Excavation/Setback/Form/Re-Bar
|
10/26/2022
|
Partial Inspection
|
GREGORY POMISH
|
Deputy Other (see comments)
|
11/2/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Reinf. Concrete
|
11/2/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Reinf. Concrete
|
11/3/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Reinf. Concrete
|
11/9/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Footing/Foundation/Slab
|
11/12/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
METHANE-Barrier
|
11/12/2022
|
Partial Inspection
|
RAFAEL ESPINOZA
|
METHANE-Subgrade
|
11/12/2022
|
Partial Inspection
|
RAFAEL ESPINOZA
|
Deputy Reinf. Concrete
|
11/14/2022
|
Conditional Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
11/14/2022
|
Not Ready for Inspection
|
NICK DANERI
|
Green Building Rough
|
11/14/2022
|
Not Ready for Inspection
|
NICK DANERI
|
METHANE-Rough
|
11/14/2022
|
Not Ready for Inspection
|
NICK DANERI
|
Reinforced Concrete Frame
|
11/14/2022
|
Not Ready for Inspection
|
NICK DANERI
|
Verify Sprinkler Sign Off
|
11/14/2022
|
Not Ready for Inspection
|
NICK DANERI
|
Deputy Reinf. Concrete
|
11/15/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Shotcrete
|
11/15/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Footing/Foundation/Slab
|
11/15/2022
|
Partial Approval
|
NICK DANERI
|
METHANE-Barrier
|
11/15/2022
|
Conditional Approval
|
NICK DANERI
|
METHANE-Subgrade
|
11/15/2022
|
Conditional Approval
|
NICK DANERI
|
Deputy Grading
|
11/22/2022
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Grading
|
11/30/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Other (see comments)
|
11/30/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Reinf. Concrete
|
11/30/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Shotcrete
|
11/30/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Steel/Welding
|
11/30/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Reinf. Concrete
|
12/1/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Reinf. Concrete
|
12/2/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Reinf. Concrete
|
12/7/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Reinf. Concrete
|
12/8/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Reinf. Concrete
|
12/9/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Reinf. Concrete
|
12/12/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Reinf. Concrete
|
12/13/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Steel/Welding
|
12/19/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Reinf. Concrete
|
12/21/2022
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Steel/Welding
|
12/21/2022
|
Conditional Approval
|
GREGORY POMISH
|
Floor/Roof Diaphrgm/Shear Wall
|
12/21/2022
|
Partial Inspection
|
GREGORY POMISH
|
METHANE-Barrier
|
12/21/2022
|
Not Ready for Inspection
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
12/22/2022
|
Conditional Approval
|
NICK DANERI
|
Footing/Foundation/Slab
|
12/22/2022
|
Partial Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
12/23/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Reinf. Concrete
|
12/27/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Reinf. Concrete
|
12/29/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Reinf. Concrete
|
12/30/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Special/Order Compliance
|
12/30/2022
|
Partial Inspection
|
NICK DANERI
|
Deputy Reinf. Concrete
|
1/3/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Reinf. Concrete
|
1/4/2023
|
Partial Approval
|
JAMES POWERS
|
Footing/Foundation/Slab
|
1/4/2023
|
Partial Approval
|
JAMES POWERS
|
METHANE-Subgrade
|
1/4/2023
|
Partial Approval
|
JAMES POWERS
|
Deputy Reinf. Concrete
|
1/5/2023
|
Partial Approval
|
JAMES POWERS
|
Green Building Rough
|
1/5/2023
|
Not Ready for Inspection
|
JAMES POWERS
|
METHANE-Rough
|
1/5/2023
|
Partial Approval
|
JAMES POWERS
|
Reinforced Concrete Frame
|
1/5/2023
|
Partial Approval
|
JAMES POWERS
|
Verify Sprinkler Sign Off
|
1/5/2023
|
Not Ready for Inspection
|
JAMES POWERS
|
Deputy Reinf. Concrete
|
1/6/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Reinf. Concrete
|
1/6/2023
|
Partial Approval
|
JAMES POWERS
|
Deputy Reinf. Concrete
|
1/9/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Reinf. Concrete
|
1/10/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Reinf. Concrete
|
1/11/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Shotcrete
|
1/11/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
1/12/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Shotcrete
|
1/12/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Reinf. Concrete
|
1/17/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Shotcrete
|
1/17/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Reinf. Concrete
|
1/18/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Shotcrete
|
1/18/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Reinf. Concrete
|
1/19/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Shotcrete
|
1/19/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Reinf. Concrete
|
1/20/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Shotcrete
|
1/20/2023
|
Conditional Approval
|
NICK DANERI
|
Green Building Rough
|
1/20/2023
|
Not Ready for Inspection
|
NICK DANERI
|
METHANE-Rough
|
1/20/2023
|
Partial Inspection
|
NICK DANERI
|
Reinforced Concrete Frame
|
1/20/2023
|
Partial Approval
|
NICK DANERI
|
Verify Sprinkler Sign Off
|
1/20/2023
|
Not Ready for Inspection
|
NICK DANERI
|
Deputy Reinf. Concrete
|
1/23/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Shotcrete
|
1/23/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Reinf. Concrete
|
1/24/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Shotcrete
|
1/24/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Green Building Rough
|
1/24/2023
|
Not Ready for Inspection
|
JAMES POWERS
|
METHANE-Rough
|
1/24/2023
|
Not Ready for Inspection
|
JAMES POWERS
|
Reinforced Concrete Frame
|
1/24/2023
|
Partial Approval
|
JAMES POWERS
|
Verify Sprinkler Sign Off
|
1/24/2023
|
Not Ready for Inspection
|
JAMES POWERS
|
Deputy Reinf. Concrete
|
1/25/2023
|
Partial Approval
|
JAMES POWERS
|
Deputy Shotcrete
|
1/25/2023
|
Partial Approval
|
JAMES POWERS
|
Floor/Roof Diaphrgm/Shear Wall
|
1/25/2023
|
Partial Approval
|
JAMES POWERS
|
Insulation
|
1/25/2023
|
Not Ready for Inspection
|
JAMES POWERS
|
Deputy Reinf. Concrete
|
1/26/2023
|
Partial Approval
|
JAMES POWERS
|
Deputy Shotcrete
|
1/26/2023
|
Partial Approval
|
JAMES POWERS
|
Reinforced Concrete Frame
|
1/26/2023
|
Partial Approval
|
JAMES POWERS
|
Deputy Reinf. Concrete
|
1/27/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Shotcrete
|
1/27/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Reinf. Concrete
|
1/30/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Shotcrete
|
1/30/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Reinf. Concrete
|
1/31/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Shotcrete
|
1/31/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Reinf. Concrete
|
2/1/2023
|
Partial Approval
|
JAMES POWERS
|
Deputy Shotcrete
|
2/1/2023
|
Partial Approval
|
JAMES POWERS
|
Footing/Foundation/Slab
|
2/1/2023
|
Partial Approval
|
JAMES POWERS
|
METHANE-Barrier
|
2/1/2023
|
Not Ready for Inspection
|
JAMES POWERS
|
METHANE-Subgrade
|
2/1/2023
|
Not Ready for Inspection
|
JAMES POWERS
|
Deputy Reinf. Concrete
|
2/3/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Shotcrete
|
2/3/2023
|
Conditional Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
2/3/2023
|
Partial Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
2/7/2023
|
Not Ready for Inspection
|
JAMES POWERS
|
Deputy Reinf. Concrete
|
2/8/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Shotcrete
|
2/8/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Reinforced Concrete Frame
|
2/8/2023
|
Partial Approval
|
JAMES POWERS
|
Deputy Reinf. Concrete
|
2/9/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Shotcrete
|
2/9/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Reinf. Concrete
|
2/10/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Shotcrete
|
2/10/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Floor/Roof Diaphrgm/Shear Wall
|
2/10/2023
|
Off-Hour Fees Due
|
|
Reinforced Concrete Frame
|
2/10/2023
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
Deputy Reinf. Concrete
|
2/13/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Shotcrete
|
2/13/2023
|
Conditional Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
2/13/2023
|
Partial Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
2/14/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Shotcrete
|
2/14/2023
|
Conditional Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
2/14/2023
|
Partial Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
2/15/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Shotcrete
|
2/15/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Reinf. Concrete
|
2/16/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Shotcrete
|
2/16/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Reinf. Concrete
|
2/17/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Shotcrete
|
2/17/2023
|
Conditional Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
2/17/2023
|
Not Ready for Inspection
|
NICK DANERI
|
Deputy Reinf. Concrete
|
2/21/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Shotcrete
|
2/21/2023
|
Conditional Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
2/21/2023
|
Partial Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
2/22/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Shotcrete
|
2/22/2023
|
Conditional Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
2/22/2023
|
Partial Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
2/23/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Shotcrete
|
2/23/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Reinf. Concrete
|
2/24/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Shotcrete
|
2/24/2023
|
Conditional Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
2/24/2023
|
Partial Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
2/27/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Shotcrete
|
2/27/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
2/28/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Shotcrete
|
2/28/2023
|
Conditional Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
2/28/2023
|
Partial Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
3/1/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Shotcrete
|
3/1/2023
|
Conditional Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
3/1/2023
|
Partial Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
3/2/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Shotcrete
|
3/2/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Reinf. Concrete
|
3/6/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Shotcrete
|
3/6/2023
|
Conditional Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
3/6/2023
|
Partial Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
3/7/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Shotcrete
|
3/7/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Reinf. Concrete
|
3/8/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Shotcrete
|
3/8/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Reinf. Concrete
|
3/9/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Shotcrete
|
3/9/2023
|
Conditional Approval
|
NICK DANERI
|
Footing/Foundation/Slab
|
3/9/2023
|
Partial Approval
|
NICK DANERI
|
METHANE-Barrier
|
3/9/2023
|
Partial Inspection
|
NICK DANERI
|
METHANE-Subgrade
|
3/9/2023
|
Partial Inspection
|
NICK DANERI
|
Deputy Reinf. Concrete
|
3/10/2023
|
No Access for Inspection
|
NICK DANERI
|
Deputy Shotcrete
|
3/10/2023
|
No Access for Inspection
|
NICK DANERI
|
Deputy Reinf. Concrete
|
3/13/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Shotcrete
|
3/13/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Reinf. Concrete
|
3/14/2023
|
Conditional Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
3/14/2023
|
Partial Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
3/15/2023
|
Conditional Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
3/15/2023
|
Partial Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
3/16/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Reinf. Concrete
|
3/17/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Reinf. Concrete
|
3/17/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Shotcrete
|
3/17/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Floor/Roof Diaphrgm/Shear Wall
|
3/17/2023
|
Partial Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
3/20/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Shotcrete
|
3/20/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Reinf. Concrete
|
3/21/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Shotcrete
|
3/21/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
3/22/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Shotcrete
|
3/22/2023
|
Conditional Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
3/22/2023
|
Partial Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
3/23/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Shotcrete
|
3/23/2023
|
Conditional Approval
|
NICK DANERI
|
Footing/Foundation/Slab
|
3/23/2023
|
Partial Approval
|
NICK DANERI
|
METHANE-Barrier
|
3/23/2023
|
Partial Inspection
|
NICK DANERI
|
METHANE-Subgrade
|
3/23/2023
|
Partial Inspection
|
NICK DANERI
|
Deputy Reinf. Concrete
|
3/24/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Shotcrete
|
