Footing/Foundation/Slab
|
3/8/2019
|
Partial Inspection
|
JOHN KITCKO
|
|
Footing/Foundation/Slab
|
3/13/2019
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Pre-Inspection
|
3/14/2019
|
Partial Approval
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
3/18/2019
|
Approved
|
JOHN KITCKO
|
|
Footing/Foundation/Slab
|
3/20/2019
|
Partial Approval
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
3/22/2019
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
4/1/2019
|
Approved
|
JOHN KITCKO
|
|
Footing/Foundation/Slab
|
4/1/2019
|
Partial Approval
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
4/10/2019
|
Approved
|
JOHN KITCKO
|
|
Green Building Rough
|
4/15/2019
|
Partial Approval
|
JOHN KITCKO
|
|
Reinforced Masonry Frame
|
4/15/2019
|
Partial Approval
|
JOHN KITCKO
|
|
Verify Sprinkler Sign Off
|
4/15/2019
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
4/17/2019
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
4/18/2019
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
4/19/2019
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
4/19/2019
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
4/22/2019
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
4/23/2019
|
Conditional Approval
|
CAMERON CHABAN
|
|
Footing/Foundation/Slab
|
4/23/2019
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
4/24/2019
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
4/25/2019
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
4/26/2019
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
4/29/2019
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
4/30/2019
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
5/1/2019
|
Approved
|
JOHN KITCKO
|
|
Green Building Rough
|
5/1/2019
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Reinforced Masonry Frame
|
5/1/2019
|
Partial Approval
|
JOHN KITCKO
|
|
Verify Sprinkler Sign Off
|
5/1/2019
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
5/2/2019
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
5/3/2019
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
5/6/2019
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
5/7/2019
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
5/8/2019
|
Approved
|
JOHN KITCKO
|
|
Green Building Rough
|
5/8/2019
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Reinforced Masonry Frame
|
5/8/2019
|
Partial Approval
|
JOHN KITCKO
|
|
Verify Sprinkler Sign Off
|
5/8/2019
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
5/9/2019
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
5/10/2019
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
5/13/2019
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
5/14/2019
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
5/15/2019
|
Approved
|
JOHN KITCKO
|
|
Green Building Rough
|
5/15/2019
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Reinforced Masonry Frame
|
5/15/2019
|
Partial Approval
|
JOHN KITCKO
|
|
Verify Sprinkler Sign Off
|
5/15/2019
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
5/16/2019
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
5/17/2019
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
5/20/2019
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
5/21/2019
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
5/22/2019
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
5/23/2019
|
Approved
|
JOHN KITCKO
|
|
Green Building Rough
|
5/23/2019
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Reinforced Masonry Frame
|
5/23/2019
|
Partial Approval
|
JOHN KITCKO
|
|
Verify Sprinkler Sign Off
|
5/23/2019
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
5/29/2019
|
Approved
|
JOHN KITCKO
|
|
Green Building Rough
|
5/29/2019
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Reinforced Masonry Frame
|
5/29/2019
|
Partial Approval
|
JOHN KITCKO
|
|
Verify Sprinkler Sign Off
|
5/29/2019
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
5/30/2019
|
Conditional Approval
|
JAMES STEPHENS
|
|
Deputy Reinf. Masonry
|
5/31/2019
|
Conditional Approval
|
JAMES STEPHENS
|
|
Deputy Reinf. Masonry
|
6/3/2019
|
Conditional Approval
|
JAMES STEPHENS
|
|
Deputy Reinf. Masonry
|
6/4/2019
|
Approved
|
JOHN KITCKO
|
|
Footing/Foundation/Slab
|
6/4/2019
|
Partial Approval
|
JOHN KITCKO
|
|
Green Building Rough
|
6/4/2019
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Reinforced Masonry Frame
|
6/4/2019
|
Partial Approval
|
JOHN KITCKO
|
|
Verify Sprinkler Sign Off
|
6/4/2019
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
6/5/2019
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
6/6/2019
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
6/7/2019
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
6/12/2019
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
6/13/2019
|
Conditional Approval
|
DANNY RODRIGUEZ
|
|
Green Building Rough
|
6/13/2019
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Reinforced Masonry Frame
|
6/13/2019
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Verify Sprinkler Sign Off
|
6/13/2019
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Deputy Reinf. Masonry
|
6/14/2019
|
Approved
|
JOHN KITCKO
|
|
Footing/Foundation/Slab
|
6/14/2019
|
Partial Approval
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
6/17/2019
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
6/18/2019
|
Approved
|
JOHN KITCKO
|
|
Green Building Rough
|
6/18/2019
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Reinforced Masonry Frame
