960 N NORTH MAIN ST 90012

Certificate Information: 960 N NORTH MAIN ST 90012

Application / Permit
17010-10000-04089
Plan Check / Job No.
B17LA19394
Group
Building
Type
Bldg-New
Sub-Type
Commercial
Primary Use
(22) Storage Building for Household Goods
Work Description
New 3 story self-storage building for household goods with 1 level of basement
Permit Issued
Issued on 4/4/2019
Issuing Office
Metro
Current Status
CofO Issued on 3/1/2022
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 11/3/2017 APPLICANT
Assigned to Plan Check Engineer 11/8/2017 SAI KHUM
Corrections Issued 11/29/2017 SAI KHUM
Quality Review Completed 11/30/2017 ALLEN MANALANSAN
Building Plans Picked Up 12/4/2017 APPLICANT
Applicant returned to address corrections 1/18/2019 HERNAN ARREOLA
Plan Check Approved 4/4/2019 HERNAN ARREOLA
Issued 4/4/2019 LADBS
TCO Issued (Expire Date: 06-16-2021) 12/18/2020 ERNESTO CORRAL
TCO Issued (Expire Date: 05-01-2022) 11/2/2021 ERNESTO CORRAL
CofO in Progress 2/28/2022 RAFAEL ESPINOZA
Permit Finaled 3/1/2022 ERNESTO CORRAL
CofO Issued 3/1/2022 ERNESTO CORRAL
Permit Finaled 3/1/2022 ERNESTO CORRAL

Permit Application Clearance Information

Eng Process Fee Ord 176,300 Cleared 6/7/2018 MICHAEL CASTILLO
Project located in CRA area Cleared 6/7/2018 JIM URQUHART
Address approval Cleared 8/28/2018 STEVE MELGAR
Sewer availability Cleared 11/16/2018 JEANETTE VONG
Highway dedication Cleared 11/21/2018 JEANETTE VONG
Low Impact Development Cleared 11/21/2018 MITESH PATEL
Roof/Waste drainage to street Cleared 11/21/2018 JEANETTE VONG
Green Code Cleared 1/8/2019 SAI KHUM
Driveway location Cleared 1/25/2019 TAIMOUR TANAVOLI
Internal circulation Cleared 1/25/2019 TAIMOUR TANAVOLI
Work Adjacent to Public Way Cleared 1/25/2019 CHIU TAM
Hydrant and Access approval Cleared 1/28/2019 ROBERT DUFF
DAS Clearance Cleared 1/31/2019 ELIZABETH TOMS
Site Plan review Cleared 3/28/2019 MICHAEL SIN
Specific Plan Cleared 3/28/2019 MICHAEL SIN
Building over 3-story or 36-ft Cleared 4/4/2019 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 4/4/2019 CALOSHA APPROVED

Contact Information

Contractor Padelford A J & Son Inc; Lic. No.: 222840-B P O BOX 185      ARTESIA, CA 907020185