3/24/2023
|
Conditional Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
3/24/2023
|
Not Ready for Inspection
|
NICK DANERI
|
Green Building Rough
|
3/24/2023
|
Partial Inspection
|
GREGORY POMISH
|
METHANE-Rough
|
3/24/2023
|
Partial Inspection
|
GREGORY POMISH
|
Reinforced Concrete Frame
|
3/24/2023
|
Partial Approval
|
GREGORY POMISH
|
Verify Sprinkler Sign Off
|
3/24/2023
|
Partial Inspection
|
GREGORY POMISH
|
Floor/Roof Diaphrgm/Shear Wall
|
3/27/2023
|
Partial Approval
|
EDWIN GREGORYONA
|
Footing/Foundation/Slab
|
3/29/2023
|
Off-Hour Fees Due
|
|
Footing/Foundation/Slab
|
3/29/2023
|
Partial Approval
|
EDWIN GREGORYONA
|
METHANE-Barrier
|
3/29/2023
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
METHANE-Barrier
|
3/29/2023
|
Off-Hour Fees Due
|
|
METHANE-Subgrade
|
3/29/2023
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
METHANE-Subgrade
|
3/29/2023
|
Off-Hour Fees Due
|
|
Deputy Reinf. Concrete
|
3/30/2023
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Shotcrete
|
3/30/2023
|
Conditional Approval
|
GREGORY POMISH
|
Floor/Roof Diaphrgm/Shear Wall
|
3/30/2023
|
Partial Inspection
|
GREGORY POMISH
|
Footing/Foundation/Slab
|
3/30/2023
|
Partial Approval
|
GREGORY POMISH
|
METHANE-Barrier
|
3/30/2023
|
Not Ready for Inspection
|
GREGORY POMISH
|
METHANE-Subgrade
|
3/30/2023
|
Not Ready for Inspection
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
3/31/2023
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Shotcrete
|
3/31/2023
|
Conditional Approval
|
GREGORY POMISH
|
Floor/Roof Diaphrgm/Shear Wall
|
3/31/2023
|
Partial Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
4/3/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Shotcrete
|
4/3/2023
|
Conditional Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
4/3/2023
|
Partial Approval
|
NICK DANERI
|
Deputy Other (see comments)
|
4/4/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
4/4/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Shotcrete
|
4/4/2023
|
Conditional Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
4/4/2023
|
Partial Approval
|
GREGORY POMISH
|
Green Building Rough
|
4/4/2023
|
Not Ready for Inspection
|
NICK DANERI
|
METHANE-Rough
|
4/4/2023
|
Partial Inspection
|
NICK DANERI
|
Reinforced Concrete Frame
|
4/4/2023
|
Partial Approval
|
NICK DANERI
|
Verify Sprinkler Sign Off
|
4/4/2023
|
Not Ready for Inspection
|
NICK DANERI
|
Deputy Reinf. Concrete
|
4/5/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Shotcrete
|
4/5/2023
|
Conditional Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
4/5/2023
|
Partial Approval
|
JAMES POWERS
|
Floor/Roof Diaphrgm/Shear Wall
|
4/5/2023
|
Partial Approval
|
NICK DANERI
|
Footing/Foundation/Slab
|
4/5/2023
|
Partial Approval
|
NICK DANERI
|
METHANE-Barrier
|
4/5/2023
|
Partial Inspection
|
NICK DANERI
|
METHANE-Subgrade
|
4/5/2023
|
Partial Inspection
|
NICK DANERI
|
Special/Order Compliance
|
4/5/2023
|
Approved
|
ALAN MORELOS
|
Deputy Reinf. Concrete
|
4/6/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Shotcrete
|
4/6/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Steel/Welding
|
4/6/2023
|
Conditional Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
4/6/2023
|
Partial Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
4/11/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Shotcrete
|
4/11/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Reinf. Concrete
|
4/12/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Shotcrete
|
4/12/2023
|
Conditional Approval
|
NICK DANERI
|
Footing/Foundation/Slab
|
4/12/2023
|
Partial Approval
|
NICK DANERI
|
METHANE-Barrier
|
4/12/2023
|
Partial Inspection
|
NICK DANERI
|
METHANE-Subgrade
|
4/12/2023
|
Partial Inspection
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
4/13/2023
|
Partial Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
4/14/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Shotcrete
|
4/14/2023
|
Conditional Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
4/14/2023
|
Partial Approval
|
DAVID BURKHEAD
|
Floor/Roof Diaphrgm/Shear Wall
|
4/14/2023
|
Partial Approval
|
NICK DANERI
|
Green Building Rough
|
4/14/2023
|
Partial Inspection
|
NICK DANERI
|
METHANE-Rough
|
4/14/2023
|
Partial Inspection
|
NICK DANERI
|
Reinforced Concrete Frame
|
4/14/2023
|
Partial Approval
|
NICK DANERI
|
Verify Sprinkler Sign Off
|
4/14/2023
|
Partial Inspection
|
NICK DANERI
|
Deputy Reinf. Concrete
|
4/17/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Shotcrete
|
4/17/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
4/18/2023
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Shotcrete
|
4/18/2023
|
Conditional Approval
|
GREGORY POMISH
|
Floor/Roof Diaphrgm/Shear Wall
|
4/18/2023
|
Partial Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
4/19/2023
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Shotcrete
|
4/19/2023
|
Conditional Approval
|
GREGORY POMISH
|
Floor/Roof Diaphrgm/Shear Wall
|
4/19/2023
|
Partial Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
4/20/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Other (see comments)
|
4/24/2023
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
4/24/2023
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Shotcrete
|
4/24/2023
|
Conditional Approval
|
GREGORY POMISH
|
Floor/Roof Diaphrgm/Shear Wall
|
4/24/2023
|
Partial Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
4/26/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Shotcrete
|
4/26/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Reinf. Concrete
|
4/27/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Shotcrete
|
4/27/2023
|
Conditional Approval
|
NICK DANERI
|
Footing/Foundation/Slab
|
4/27/2023
|
Partial Approval
|
NICK DANERI
|
METHANE-Barrier
|
4/27/2023
|
Partial Inspection
|
NICK DANERI
|
METHANE-Subgrade
|
4/27/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
4/28/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Shotcrete
|
4/28/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Floor/Roof Diaphrgm/Shear Wall
|
5/2/2023
|
Partial Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
5/3/2023
|
Partial Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
5/4/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Shotcrete
|
5/4/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Reinf. Concrete
|
5/5/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Shotcrete
|
5/5/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Floor/Roof Diaphrgm/Shear Wall
|
5/5/2023
|
Not Ready for Inspection
|
LARRY ARNICK
|
Deputy Reinf. Concrete
|
5/8/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Shotcrete
|
5/8/2023
|
Conditional Approval
|
NICK DANERI
|
Footing/Foundation/Slab
|
5/8/2023
|
Partial Approval
|
NICK DANERI
|
METHANE-Barrier
|
5/8/2023
|
Partial Inspection
|
NICK DANERI
|
METHANE-Subgrade
|
5/8/2023
|
Partial Inspection
|
NICK DANERI
|
Deputy Reinf. Concrete
|
5/9/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Shotcrete
|
5/9/2023
|
Conditional Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
5/9/2023
|
Partial Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
5/10/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Shotcrete
|
5/10/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Reinf. Concrete
|
5/12/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Shotcrete
|
5/12/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Reinf. Concrete
|
5/15/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Deputy Shotcrete
|
5/15/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Reinforced Concrete Frame
|
5/15/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
Deputy Reinf. Concrete
|
5/16/2023
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Shotcrete
|
5/16/2023
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
5/17/2023
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Shotcrete
|
5/17/2023
|
Conditional Approval
|
GREGORY POMISH
|
Floor/Roof Diaphrgm/Shear Wall
|
5/17/2023
|
Partial Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
5/18/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Shotcrete
|
5/18/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Reinf. Concrete
|
5/19/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Reinf. Concrete
|
5/22/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Reinf. Concrete
|
5/24/2023
|
Conditional Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
5/24/2023
|
Partial Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
5/30/2023
|
Conditional Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
5/30/2023
|
Partial Approval
|
NICK DANERI
|
Deputy Other (see comments)
|
5/31/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
5/31/2023
|
Conditional Approval
|
NICK DANERI
|
Footing/Foundation/Slab
|
5/31/2023
|
Partial Approval
|
NICK DANERI
|
METHANE-Barrier
|
5/31/2023
|
Partial Approval
|
NICK DANERI
|
METHANE-Subgrade
|
5/31/2023
|
Partial Approval
|
NICK DANERI
|
Deputy Other (see comments)
|
6/1/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
6/1/2023
|
Conditional Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
6/1/2023
|
Partial Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
6/2/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Reinf. Concrete
|
6/5/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Reinf. Concrete
|
6/6/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Shotcrete
|
6/6/2023
|
Conditional Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
6/6/2023
|
Partial Approval
|
NICK DANERI
|
Footing/Foundation/Slab
|
6/6/2023
|
Partial Approval
|
NICK DANERI
|
METHANE-Barrier
|
6/6/2023
|
Partial Approval
|
NICK DANERI
|
METHANE-Subgrade
|
6/6/2023
|
Partial Inspection
|
NICK DANERI
|
Deputy Reinf. Concrete
|
6/7/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Shotcrete
|
6/7/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Reinf. Concrete
|
6/9/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Shotcrete
|
6/9/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Reinf. Concrete
|
6/12/2023
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Shotcrete
|
6/12/2023
|
Conditional Approval
|
GREGORY POMISH
|
Floor/Roof Diaphrgm/Shear Wall
|
6/12/2023
|
Partial Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
6/13/2023
|
Conditional Approval
|
GREGORY POMISH
|
Floor/Roof Diaphrgm/Shear Wall
|
6/13/2023
|
Partial Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
6/14/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
6/15/2023
|
Conditional Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
6/15/2023
|
Partial Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
6/19/2023
|
Off-Hour Fees Due
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/19/2023
|
Partial Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
6/20/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Masonry
|
6/20/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Shotcrete
|
6/20/2023
|
Conditional Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
6/20/2023
|
Partial Approval
|
NICK DANERI
|
METHANE-Barrier
|
6/20/2023
|
Partial Inspection
|
NICK DANERI
|
METHANE-Subgrade
|
6/20/2023
|
Conditional Approval
|
NICK DANERI
|
Special/Order Compliance
|
6/20/2023
|
Approved
|
ALFREDO LOPEZ
|
Deputy Reinf. Concrete
|
6/21/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Masonry
|
6/21/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Shotcrete
|
6/21/2023
|
Conditional Approval
|
NICK DANERI
|
Footing/Foundation/Slab
|
6/21/2023
|
Partial Approval
|
NICK DANERI
|
Footing/Foundation/Slab
|
6/22/2023
|
Partial Approval
|
DAVID BURKHEAD
|
METHANE-Barrier
|
6/22/2023
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
METHANE-Subgrade
|
6/22/2023
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
Deputy Reinf. Concrete
|
6/27/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Shotcrete
|
6/27/2023
|
Conditional Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
6/27/2023
|
Corrections Issued
|
EDWIN GREGORYONA
|
Floor/Roof Diaphrgm/Shear Wall
|
6/27/2023
|
Not Ready for Inspection
|
NICK DANERI
|
Deputy Reinf. Concrete
|
6/28/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Deputy Shotcrete
|
6/28/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Footing/Foundation/Slab
|
6/28/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
METHANE-Barrier
|
6/28/2023
|
Approved
|
RAFAEL ESPINOZA
|
METHANE-Subgrade
|
6/28/2023
|
Approved
|
RAFAEL ESPINOZA
|
Reinforced Concrete Frame
|
6/28/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
Deputy Reinf. Concrete
|
6/29/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Shotcrete
|
6/29/2023
|
Conditional Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
6/29/2023
|
Not Ready for Inspection
|
NICK DANERI
|
Masonry Wall/Backfill
|
6/29/2023
|
Partial Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
7/3/2023
|
Partial Approval
|
NICK DANERI
|
Footing/Foundation/Slab
|
7/3/2023
|
Partial Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
7/6/2023
|
Partial Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
7/7/2023
|
Conditional Approval
|
GREGORY POMISH
|
Floor/Roof Diaphrgm/Shear Wall
|
7/7/2023
|
Partial Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
7/10/2023
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Shotcrete
|
7/10/2023
|
Conditional Approval
|
GREGORY POMISH
|
Floor/Roof Diaphrgm/Shear Wall
|
7/10/2023
|
Partial Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
7/11/2023
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Shotcrete
|
7/11/2023
|
Conditional Approval
|
GREGORY POMISH
|
