approval
|
DANIEL MC AULIFFE
|
Deputy Shotcrete
|
7/13/2021
|
Conditional Approval
|
DANIEL MC AULIFFE
|
Deputy Reinf. Masonry
|
7/14/2021
|
Conditional Approval
|
DANIEL MC AULIFFE
|
Deputy Reinf. Masonry
|
7/15/2021
|
Approved
|
DANIEL MC AULIFFE
|
Excavation/Setback/Form/Re-Bar
|
7/21/2021
|
Partial Approval
|
DANIEL MC AULIFFE
|
Deputy Reinf. Concrete
|
7/26/2021
|
Approved
|
DANIEL MC AULIFFE
|
Deputy Reinf. Concrete
|
8/2/2021
|
Approved
|
DANIEL MC AULIFFE
|
Deputy Reinf. Concrete
|
10/26/2021
|
Conditional Approval
|
DANIEL MC AULIFFE
|
Deputy Reinf. Concrete
|
10/28/2021
|
Conditional Approval
|
DANIEL MC AULIFFE
|
Deputy Reinf. Concrete
|
10/29/2021
|
Conditional Approval
|
DANIEL MC AULIFFE
|
Deputy Reinf. Concrete
|
11/9/2021
|
Approved
|
DANIEL MC AULIFFE
|
Footing/Foundation/Slab
|
11/9/2021
|
Partial Approval
|
DANIEL MC AULIFFE
|
Deputy Reinf. Concrete
|
11/10/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Deputy Reinf. Concrete
|
11/12/2021
|
Approved
|
DANIEL MC AULIFFE
|
Deputy Reinf. Concrete
|
12/2/2021
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
12/13/2021
|
Conditional Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
12/15/2021
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
12/15/2021
|
Conditional Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
12/16/2021
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
12/16/2021
|
Conditional Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
12/17/2021
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
12/17/2021
|
Conditional Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
12/20/2021
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
12/20/2021
|
Conditional Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
12/21/2021
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
12/21/2021
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
12/23/2021
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
12/29/2021
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
1/11/2022
|
Conditional Approval
|
DAVID BURKHEAD
|
Deputy Fireproofing
|
1/12/2022
|
Partial Approval
|
JAMES POWERS
|
Deputy Reinf. Concrete
|
1/24/2022
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
1/28/2022
|
Conditional Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
1/31/2022
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
1/31/2022
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
2/3/2022
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
2/4/2022
|
Conditional Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
2/10/2022
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
2/10/2022
|
Conditional Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
2/11/2022
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
2/11/2022
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
2/14/2022
|
Conditional Approval
|
NICK DANERI
|
Footing/Foundation/Slab
|
2/14/2022
|
Not Ready for Inspection
|
NICK DANERI
|
Deputy Reinf. Concrete
|
2/18/2022
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
2/25/2022
|
Conditional Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
3/2/2022
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
3/2/2022
|
Conditional Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
3/4/2022
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
3/4/2022
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
3/11/2022
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
3/21/2022
|
Conditional Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
4/27/2022
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
4/27/2022
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
5/2/2022
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
5/4/2022
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
5/9/2022
|
Conditional Approval
|
NICK DANERI
|
Special/Order Compliance
|
5/10/2022
|
Partial Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
5/11/2022
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
5/18/2022
|
Partial Approval
|
JAMES POWERS
|
Deputy Drilled-In Anchors
|
5/23/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
Deputy Reinf. Concrete
|
5/23/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
Deputy Pre-Stress Concrete
|
5/31/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
Deputy Reinf. Concrete
|
5/31/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
Deputy Pre-Stress Concrete
|
6/1/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
Deputy Reinf. Concrete
|
6/1/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
Deputy Pre-Stress Concrete
|
6/6/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
Deputy Reinf. Concrete
|
6/6/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
Deputy Pre-Stress Concrete
|
6/7/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