Inspector Information

RONALD JIMENEZ, (213) 482-0307 Office Hours: 7:00-8:00 AM MON-FRI
LARRY ARNICK, (213) 482-0307 Office Hours: 7:00-8:00 AM MON-FRI
JOEY BUCHANAN, (213) 482-0307 Office Hours: 7:00-8:00 AM MON-FRI
ERNESTO CORRAL, (213) 482-0307 Office Hours: 7:00-8:00 AM MON-FRI
RAFAEL ESPINOZA, (213) 482-0307 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Excavation/Setback/Form/Re-Bar 5/21/2019 Partial Inspection ERNESTO CORRAL
Footing/Foundation/Slab 5/21/2019 Partial Inspection ERNESTO CORRAL
METHANE-Barrier 5/21/2019 Not Ready for Inspection ERNESTO CORRAL
METHANE-Subgrade 5/21/2019 Not Ready for Inspection ERNESTO CORRAL
Excavation/Setback/Form/Re-Bar 5/22/2019 Corrections Issued ERNESTO CORRAL
Footing/Foundation/Slab 6/24/2019 Not Ready for Inspection ERNESTO CORRAL
METHANE-Barrier 6/24/2019 Not Ready for Inspection ERNESTO CORRAL
METHANE-Subgrade 6/24/2019 Partial Inspection ERNESTO CORRAL
Piling/Pier/Caisson 6/24/2019 Partial Inspection ERNESTO CORRAL
Excavation/Setback/Form/Re-Bar 7/23/2019 Partial Inspection ERNESTO CORRAL
Green Building Rough 7/25/2019 Conditional Approval LESLIE TRUJILLO
METHANE-Rough 7/25/2019 Partial Approval LESLIE TRUJILLO
Reinforced Masonry Frame 7/25/2019 Partial Approval LESLIE TRUJILLO
Verify Sprinkler Sign Off 7/25/2019 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 8/6/2019 Not Ready for Inspection ERNESTO CORRAL
METHANE-Barrier 8/6/2019 No Access for Inspection ERNESTO CORRAL
Footing/Foundation/Slab 8/7/2019 Approved ERNESTO CORRAL
METHANE-Barrier 8/7/2019 Approved ERNESTO CORRAL
METHANE-Subgrade 8/7/2019 Approved ERNESTO CORRAL
Masonry Wall/Backfill 8/15/2019 Partial Inspection ERNESTO CORRAL
Green Building Rough 8/16/2019 Not Ready for Inspection ERNESTO CORRAL
METHANE-Rough 8/16/2019 Approved ERNESTO CORRAL
Reinforced Masonry Frame 8/16/2019 Partial Inspection ERNESTO CORRAL
Verify Sprinkler Sign Off 8/16/2019 Not Ready for Inspection ERNESTO CORRAL
Masonry Wall/Backfill 8/19/2019 Partial Inspection ERNESTO CORRAL
Excavation/Setback/Form/Re-Bar 8/23/2019 Not Ready for Inspection DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 8/28/2019 Partial Inspection ERNESTO CORRAL
Reinforced Concrete Frame 8/28/2019 Partial Inspection ERNESTO CORRAL
Masonry Wall/Backfill 8/29/2019 Partial Inspection ERNESTO CORRAL
Green Building Rough 9/3/2019 Approved ERNESTO CORRAL
Masonry Wall/Backfill 9/3/2019 Partial Inspection ERNESTO CORRAL
Reinforced Masonry Frame 9/3/2019 Partial Inspection ERNESTO CORRAL
Verify Sprinkler Sign Off 9/3/2019 Not Ready for Inspection ERNESTO CORRAL
Masonry Wall/Backfill 9/5/2019 Partial Inspection ERNESTO CORRAL
Deputy Reinf. Concrete 9/6/2019 Conditional Approval ERNESTO CORRAL
Masonry Wall/Backfill 9/9/2019 Partial Inspection ERNESTO CORRAL
Light Gage Steel Frame 10/1/2019 Partial Inspection ERNESTO CORRAL
Deputy Steel/Welding 10/2/2019 Conditional Approval ERNESTO CORRAL
Floor/Roof Diaphrgm/Shear Wall 11/1/2019 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/4/2019 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 11/18/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 11/18/2019 Conditional Approval ERNESTO CORRAL
Reinforced Masonry Frame 11/18/2019 Partial Inspection ERNESTO CORRAL
Verify Sprinkler Sign Off 11/18/2019 Not Ready for Inspection ERNESTO CORRAL
Deputy Drilled-In Anchors 11/19/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 11/19/2019 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 11/20/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 11/20/2019 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 11/21/2019 Approved DANIEL MC AULIFFE
Deputy Reinf. Masonry 11/21/2019 Conditional Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 11/22/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 11/22/2019 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 11/22/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 11/25/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 11/26/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 11/27/2019 Conditional Approval ERNESTO CORRAL
Reinforced Masonry Frame 12/3/2019 Partial Inspection ERNESTO CORRAL
Verify Sprinkler Sign Off 12/3/2019 Not Ready for Inspection ERNESTO CORRAL
Deputy Drilled-In Anchors 12/9/2019 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 12/9/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 12/10/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 12/10/2019 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 12/11/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 12/11/2019 Conditional Approval ERNESTO CORRAL
Reinforced Concrete Frame 12/11/2019 Partial Inspection ERNESTO CORRAL
Deputy Drilled-In Anchors 12/12/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 12/12/2019 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 12/13/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 12/13/2019 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 12/16/2019 Conditional Approval JEFFREY FULTON
Deputy Reinf. Masonry 12/16/2019 Conditional Approval JEFFREY FULTON
Deputy Drilled-In Anchors 12/17/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 12/17/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 12/17/2019 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 12/18/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 12/18/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 12/18/2019 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 12/19/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 12/19/2019 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 12/20/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 12/20/2019 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 1/6/2020 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 1/6/2020 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 1/7/2020 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 1/7/2020 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 1/8/2020 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 1/8/2020 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 1/9/2020 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 1/9/2020 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 1/10/2020 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 1/10/2020 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 1/13/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 1/13/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 1/14/2020 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 1/14/2020 Conditional Approval ERNESTO CORRAL
Reinforced Masonry Frame 1/14/2020 Not Ready for Inspection ERNESTO CORRAL
Verify Sprinkler Sign Off 1/14/2020 Not Ready for Inspection ERNESTO CORRAL
Deputy Drilled-In Anchors 1/15/2020 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 1/15/2020 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 1/16/2020 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 1/16/2020 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 1/17/2020 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 1/17/2020 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 1/17/2020 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 1/21/2020 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 1/21/2020 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 1/22/2020 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 1/22/2020 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 1/23/2020 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 1/23/2020 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 1/24/2020 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 1/24/2020 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 1/27/2020 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 1/27/2020 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 1/28/2020 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 1/28/2020 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 1/29/2020 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 1/29/2020 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 1/30/2020 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 1/30/2020 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 2/3/2020 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 2/3/2020 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 2/4/2020 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 2/4/2020 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 2/5/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Masonry 2/5/2020 Approved DANIEL MC AULIFFE
