1243 N GOWER ST 90038

Certificate Information: 1243 N GOWER ST 90038

Application / Permit
17010-10000-03250
Plan Check / Job No.
B17LA15256
Group
Building
Type
Bldg-New
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
NEW 96' X 36' (4) STORY 5 UNIT APARTMENT BUILDING WITH A ROOFTOP DECK FOR EACH UNIT. NFPA-13 SPRINKLERS THROUGHOUT.
Permit Issued
Issued on 5/7/2018
Issuing Office
Metro
Current Status
CofO Issued on 10/6/2021
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 8/24/2017 APPLICANT
Assigned to Plan Check Engineer 9/14/2017 MICHAEL PEREZ
Disabled Access Plans Picked Up 9/22/2017 APPLICANT
Green Plans Picked Up 9/28/2017 APPLICANT
Corrections Issued 9/29/2017 SHUNYU ZHANG
Quality Review Completed 10/10/2017 MINYE PAK
Building Plans Picked Up 10/11/2017 APPLICANT
Applicant returned to address corrections 1/4/2018 SHUNYU ZHANG
Applicant returned to address corrections 4/5/2018 MICHAEL PEREZ
Applicant returned to address corrections 4/12/2018 MICHAEL PEREZ
Plan Check Approved 4/20/2018 MICHAEL PEREZ
Issued 5/7/2018 LADBS
CofO in Progress 10/6/2021 DANIEL MC AULIFFE
Permit Finaled 10/6/2021 TERRY HERR
CofO Issued 10/6/2021 TERRY HERR
Permit Finaled 10/6/2021 TERRY HERR

Permit Application Clearance Information

ZI Cleared 10/18/2017 BRIDGETTE WOOTEN
Address approval Cleared 10/19/2017 STEVE MELGAR
Eng Process Fee Ord 176,300 Cleared 10/19/2017 STEVE MELGAR
Permit Cleared 10/19/2017 STEVE MELGAR
Hydrant and Access approval Cleared 12/13/2017 ROBERT DUFF
Frnt yard landscape/Water mgmt Cleared 12/19/2017 FIPE LEILUA
Green Code Cleared 12/28/2017 JOHN KLARIN
Building over 3-story or 36-ft Cleared 1/4/2018 CALOSHA APPROVED
DAS Clearance Cleared 1/4/2018 SHINE LIN
Excavation more than 5-ft deep Cleared 1/4/2018 CALOSHA APPROVED
Project located in CRA area Cleared 1/23/2018 JIM URQUHART
Fire Marshall Fire Life Safety Cleared 3/9/2018 VIDAL GARCIA
Low Impact Development Cleared 3/9/2018 IDA MEISAMI-FARD
Roof/Waste drainage to street Cleared 4/20/2018 STEVE MELGAR
Sewer availability Cleared 4/20/2018 STEVE MELGAR

Contact Information

Architect Wickersham, Brian; Lic. No.: C32742 6142 BUENA VISTA TERRACE      LOS ANGELES, CA 90042
Contractor Calcrete Construction Inc; Lic. No.: 854638-B 11666 PENDLETON STREET      SUN VALLEY, CA 91352
Engineer Mahn, Jonathan Edward; Lic. No.: C60293 12848 FOOTHILL BLVD      SYLMAR, CA 91381
Engineer Mills, Garrett Ward; Lic. No.: S5271 1276 E COLORADO BLVD STE 201      PASADENA, CA 91106

