New 6-story, Type IIIA, 46-unit apartment building over 2 subterranean, Type IA, parking garages.
Permit Issued
Issued on 1/11/2019
Issuing Office
Metro
Current Status
CofO Issued on 2/12/2024
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 7/13/2017 APPLICANT
Assigned to Plan Check Engineer 8/10/2017 KESETE HAREGOT
Corrections Issued 9/14/2017 KESETE HAREGOT
Quality Review Completed 9/18/2017 CHARLES CHANG
Building Plans Picked Up 9/21/2017 APPLICANT
Disabled Access Plans Picked Up 9/21/2017 APPLICANT
Green Plans Picked Up 9/21/2017 APPLICANT
Applicant returned to address corrections 10/4/2017 KESETE HAREGOT
Applicant returned to address corrections 10/16/2017 KESETE HAREGOT
Applicant returned to address corrections 11/7/2017 KESETE HAREGOT
Applicant returned to address corrections 12/20/2017 KESETE HAREGOT
Plan Check Approved 1/26/2018 KESETE HAREGOT
Plan Check Approved 4/18/2018 KESETE HAREGOT
Issued 1/11/2019 LADBS
TCO Issued (Expire Date: 08-07-2024) 2/9/2024 ERNESTO CORRAL
CofO in Progress 2/12/2024 NICK DANERI
CofO Issued 2/12/2024 ERNESTO CORRAL
Permit Finaled 2/12/2024 ERNESTO CORRAL

Permit Application Clearance Information

CPC Cleared 10/2/2017 BRIAN CARR
CPC Cleared 10/2/2017 BRIAN CARR
CPC Cleared 10/2/2017 BRIAN CARR
Address approval Cleared 10/11/2017 STEVE MELGAR
Construction near power lines Cleared 10/11/2017 RIDWAN HARDY
Construction within easement Cleared 10/11/2017 RIDWAN HARDY
Eng Process Fee Ord 176,300 Cleared 10/11/2017 STEVE MELGAR
Highway dedication Cleared 10/11/2017 STEVE MELGAR
Permit Cleared 10/11/2017 STEVE MELGAR
Hydrant and Access approval Cleared 12/5/2017 ROBERT DUFF
DAS Clearance Cleared 12/7/2017 EDDIE GARIN
Frnt yard landscape/Water mgmt Cleared 12/18/2017 JESSE RAMOS
Green Code Cleared 12/18/2017 NEGAR NEJAD
Opn space landscape/Water mgmt Cleared 12/18/2017 JESSE RAMOS
Sewer availability Cleared 1/4/2018 CARLA VALLADARES
Methane Ordinance Cleared 1/5/2018 DOMINIQUE MEDINA
Fire Marshall Fire Life Safety Cleared 1/12/2018 MENOA AGHAJANI
Low Impact Development Cleared 1/18/2018 MARTIN FRAGOSO
Roof/Waste drainage to street Cleared 1/18/2018 JACOB BIGLER
Work Adjacent to Public Way Cleared 1/22/2018 BOK GOH
Building over 3-story or 36-ft Cleared 1/26/2018 CALOSHA APPROVED

Contact Information

Contractor Wilshire Construction L P; Lic. No.: 1048091-B 3470 WILSHIRE STE 1010      LOS ANGELES,
Engineer Cook, Daniel Stevens; Lic. No.: L4964 913 RIDGE HEIGHTS DRIVE      FALLBROOK, CA 92028
Engineer Funk, David Lyle; Lic. No.: S5421 619 BERYL ST      REDONDO BEACH, CA 90277

Inspector Information

NICK DANERI, (213) 202-5615 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 6/10/2019 Partial Approval LESLIE TRUJILLO
Pre-Inspection 10/23/2019 Partial Inspection LESLIE TRUJILLO
Footing/Foundation/Slab 6/9/2020 Partial Inspection RAFAEL ESPINOZA
METHANE-Barrier 6/9/2020 Not Ready for Inspection RAFAEL ESPINOZA
METHANE-Subgrade 6/9/2020 Not Ready for Inspection RAFAEL ESPINOZA
Pre-Inspection 6/17/2020 Partial Inspection RAFAEL ESPINOZA
Grading Pre-Inspection 8/11/2020 Conditional Approval RAFAEL ESPINOZA
Pre-Inspection 8/11/2020 Approved RAFAEL ESPINOZA