|
6/18/2019
|
Partial Approval
|
JOHN KITCKO
|
|
Verify Sprinkler Sign Off
|
6/18/2019
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
6/19/2019
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
6/20/2019
|
Approved
|
JOHN KITCKO
|
|
Footing/Foundation/Slab
|
6/20/2019
|
Partial Approval
|
JOHN KITCKO
|
|
Green Building Rough
|
6/20/2019
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Reinforced Masonry Frame
|
6/20/2019
|
Partial Approval
|
JOHN KITCKO
|
|
Verify Sprinkler Sign Off
|
6/20/2019
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
6/21/2019
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
6/24/2019
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
6/25/2019
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
6/26/2019
|
Approved
|
JOHN KITCKO
|
|
Footing/Foundation/Slab
|
6/26/2019
|
Partial Approval
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
6/27/2019
|
Conditional Approval
|
JAMES STEPHENS
|
|
Deputy Reinf. Masonry
|
6/28/2019
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
7/2/2019
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
7/3/2019
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
7/8/2019
|
Approved
|
JOHN KITCKO
|
|
Reinforced Concrete Frame
|
7/8/2019
|
Partial Approval
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
7/9/2019
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
7/10/2019
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
7/11/2019
|
Approved
|
JOHN KITCKO
|
|
Green Building Rough
|
7/11/2019
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Reinforced Masonry Frame
|
7/11/2019
|
Partial Approval
|
JOHN KITCKO
|
|
Verify Sprinkler Sign Off
|
7/11/2019
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
7/12/2019
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
7/15/2019
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
7/16/2019
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
7/17/2019
|
Approved
|
JOHN KITCKO
|
|
Green Building Rough
|
7/17/2019
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Reinforced Masonry Frame
|
7/17/2019
|
Partial Approval
|
JOHN KITCKO
|
|
Verify Sprinkler Sign Off
|
7/17/2019
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
7/18/2019
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
7/19/2019
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
7/23/2019
|
Approved
|
JOHN KITCKO
|
|
Green Building Rough
|
7/23/2019
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Reinforced Masonry Frame
|
7/23/2019
|
Partial Approval
|
JOHN KITCKO
|
|
Verify Sprinkler Sign Off
|
7/23/2019
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
7/24/2019
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
7/25/2019
|
Approved
|
JOHN KITCKO
|
|
Footing/Foundation/Slab
|
7/25/2019
|
Partial Approval
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
7/26/2019
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
7/29/2019
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
7/30/2019
|
Approved
|
JOHN KITCKO
|
|
Green Building Rough
|
7/30/2019
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Reinforced Masonry Frame
|
7/30/2019
|
Partial Approval
|
JOHN KITCKO
|
|
Verify Sprinkler Sign Off
|
7/30/2019
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
7/31/2019
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
8/1/2019
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
8/2/2019
|
Approved
|
JOHN KITCKO
|
|
Green Building Rough
|
8/2/2019
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Reinforced Masonry Frame
|
8/2/2019
|
Partial Approval
|
JOHN KITCKO
|
|
Verify Sprinkler Sign Off
|
8/2/2019
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
8/5/2019
|
Approved
|
JOHN KITCKO
|
|
Footing/Foundation/Slab
|
8/5/2019
|
Partial Approval
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
8/6/2019
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
8/7/2019
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
8/8/2019
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
8/9/2019
|
Approved
|
JOHN KITCKO
|
|
Deputy Drilled-In Anchors
|
8/12/2019
|
Approved
|
JOHN KITCKO
|
|
Reinforced Concrete Frame
|
8/27/2019
|
Partial Approval
|
JOHN KITCKO
|
|
Footing/Foundation/Slab
|
8/29/2019
|
Partial Approval
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
9/4/2019
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
9/5/2019
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
9/9/2019
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
9/10/2019
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
9/11/2019
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
9/11/2019
|
Approved
|
JOHN KITCKO
|
|
Footing/Foundation/Slab
|
9/11/2019
|
Partial Approval
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
9/12/2019
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
9/12/2019
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
9/13/2019
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
9/13/2019
|
Approved
|
JOHN KITCKO
|
|
Green Building Rough
|
9/13/2019
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Reinforced Masonry Frame
|
9/13/2019
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Verify Sprinkler Sign Off
|
9/13/2019
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
9/16/2019
|
Approved
|
JOHN KITCKO
|
|
Footing/Foundation/Slab
|
9/16/2019
|
Conditional Approval
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
9/17/2019