Deputy Drilled-In Anchors 2/6/2020 Conditional Approval DANIEL COLLINS
Deputy Reinf. Masonry 2/6/2020 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 2/7/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Masonry 2/7/2020 Approved DANIEL MC AULIFFE
Deputy Drilled-In Anchors 2/10/2020 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 2/10/2020 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 2/11/2020 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 2/11/2020 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 2/12/2020 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 2/12/2020 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 2/13/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 2/13/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 2/14/2020 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 2/14/2020 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 2/18/2020 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 2/18/2020 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 2/19/2020 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 2/19/2020 Conditional Approval ERNESTO CORRAL
Light Gage Steel Frame 2/19/2020 Partial Inspection ERNESTO CORRAL
Deputy Drilled-In Anchors 2/20/2020 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 2/20/2020 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 2/21/2020 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 2/21/2020 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 2/24/2020 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 2/24/2020 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 2/25/2020 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 2/25/2020 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 2/26/2020 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 2/26/2020 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 2/26/2020 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 2/27/2020 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 2/27/2020 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 2/28/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Masonry 2/28/2020 Approved DANIEL MC AULIFFE
Deputy Drilled-In Anchors 3/2/2020 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 3/2/2020 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 3/3/2020 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 3/3/2020 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 3/3/2020 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 3/4/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Masonry 3/4/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 3/4/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 3/5/2020 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 3/5/2020 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 3/5/2020 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 3/6/2020 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 3/6/2020 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 3/6/2020 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 3/9/2020 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 3/9/2020 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 3/9/2020 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 3/10/2020 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 3/10/2020 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 3/10/2020 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 3/11/2020 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 3/11/2020 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 3/11/2020 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 3/12/2020 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 3/12/2020 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 3/12/2020 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 3/13/2020 No Access for Inspection ERNESTO CORRAL
Deputy Reinf. Masonry 3/13/2020 No Access for Inspection ERNESTO CORRAL
Deputy Drilled-In Anchors 3/16/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 3/16/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 3/17/2020 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 3/17/2020 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 3/18/2020 Conditional Approval DANIEL COLLINS
Deputy Reinf. Masonry 3/18/2020 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 3/19/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Masonry 3/19/2020 Approved DANIEL MC AULIFFE
Deputy Drilled-In Anchors 3/20/2020 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Masonry 3/20/2020 Conditional Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 3/23/2020 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 3/23/2020 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 3/24/2020 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 3/24/2020 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 3/25/2020 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 3/25/2020 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 3/26/2020 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 3/26/2020 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 3/27/2020 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 3/27/2020 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 4/2/2020 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 4/3/2020 Conditional Approval ERNESTO CORRAL
Reinforced Concrete Frame 4/21/2020 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 4/22/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 4/22/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 4/24/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 5/5/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 5/6/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 5/7/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 5/8/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 5/19/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 5/20/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 5/21/2020 Conditional Approval RAFAEL ESPINOZA
Light Gage Steel Frame 5/21/2020 Partial Approval RAFAEL ESPINOZA
Deputy Steel/Welding 5/22/2020 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 5/27/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 5/28/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 5/29/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 6/1/2020 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 6/2/2020 Conditional Approval NICK DANERI
Deputy Steel/Welding 6/3/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 6/4/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 6/5/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 6/8/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 6/9/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 6/10/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 6/11/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 6/12/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 6/15/2020 Conditional Approval RAFAEL ESPINOZA