Inspector Information

DAVID BURKHEAD, (213) 482-7294 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Reinf. Concrete 8/9/2018 Conditional Approval TED RIES
Footing/Foundation/Slab 8/10/2018 Partial Inspection TED RIES
Deputy Reinf. Concrete 8/28/2018 Conditional Approval TED RIES
Footing/Foundation/Slab 8/28/2018 Not Ready for Inspection TED RIES
Green Building Rough 8/29/2018 Not Ready for Inspection TED RIES
Reinforced Concrete Frame 8/29/2018 Partial Approval TED RIES
Verify Sprinkler Sign Off 8/29/2018 Not Ready for Inspection TED RIES
Deputy Drilled-In Anchors 9/6/2018 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 9/18/2018 Conditional Approval TED RIES
Deputy Reinf. Concrete 9/25/2018 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 10/31/2018 Approved TED RIES
Footing/Foundation/Slab 10/31/2018 Partial Approval TED RIES
Deputy Reinf. Concrete 11/2/2018 Approved TED RIES
Reinforced Masonry Frame 11/7/2018 Partial Approval TED RIES
Deputy Reinf. Masonry 11/9/2018 Approved TED RIES
Footing/Foundation/Slab 5/31/2019 Partial Approval TED RIES
Deputy Reinf. Concrete 7/17/2019 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 7/18/2019 Conditional Approval DANIEL MC AULIFFE
Footing/Foundation/Slab 7/18/2019 Partial Inspection DANIEL MC AULIFFE
Masonry Wall/Backfill 7/19/2019 Partial Approval JAMES POWERS
Footing/Foundation/Slab 7/22/2019 Partial Inspection DANIEL MC AULIFFE
Green Building Rough 7/22/2019 Not Ready for Inspection DANIEL MC AULIFFE
Reinforced Concrete Frame 7/22/2019 Not Ready for Inspection DANIEL MC AULIFFE
Verify Sprinkler Sign Off 7/22/2019 Not Ready for Inspection DANIEL MC AULIFFE
Deputy Reinf. Concrete 7/24/2019 Approved JEFF BYTHEWAY
Floor/Roof Diaphrgm/Shear Wall 9/19/2019 Partial Approval DANIEL MC AULIFFE
Structural Steel Frame 9/19/2019 Partial Approval DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 10/16/2019 Partial Approval DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 4/3/2020 Approved EDWIN GREGORYONA
Green Building Rough 4/3/2020 Partial Inspection EDWIN GREGORYONA
Verify Sprinkler Sign Off 4/3/2020 Approved EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 4/29/2020 Not Ready for Inspection DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 5/1/2020 Partial Approval DANIEL MC AULIFFE
Insulation 5/29/2020 Partial Approval DANIEL MC AULIFFE
Interior/Exterior Lathing 5/29/2020 Partial Approval DANIEL MC AULIFFE
Drywall Nailing 6/16/2020 Partial Inspection DANIEL MC AULIFFE
Deputy Reinf. Concrete 6/22/2020 Conditional Approval DANIEL MC AULIFFE
Footing/Foundation/Slab 6/22/2020 Partial Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 7/6/2020 Conditional Approval DANIEL MC AULIFFE
Interior/Exterior Lathing 7/23/2020 Partial Approval EDWIN GREGORYONA
Insulation 8/17/2020 Approved EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 8/28/2020 Partial Approval DANIEL MC AULIFFE
Drywall Nailing 9/17/2020 Partial Approval EDWIN GREGORYONA
Drywall Nailing 9/29/2020 Partial Approval DANIEL MC AULIFFE
Interior/Exterior Lathing 9/30/2020 Not Ready for Inspection DANIEL MC AULIFFE
Footing/Foundation/Slab 10/2/2020 Not Ready for Inspection DANIEL MC AULIFFE
Drywall Nailing 10/7/2020 Partial Approval DANIEL MC AULIFFE
Green Building Rough 11/17/2020 Approved DANIEL MC AULIFFE
Wood Frame 11/17/2020 Not Ready for Inspection DANIEL MC AULIFFE
Final 9/2/2021 Conditional Approval DANIEL MC AULIFFE
Footing/Foundation/Slab 9/2/2021 Approved DANIEL MC AULIFFE
Green Building Final 9/2/2021 Approved DANIEL MC AULIFFE
Reinforced Concrete Frame 9/2/2021 Approved DANIEL MC AULIFFE
SGSOV-Seismic Gas S/O Valve 9/2/2021 SGSOV Approved DANIEL MC AULIFFE
Smoke Detectors 9/2/2021 Approved DANIEL MC AULIFFE
Wood Frame 9/2/2021 Approved DANIEL MC AULIFFE
Final 9/20/2021 Conditional Approval DANIEL MC AULIFFE
Final 9/29/2021 Not Ready for Inspection DANIEL MC AULIFFE
Final 10/5/2021 Conditional Approval DANIEL MC AULIFFE