10816 W HORTENSE ST 91602

Certificate Information: 10816 W HORTENSE ST 91602

Application / Permit
17010-10000-04733
Plan Check / Job No.
B17LA22063
Group
Building
Type
Bldg-New
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
3-STORY W/ ROOF DECK SINGLE FAMILY DWELLING (lot 1, floor plan P2) "Small lot subdivision pursuant to Tentative Tract Map No 75015-SL. A certificate of occupancy (temporary or final) shall not be issued until after the final map has been recorded"
Permit Issued
Issued on 11/21/2018
Issuing Office
Metro
Current Status
CofO Issued on 8/24/2020
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 12/1/2017 APPLICANT
Green Plans Picked Up 12/19/2017 APPLICANT
Assigned to Plan Check Engineer 12/21/2017 HERNAN ARREOLA
Corrections Issued 1/2/2018 SHUNYU ZHANG
Quality Review Completed 1/11/2018 MINYE PAK
Building Plans Picked Up 1/16/2018 APPLICANT
Plan Check Approved 11/21/2018 HERNAN ARREOLA
Issued 11/21/2018 LADBS
CofO in Progress 8/21/2020 JOSEPH SAGEN
Permit Finaled 8/24/2020 DONALD SUNSERI
CofO Issued 8/24/2020 DONALD SUNSERI
Permit Finaled 8/24/2020 DONALD SUNSERI

Permit Application Clearance Information

Address approval Cleared 3/28/2018 STEVE MELGAR
Low Impact Development Cleared 6/27/2018 SAM NAVID
Hydrant and Access approval Cleared 9/5/2018 JOHN DALLAS
Frnt yard landscape/Water mgmt Cleared 10/17/2018 SOPHIE GABEL-SCHEINBAU
Green Code Cleared 10/17/2018 KATHRYN BUTTERWORTH
Tract Map conditions Cleared 10/17/2018 SOPHIE GABEL-SCHEINBAU
Tract Map conditions Cleared 10/17/2018 SOPHIE GABEL-SCHEINBAU
Tract Map conditions Cleared 10/17/2018 SOPHIE GABEL-SCHEINBAU
ZA Case Cleared 10/17/2018 SOPHIE GABEL-SCHEINBAU
Eng Process Fee Ord 176,300 Cleared 11/5/2018 NAZILA NOORIFAR
Highway dedication Cleared 11/5/2018 LEE GUILBEAUX
Permit Cleared 11/5/2018 LEE GUILBEAUX
Roof/Waste drainage to street Cleared 11/5/2018 CHRISTINE REUSCH
Sewer availability Cleared 11/5/2018 NAZILA NOORIFAR
Building over 3-story or 36-ft Cleared 11/21/2018 CALOSHA APPROVED

Contact Information

Architect Texter, Christopher S; Lic. No.: C25901 2 BUELLTON      IRVINE, CA 92602
Contractor Warmington Residential California Inc; Lic. No.: 852282-B 3090 PULLMAN STREET      COSTA MESA, CA 92626
Engineer Allen, Thomas Christopher; Lic. No.: S5460 2 VENTURE, SUITE 200      IRVINE, CA 92618
Engineer Awad, Ramy F; Lic. No.: C41729 14169 WILDROSE LN      CHINO HILLS, CA 91709
Engineer Berliner, Neal David; Lic. No.: GE2576 4913 MONUMENT ST      SIMI VALLEY, CA 93063
Engineer Geocon, West Inc; Lic. No.: GE3092 3303 N SAN FERNANDO BLVD   SUITE 100    BURBANK, CA 91504