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
9/18/2019
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
9/19/2019
|
Approved
|
JOHN KITCKO
|
|
Green Building Rough
|
9/19/2019
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Reinforced Masonry Frame
|
9/19/2019
|
Partial Approval
|
JOHN KITCKO
|
|
Verify Sprinkler Sign Off
|
9/19/2019
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
9/20/2019
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
9/23/2019
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
9/24/2019
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
9/25/2019
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
9/26/2019
|
Conditional Approval
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
9/27/2019
|
Approved
|
JOHN KITCKO
|
|
Structural Steel Frame
|
10/17/2019
|
Partial Inspection
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
10/22/2019
|
Approved
|
JOHN KITCKO
|
|
Green Building Rough
|
10/29/2019
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Reinforced Masonry Frame
|
10/29/2019
|
Partial Approval
|
JOHN KITCKO
|
|
Verify Sprinkler Sign Off
|
10/29/2019
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Deputy Drilled-In Anchors
|
10/30/2019
|
Approved
|
JOHN KITCKO
|
|
Green Building Rough
|
10/30/2019
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Reinforced Masonry Frame
|
10/30/2019
|
Partial Approval
|
JOHN KITCKO
|
|
Verify Sprinkler Sign Off
|
10/30/2019
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Light Gage Steel Frame
|
11/7/2019
|
Partial Approval
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
11/20/2019
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
11/21/2019
|
Approved
|
JOHN KITCKO
|
|
Footing/Foundation/Slab
|
11/21/2019
|
Partial Approval
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
11/22/2019
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
11/26/2019
|
Conditional Approval
|
RICKEY JACKSON
|
|
Drywall Nailing
|
11/26/2019
|
Partial Inspection
|
ANDREW DORSO
|
|
Insulation
|
11/26/2019
|
Partial Inspection
|
ANDREW DORSO
|
|
Deputy Reinf. Masonry
|
11/27/2019
|
Conditional Approval
|
DANNY RODRIGUEZ
|
|
Light Gage Steel Frame
|
12/4/2019
|
Partial Inspection
|
JOHN KITCKO
|
|
Floor/Roof Diaphrgm/Shear Wall
|
12/12/2019
|
Partial Approval
|
JOHN KITCKO
|
|
Drywall Nailing
|
12/13/2019
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Drywall Nailing
|
12/17/2019
|
Partial Approval
|
JOHN KITCKO
|
|
Drywall Nailing
|
12/23/2019
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Light Gage Steel Frame
|
12/23/2019
|
Partial Inspection
|
JOHN KITCKO
|
|
Light Gage Steel Frame
|
12/30/2019
|
Partial Approval
|
JOHN KITCKO
|
|
Drywall Nailing
|
1/14/2020
|
Partial Approval
|
JOHN KITCKO
|
|
Light Gage Steel Frame
|
1/31/2020
|
Partial Approval
|
JOHN KITCKO
|
|
Footing/Foundation/Slab
|
2/6/2020
|
Partial Approval
|
JOHN KITCKO
|
|
Light Gage Steel Frame
|
2/19/2020
|
Partial Inspection
|
JOHN KITCKO
|
|
T-Bar Ceiling
|
3/9/2020
|
Approved
|
JOHN KITCKO
|
|
Final
|
4/1/2020
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Footing/Foundation/Slab
|
4/1/2020
|
Approved
|
JOHN KITCKO
|
|
Green Building Final
|
4/1/2020
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Green Building Rough
|
4/1/2020
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Reinforced Masonry Frame
|
4/1/2020
|
Partial Inspection
|
JOHN KITCKO
|
|
SGSOV-Seismic Gas S/O Valve
|
4/1/2020
|
SGSOV Not Ready
|
JOHN KITCKO
|
|
SUSMP-Std. Urban Storm Water
|
4/1/2020
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Smoke Detectors
|
4/1/2020
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Verify Sprinkler Sign Off
|
4/1/2020
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Final
|
4/8/2020
|
Partial Inspection
|
JOHN KITCKO
|
|
Green Building Final
|
4/8/2020
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Green Building Rough
|
4/8/2020
|
Approved
|
JOHN KITCKO
|
|
Reinforced Masonry Frame
|
4/8/2020
|
Partial Inspection
|
JOHN KITCKO
|
|
SGSOV-Seismic Gas S/O Valve
|
4/8/2020
|
SGSOV Not Ready
|
JOHN KITCKO
|
|
SUSMP-Std. Urban Storm Water
|
4/8/2020
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Smoke Detectors
|
4/8/2020
|
Approved
|
JOHN KITCKO
|
|
Verify Sprinkler Sign Off
|
4/8/2020
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Final
|
5/6/2020
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Green Building Final
|
5/6/2020
|
Approved
|
JOHN KITCKO
|
|
Reinforced Masonry Frame
|
5/6/2020
|
Partial Inspection
|
JOHN KITCKO
|
|
SGSOV-Seismic Gas S/O Valve
|
5/6/2020
|
SGSOV Not Ready
|
JOHN KITCKO
|
|
SUSMP-Std. Urban Storm Water
|
5/6/2020
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Verify Sprinkler Sign Off
|
5/6/2020
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Reinforced Masonry Frame
|
5/26/2020
|
Partial Inspection
|
JOHN KITCKO
|
|
SGSOV-Seismic Gas S/O Valve
|
5/26/2020
|
SGSOV Not Ready
|
JOHN KITCKO
|
|
SUSMP-Std. Urban Storm Water
|
5/26/2020
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Final
|
6/5/2020
|
OK for TCO
|
JOHN KITCKO
|
|
Reinforced Masonry Frame
|
6/5/2020
|
Approved
|
JOHN KITCKO
|
|
SGSOV-Seismic Gas S/O Valve
|
6/5/2020
|
SGSOV Approved
|
JOHN KITCKO
|
|
SUSMP-Std. Urban Storm Water
|
6/5/2020
|
Approved
|
JOHN KITCKO
|
|
Verify Sprinkler Sign Off
|
6/5/2020
|
Approved
|
JOHN KITCKO
|
|
Final
|
9/28/2020
|
OK to Issue CofO
|
JOHN KITCKO
|
|
Special/Order Compliance
|
11/10/2020
|
Partial Inspection
|
JOHN KITCKO
|