10812 W RENNES ST 91602
Certificate Information: 10812 W RENNES ST 91602
- Application / Permit
- 17010-10000-04743
- Plan Check / Job No.
- B17LA22063
- Group
- Building
- Type
- Bldg-New
- Sub-Type
- 1 or 2 Family Dwelling
- Primary Use
- (1) Dwelling - Single Family
- Work Description
- 3-STORY W/ ROOF DECK SINGLE FAMILY DWELLING (lot 11, floor plan P2) "Small lot subdivision pursuant to Tentative Tract Map No 75015-SL. A certificate of occupancy (temporary or final) shall not be issued until after the final map has been recorded"
- Permit Issued
- Issued on 11/21/2018
- Issuing Office
- Metro
- Current Status
- CofO Issued on 9/2/2020
- Certificate of Occupancy
- CofO Issued More Information
Permit Application Status History
| Submitted | 12/1/2017 | APPLICANT |
| Green Plans Picked Up | 12/19/2017 | APPLICANT |
| Assigned to Plan Check Engineer | 12/21/2017 | HERNAN ARREOLA |
| Corrections Issued | 1/2/2018 | SHUNYU ZHANG |
| Quality Review Completed | 1/11/2018 | MINYE PAK |
| Building Plans Picked Up | 1/16/2018 | APPLICANT |
| Plan Check Approved | 11/21/2018 | HERNAN ARREOLA |
| Issued | 11/21/2018 | LADBS |
| CofO in Progress | 8/28/2020 | JOSEPH SAGEN |
| Permit Finaled | 9/2/2020 | DONALD SUNSERI |
| CofO Issued | 9/2/2020 | DONALD SUNSERI |
| Permit Finaled | 9/2/2020 | DONALD SUNSERI |
Permit Application Clearance Information
| Address approval | Cleared | 3/28/2018 | STEVE MELGAR |
| Low Impact Development | Cleared | 6/27/2018 | SAM NAVID |
| Hydrant and Access approval | Cleared | 9/5/2018 | JOHN DALLAS |
| Frnt yard landscape/Water mgmt | Cleared | 10/17/2018 | SOPHIE GABEL-SCHEINBAU |
| Green Code | Cleared | 10/17/2018 | KATHRYN BUTTERWORTH |
| Green Code | Cleared | 10/17/2018 | SHUNYU ZHANG |
| Tract Map conditions | Cleared | 10/17/2018 | SOPHIE GABEL-SCHEINBAU |
| Tract Map conditions | Cleared | 10/17/2018 | SOPHIE GABEL-SCHEINBAU |
| Tract Map conditions | Cleared | 10/17/2018 | SOPHIE GABEL-SCHEINBAU |
| ZA Case | Cleared | 10/17/2018 | SOPHIE GABEL-SCHEINBAU |
| Eng Process Fee Ord 176,300 | Cleared | 11/5/2018 | NAZILA NOORIFAR |
| Highway dedication | Cleared | 11/5/2018 | LEE GUILBEAUX |
| Permit | Cleared | 11/5/2018 | LEE GUILBEAUX |
| Roof/Waste drainage to street | Cleared | 11/5/2018 | LEE GUILBEAUX |
| Sewer availability | Cleared | 11/5/2018 | NAZILA NOORIFAR |
Contact Information
| Architect | Texter, Christopher S; Lic. No.: C25901 | 2 BUELLTON IRVINE, CA 92602 |
| Contractor | Warmington Residential California Inc; Lic. No.: 852282-B | 3090 PULLMAN STREET COSTA MESA, CA 92626 |
| Engineer | Allen, Thomas Christopher; Lic. No.: S5460 | 2 VENTURE, SUITE 200 IRVINE, CA 92618 |
| Engineer | Awad, Ramy F; Lic. No.: C41729 | 14169 WILDROSE LN CHINO HILLS, CA 91709 |
| Engineer | Berliner, Neal David; Lic. No.: GE2576 | 4913 MONUMENT ST SIMI VALLEY, CA 93063 |
| Engineer | Geocon, West Inc; Lic. No.: GE3092 | 3303 N SAN FERNANDO BLVD SUITE 100 BURBANK, CA 91504 |
Inspector Information
| JOSEPH SAGEN, (818) 774-4353 | Office Hours: 7:00-8:00 AM MON-FRI |
Pending Inspections
| No Data Available. |
Inspection Request History
| Excavation/Setback/Form/Re-Bar | 1/2/2019 | Not Ready for Inspection | DONALD SUNSERI |
| Footing/Foundation/Slab | 1/2/2019 | Not Ready for Inspection | DONALD SUNSERI |