Deputy Methane Barrier 8/14/2020 Conditional Approval RAFAEL ESPINOZA
METHANE-Barrier 8/18/2020 Partial Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 8/20/2020 Partial Approval RAFAEL ESPINOZA
METHANE-Barrier 8/20/2020 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 8/24/2020 Conditional Approval RAFAEL ESPINOZA
Excavation/Setback/Form/Re-Bar 9/11/2020 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 9/25/2020 Conditional Approval RAFAEL ESPINOZA
METHANE-Barrier 9/28/2020 Partial Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 10/8/2020 Not Ready for Inspection RAFAEL ESPINOZA
METHANE-Barrier 10/8/2020 Partial Approval RAFAEL ESPINOZA
METHANE-Subgrade 10/8/2020 Partial Approval RAFAEL ESPINOZA
Excavation/Setback/Form/Re-Bar 10/9/2020 Partial Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 10/20/2020 Not Ready for Inspection RAFAEL ESPINOZA
METHANE-Barrier 10/20/2020 Partial Inspection RAFAEL ESPINOZA
METHANE-Subgrade 10/20/2020 Partial Approval RAFAEL ESPINOZA
Excavation/Setback/Form/Re-Bar 10/21/2020 Partial Approval RAFAEL ESPINOZA
METHANE-Barrier 10/23/2020 Partial Approval RAFAEL ESPINOZA
METHANE-Subgrade 10/23/2020 Partial Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 10/23/2020 Conditional Approval RAFAEL ESPINOZA
Excavation/Setback/Form/Re-Bar 11/5/2020 Partial Approval RAFAEL ESPINOZA
Excavation/Setback/Form/Re-Bar 11/19/2020 Partial Inspection RAFAEL ESPINOZA
METHANE-Barrier 11/19/2020 Partial Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 11/20/2020 Partial Approval RAFAEL ESPINOZA
METHANE-Subgrade 11/20/2020 Approved RAFAEL ESPINOZA
Excavation/Setback/Form/Re-Bar 12/3/2020 Partial Inspection RAFAEL ESPINOZA
Green Building Rough 12/3/2020 Approved RAFAEL ESPINOZA
METHANE-Rough 12/3/2020 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Concrete Frame 12/3/2020 Not Ready for Inspection RAFAEL ESPINOZA
Verify Sprinkler Sign Off 12/3/2020 Not Ready for Inspection RAFAEL ESPINOZA
Excavation/Setback/Form/Re-Bar 12/4/2020 Partial Approval RAFAEL ESPINOZA
METHANE-Rough 12/9/2020 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Concrete Frame 12/9/2020 Conditional Approval RAFAEL ESPINOZA
Verify Sprinkler Sign Off 12/9/2020 Not Ready for Inspection RAFAEL ESPINOZA
Excavation/Setback/Form/Re-Bar 12/14/2020 Partial Approval RAFAEL ESPINOZA
Excavation/Setback/Form/Re-Bar 12/31/2020 Conditional Approval RAFAEL ESPINOZA
Excavation/Setback/Form/Re-Bar 1/7/2021 Partial Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 1/12/2021 Partial Approval RAFAEL ESPINOZA
Excavation/Setback/Form/Re-Bar 1/21/2021 Not Ready for Inspection KATY RAMIREZ
Excavation/Setback/Form/Re-Bar 1/22/2021 Not Ready for Inspection KATY RAMIREZ
Reinforced Concrete Frame 2/4/2021 Partial Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 2/10/2021 Partial Approval RAFAEL ESPINOZA
Excavation/Setback/Form/Re-Bar 3/31/2021 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Concrete Frame 4/1/2021 Partial Approval RAFAEL ESPINOZA
Drywall Nailing 4/30/2021 Partial Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 4/30/2021 Partial Approval RAFAEL ESPINOZA
Light Gage Steel Frame 4/30/2021 Partial Approval RAFAEL ESPINOZA