Floor/Roof Diaphrgm/Shear Wall
|
7/11/2023
|
Partial Approval
|
GREGORY POMISH
|
Green Building Rough
|
7/11/2023
|
Partial Inspection
|
GREGORY POMISH
|
METHANE-Rough
|
7/11/2023
|
Partial Inspection
|
GREGORY POMISH
|
Reinforced Concrete Frame
|
7/11/2023
|
Partial Approval
|
GREGORY POMISH
|
Verify Sprinkler Sign Off
|
7/11/2023
|
Partial Inspection
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
7/13/2023
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Shotcrete
|
7/13/2023
|
Conditional Approval
|
GREGORY POMISH
|
Floor/Roof Diaphrgm/Shear Wall
|
7/13/2023
|
Partial Approval
|
GREGORY POMISH
|
Footing/Foundation/Slab
|
7/13/2023
|
Partial Inspection
|
KATY RAMIREZ
|
Masonry Wall/Backfill
|
7/17/2023
|
Partial Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
7/18/2023
|
Partial Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
7/19/2023
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Pre-Stress Concrete
|
7/19/2023
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
7/19/2023
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Shotcrete
|
7/19/2023
|
Conditional Approval
|
GREGORY POMISH
|
Footing/Foundation/Slab
|
7/19/2023
|
Partial Approval
|
GREGORY POMISH
|
Deputy Drilled-In Anchors
|
7/20/2023
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Pre-Stress Concrete
|
7/20/2023
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
7/20/2023
|
Conditional Approval
|
GREGORY POMISH
|
Floor/Roof Diaphrgm/Shear Wall
|
7/20/2023
|
Partial Approval
|
GREGORY POMISH
|
Deputy Drilled-In Anchors
|
7/21/2023
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Pre-Stress Concrete
|
7/21/2023
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
7/21/2023
|
Conditional Approval
|
GREGORY POMISH
|
Floor/Roof Diaphrgm/Shear Wall
|
7/21/2023
|
Partial Approval
|
GREGORY POMISH
|
Deputy Drilled-In Anchors
|
7/24/2023
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Pre-Stress Concrete
|
7/24/2023
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
7/24/2023
|
Conditional Approval
|
GREGORY POMISH
|
Floor/Roof Diaphrgm/Shear Wall
|
7/24/2023
|
Partial Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
7/26/2023
|
Conditional Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
7/26/2023
|
Partial Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
7/27/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
7/27/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Shotcrete
|
7/27/2023
|
Conditional Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
7/27/2023
|
Corrections Issued
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
7/28/2023
|
Partial Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
7/31/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
7/31/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Shotcrete
|
7/31/2023
|
Conditional Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
7/31/2023
|
Partial Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
8/1/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
8/1/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Shotcrete
|
8/1/2023
|
Conditional Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
8/1/2023
|
Partial Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
8/3/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
8/3/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Shotcrete
|
8/3/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
8/4/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
8/4/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
8/4/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Shotcrete
|
8/4/2023
|
Conditional Approval
|
NICK DANERI
|
Reinforced Masonry Frame
|
8/4/2023
|
Partial Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
8/7/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
8/7/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
8/7/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
8/8/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
8/8/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
8/8/2023
|
Conditional Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
8/8/2023
|
Partial Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
8/9/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
8/9/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
8/9/2023
|
Conditional Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
8/9/2023
|
Not Ready for Inspection
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
8/10/2023
|
Partial Approval
|
JAMES POWERS
|
Deputy Pre-Stress Concrete
|
8/10/2023
|
Partial Approval
|
JAMES POWERS
|
Deputy Reinf. Concrete
|
8/10/2023
|
Partial Approval
|
JAMES POWERS
|
Floor/Roof Diaphrgm/Shear Wall
|
8/10/2023
|
Partial Approval
|
JAMES POWERS
|
Deputy Pre-Stress Concrete
|
8/11/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
8/11/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
8/14/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
8/14/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
8/14/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
8/15/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
8/15/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
8/15/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
8/16/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
8/16/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
8/16/2023
|
Conditional Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
8/16/2023
|
Partial Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
8/17/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
8/17/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
8/17/2023
|
Conditional Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
8/17/2023
|
Corrections Issued
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
8/18/2023
|
Conditional Approval
|
KATY RAMIREZ
|
Deputy Pre-Stress Concrete
|
8/18/2023
|
Conditional Approval
|
KATY RAMIREZ
|
Deputy Reinf. Concrete
|
8/18/2023
|
Conditional Approval
|
KATY RAMIREZ
|
Floor/Roof Diaphrgm/Shear Wall
|
8/18/2023
|
Partial Approval
|
KATY RAMIREZ
|
Deputy Drilled-In Anchors
|
8/21/2023
|
Conditional Approval
|
LARRY ARNICK
|
Deputy Pre-Stress Concrete
|
8/21/2023
|
Conditional Approval
|
LARRY ARNICK
|
Deputy Reinf. Concrete
|
8/21/2023
|
Conditional Approval
|
LARRY ARNICK
|
Deputy Drilled-In Anchors
|
8/22/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
8/22/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
8/22/2023
|
Conditional Approval
|
NICK DANERI
|
Reinforced Masonry Frame
|
8/22/2023
|
Partial Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
8/23/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
8/23/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
8/23/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
8/24/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
8/24/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
8/24/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
8/25/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
8/25/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
8/25/2023
|
Conditional Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
8/25/2023
|
Partial Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
8/28/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
8/28/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
8/28/2023
|
Conditional Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
8/28/2023
|
Partial Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
8/29/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
8/29/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
8/29/2023
|
Conditional Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
8/29/2023
|
Partial Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
8/30/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
8/30/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
8/30/2023
|
Conditional Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
8/30/2023
|
Partial Inspection
|
NICK DANERI
|
Footing/Foundation/Slab
|
8/30/2023
|
Partial Approval
|
NICK DANERI
|
Green Building Rough
|
8/30/2023
|
Not Ready for Inspection
|
NICK DANERI
|
METHANE-Rough
|
8/30/2023
|
Approved
|
NICK DANERI
|
Reinforced Concrete Frame
|
8/30/2023
|
Partial Inspection
|
NICK DANERI
|
Verify Sprinkler Sign Off
|
8/30/2023
|
Not Ready for Inspection
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
8/31/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
8/31/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
8/31/2023
|
Conditional Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
8/31/2023
|
Not Ready for Inspection
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
9/1/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
9/1/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
9/1/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
9/5/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
9/5/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
9/5/2023
|
Conditional Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
9/5/2023
|
Partial Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
9/6/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
9/6/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
9/6/2023
|
Conditional Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
9/6/2023
|
Partial Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
9/7/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
9/7/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
9/7/2023
|
Conditional Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
9/7/2023
|
Partial Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
9/8/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
9/8/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
9/8/2023
|
Conditional Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
9/9/2023
|
Off-Hour Fees Due
|
|
Deputy Drilled-In Anchors
|
9/11/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Other (see comments)
|
9/11/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
9/11/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
9/11/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
9/12/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Other (see comments)
|
9/12/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
9/12/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
9/12/2023
|
Conditional Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
9/12/2023
|
Partial Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
9/13/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Other (see comments)
|
9/13/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
9/13/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
9/13/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
9/14/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Other (see comments)
|
9/14/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
9/14/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
9/14/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
9/15/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Other (see comments)
|
9/15/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
9/15/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
9/15/2023
|
Conditional Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
9/15/2023
|
Partial Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
9/18/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
9/18/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
9/18/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
9/19/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
9/19/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
9/19/2023
|
Conditional Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
9/19/2023
|
Partial Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
9/20/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
9/20/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
9/20/2023
|
Conditional Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
9/20/2023
|
Partial Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
9/21/2023
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Pre-Stress Concrete
|
9/21/2023
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
9/21/2023
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Drilled-In Anchors
|
9/22/2023
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Pre-Stress Concrete
|
9/22/2023
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
9/22/2023
|
Conditional Approval
|
GREGORY POMISH
|
Reinforced Masonry Frame
|
9/22/2023
|
Partial Approval
|
GREGORY POMISH
|
Deputy Drilled-In Anchors
|
9/25/2023
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Pre-Stress Concrete
|
9/25/2023
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
9/25/2023
|
Conditional Approval
|
GREGORY POMISH
|
Floor/Roof Diaphrgm/Shear Wall
|
9/25/2023
|
Partial Approval
|
GREGORY POMISH
|
Deputy Drilled-In Anchors
|
9/26/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
9/26/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
9/26/2023
|
Conditional Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
9/26/2023
|
Partial Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
9/27/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
9/27/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
9/27/2023
|
Conditional Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
9/27/2023
|
Partial Approval
|
NICK DANERI
|
Reinforced Masonry Frame
|
9/27/2023
|
Partial Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