Insulation 6/15/2020 Partial Approval RAFAEL ESPINOZA
Deputy Steel/Welding 6/16/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 6/17/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 6/18/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 6/19/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 6/23/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 6/24/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 6/25/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 6/26/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 6/29/2020 Conditional Approval RAFAEL ESPINOZA
Drywall Nailing 6/29/2020 Partial Approval RAFAEL ESPINOZA
Deputy Steel/Welding 6/30/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 7/1/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 7/2/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 7/6/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 7/7/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 7/8/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 7/9/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 7/10/2020 Conditional Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 7/10/2020 Partial Approval RAFAEL ESPINOZA
Deputy Steel/Welding 7/13/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 7/14/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 7/15/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 7/16/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 7/17/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 7/20/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 7/21/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 7/22/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 7/23/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 7/24/2020 Conditional Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 7/27/2020 Partial Approval RAFAEL ESPINOZA
Deputy Steel/Welding 7/28/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 7/29/2020 Conditional Approval RAFAEL ESPINOZA
Insulation 7/29/2020 Partial Approval RAFAEL ESPINOZA
Deputy Steel/Welding 7/30/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 7/31/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 8/3/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 8/4/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 8/5/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 8/6/2020 Conditional Approval LANNY MERRICK
Deputy Steel/Welding 8/7/2020 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 8/10/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 8/11/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 8/12/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 8/13/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 8/14/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 8/17/2020 Conditional Approval NICK DANERI
Deputy Steel/Welding 8/19/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 8/20/2020 Conditional Approval RAFAEL ESPINOZA
Wall Anchors 8/20/2020 Partial Approval RAFAEL ESPINOZA
Deputy Steel/Welding 8/21/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 8/25/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 8/26/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 8/31/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 9/1/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 9/2/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 9/3/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 9/4/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 9/8/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 9/9/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 9/10/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 9/11/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 9/14/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 9/15/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 9/16/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 9/17/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 9/18/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 9/21/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 9/22/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 9/23/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 9/24/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 9/25/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 9/29/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 9/30/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 10/1/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 10/2/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 10/5/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 10/6/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 10/7/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 10/8/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 10/9/2020 Conditional Approval RAFAEL ESPINOZA
Drywall Nailing 10/9/2020 Partial Approval RAFAEL ESPINOZA
Drywall Nailing 10/13/2020 Partial Approval RAFAEL ESPINOZA
Insulation 10/13/2020 Partial Approval RAFAEL ESPINOZA
Light Gage Steel Frame 10/13/2020 Partial Approval RAFAEL ESPINOZA
Deputy Steel/Welding 10/19/2020 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 10/20/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 10/21/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 10/22/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 10/23/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 10/27/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 10/28/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 10/29/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 10/30/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 11/4/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 11/5/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 11/6/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 11/9/2020 Conditional Approval RAFAEL ESPINOZA
Drywall Nailing 11/9/2020 Partial Approval RAFAEL ESPINOZA
Deputy Steel/Welding 11/10/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 11/12/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 11/13/2020 Conditional Approval RAFAEL ESPINOZA
Drywall Nailing 11/13/2020 Partial Approval RAFAEL ESPINOZA
Deputy Steel/Welding 11/16/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 11/17/2020 Conditional Approval RAFAEL ESPINOZA
Drywall Nailing 11/17/2020 Partial Approval RAFAEL ESPINOZA
Deputy Steel/Welding 11/18/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 11/19/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 11/20/2020 Conditional Approval NICK DANERI
Final 12/8/2020 Not Ready for Inspection RAFAEL ESPINOZA
Green Building Final 12/8/2020 Approved RAFAEL ESPINOZA
Reinforced Masonry Frame 12/8/2020 Partial Approval RAFAEL ESPINOZA
SGSOV-Seismic Gas S/O Valve 12/8/2020 SGSOV Not Ready RAFAEL ESPINOZA
Smoke Detectors 12/8/2020 Not Ready for Inspection RAFAEL ESPINOZA
Verify Sprinkler Sign Off 12/8/2020 Not Ready for Inspection RAFAEL ESPINOZA
Final 12/11/2020 OK for TCO RAFAEL ESPINOZA
Reinforced Masonry Frame 12/11/2020 Approved RAFAEL ESPINOZA
SGSOV-Seismic Gas S/O Valve 12/11/2020 SGSOV Approved RAFAEL ESPINOZA
Smoke Detectors 12/11/2020 Approved RAFAEL ESPINOZA
Verify Sprinkler Sign Off 12/11/2020 Approved RAFAEL ESPINOZA
Special/Order Compliance 5/19/2021 Approved RAFAEL ESPINOZA
Pre-Inspection 12/9/2021 Partial Inspection RAFAEL ESPINOZA
Final 12/21/2021 Not Ready for Inspection NICK DANERI
Final 1/3/2022 Partial Inspection RAFAEL ESPINOZA