Excavation/Setback/Form/Re-Bar 5/7/2021 Partial Approval NICK DANERI
Masonry Wall/Backfill 5/7/2021 Partial Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 5/10/2021 Partial Approval DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 5/21/2021 Partial Approval NICK DANERI
Masonry Wall/Backfill 5/24/2021 Partial Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 6/1/2021 Conditional Approval RAFAEL ESPINOZA
Drywall Nailing 6/7/2021 Partial Approval RAFAEL ESPINOZA
Light Gage Steel Frame 6/7/2021 Partial Approval RAFAEL ESPINOZA
Excavation/Setback/Form/Re-Bar 6/24/2021 Partial Approval JAMES POWERS
METHANE-Barrier 6/24/2021 Not Ready for Inspection JAMES POWERS
Reinforced Concrete Frame 6/24/2021 Partial Approval JAMES POWERS
Floor/Roof Diaphrgm/Shear Wall 6/29/2021 Partial Approval JAMES POWERS
Drywall Nailing 7/7/2021 Partial Approval JAMES POWERS
Floor/Roof Diaphrgm/Shear Wall 7/7/2021 Partial Approval JAMES POWERS
Reinforced Concrete Frame 7/15/2021 Partial Approval JAMES POWERS
Excavation/Setback/Form/Re-Bar 7/22/2021 Not Ready for Inspection JAMES POWERS
Floor/Roof Diaphrgm/Shear Wall 7/22/2021 Partial Approval JAMES POWERS
Drywall Nailing 7/28/2021 Partial Approval JAMES POWERS
METHANE-Rough 8/6/2021 Not Ready for Inspection JAMES POWERS
Verify Sprinkler Sign Off 8/6/2021 Not Ready for Inspection JAMES POWERS
Wood Frame 8/6/2021 Not Ready for Inspection JAMES POWERS
Floor/Roof Diaphrgm/Shear Wall 8/9/2021 Partial Approval JAMES POWERS
Floor/Roof Diaphrgm/Shear Wall 8/16/2021 Partial Approval JAMES POWERS
Drywall Nailing 8/24/2021 Partial Approval JAMES POWERS
Excavation/Setback/Form/Re-Bar 8/27/2021 Not Ready for Inspection MARK FERRARI
Deputy Drilled-In Anchors 8/31/2021 Partial Approval JAMES POWERS
Deputy Wood Construction 8/31/2021 Partial Approval JAMES POWERS
Excavation/Setback/Form/Re-Bar 9/1/2021 Partial Approval JAMES POWERS
Floor/Roof Diaphrgm/Shear Wall 9/30/2021 Partial Approval SORIN CIRSTOIU
METHANE-Rough 9/30/2021 Partial Inspection SORIN CIRSTOIU
Verify Sprinkler Sign Off 9/30/2021 Partial Inspection SORIN CIRSTOIU
Wood Frame 9/30/2021 Partial Approval SORIN CIRSTOIU
Insulation 10/15/2021 Partial Inspection JONATHAN QUACH
Insulation 10/19/2021 Partial Approval DANIEL COLLINS
METHANE-Rough 10/19/2021 Not Ready for Inspection DANIEL COLLINS
Verify Sprinkler Sign Off 10/19/2021 Not Ready for Inspection DANIEL COLLINS
Wood Frame 10/19/2021 Partial Approval DANIEL COLLINS
Insulation 10/21/2021 Partial Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 11/5/2021 Partial Approval JAMES POWERS
METHANE-Rough 11/5/2021 Not Ready for Inspection JAMES POWERS
Verify Sprinkler Sign Off 11/5/2021 Not Ready for Inspection JAMES POWERS
Insulation 11/8/2021 Partial Approval DANIEL COLLINS
METHANE-Rough 11/15/2021 Not Ready for Inspection JAMES POWERS
Verify Sprinkler Sign Off 11/15/2021 Not Ready for Inspection JAMES POWERS
Wood Frame 11/15/2021 Not Ready for Inspection JAMES POWERS
Deputy Wood Construction 11/16/2021 Conditional Approval ERNESTO CORRAL
Floor/Roof Diaphrgm/Shear Wall 11/17/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 11/19/2021 Partial Approval EDWIN GREGORYONA