Deputy Reinf. Concrete
|
6/7/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
Deputy Pre-Stress Concrete
|
6/10/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
Deputy Reinf. Concrete
|
6/10/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
Deputy Drilled-In Anchors
|
6/16/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
Deputy Pre-Stress Concrete
|
6/16/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
Deputy Reinf. Concrete
|
6/16/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
Deputy Drilled-In Anchors
|
6/17/2022
|
Conditional Approval
|
WINSTON DUNNING
|
Deputy Pre-Stress Concrete
|
6/17/2022
|
Conditional Approval
|
WINSTON DUNNING
|
Deputy Reinf. Concrete
|
6/17/2022
|
Conditional Approval
|
WINSTON DUNNING
|
Deputy Drilled-In Anchors
|
6/21/2022
|
Conditional Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
6/21/2022
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
6/21/2022
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
8/16/2022
|
Conditional Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
11/9/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Fireproofing
|
11/9/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Steel/Welding
|
11/9/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Drilled-In Anchors
|
11/10/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Fireproofing
|
11/10/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Steel/Welding
|
11/10/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Drilled-In Anchors
|
11/14/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Fireproofing
|
11/14/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Steel/Welding
|
11/14/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Reinf. Masonry
|
11/30/2022
|
Conditional Approval
|
NICK DANERI
|
Insulation
|
12/9/2022
|
Partial Approval
|
NICK DANERI
|
Light Gage Steel Frame
|
12/28/2022
|
Partial Approval
|
NICK DANERI
|
Deputy Steel/Welding
|
6/29/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Fireproofing
|
8/18/2023
|
Conditional Approval
|
NICK DANERI
|
Final
|
12/6/2023
|
Partial Inspection
|
NICK DANERI
|
Footing/Foundation/Slab
|
12/6/2023
|
Approved
|
NICK DANERI
|
Green Building Final
|
12/6/2023
|
Partial Inspection
|
NICK DANERI
|
Green Building Rough
|
12/6/2023
|
Partial Inspection
|
NICK DANERI
|
Reinforced Concrete Frame
|
12/6/2023
|
Partial Inspection
|
NICK DANERI
|
SGSOV-Seismic Gas S/O Valve
|
12/6/2023
|
SGSOV Not Ready
|
NICK DANERI
|
SUSMP-Std. Urban Storm Water
|
12/6/2023
|
Partial Inspection
|
NICK DANERI
|
Smoke Detectors
|
12/6/2023
|
Partial Inspection
|
NICK DANERI
|
Verify Sprinkler Sign Off
|
12/6/2023
|
Conditional Approval
|
NICK DANERI
|
Final
|
12/11/2023
|
Not Ready for Inspection
|
NICK DANERI
|
Green Building Final
|
12/11/2023
|
Partial Inspection
|
NICK DANERI
|
Green Building Rough
|
12/11/2023
|
Approved
|
NICK DANERI
|
Reinforced Concrete Frame
|
12/11/2023
|
Partial Inspection
|
NICK DANERI
|
SGSOV-Seismic Gas S/O Valve
|
12/11/2023
|
SGSOV Not Ready
|
NICK DANERI
|
SUSMP-Std. Urban Storm Water
|
12/11/2023
|
Partial Inspection
|
NICK DANERI
|
Smoke Detectors
|
12/11/2023
|
Partial Inspection
|
NICK DANERI
|
Verify Sprinkler Sign Off
|
12/11/2023
|
Partial Inspection
|
NICK DANERI
|
Pre-Inspection
|
12/12/2023
|
Corrections Issued
|
NICK DANERI
|
Pre-Inspection
|
12/13/2023
|
Partial Approval
|
NICK DANERI
|
Pre-Inspection
|
12/14/2023
|
Partial Approval
|
NICK DANERI
|
Pre-Inspection
|
12/15/2023
|
Partial Approval
|
NICK DANERI
|
Pre-Inspection
|
12/19/2023
|
Partial Inspection
|
NICK DANERI
|
Final
|
12/20/2023
|
Partial Inspection
|
NICK DANERI
|
Green Building Final
|
12/20/2023
|
Not Ready for Inspection
|
NICK DANERI
|
Reinforced Concrete Frame
|
12/20/2023
|
Not Ready for Inspection
|
NICK DANERI
|
SGSOV-Seismic Gas S/O Valve
|
12/20/2023
|
SGSOV Not Ready
|
NICK DANERI
|
SUSMP-Std. Urban Storm Water
|
12/20/2023
|
Partial Inspection
|
NICK DANERI
|
Smoke Detectors
|
12/20/2023
|
Approved
|
NICK DANERI
|
Verify Sprinkler Sign Off
|
12/20/2023
|
Conditional Approval
|
NICK DANERI
|
Pre-Inspection
|
12/26/2023
|
Partial Inspection
|
NICK DANERI
|
Pre-Inspection
|
1/17/2024
|
Partial Inspection
|
NICK DANERI
|
Pre-Inspection
|
1/18/2024
|
Approved
|
NICK DANERI
|
Special/Order Compliance
|
1/18/2024
|
Partial Approval
|
LUIS CCAMACHO
|
Special/Order Compliance
|
6/24/2024
|
Conditional Approval
|
NICK DANERI
|
Final
|
10/3/2024
|
OK to Issue CofO
|
NICK DANERI
|
Green Building Final
|
10/3/2024
|
Approved
|
NICK DANERI
|
Reinforced Concrete Frame
|
10/3/2024
|
Approved
|
NICK DANERI
|
SGSOV-Seismic Gas S/O Valve
|
10/3/2024
|
SGSOV Approved
|
NICK DANERI
|
SUSMP-Std. Urban Storm Water
|
10/3/2024
|
Approved
|
NICK DANERI
|
Verify Sprinkler Sign Off
|
10/3/2024
|
Approved
|
NICK DANERI
|