Inspector Information

JOSEPH SAGEN, (818) 774-4353 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Excavation/Setback/Form/Re-Bar 1/2/2019 Not Ready for Inspection DONALD SUNSERI
Footing/Foundation/Slab 1/2/2019 Not Ready for Inspection DONALD SUNSERI
Footing/Foundation/Slab 1/3/2019 Approved JOHN KIDWELL
Deputy Reinf. Concrete 1/4/2019 No Access for Inspection JOHN KIDWELL
Deputy Wood Construction 3/21/2019 Approved DONALD SUNSERI
Floor/Roof Diaphrgm/Shear Wall 3/22/2019 Partial Approval BRUCE ROZAK
Floor/Roof Diaphrgm/Shear Wall 3/28/2019 Partial Approval DONALD SUNSERI
Floor/Roof Diaphrgm/Shear Wall 4/1/2019 Partial Approval DONALD SUNSERI
Deputy Wood Construction 5/7/2019 Approved DONALD SUNSERI
Floor/Roof Diaphrgm/Shear Wall 5/8/2019 Partial Inspection DONALD SUNSERI
Deputy Drilled-In Anchors 5/14/2019 Approved DONALD SUNSERI
Deputy Wood Construction 5/14/2019 Approved DONALD SUNSERI
Floor/Roof Diaphrgm/Shear Wall 5/14/2019 Partial Approval DONALD SUNSERI
Deputy Drilled-In Anchors 5/15/2019 Approved DONALD SUNSERI
Floor/Roof Diaphrgm/Shear Wall 5/20/2019 Partial Approval DONALD SUNSERI
Floor/Roof Diaphrgm/Shear Wall 6/24/2019 Partial Approval DONALD SUNSERI
Floor/Roof Diaphrgm/Shear Wall 6/26/2019 Partial Approval DONALD SUNSERI
Floor/Roof Diaphrgm/Shear Wall 8/15/2019 Partial Approval JOSEPH SAGEN
Deputy Wood Construction 8/16/2019 Partial Approval JOSEPH SAGEN
Floor/Roof Diaphrgm/Shear Wall 8/16/2019 Partial Approval JOSEPH SAGEN
Floor/Roof Diaphrgm/Shear Wall 8/19/2019 Not Ready for Inspection JOSEPH SAGEN
Floor/Roof Diaphrgm/Shear Wall 8/21/2019 Partial Approval JOSEPH SAGEN
Deputy Wood Construction 9/13/2019 Partial Approval JOSEPH SAGEN
Floor/Roof Diaphrgm/Shear Wall 9/13/2019 Partial Approval JOSEPH SAGEN
Deputy Wood Construction 10/1/2019 Partial Approval JOSEPH SAGEN
Pre-Inspection 10/1/2019 Not Ready for Inspection JOSEPH SAGEN
Deputy Wood Construction 10/3/2019 Partial Approval JOSEPH SAGEN
Floor/Roof Diaphrgm/Shear Wall 10/3/2019 Partial Approval JOSEPH SAGEN
ELECTRICAL-Rough 10/8/2019 Not Ready for Inspection JOSEPH SAGEN
HVAC-Rough 10/8/2019 Not Ready for Inspection JOSEPH SAGEN
Deputy Wood Construction 10/10/2019 Partial Approval JOSEPH SAGEN
HVAC-Rough 10/10/2019 Approved JOSEPH SAGEN
PLUMBING-Rough 10/10/2019 Not Ready for Inspection JOSEPH SAGEN
PLUMBING-Rough 10/11/2019 Not Ready for Inspection DONALD SUNSERI
PLUMBING-Rough 10/16/2019 Approved JOSEPH SAGEN
Deputy Wood Construction 10/17/2019 Approved JOSEPH SAGEN
ELECTRICAL-Rough 10/17/2019 Approved JOSEPH SAGEN
Floor/Roof Diaphrgm/Shear Wall 10/18/2019 Partial Approval JOSEPH SAGEN
BUILDING-Rough-Frame 10/24/2019 Approved JOSEPH SAGEN
Green Building Rough 10/24/2019 Approved JOSEPH SAGEN
MERV13>=Rough 10/24/2019 Approved JOSEPH SAGEN
Verify Sprinkler Sign Off 10/24/2019 Approved JOSEPH SAGEN
Interior/Exterior Lathing 11/8/2019 Approved JOSEPH SAGEN
Drywall Nailing 11/12/2019 Approved JOSEPH SAGEN
Interior/Exterior Lathing 12/3/2019 Approved JOSEPH SAGEN
Gas Test 2/13/2020 Approved JOSEPH SAGEN
Underground Mechanical 2/13/2020 Partial Approval JOSEPH SAGEN
Underground Mechanical 2/19/2020 Partial Approval JOSEPH SAGEN
Gas Test 3/26/2020 Approved JOSEPH SAGEN
SGSOV-Seismic Gas S/O Valve 4/8/2020 SGSOV Approved JOSEPH SAGEN
ELECTRICAL-Final 5/4/2020 Not Ready for Inspection JOSEPH SAGEN
Service/Power Release 5/11/2020 Approved JOSEPH SAGEN
ELECTRICAL-Final 7/13/2020 Approved JOSEPH SAGEN
HVAC-Final 7/13/2020 Not Ready for Inspection JOSEPH SAGEN
PLUMBING-Final 7/13/2020 Approved JOSEPH SAGEN
HVAC-Final 7/23/2020 Approved JOSEPH SAGEN
Final 8/18/2020 Not Ready for Inspection JOSEPH SAGEN
Green Building Final 8/18/2020 Approved JOSEPH SAGEN
MERV13>=Final 8/18/2020 Approved JOSEPH SAGEN
Smoke Detectors 8/18/2020 Not Ready for Inspection JOSEPH SAGEN
Final 8/20/2020 OK to Issue CofO JOSEPH SAGEN
Smoke Detectors 8/20/2020 Approved JOSEPH SAGEN