Drywall Nailing 11/19/2021 Partial Approval EDWIN GREGORYONA
Drywall Nailing 11/24/2021 Partial Approval RAFAEL ESPINOZA
Insulation 11/29/2021 Partial Approval NICK DANERI
Deputy Steel/Welding 12/1/2021 Conditional Approval NICK DANERI
Insulation 12/1/2021 Partial Approval NICK DANERI
Deputy Steel/Welding 12/2/2021 Conditional Approval NICK DANERI
Wall Anchors 12/7/2021 Partial Approval NICK DANERI
Deputy Steel/Welding 12/8/2021 Conditional Approval NICK DANERI
Deputy Wood Construction 12/8/2021 Conditional Approval NICK DANERI
Floor/Roof Diaphrgm/Shear Wall 12/8/2021 Partial Approval NICK DANERI
Deputy Steel/Welding 12/9/2021 Conditional Approval NICK DANERI
Deputy Wood Construction 12/9/2021 Conditional Approval NICK DANERI
Deputy Steel/Welding 12/10/2021 Conditional Approval NICK DANERI
Deputy Wood Construction 12/10/2021 Conditional Approval NICK DANERI
Drywall Nailing 12/13/2021 Partial Approval NICK DANERI
Insulation 12/17/2021 Partial Approval NICK DANERI
Floor/Roof Diaphrgm/Shear Wall 12/29/2021 Partial Approval NICK DANERI
Drywall Nailing 1/5/2022 Partial Approval NICK DANERI
Deputy Wood Construction 1/7/2022 Conditional Approval NICK DANERI
Floor/Roof Diaphrgm/Shear Wall 1/7/2022 Partial Approval NICK DANERI
Insulation 1/11/2022 Partial Approval RAFAEL ESPINOZA
Insulation 1/13/2022 Partial Approval JAMES POWERS
Drywall Nailing 1/18/2022 Partial Approval JAMES POWERS
Interior/Exterior Lathing 1/19/2022 Partial Approval TED RIES
Masonry Wall/Backfill 1/21/2022 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 1/24/2022 Conditional Approval NICK DANERI
Deputy Wood Construction 1/24/2022 Conditional Approval NICK DANERI
Deputy Reinf. Masonry 1/25/2022 Conditional Approval NICK DANERI
Insulation 1/26/2022 Partial Approval NICK DANERI
Floor/Roof Diaphrgm/Shear Wall 1/28/2022 Partial Approval NICK DANERI
Interior/Exterior Lathing 1/28/2022 Partial Approval NICK DANERI
Deputy Wood Construction 1/31/2022 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 2/1/2022 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 2/2/2022 Partial Approval NICK DANERI
Floor/Roof Diaphrgm/Shear Wall 2/2/2022 Partial Approval NICK DANERI
Insulation 2/2/2022 Partial Approval NICK DANERI
Deputy Wood Construction 2/8/2022 Conditional Approval NICK DANERI
Deputy Wood Construction 2/10/2022 Conditional Approval NICK DANERI
Deputy Wood Construction 2/14/2022 Conditional Approval NICK DANERI
Deputy Drilled-In Anchors 2/16/2022 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 2/16/2022 Conditional Approval NICK DANERI
Masonry Wall/Backfill 2/17/2022 Partial Approval NICK DANERI
Insulation 2/22/2022 Partial Approval JAMES POWERS
Interior/Exterior Lathing 2/28/2022 Partial Approval NICK DANERI
Insulation 3/7/2022 Not Ready for Inspection NICK DANERI
Masonry Wall/Backfill 3/7/2022 Partial Approval NICK DANERI
Deputy Drilled-In Anchors 3/9/2022 Conditional Approval NICK DANERI
Deputy Reinf. Masonry 3/9/2022 Conditional Approval NICK DANERI
Masonry Wall/Backfill 3/9/2022 Partial Approval NICK DANERI
Deputy Reinf. Concrete 3/11/2022 Conditional Approval NICK DANERI
Deputy Reinf. Masonry 3/11/2022 Conditional Approval NICK DANERI