9/28/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
9/28/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
9/28/2023
|
Conditional Approval
|
NICK DANERI
|
Reinforced Masonry Frame
|
9/28/2023
|
Partial Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
9/29/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
9/29/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
9/29/2023
|
Conditional Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
9/29/2023
|
Partial Inspection
|
NICK DANERI
|
Footing/Foundation/Slab
|
9/29/2023
|
Partial Inspection
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
10/2/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
10/2/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
10/2/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
10/3/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
10/3/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
10/3/2023
|
Conditional Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
10/3/2023
|
Partial Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
10/4/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
10/4/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
10/4/2023
|
Conditional Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
10/4/2023
|
Partial Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
10/5/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
10/5/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
10/5/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
10/6/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
10/6/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
10/6/2023
|
Conditional Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
10/9/2023
|
Off-Hour Fees Due
|
|
Green Building Rough
|
10/9/2023
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
Reinforced Concrete Frame
|
10/9/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
Verify Sprinkler Sign Off
|
10/9/2023
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
Deputy Drilled-In Anchors
|
10/10/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
10/10/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
10/10/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Masonry
|
10/10/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Steel/Welding
|
10/10/2023
|
Conditional Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
10/10/2023
|
Partial Approval
|
NICK DANERI
|
Masonry Wall/Backfill
|
10/10/2023
|
Partial Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
10/11/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
10/11/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
10/11/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Masonry
|
10/11/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Steel/Welding
|
10/11/2023
|
Conditional Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
10/11/2023
|
Off-Hour Fees Due
|
|
Floor/Roof Diaphrgm/Shear Wall
|
10/11/2023
|
Partial Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
10/12/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
10/12/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
10/12/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Masonry
|
10/12/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Steel/Welding
|
10/12/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
10/13/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
10/13/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
10/13/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Masonry
|
10/13/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Steel/Welding
|
10/13/2023
|
Conditional Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
10/13/2023
|
Not Ready for Inspection
|
NICK DANERI
|
Footing/Foundation/Slab
|
10/13/2023
|
Partial Approval
|
NICK DANERI
|
Green Building Rough
|
10/13/2023
|
Not Ready for Inspection
|
NICK DANERI
|
Reinforced Concrete Frame
|
10/13/2023
|
Partial Approval
|
NICK DANERI
|
Verify Sprinkler Sign Off
|
10/13/2023
|
Not Ready for Inspection
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
10/16/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
10/16/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
10/16/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
10/17/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
10/17/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
10/17/2023
|
Conditional Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
10/17/2023
|
Partial Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
10/18/2023
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Pre-Stress Concrete
|
10/18/2023
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
10/18/2023
|
Conditional Approval
|
GREGORY POMISH
|
Floor/Roof Diaphrgm/Shear Wall
|
10/18/2023
|
Partial Approval
|
GREGORY POMISH
|
Light Gage Steel Frame
|
10/18/2023
|
Partial Inspection
|
GREGORY POMISH
|
Deputy Drilled-In Anchors
|
10/19/2023
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Pre-Stress Concrete
|
10/19/2023
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
10/19/2023
|
Conditional Approval
|
GREGORY POMISH
|
Excavation/Setback/Form/Re-Bar
|
10/19/2023
|
Conditional Approval
|
JACOB MYERS
|
Footing/Foundation/Slab
|
10/19/2023
|
Partial Approval
|
GREGORY POMISH
|
Deputy Drilled-In Anchors
|
10/20/2023
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Pre-Stress Concrete
|
10/20/2023
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
10/20/2023
|
Conditional Approval
|
GREGORY POMISH
|
Floor/Roof Diaphrgm/Shear Wall
|
10/20/2023
|
Partial Approval
|
GREGORY POMISH
|
Special/Order Compliance
|
10/20/2023
|
Partial Approval
|
JACOB MYERS
|
Deputy Drilled-In Anchors
|
10/23/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
10/23/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
10/23/2023
|
Conditional Approval
|
NICK DANERI
|
Drywall Nailing
|
10/23/2023
|
Partial Inspection
|
NICK DANERI
|
Green Building Rough
|
10/23/2023
|
Not Ready for Inspection
|
NICK DANERI
|
Light Gage Steel Frame
|
10/23/2023
|
Partial Inspection
|
NICK DANERI
|
Masonry Wall/Backfill
|
10/23/2023
|
Partial Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
10/24/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
10/24/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
10/24/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Masonry
|
10/24/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Steel/Welding
|
10/24/2023
|
Conditional Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
10/24/2023
|
Partial Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
10/25/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
10/25/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
10/25/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Masonry
|
10/25/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Steel/Welding
|
10/25/2023
|
Conditional Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
10/25/2023
|
Partial Approval
|
NICK DANERI
|
Green Building Rough
|
10/25/2023
|
Not Ready for Inspection
|
NICK DANERI
|
Reinforced Concrete Frame
|
10/25/2023
|
Partial Approval
|
NICK DANERI
|
Verify Sprinkler Sign Off
|
10/25/2023
|
Not Ready for Inspection
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
10/26/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Pre-Stress Concrete
|
10/26/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Reinf. Concrete
|
10/26/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Reinf. Masonry
|
10/26/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Steel/Welding
|
10/26/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Drilled-In Anchors
|
10/27/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Pre-Stress Concrete
|
10/27/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Reinf. Concrete
|
10/27/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Reinf. Masonry
|
10/27/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Steel/Welding
|
10/27/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Drilled-In Anchors
|
10/30/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
10/30/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
10/30/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Masonry
|
10/30/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Steel/Welding
|
10/30/2023
|
Conditional Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
10/30/2023
|
Partial Inspection
|
NICK DANERI
|
Footing/Foundation/Slab
|
10/30/2023
|
Partial Approval
|
NICK DANERI
|
Green Building Rough
|
10/30/2023
|
Conditional Approval
|
NICK DANERI
|
Reinforced Concrete Frame
|
10/30/2023
|
Partial Inspection
|
NICK DANERI
|
Verify Sprinkler Sign Off
|
10/30/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
10/31/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
10/31/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
10/31/2023
|
Conditional Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
10/31/2023
|
Partial Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
11/1/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
11/1/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
11/1/2023
|
Conditional Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
11/1/2023
|
Partial Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
11/2/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
11/2/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
11/2/2023
|
Conditional Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
11/2/2023
|
Partial Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
11/3/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
11/3/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
11/3/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
11/6/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Pre-Stress Concrete
|
11/6/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Reinf. Concrete
|
11/6/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Drilled-In Anchors
|
11/7/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
11/7/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
11/7/2023
|
Conditional Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
11/7/2023
|
Partial Inspection
|
NICK DANERI
|
Footing/Foundation/Slab
|
11/7/2023
|
Partial Approval
|
NICK DANERI
|
Green Building Rough
|
11/7/2023
|
Partial Inspection
|
NICK DANERI
|
Masonry Wall/Backfill
|
11/7/2023
|
Partial Approval
|
NICK DANERI
|
Verify Sprinkler Sign Off
|
11/7/2023
|
Partial Inspection
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
11/8/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
11/8/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
11/8/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Masonry
|
11/8/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Steel/Welding
|
11/8/2023
|
Conditional Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
11/8/2023
|
Partial Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
11/9/2023
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Pre-Stress Concrete
|
11/9/2023
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
11/9/2023
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Reinf. Masonry
|
11/9/2023
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Steel/Welding
|
11/9/2023
|
Conditional Approval
|
GREGORY POMISH
|
Floor/Roof Diaphrgm/Shear Wall
|
11/9/2023
|
Partial Approval
|
GREGORY POMISH
|
Deputy Drilled-In Anchors
|
11/13/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Pre-Stress Concrete
|
11/13/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Reinf. Concrete
|
11/13/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Drilled-In Anchors
|
11/14/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
11/14/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
11/14/2023
|
Conditional Approval
|
NICK DANERI
|
Light Gage Steel Frame
|
11/14/2023
|
Partial Approval
|
NICK DANERI
|
Masonry Wall/Backfill
|
11/14/2023
|
Partial Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
11/15/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Masonry
|
11/15/2023
|
Conditional Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
11/15/2023
|
Partial Approval
|
NICK DANERI
|
Deputy Fireproofing
|
11/16/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
11/16/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Masonry
|
11/16/2023
|
Conditional Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
11/16/2023
|
Partial Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
11/17/2023
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Reinf. Masonry
|
11/17/2023
|
Conditional Approval
|
GREGORY POMISH
|
Floor/Roof Diaphrgm/Shear Wall
|
11/17/2023
|
Partial Approval
|
GREGORY POMISH
|
Insulation
|
11/17/2023
|
Not Ready for Inspection
|
GREGORY POMISH
|
Deputy Pre-Stress Concrete
|
11/20/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
11/20/2023
|
Conditional Approval
|
NICK DANERI
|
Insulation
|
11/20/2023
|
Partial Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
11/21/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Reinf. Concrete
|
11/21/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Pre-Stress Concrete
|
11/27/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Light Gage Steel Frame
|
11/27/2023
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
Reinforced Concrete Frame
|
11/27/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
Deputy Drilled-In Anchors
|
11/28/2023
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Pre-Stress Concrete
|
11/28/2023
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
11/28/2023
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Shotcrete