| Footing/Foundation/Slab | 1/3/2019 | Approved | JOHN KIDWELL |
| Deputy Reinf. Concrete | 1/4/2019 | No Access for Inspection | JOHN KIDWELL |
| Deputy Wood Construction | 3/21/2019 | Approved | DONALD SUNSERI |
| Floor/Roof Diaphrgm/Shear Wall | 3/22/2019 | Partial Approval | BRUCE ROZAK |
| Floor/Roof Diaphrgm/Shear Wall | 3/28/2019 | Partial Approval | DONALD SUNSERI |
| Floor/Roof Diaphrgm/Shear Wall | 4/1/2019 | Partial Approval | DONALD SUNSERI |
| Deputy Wood Construction | 5/14/2019 | Approved | DONALD SUNSERI |
| Floor/Roof Diaphrgm/Shear Wall | 5/14/2019 | Partial Approval | DONALD SUNSERI |
| Floor/Roof Diaphrgm/Shear Wall | 5/20/2019 | Partial Approval | DONALD SUNSERI |
| Floor/Roof Diaphrgm/Shear Wall | 6/24/2019 | Partial Approval | DONALD SUNSERI |
| Floor/Roof Diaphrgm/Shear Wall | 6/26/2019 | Partial Approval | DONALD SUNSERI |
| Floor/Roof Diaphrgm/Shear Wall | 8/19/2019 | Not Ready for Inspection | JOSEPH SAGEN |
| Floor/Roof Diaphrgm/Shear Wall | 8/21/2019 | Partial Approval | JOSEPH SAGEN |
| Floor/Roof Diaphrgm/Shear Wall | 8/26/2019 | Partial Approval | JOSEPH SAGEN |
| Floor/Roof Diaphrgm/Shear Wall | 9/16/2019 | Partial Approval | JOSEPH SAGEN |
| Deputy Wood Construction | 9/25/2019 | Approved | DONALD SUNSERI |
| Floor/Roof Diaphrgm/Shear Wall | 10/16/2019 | Partial Approval | JOSEPH SAGEN |
| PLUMBING-Rough | 10/16/2019 | Approved | JOSEPH SAGEN |
| ELECTRICAL-Rough | 10/22/2019 | Approved | JOSEPH SAGEN |
| HVAC-Rough | 10/22/2019 | Not Ready for Inspection | JOSEPH SAGEN |
| HVAC-Rough | 10/23/2019 | Approved | JOSEPH SAGEN |
| Floor/Roof Diaphrgm/Shear Wall | 10/24/2019 | Partial Approval | JOSEPH SAGEN |
| BUILDING-Rough-Frame | 11/1/2019 | Corrections Issued | BRUCE ROZAK |
| Green Building Rough | 11/1/2019 | Approved | BRUCE ROZAK |
| MERV13>=Rough | 11/1/2019 | Not Ready for Inspection | BRUCE ROZAK |
| Verify Sprinkler Sign Off | 11/1/2019 | Not Ready for Inspection | BRUCE ROZAK |
| BUILDING-Rough-Frame | 11/6/2019 | Approved | JOSEPH SAGEN |
| MERV13>=Rough | 11/6/2019 | Approved | JOSEPH SAGEN |
| Verify Sprinkler Sign Off | 11/6/2019 | Approved | JOSEPH SAGEN |
| Interior/Exterior Lathing | 11/14/2019 | Approved | JOSEPH SAGEN |
| Drywall Nailing | 11/20/2019 | Not Ready for Inspection | JOSEPH SAGEN |
| Drywall Nailing | 11/21/2019 | Approved | JOSEPH SAGEN |
| Interior/Exterior Lathing | 12/12/2019 | Approved | JOSEPH SAGEN |
| Gas Test | 2/20/2020 | Approved | JOSEPH SAGEN |
| Underground Mechanical | 4/1/2020 | Partial Approval | JOSEPH SAGEN |
| Underground Mechanical | 4/8/2020 | Partial Approval | JOSEPH SAGEN |
| Underground Mechanical | 5/22/2020 | Partial Approval | JOSEPH SAGEN |
| Service/Power Release | 5/27/2020 | Approved | JOSEPH SAGEN |
| SGSOV-Seismic Gas S/O Valve | 5/29/2020 | SGSOV Approved | JOSEPH SAGEN |
| ELECTRICAL-Final | 7/23/2020 | Approved | JOSEPH SAGEN |
| HVAC-Final | 7/23/2020 | Approved | JOSEPH SAGEN |
| PLUMBING-Final | 7/23/2020 | Approved | JOSEPH SAGEN |
| Final | 8/28/2020 | OK to Issue CofO | JOSEPH SAGEN |
| Green Building Final | 8/28/2020 | Approved | JOSEPH SAGEN |
| MERV13>=Final | 8/28/2020 | Approved | JOSEPH SAGEN |
| Smoke Detectors | 8/28/2020 | Approved | JOSEPH SAGEN |