|
11/28/2023
|
Conditional Approval
|
GREGORY POMISH
|
Floor/Roof Diaphrgm/Shear Wall
|
11/28/2023
|
Partial Approval
|
GREGORY POMISH
|
Deputy Drilled-In Anchors
|
11/29/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
11/29/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
11/29/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Shotcrete
|
11/29/2023
|
Conditional Approval
|
NICK DANERI
|
Drywall Nailing
|
11/29/2023
|
Partial Approval
|
NICK DANERI
|
Green Building Rough
|
11/29/2023
|
Not Ready for Inspection
|
NICK DANERI
|
Light Gage Steel Frame
|
11/29/2023
|
Partial Approval
|
NICK DANERI
|
Reinforced Concrete Frame
|
11/29/2023
|
Partial Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
11/30/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
11/30/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
11/30/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Shotcrete
|
11/30/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
12/1/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
12/1/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
12/1/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Shotcrete
|
12/1/2023
|
Conditional Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
12/1/2023
|
Partial Approval
|
NICK DANERI
|
Light Gage Steel Frame
|
12/1/2023
|
Partial Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
12/4/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Pre-Stress Concrete
|
12/4/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Reinf. Concrete
|
12/4/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Shotcrete
|
12/4/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Pre-Stress Concrete
|
12/5/2023
|
Conditional Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
12/5/2023
|
Partial Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
12/6/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
12/6/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
12/6/2023
|
Conditional Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
12/6/2023
|
Partial Approval
|
NICK DANERI
|
Insulation
|
12/6/2023
|
Partial Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
12/7/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
12/7/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
12/7/2023
|
Conditional Approval
|
NICK DANERI
|
Drywall Nailing
|
12/7/2023
|
Partial Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
12/7/2023
|
Partial Approval
|
NICK DANERI
|
Green Building Rough
|
12/7/2023
|
Not Ready for Inspection
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
12/8/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
12/8/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
12/8/2023
|
Conditional Approval
|
NICK DANERI
|
Light Gage Steel Frame
|
12/8/2023
|
Not Ready for Inspection
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
12/12/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
12/12/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
12/12/2023
|
Conditional Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
12/12/2023
|
Partial Approval
|
NICK DANERI
|
Masonry Wall/Backfill
|
12/12/2023
|
Partial Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
12/13/2023
|
Conditional Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
12/13/2023
|
Partial Approval
|
NICK DANERI
|
Insulation
|
12/13/2023
|
Partial Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
12/15/2023
|
Conditional Approval
|
NICK DANERI
|
Drywall Nailing
|
12/15/2023
|
Partial Approval
|
NICK DANERI
|
Green Building Rough
|
12/15/2023
|
Not Ready for Inspection
|
NICK DANERI
|
Light Gage Steel Frame
|
12/15/2023
|
Partial Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
12/18/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
12/18/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
12/18/2023
|
Conditional Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
12/18/2023
|
Partial Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
12/19/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
12/19/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
12/19/2023
|
Conditional Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
12/19/2023
|
Partial Approval
|
NICK DANERI
|
Masonry Wall/Backfill
|
12/19/2023
|
Partial Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
12/20/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
12/20/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
12/20/2023
|
Conditional Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
12/20/2023
|
Not Ready for Inspection
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
12/21/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
12/21/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
12/21/2023
|
Conditional Approval
|
NICK DANERI
|
Drywall Nailing
|
12/21/2023
|
Partial Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
12/21/2023
|
Partial Approval
|
NICK DANERI
|
Green Building Rough
|
12/21/2023
|
Not Ready for Inspection
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
12/22/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
12/22/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
12/22/2023
|
Conditional Approval
|
NICK DANERI
|
Insulation
|
12/22/2023
|
Partial Approval
|
NICK DANERI
|
Light Gage Steel Frame
|
12/22/2023
|
Partial Approval
|
NICK DANERI
|
Light Gage Steel Frame
|
12/26/2023
|
Partial Inspection
|
NICK DANERI
|
Special/Order Compliance
|
12/27/2023
|
Partial Inspection
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
12/28/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
12/28/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
12/28/2023
|
Conditional Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
12/28/2023
|
Partial Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
12/29/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
12/29/2023
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
12/29/2023
|
Conditional Approval
|
NICK DANERI
|
Drywall Nailing
|
12/29/2023
|
Partial Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
12/29/2023
|
Partial Approval
|
NICK DANERI
|
Green Building Rough
|
12/29/2023
|
Not Ready for Inspection
|
NICK DANERI
|
Insulation
|
12/29/2023
|
Partial Approval
|
NICK DANERI
|
Light Gage Steel Frame
|
12/29/2023
|
Partial Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
1/2/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
1/2/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
1/2/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Masonry
|
1/2/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
1/3/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
1/3/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
1/3/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Masonry
|
1/3/2024
|
Conditional Approval
|
NICK DANERI
|
Light Gage Steel Frame
|
1/3/2024
|
Partial Inspection
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
1/4/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
1/4/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
1/4/2024
|
Conditional Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
1/4/2024
|
Not Ready for Inspection
|
NICK DANERI
|
Light Gage Steel Frame
|
1/4/2024
|
Partial Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
1/5/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Masonry
|
1/5/2024
|
Conditional Approval
|
NICK DANERI
|
Drywall Nailing
|
1/5/2024
|
Partial Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
1/5/2024
|
Partial Approval
|
NICK DANERI
|
Green Building Rough
|
1/5/2024
|
Not Ready for Inspection
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
1/8/2024
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Pre-Stress Concrete
|
1/8/2024
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
1/8/2024
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Reinf. Masonry
|
1/8/2024
|
Conditional Approval
|
GREGORY POMISH
|
Floor/Roof Diaphrgm/Shear Wall
|
1/8/2024
|
Partial Approval
|
GREGORY POMISH
|
Deputy Pre-Stress Concrete
|
1/9/2024
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Reinf. Masonry
|
1/9/2024
|
Conditional Approval
|
GREGORY POMISH
|
Floor/Roof Diaphrgm/Shear Wall
|
1/9/2024
|
Partial Inspection
|
GREGORY POMISH
|
Insulation
|
1/9/2024
|
Partial Inspection
|
GREGORY POMISH
|
Deputy Pre-Stress Concrete
|
1/10/2024
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Reinf. Masonry
|
1/10/2024
|
Conditional Approval
|
GREGORY POMISH
|
Light Gage Steel Frame
|
1/10/2024
|
Partial Approval
|
GREGORY POMISH
|
Deputy Pre-Stress Concrete
|
1/11/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Reinf. Masonry
|
1/11/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Drilled-In Anchors
|
1/12/2024
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Pre-Stress Concrete
|
1/12/2024
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
1/12/2024
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Reinf. Masonry
|
1/12/2024
|
Conditional Approval
|
GREGORY POMISH
|
Drywall Nailing
|
1/12/2024
|
Partial Approval
|
GREGORY POMISH
|
Floor/Roof Diaphrgm/Shear Wall
|
1/12/2024
|
Partial Approval
|
GREGORY POMISH
|
Green Building Rough
|
1/12/2024
|
Partial Inspection
|
GREGORY POMISH
|
Insulation
|
1/12/2024
|
Partial Approval
|
GREGORY POMISH
|
Floor/Roof Diaphrgm/Shear Wall
|
1/15/2024
|
Off-Hour Fees Due
|
|
Floor/Roof Diaphrgm/Shear Wall
|
1/15/2024
|
Partial Approval
|
RAFAEL ESPINOZA
|
Deputy Drilled-In Anchors
|
1/16/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Pre-Stress Concrete
|
1/16/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Reinf. Concrete
|
1/16/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Reinf. Masonry
|
1/16/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Drilled-In Anchors
|
1/17/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Pre-Stress Concrete
|
1/17/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Reinf. Concrete
|
1/17/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Reinf. Masonry
|
1/17/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Floor/Roof Diaphrgm/Shear Wall
|
1/17/2024
|
Off-Hour Fees Due
|
|
Deputy Drilled-In Anchors
|
1/18/2024
|
No Access for Inspection
|
MICHAEL ROSENBERG
|
Deputy Pre-Stress Concrete
|
1/18/2024
|
No Access for Inspection
|
MICHAEL ROSENBERG
|
Deputy Reinf. Concrete
|
1/18/2024
|
No Access for Inspection
|
MICHAEL ROSENBERG
|
Deputy Reinf. Masonry
|
1/18/2024
|
No Access for Inspection
|
MICHAEL ROSENBERG
|
Deputy Drilled-In Anchors
|
1/19/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
1/19/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
1/19/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Masonry
|
1/19/2024
|
Conditional Approval
|
NICK DANERI
|
Drywall Nailing
|
1/19/2024
|
Partial Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
1/19/2024
|
Partial Approval
|
NICK DANERI
|
Green Building Rough
|
1/19/2024
|
Not Ready for Inspection
|
NICK DANERI
|
Insulation
|
1/19/2024
|
Partial Approval
|
NICK DANERI
|
Light Gage Steel Frame
|
1/19/2024
|
Partial Approval
|
NICK DANERI
|
Special/Order Compliance
|
1/19/2024
|
Partial Approval
|
RICARDO ROBLES
|
Deputy Drilled-In Anchors
|
1/22/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
1/22/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
1/22/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Masonry
|
1/22/2024
|
Conditional Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
1/22/2024
|
Partial Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
1/22/2024
|
Partial Inspection
|
NICK DANERI
|
Insulation
|
1/22/2024
|
Partial Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
1/23/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
1/23/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
1/23/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Masonry
|
1/23/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
1/24/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Pre-Stress Concrete
|
1/24/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Reinf. Concrete
|
1/24/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Reinf. Masonry
|
1/24/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Drilled-In Anchors
|
1/26/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
1/26/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
1/26/2024
|
Conditional Approval
|
NICK DANERI
|
Drywall Nailing
|
1/26/2024
|
Partial Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
1/26/2024
|
Partial Approval
|
NICK DANERI
|
Green Building Rough
|
1/26/2024
|
Not Ready for Inspection
|
NICK DANERI
|
Light Gage Steel Frame
|
1/26/2024
|
Not Ready for Inspection
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
1/29/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
1/29/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
1/29/2024
|
Conditional Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
1/29/2024
|
Partial Approval
|
NICK DANERI
|
Insulation
|
1/29/2024
|
Partial Approval
|
NICK DANERI
|
Light Gage Steel Frame
|
1/29/2024
|
Partial Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
1/30/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
1/30/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
1/30/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Masonry
|
1/30/2024
|
Conditional Approval
|
NICK DANERI
|
Masonry Wall/Backfill
|
1/30/2024
|
Partial Approval
|
NICK DANERI
|
Deputy Reinf. Masonry
|
1/31/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Pre-Stress Concrete
|
2/1/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Masonry
|
2/1/2024
|
Conditional Approval
|
NICK DANERI
|
Light Gage Steel Frame
|
2/1/2024
|
Partial Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
2/6/2024
|
Conditional Approval
|
NICK DANERI
|
Drywall Nailing
|
2/6/2024
|
Partial Approval
|
NICK DANERI
|
Green Building Rough
|
2/6/2024
|
Not Ready for Inspection
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
2/8/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Masonry
|
2/8/2024
|
Conditional Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
2/8/2024
|
Partial Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
2/9/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Reinf. Masonry
|
2/9/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Pre-Stress Concrete
|
2/12/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Masonry
|
2/12/2024
|
Conditional Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
2/12/2024
|
Partial Approval
|
NICK DANERI
|
Insulation
|
2/12/2024
|
Partial Approval
|
NICK DANERI
|
Light Gage Steel Frame
|
2/12/2024
|
Partial Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
2/13/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Pre-Stress Concrete
|
2/13/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Reinf. Concrete
|
2/13/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Reinf. Masonry
|
2/13/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Drilled-In Anchors
|
2/14/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Pre-Stress Concrete
|
2/14/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Reinf. Concrete
|
2/14/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Reinf. Masonry
|
2/14/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Drilled-In Anchors
|
2/15/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Pre-Stress Concrete
|
2/15/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Reinf. Concrete
|
2/15/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Reinf. Masonry
|
2/15/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Drilled-In Anchors
|
2/16/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
2/16/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
2/16/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Masonry
|
2/16/2024
|
Conditional Approval
|
NICK DANERI
|
Drywall Nailing
|
2/16/2024
|
Partial Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
2/16/2024
|
Partial Approval
|
NICK DANERI
|
Green Building Rough
|
2/16/2024
|
Not Ready for Inspection
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
2/20/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
2/20/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
2/20/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Masonry
|
2/20/2024
|
Conditional Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
2/20/2024
|
Partial Approval
|
NICK DANERI
|
Insulation
|
2/20/2024
|
Partial Approval
|
NICK DANERI
|
Light Gage Steel Frame
|
2/20/2024
|
Partial Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
2/21/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Pre-Stress Concrete
|
2/21/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Reinf. Concrete
|
2/21/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Drilled-In Anchors
|
2/26/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
2/26/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
2/26/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Masonry
|
2/26/2024
|
Conditional Approval
|
NICK DANERI
|
Drywall Nailing
|
2/26/2024
|
Partial Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
2/26/2024
|
Partial Approval
|
NICK DANERI
|
Green Building Rough
|
2/26/2024
|
Not Ready for Inspection
|
NICK DANERI
|
Insulation
|
2/26/2024
|
Partial Approval
|
NICK DANERI
|
Light Gage Steel Frame
|
2/26/2024
|
Partial Approval
|
NICK DANERI
|
Reinforced Masonry Frame
|
2/26/2024
|
Partial Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
2/27/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
2/27/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
2/27/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Masonry
|
2/27/2024
|
Conditional Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
2/27/2024
|
Partial Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
3/1/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
3/1/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
3/1/2024
|
Conditional Approval
|
NICK DANERI
|
Drywall Nailing
|
3/1/2024
|
Partial Approval
|
NICK DANERI
|
Green Building Rough
|
3/1/2024
|
Conditional Approval
|
NICK DANERI
|
Insulation
|
3/1/2024
|
Partial Approval
|
NICK DANERI
|
Light Gage Steel Frame
|
3/1/2024
|
Partial Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
3/4/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
3/4/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
3/4/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Masonry
|
3/4/2024
|
Conditional Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
3/4/2024
|
Partial Approval
|
NICK DANERI
|
Insulation
|
3/4/2024
|
Partial Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
3/5/2024
|
Partial Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
3/7/2024
|
Partial Approval
|
JAMES POWERS
|
Deputy Pre-Stress Concrete
|
3/7/2024
|
Partial Approval
|
JAMES POWERS
|
Deputy Reinf. Concrete
|
3/7/2024
|
Partial Approval
|
JAMES POWERS
|
Deputy Drilled-In Anchors
|
3/8/2024
|
Partial Approval
|
JAMES POWERS
|
Deputy Pre-Stress Concrete
|
3/8/2024
|
Partial Approval
|
JAMES POWERS
|
Deputy Reinf. Concrete
|
3/8/2024
|
Partial Approval
|
JAMES POWERS
|
Insulation
|
3/8/2024
|
Partial Approval
|
JAMES POWERS
|
Light Gage Steel Frame
|
3/8/2024
|
Partial Approval
|
JAMES POWERS
|
Deputy Drilled-In Anchors
|
3/11/2024
|
Partial Approval
|
LUIS CCAMACHO
|
Deputy Pre-Stress Concrete
|
3/11/2024
|
Partial Approval
|
LUIS CCAMACHO
|
Deputy Reinf. Concrete
|
3/11/2024
|
Partial Approval
|
LUIS CCAMACHO
|
Deputy Reinf. Masonry
|
3/11/2024
|
Partial Approval
|
LUIS CCAMACHO
|
Floor/Roof Diaphrgm/Shear Wall
|
3/11/2024
|
Partial Approval
|
LUIS CCAMACHO
|
Special/Order Compliance
|
3/11/2024
|
Partial Approval
|
ALFREDO LOPEZ
|
Deputy Drilled-In Anchors
|
3/12/2024
|
Partial Approval
|
LUIS CCAMACHO
|
Deputy Pre-Stress Concrete
|
3/12/2024
|
Partial Approval
|
LUIS CCAMACHO
|
Deputy Reinf. Concrete
|
3/12/2024
|
Partial Approval
|
LUIS CCAMACHO
|
Deputy Reinf. Masonry
|
3/12/2024
|
Partial Approval
|
LUIS CCAMACHO
|
Drywall Nailing
|
3/12/2024
|
Partial Approval
|
LUIS CCAMACHO
|
Floor/Roof Diaphrgm/Shear Wall
|
3/12/2024
|
Partial Approval
|
LUIS CCAMACHO
|
Green Building Rough
|
3/12/2024
|
Not Ready for Inspection
|
LUIS CCAMACHO
|
Deputy Drilled-In Anchors
|
3/13/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
3/13/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
3/13/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Masonry
|
3/13/2024
|
Conditional Approval
|
NICK DANERI
|
Insulation
|
3/13/2024
|
Partial Approval
|
NICK DANERI
|
Light Gage Steel Frame
|
3/13/2024
|
Partial Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
3/14/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Pre-Stress Concrete
|
3/14/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Reinf. Concrete
|
3/14/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Reinf. Masonry
|
3/14/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Drilled-In Anchors
|
3/18/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
3/18/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
3/18/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Masonry
|
3/18/2024
|
Conditional Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
3/18/2024
|
Partial Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
3/19/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
3/19/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
3/19/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Masonry
|
3/19/2024
|
Conditional Approval
|
NICK DANERI
|
Drywall Nailing
|
3/19/2024
|
Partial Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
3/19/2024
|
Partial Approval
|
NICK DANERI
|
Green Building Rough
|
3/19/2024
|
Not Ready for Inspection
|
NICK DANERI
|
Insulation
|
3/19/2024
|
Partial Approval
|
NICK DANERI
|
Light Gage Steel Frame
|
3/19/2024
|
Partial Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
3/20/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
3/20/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
3/20/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Masonry
|
3/20/2024
|
Conditional Approval
|
NICK DANERI
|
Special/Order Compliance
|
3/20/2024
|
Partial Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
3/21/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Pre-Stress Concrete
|
3/21/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Reinf. Concrete
|
3/21/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Reinf. Masonry
|
3/21/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Wood Frame
|
3/25/2024
|
Partial Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
3/26/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Masonry
|
3/26/2024
|
Conditional Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
3/26/2024
|
Partial Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
3/27/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
3/27/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
3/27/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Masonry
|
3/27/2024
|
Conditional Approval
|
NICK DANERI
|
Drywall Nailing
|
3/27/2024
|
Partial Approval
|
NICK DANERI
|
Green Building Rough
|
3/27/2024
|
Partial Inspection
|
NICK DANERI
|
Insulation
|
3/27/2024
|
Partial Approval
|
NICK DANERI
|
Light Gage Steel Frame
|
3/27/2024
|
Partial Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
4/1/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
4/1/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
4/1/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Masonry
|
4/1/2024
|
Conditional Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
4/1/2024
|
Partial Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
4/2/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
4/2/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
4/2/2024
|
Conditional Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
4/2/2024
|
Partial Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
4/3/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
4/3/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
4/3/2024
|
Conditional Approval
|
NICK DANERI
|
Drywall Nailing
|
4/3/2024
|
Partial Approval
|
NICK DANERI
|
Green Building Rough
|
4/3/2024
|
Not Ready for Inspection
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
4/8/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
4/8/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
4/8/2024
|
Conditional Approval
|
NICK DANERI
|
Drywall Nailing
|
4/8/2024
|
Partial Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
4/8/2024
|
Partial Approval
|
NICK DANERI
|
Green Building Rough
|
4/8/2024
|
Not Ready for Inspection
|
NICK DANERI
|
Light Gage Steel Frame
|
4/8/2024
|
Partial Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
4/9/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
4/9/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
4/9/2024
|
Conditional Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
4/9/2024
|
Partial Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
4/10/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
4/10/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
4/10/2024
|
Conditional Approval
|
NICK DANERI
|
Insulation
|
4/10/2024
|
Partial Approval
|
NICK DANERI
|
Light Gage Steel Frame
|
4/10/2024
|
Partial Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
4/12/2024
|
Conditional Approval
|
RONALD JIMENEZ
|
Deputy Pre-Stress Concrete
|
4/12/2024
|
Conditional Approval
|
RONALD JIMENEZ
|
Deputy Reinf. Concrete
|
4/12/2024
|
Conditional Approval
|
RONALD JIMENEZ
|
Drywall Nailing
|
4/12/2024
|
Partial Approval
|
RONALD JIMENEZ
|
Insulation
|
4/12/2024
|
Partial Approval
|
RONALD JIMENEZ
|
Light Gage Steel Frame
|
4/12/2024
|
Partial Approval
|
RONALD JIMENEZ
|
Floor/Roof Diaphrgm/Shear Wall
|
4/15/2024
|
Partial Approval
|
LUIS CCAMACHO
|
Deputy Drilled-In Anchors
|
4/16/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
4/16/2024
|
Conditional Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
4/16/2024
|
Partial Approval
|
NICK DANERI
|
Drywall Nailing
|
4/17/2024
|
Partial Approval
|
NICK DANERI
|
Green Building Rough
|
4/17/2024
|
Not Ready for Inspection
|
NICK DANERI
|
Insulation
|
4/17/2024
|
Partial Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
4/19/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
4/19/2024
|
Conditional Approval
|
NICK DANERI
|
Masonry Wall/Backfill
|
4/19/2024
|
Partial Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
4/22/2024
|
Partial Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
4/23/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
4/23/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
4/23/2024
|
Conditional Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
4/23/2024
|
Off-Hour Fees Due
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/23/2024
|
Partial Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
4/24/2024
|
Conditional Approval
|
LARRY ARNICK
|
Deputy Pre-Stress Concrete
|
4/24/2024
|
Conditional Approval
|
LARRY ARNICK
|
Deputy Reinf. Concrete
|
4/24/2024
|
Conditional Approval
|
LARRY ARNICK
|
Drywall Nailing
|
4/24/2024
|
Partial Approval
|
LARRY ARNICK
|
Green Building Rough
|
4/24/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
Insulation
|
4/24/2024
|
Partial Approval
|
LARRY ARNICK
|
Light Gage Steel Frame
|
4/24/2024
|
Partial Approval
|
LARRY ARNICK
|
Deputy Drilled-In Anchors
|
4/29/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
4/29/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
4/29/2024
|
Conditional Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
4/29/2024
|
Partial Approval
|
NICK DANERI
|
Special/Order Compliance
|
4/29/2024
|
Partial Inspection
|
JEROME BLACKWOOD
|
Deputy Pre-Stress Concrete
|
4/30/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
4/30/2024
|
Conditional Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
4/30/2024
|
Partial Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
5/1/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
5/1/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
5/2/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
5/2/2024
|
Conditional Approval
|
NICK DANERI
|
Drywall Nailing
|
5/2/2024
|
Partial Approval
|
NICK DANERI
|
Green Building Rough
|
5/2/2024
|
Not Ready for Inspection
|
NICK DANERI
|
Insulation
|
5/2/2024
|
Partial Approval
|
NICK DANERI
|
Light Gage Steel Frame
|
5/2/2024
|
Partial Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
5/6/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
5/6/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Masonry
|
5/6/2024
|
Conditional Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
5/6/2024
|
Partial Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
5/7/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
5/7/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Masonry
|
5/7/2024
|
Conditional Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
5/7/2024
|
Partial Approval
|
NICK DANERI
|
Masonry Wall/Backfill
|
5/7/2024
|
Partial Approval
|
NICK DANERI
|
Reinforced Masonry Frame
|
5/7/2024
|
Partial Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
5/9/2024
|
Partial Approval
|
LUIS CCAMACHO
|
Deputy Reinf. Concrete
|
5/9/2024
|
Partial Approval
|
LUIS CCAMACHO
|
Drywall Nailing
|
5/9/2024
|
Partial Approval
|
LUIS CCAMACHO
|
Green Building Rough
|
5/9/2024
|
Not Ready for Inspection
|
LUIS CCAMACHO
|
Insulation
|
5/9/2024
|
Partial Approval
|
LUIS CCAMACHO
|
Light Gage Steel Frame
|
5/9/2024
|
Partial Approval
|
LUIS CCAMACHO
|
Floor/Roof Diaphrgm/Shear Wall
|
5/14/2024
|
Partial Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
5/15/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
5/15/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
5/15/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Masonry
|
5/15/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Shotcrete
|
5/15/2024
|
Conditional Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
5/15/2024
|
Partial Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
5/16/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
5/16/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
5/16/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Masonry
|
5/16/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Shotcrete
|
5/16/2024
|
Conditional Approval
|
NICK DANERI
|
Drywall Nailing
|
5/16/2024
|
Partial Approval
|
NICK DANERI
|
Green Building Rough
|
5/16/2024
|
Not Ready for Inspection
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
5/17/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
5/17/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
5/17/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Masonry
|
5/17/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Shotcrete
|
5/17/2024
|
Conditional Approval
|
NICK DANERI
|
Insulation
|
5/17/2024
|
Partial Approval
|
NICK DANERI
|
Light Gage Steel Frame
|
5/17/2024
|
Partial Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
5/21/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
5/21/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
5/21/2024
|
Conditional Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
5/21/2024
|
Partial Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
5/22/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
5/22/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
5/22/2024
|
Conditional Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
5/22/2024
|
Partial Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
5/24/2024
|
Conditional Approval
|
JEFFREY FULTON
|
Deputy Pre-Stress Concrete
|
5/24/2024
|
Conditional Approval
|
JEFFREY FULTON
|
Deputy Reinf. Concrete
|
5/24/2024
|
Conditional Approval
|
JEFFREY FULTON
|
Drywall Nailing
|
5/24/2024
|
Partial Inspection
|
JEFFREY FULTON
|
Green Building Rough
|
5/24/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
Insulation
|
5/24/2024
|
Partial Inspection
|
JEFFREY FULTON
|
Light Gage Steel Frame
|
5/24/2024
|
Partial Inspection
|
JEFFREY FULTON
|
Deputy Pre-Stress Concrete
|
5/29/2024
|
Conditional Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
5/29/2024
|
Partial Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
5/30/2024
|
Conditional Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
5/30/2024
|
Partial Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
6/3/2024
|
Conditional Approval
|
NICK DANERI
|
Drywall Nailing
|
6/3/2024
|
Partial Approval
|
NICK DANERI
|
Green Building Rough
|
6/3/2024
|
Not Ready for Inspection
|
NICK DANERI
|
Insulation
|
6/3/2024
|
Partial Approval
|
NICK DANERI
|
Light Gage Steel Frame
|
6/3/2024
|
Partial Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
6/5/2024
|
Approved
|
LUIS CCAMACHO
|
Floor/Roof Diaphrgm/Shear Wall
|
6/5/2024
|
Partial Approval
|
LUIS CCAMACHO
|
Deputy Pre-Stress Concrete
|
6/6/2024
|
Conditional Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
6/6/2024
|
Partial Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
6/10/2024
|
Conditional Approval
|
NICK DANERI
|
Drywall Nailing
|
6/10/2024
|
Partial Approval
|
NICK DANERI
|
Green Building Rough
|
6/10/2024
|
Not Ready for Inspection
|
NICK DANERI
|
Insulation
|
6/10/2024
|
Partial Approval
|
NICK DANERI
|
Light Gage Steel Frame
|
6/10/2024
|
Partial Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
6/12/2024
|
Partial Approval
|
JAMES POWERS
|
Deputy Pre-Stress Concrete
|
6/12/2024
|
Partial Approval
|
JAMES POWERS
|
Deputy Reinf. Concrete
|
6/12/2024
|
Partial Approval
|
JAMES POWERS
|
Reinforced Concrete Frame
|
6/12/2024
|
Partial Approval
|
JAMES POWERS
|
Deputy Drilled-In Anchors
|
6/13/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
6/13/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
6/13/2024
|
Conditional Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
6/13/2024
|
Partial Approval
|
NICK DANERI
|
Insulation
|
6/13/2024
|
Partial Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
6/17/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
6/17/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
6/17/2024
|
Conditional Approval
|
NICK DANERI
|
Drywall Nailing
|
6/17/2024
|
Partial Approval
|
NICK DANERI
|
Green Building Rough
|
6/17/2024
|
Partial Inspection
|
NICK DANERI
|
Insulation
|
6/17/2024
|
Partial Approval
|
NICK DANERI
|
Light Gage Steel Frame
|
6/17/2024
|
Partial Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
6/18/2024
|
Conditional Approval
|
NICK DANERI
|
Insulation
|
6/18/2024
|
Partial Approval
|
NICK DANERI
|
Light Gage Steel Frame
|
6/18/2024
|
Partial Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
6/19/2024
|
Partial Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
6/20/2024
|
Conditional Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
6/20/2024
|
Partial Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
6/21/2024
|
Conditional Approval
|
NICK DANERI
|
Drywall Nailing
|
6/21/2024
|
Partial Approval
|
NICK DANERI
|
Green Building Rough
|
6/21/2024
|
Not Ready for Inspection
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
6/24/2024
|
Conditional Approval
|
NICK DANERI
|
Insulation
|
6/24/2024
|
Partial Approval
|
NICK DANERI
|
Light Gage Steel Frame
|
6/24/2024
|
Partial Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
6/25/2024
|
Conditional Approval
|
NICK DANERI
|
Light Gage Steel Frame
|
6/25/2024
|
Partial Approval
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
6/27/2024
|
Conditional Approval
|
NICK DANERI
|
Drywall Nailing
|
6/27/2024
|
Partial Approval
|
NICK DANERI
|
Green Building Rough
|
6/27/2024
|
Not Ready for Inspection
|
NICK DANERI
|
Deputy Pre-Stress Concrete
|
7/1/2024
|
Conditional Approval
|
NICK DANERI
|
Drywall Nailing
|
7/1/2024
|
Partial Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
7/1/2024
|
Partial Approval
|
NICK DANERI
|
Green Building Rough
|
7/1/2024
|
Not Ready for Inspection
|
NICK DANERI
|
Insulation
|
7/1/2024
|
Partial Approval
|
NICK DANERI
|
Light Gage Steel Frame
|
7/1/2024
|
Partial Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
7/5/2024
|
Partial Approval
|
JAMES POWERS
|
Deputy Shotcrete
|
7/5/2024
|
Partial Approval
|
JAMES POWERS
|
Reinforced Concrete Frame
|
7/5/2024
|
Partial Approval
|
JAMES POWERS
|
Deputy Reinf. Concrete
|
7/8/2024
|
Partial Approval
|
JAMES POWERS
|
Deputy Shotcrete
|
7/8/2024
|
Partial Approval
|
JAMES POWERS
|
Drywall Nailing
|
7/8/2024
|
Partial Approval
|
JAMES POWERS
|
Green Building Rough
|
7/8/2024
|
Not Ready for Inspection
|
JAMES POWERS
|
Insulation
|
7/8/2024
|
Not Ready for Inspection
|
JAMES POWERS
|
Reinforced Concrete Frame
|
7/8/2024
|
Partial Approval
|
JAMES POWERS
|
Deputy Drilled-In Anchors
|
7/9/2024
|
Partial Approval
|
JAMES POWERS
|
Deputy Other (see comments)
|
7/9/2024
|
Partial Approval
|
JAMES POWERS
|
Deputy Reinf. Concrete
|
7/9/2024
|
Partial Approval
|
JAMES POWERS
|
Deputy Shotcrete
|
7/9/2024
|
Partial Approval
|
JAMES POWERS
|
Light Gage Steel Frame
|
7/9/2024
|
Partial Approval
|
JAMES POWERS
|
Deputy Drilled-In Anchors
|
7/15/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Other (see comments)
|
7/15/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
7/15/2024
|
Conditional Approval
|
NICK DANERI
|
Light Gage Steel Frame
|
7/15/2024
|
Partial Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
7/16/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
7/16/2024
|
Conditional Approval
|
NICK DANERI
|
Drywall Nailing
|
7/16/2024
|
Partial Approval
|
NICK DANERI
|
Green Building Rough
|
7/16/2024
|
Not Ready for Inspection
|
NICK DANERI
|
Insulation
|
7/16/2024
|
Partial Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
7/18/2024
|
Partial Approval
|
LUIS CCAMACHO
|
Deputy Drilled-In Anchors
|
7/23/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
7/23/2024
|
Conditional Approval
|
NICK DANERI
|
Drywall Nailing
|
7/23/2024
|
Partial Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
7/23/2024
|
Partial Approval
|
NICK DANERI
|
Green Building Rough
|
7/23/2024
|
Conditional Approval
|
NICK DANERI
|
Insulation
|
7/23/2024
|
Partial Approval
|
NICK DANERI
|
Light Gage Steel Frame
|
7/23/2024
|
Partial Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
7/24/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
7/24/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
7/29/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Reinf. Concrete
|
7/29/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Drilled-In Anchors
|
7/30/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
7/30/2024
|
Conditional Approval
|
NICK DANERI
|
Drywall Nailing
|
7/30/2024
|
Partial Approval
|
NICK DANERI
|
Green Building Rough
|
7/30/2024
|
Not Ready for Inspection
|
NICK DANERI
|
Insulation
|
7/30/2024
|
Partial Approval
|
NICK DANERI
|
Light Gage Steel Frame
|
7/30/2024
|
Partial Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
7/31/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
7/31/2024
|
Conditional Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
7/31/2024
|
Partial Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
8/1/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
8/1/2024
|
Conditional Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
8/1/2024
|
Partial Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
8/6/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
8/6/2024
|
Conditional Approval
|
NICK DANERI
|
Drywall Nailing
|
8/6/2024
|
Partial Approval
|
NICK DANERI
|
Green Building Rough
|
8/6/2024
|
Not Ready for Inspection
|
NICK DANERI
|
Insulation
|
8/6/2024
|
Partial Approval
|
NICK DANERI
|
Light Gage Steel Frame
|
8/6/2024
|
Partial Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
8/12/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
8/12/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
8/13/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
8/13/2024
|
Conditional Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
8/13/2024
|
Partial Approval
|
NICK DANERI
|
Insulation
|
8/13/2024
|
Partial Approval
|
NICK DANERI
|
Light Gage Steel Frame
|
8/13/2024
|
Partial Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
8/14/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
8/14/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
8/16/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
8/16/2024
|
Conditional Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
8/16/2024
|
Partial Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
8/19/2024
|
Partial Approval
|
LUIS CCAMACHO
|
Deputy Steel/Welding
|
8/19/2024
|
Partial Approval
|
LUIS CCAMACHO
|
Drywall Nailing
|
8/19/2024
|
Partial Approval
|
LUIS CCAMACHO
|
Green Building Rough
|
8/19/2024
|
Not Ready for Inspection
|
LUIS CCAMACHO
|
Deputy Reinf. Concrete
|
8/20/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Steel/Welding
|
8/20/2024
|
Conditional Approval
|
NICK DANERI
|
Insulation
|
8/20/2024
|
Partial Approval
|
NICK DANERI
|
Light Gage Steel Frame
|
8/20/2024
|
Partial Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
8/27/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Steel/Welding
|
8/27/2024
|
Conditional Approval
|
NICK DANERI
|
Drywall Nailing
|
8/27/2024
|
Partial Approval
|
NICK DANERI
|
Green Building Rough
|
8/27/2024
|
Not Ready for Inspection
|
NICK DANERI
|
Insulation
|
8/27/2024
|
Partial Approval
|
NICK DANERI
|
Light Gage Steel Frame
|
8/27/2024
|
Partial Approval
|
NICK DANERI
|
Posting Pre-Inspection
|
8/27/2024
|
Not Ready for Inspection
|
NICK DANERI
|
Deputy Reinf. Concrete
|
9/3/2024
|
Conditional Approval
|
JEFFREY FULTON
|
Deputy Steel/Welding
|
9/3/2024
|
Conditional Approval
|
JEFFREY FULTON
|
Excavation/Setback/Form/Re-Bar
|
9/3/2024
|
Partial Inspection
|
JEFFREY FULTON
|
Deputy Drilled-In Anchors
|
9/4/2024
|
Conditional Approval
|
JEFFREY FULTON
|
Deputy Other (see comments)
|
9/4/2024
|
Conditional Approval
|
JEFFREY FULTON
|
Deputy Reinf. Concrete
|
9/4/2024
|
Conditional Approval
|
JEFFREY FULTON
|
Deputy Steel/Welding
|
9/4/2024
|
Conditional Approval
|
JEFFREY FULTON
|
Drywall Nailing
|
9/4/2024
|
Partial Inspection
|
JEFFREY FULTON
|
Green Building Rough
|
9/4/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
Insulation
|
9/4/2024
|
Partial Inspection
|
JEFFREY FULTON
|
Light Gage Steel Frame
|
9/4/2024
|
Partial Inspection
|
JEFFREY FULTON
|
Special/Order Compliance
|
9/4/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
Deputy Reinf. Concrete
|
9/11/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Steel/Welding
|
9/11/2024
|
Conditional Approval
|
NICK DANERI
|
Drywall Nailing
|
9/11/2024
|
Partial Approval
|
NICK DANERI
|
Green Building Rough
|
9/11/2024
|
Not Ready for Inspection
|
NICK DANERI
|
Insulation
|
9/11/2024
|
Partial Approval
|
NICK DANERI
|
Light Gage Steel Frame
|
9/11/2024
|
Partial Approval
|
NICK DANERI
|
Special/Order Compliance
|
9/11/2024
|
Partial Inspection
|
NICK DANERI
|
Deputy Reinf. Concrete
|
9/17/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Steel/Welding
|
9/17/2024
|
Conditional Approval
|
NICK DANERI
|
Light Gage Steel Frame
|
9/17/2024
|
Partial Approval
|
NICK DANERI
|
Drywall Nailing
|
9/18/2024
|
Partial Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
9/18/2024
|
Partial Approval
|
NICK DANERI
|
Green Building Rough
|
9/18/2024
|
Not Ready for Inspection
|
NICK DANERI
|
Insulation
|
9/18/2024
|
Partial Approval
|
NICK DANERI
|
Light Gage Steel Frame
|
9/18/2024
|
Partial Approval
|
NICK DANERI
|
Drywall Nailing
|
9/24/2024
|
Partial Approval
|
NICK DANERI
|
Green Building Rough
|
9/24/2024
|
Not Ready for Inspection
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
9/25/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
9/25/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Steel/Welding
|
9/25/2024
|
Conditional Approval
|
NICK DANERI
|
Insulation
|
9/25/2024
|
Partial Approval
|
NICK DANERI
|
Light Gage Steel Frame
|
9/25/2024
|
Partial Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
9/26/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
9/26/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Steel/Welding
|
9/26/2024
|
Conditional Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
9/26/2024
|
Partial Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
10/1/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
10/1/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Steel/Welding
|
10/1/2024
|
Conditional Approval
|
NICK DANERI
|
Light Gage Steel Frame
|
10/1/2024
|
Partial Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
10/2/2024
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Deputy Reinf. Concrete
|
10/2/2024
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Deputy Steel/Welding
|
10/2/2024
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Drywall Nailing
|
10/2/2024
|
Partial Approval
|
RAFAEL ESPINOZA
|
Green Building Rough
|
10/2/2024
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
Insulation
|
10/2/2024
|
Partial Approval
|
RAFAEL ESPINOZA
|
Light Gage Steel Frame
|
10/2/2024
|
Partial Approval
|
RAFAEL ESPINOZA
|
Deputy Reinf. Concrete
|
10/9/2024
|
Conditional Approval
|
RAFAEL CORTES
|
Deputy Reinf. Masonry
|
10/9/2024
|
Conditional Approval
|
RAFAEL CORTES
|
Deputy Steel/Welding
|
10/9/2024
|
Conditional Approval
|
RAFAEL CORTES
|
Drywall Nailing
|
10/9/2024
|
Partial Approval
|
RAFAEL CORTES
|
Green Building Rough
|
10/9/2024
|
Not Ready for Inspection
|
RAFAEL CORTES
|
Insulation
|
10/9/2024
|
Not Ready for Inspection
|
RAFAEL CORTES
|
Light Gage Steel Frame
|
10/9/2024
|
Partial Inspection
|
RAFAEL CORTES
|
Deputy Reinf. Concrete
|
10/10/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Masonry
|
10/10/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Steel/Welding
|
10/10/2024
|
Conditional Approval
|
NICK DANERI
|
Insulation
|
10/10/2024
|
Partial Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
10/16/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Masonry
|
10/16/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Steel/Welding
|
10/16/2024
|
Conditional Approval
|
NICK DANERI
|
Drywall Nailing
|
10/16/2024
|
Partial Approval
|
NICK DANERI
|
Green Building Rough
|
10/16/2024
|
Partial Inspection
|
NICK DANERI
|
Insulation
|
10/16/2024
|
Partial Approval
|
NICK DANERI
|
Light Gage Steel Frame
|
10/16/2024
|
Partial Approval
|
NICK DANERI
|
Deputy Steel/Welding
|
10/23/2024
|
Conditional Approval
|
NICK DANERI
|
Drywall Nailing
|
10/23/2024
|
Partial Approval
|
NICK DANERI
|
Green Building Rough
|
10/23/2024
|
Partial Inspection
|
NICK DANERI
|
Insulation
|
10/23/2024
|
Partial Approval
|
NICK DANERI
|
Light Gage Steel Frame
|
10/23/2024
|
Partial Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
10/28/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Steel/Welding
|
10/28/2024
|
Conditional Approval
|
NICK DANERI
|
Insulation
|
10/29/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
Light Gage Steel Frame
|
10/29/2024
|
Partial Approval
|
LARRY ARNICK
|
Deputy Steel/Welding
|
10/31/2024
|
Conditional Approval
|
LARRY ARNICK
|
Insulation
|
10/31/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
Deputy Drilled-In Anchors
|
11/1/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Steel/Welding
|
11/1/2024
|
Conditional Approval
|
NICK DANERI
|
Green Building Rough
|
11/1/2024
|
Partial Inspection
|
NICK DANERI
|
Reinforced Concrete Frame
|
11/1/2024
|
Partial Approval
|
NICK DANERI
|
Verify Sprinkler Sign Off
|
11/1/2024
|
Partial Inspection
|
NICK DANERI
|
Deputy Reinf. Concrete
|
11/5/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Steel/Welding
|
11/5/2024
|
Conditional Approval
|
NICK DANERI
|
Drywall Nailing
|
11/5/2024
|
Not Ready for Inspection
|
NICK DANERI
|
Green Building Rough
|
11/5/2024
|
Not Ready for Inspection
|
NICK DANERI
|
Deputy Reinf. Concrete
|
11/6/2024
|
Conditional Approval
|
LARRY ARNICK
|
Deputy Steel/Welding
|
11/6/2024
|
Conditional Approval
|
LARRY ARNICK
|
Drywall Nailing
|
11/6/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
Green Building Rough
|
11/6/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
Insulation
|
11/6/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
Deputy Reinf. Concrete
|
11/7/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Steel/Welding
|
11/7/2024
|
Conditional Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
11/7/2024
|
Partial Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
11/8/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Steel/Welding
|
11/8/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
11/12/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Steel/Welding
|
11/12/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
11/26/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Steel/Welding
|
11/26/2024
|
Conditional Approval
|
NICK DANERI
|
Insulation
|
11/26/2024
|
Partial Approval
|
NICK DANERI
|
Light Gage Steel Frame
|
11/26/2024
|
Partial Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
12/4/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Steel/Welding
|
12/4/2024
|
Conditional Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
12/4/2024
|
Partial Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
12/9/2024
|
Partial Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
12/10/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
12/10/2024
|
Conditional Approval
|
NICK DANERI
|
Insulation
|
12/10/2024
|
Partial Approval
|
NICK DANERI
|
Light Gage Steel Frame
|
12/10/2024
|
Partial Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
12/16/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
12/16/2024
|
Conditional Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
12/16/2024
|
Partial Approval
|
NICK DANERI
|
Deputy Steel/Welding
|
1/3/2025
|
Conditional Approval
|
LARRY ARNICK
|
Insulation
|
1/3/2025
|
Partial Approval
|
LARRY ARNICK
|
Light Gage Steel Frame
|
1/3/2025
|
Partial Approval
|
LARRY ARNICK
|
Drywall Nailing
|
1/10/2025
|
Partial Approval
|
NICK DANERI
|
Green Building Rough
|
1/10/2025
|
Partial Inspection
|
NICK DANERI
|
Pre-Inspection
|
1/14/2025
|
Corrections Issued
|
NICK DANERI
|
Drywall Nailing
|
1/22/2025
|
Partial Approval
|
NICK DANERI
|
Green Building Rough
|
1/22/2025
|
Not Ready for Inspection
|
NICK DANERI
|
Insulation
|
1/22/2025
|
Partial Approval
|
NICK DANERI
|
Light Gage Steel Frame
|
1/22/2025
|
Partial Approval
|
NICK DANERI
|
Drywall Nailing
|
1/31/2025
|
Partial Approval
|
NICK DANERI
|
Green Building Rough
|
1/31/2025
|
Not Ready for Inspection
|
NICK DANERI
|
Pre-Inspection
|
2/3/2025
|
Partial Inspection
|
NICK DANERI
|
Insulation
|
2/6/2025
|
Partial Approval
|
NICK DANERI
|
Light Gage Steel Frame
|
2/6/2025
|
Partial Approval
|
NICK DANERI
|
Insulation
|
2/12/2025
|
Partial Approval
|
NICK DANERI
|
Light Gage Steel Frame
|
2/12/2025
|
Partial Approval
|
NICK DANERI
|
Special/Order Compliance
|
2/20/2025
|
Partial Approval
|
JEROME BLACKWOOD
|
Drywall Nailing
|
2/21/2025
|
Partial Approval
|
LARRY ARNICK
|
Green Building Rough
|
2/21/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
Drywall Nailing
|
2/27/2025
|
Approved
|
NICK DANERI
|
Final
|
2/27/2025
|
Not Ready for Inspection
|
NICK DANERI
|
Footing/Foundation/Slab
|
2/27/2025
|
Approved
|
NICK DANERI
|
Green Building Final
|
2/27/2025
|
Not Ready for Inspection
|
NICK DANERI
|
Green Building Rough
|
2/27/2025
|
Approved
|
NICK DANERI
|
Reinforced Concrete Frame
|
2/27/2025
|
Not Ready for Inspection
|
NICK DANERI
|
SGSOV-Seismic Gas S/O Valve
|
2/27/2025
|
SGSOV Not Ready
|
NICK DANERI
|
Smoke Detectors
|
2/27/2025
|
Approved
|
NICK DANERI
|
Verify Sprinkler Sign Off
|
2/27/2025
|
Not Ready for Inspection
|
NICK DANERI
|
Pre-Inspection
|
3/6/2025
|
Partial Inspection
|
NICK DANERI
|
Pre-Inspection
|
3/6/2025
|
Partial Inspection
|
RONALD JIMENEZ
|
Special/Order Compliance
|
3/6/2025
|
Not Ready for Inspection
|
RAFAEL CORTES
|
Special/Order Compliance
|
3/10/2025
|
Partial Inspection
|
NICK DANERI
|
Final
|
4/2/2025
|
Partial Inspection
|
NICK DANERI
|
Green Building Final
|
4/2/2025
|
Not Ready for Inspection
|
NICK DANERI
|
Reinforced Concrete Frame
|
4/2/2025
|
Not Ready for Inspection
|
NICK DANERI
|
SGSOV-Seismic Gas S/O Valve
|
4/2/2025
|
SGSOV Not Ready
|
NICK DANERI
|
Verify Sprinkler Sign Off
|
4/2/2025
|
Not Ready for Inspection
|
NICK DANERI
|
Pre-Inspection
|
4/7/2025
|
Partial Approval
|
NICK DANERI
|
Pre-Inspection
|
4/8/2025
|
Partial Approval
|
NICK DANERI
|
Final
|
4/10/2025
|
Partial Inspection
|
NICK DANERI
|
Green Building Final
|
4/10/2025
|
Not Ready for Inspection
|
NICK DANERI
|
Reinforced Concrete Frame
|
4/10/2025
|
Not Ready for Inspection
|
NICK DANERI
|
SGSOV-Seismic Gas S/O Valve
|
4/10/2025
|
SGSOV Not Ready
|
NICK DANERI
|
Verify Sprinkler Sign Off
|
4/10/2025
|
Not Ready for Inspection
|
NICK DANERI
|
Final
|
4/22/2025
|
Not Ready for Inspection
|
NICK DANERI
|
Green Building Final
|
4/22/2025
|
Not Ready for Inspection
|
NICK DANERI
|
Reinforced Concrete Frame
|
4/22/2025
|
Not Ready for Inspection
|
NICK DANERI
|
SGSOV-Seismic Gas S/O Valve
|
4/22/2025
|
SGSOV Approved
|
NICK DANERI
|
Verify Sprinkler Sign Off
|
4/22/2025
|
Not Ready for Inspection
|
NICK DANERI
|
Final
|
4/24/2025
|
Not Ready for Inspection
|
NICK DANERI
|
Green Building Final
|
4/24/2025
|
Not Ready for Inspection
|
NICK DANERI
|
Reinforced Concrete Frame
|
4/24/2025
|
Not Ready for Inspection
|
NICK DANERI
|
Verify Sprinkler Sign Off
|
4/24/2025
|
Not Ready for Inspection
|
NICK DANERI
|
Final
|
4/28/2025
|
Not Ready for Inspection
|
NICK DANERI
|
Green Building Final
|
4/28/2025
|
Not Ready for Inspection
|
NICK DANERI
|
Reinforced Concrete Frame
|
4/28/2025
|
Not Ready for Inspection
|
NICK DANERI
|
Verify Sprinkler Sign Off
|
4/28/2025
|
Not Ready for Inspection
|
NICK DANERI
|
Final
|
4/30/2025
|
Partial Inspection
|
NICK DANERI
|
Green Building Final
|
4/30/2025
|
Not Ready for Inspection
|
NICK DANERI
|
Reinforced Concrete Frame
|
4/30/2025
|
Not Ready for Inspection
|
NICK DANERI
|
Verify Sprinkler Sign Off
|
4/30/2025
|
Not Ready for Inspection
|
NICK DANERI
|
Final
|
5/5/2025
|
Partial Inspection
|
NICK DANERI
|
Green Building Final
|
5/5/2025
|
Not Ready for Inspection
|
NICK DANERI
|
Reinforced Concrete Frame
|
5/5/2025
|
Approved
|
NICK DANERI
|
Verify Sprinkler Sign Off
|
5/5/2025
|
Approved
|
NICK DANERI
|