Deputy Steel/Welding 3/11/2022 Conditional Approval NICK DANERI
Footing/Foundation/Slab 3/11/2022 Partial Approval NICK DANERI
Insulation 3/16/2022 Partial Approval NICK DANERI
Deputy Reinf. Masonry 3/21/2022 Conditional Approval NICK DANERI
Masonry Wall/Backfill 3/21/2022 Partial Approval NICK DANERI
Insulation 3/22/2022 Partial Approval NICK DANERI
Drywall Nailing 3/30/2022 Partial Approval EDWIN GREGORYONA
METHANE-Rough 3/30/2022 Not Ready for Inspection EDWIN GREGORYONA
Verify Sprinkler Sign Off 3/30/2022 Not Ready for Inspection EDWIN GREGORYONA
Wood Frame 3/30/2022 Not Ready for Inspection EDWIN GREGORYONA
METHANE-Rough 4/1/2022 Not Ready for Inspection EDWIN GREGORYONA
Verify Sprinkler Sign Off 4/1/2022 Approved EDWIN GREGORYONA
Wood Frame 4/1/2022 Partial Approval EDWIN GREGORYONA
Drywall Nailing 4/11/2022 Partial Approval RAFAEL ESPINOZA
Excavation/Setback/Form/Re-Bar 4/14/2022 Partial Approval NICK DANERI
Deputy Methane Barrier 4/26/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/26/2022 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 4/26/2022 Partial Approval JAMES POWERS
Insulation 4/26/2022 Partial Approval RUSSELL BONVOULOIR
Deputy Reinf. Masonry 4/29/2022 Conditional Approval NICK DANERI
Masonry Wall/Backfill 4/29/2022 Partial Approval NICK DANERI
Insulation 5/2/2022 Partial Approval NICK DANERI
Deputy Reinf. Masonry 5/3/2022 Conditional Approval NICK DANERI
Drywall Nailing 5/4/2022 Partial Approval NICK DANERI
Deputy Reinf. Masonry 5/6/2022 Conditional Approval NICK DANERI
Insulation 5/11/2022 Partial Approval RAFAEL ESPINOZA
Special/Order Compliance 5/16/2022 Partial Approval DAVID BURKHEAD
Insulation 5/26/2022 Partial Approval NICK DANERI
METHANE-Rough 5/26/2022 Partial Approval NICK DANERI
Wood Frame 5/26/2022 Partial Approval NICK DANERI
Insulation 6/2/2022 Partial Inspection NICK DANERI
METHANE-Rough 6/2/2022 Approved NICK DANERI
Wood Frame 6/2/2022 Partial Approval NICK DANERI
Insulation 6/3/2022 Partial Approval NICK DANERI
Drywall Nailing 6/6/2022 Partial Approval NICK DANERI
Insulation 6/8/2022 Partial Approval DAVID BURKHEAD
Drywall Nailing 6/10/2022 Partial Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 6/14/2022 Partial Approval NICK DANERI
Deputy Reinf. Concrete 6/17/2022 Conditional Approval NICK DANERI
Deputy Reinf. Masonry 6/17/2022 Conditional Approval NICK DANERI
Light Gage Steel Frame 6/17/2022 Partial Approval NICK DANERI
Masonry Wall/Backfill 6/17/2022 Partial Approval NICK DANERI
Deputy Drilled-In Anchors 6/23/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 6/23/2022 Conditional Approval ERNESTO CORRAL
Excavation/Setback/Form/Re-Bar 6/27/2022 Partial Approval NICK DANERI
Insulation 6/30/2022 Partial Approval NICK DANERI
Footing/Foundation/Slab 7/6/2022 Partial Approval JAMES POWERS
METHANE-Barrier 7/6/2022 Approved JAMES POWERS
Excavation/Setback/Form/Re-Bar 7/7/2022 Partial Approval NICK DANERI
Deputy Reinf. Masonry 7/8/2022 Conditional Approval ERNESTO CORRAL
Excavation/Setback/Form/Re-Bar 7/11/2022 Partial Approval NICK DANERI
Drywall Nailing 7/22/2022 Partial Approval TIMOTHY BUXTON
Drywall Nailing 8/3/2022 Partial Approval NICK DANERI
Deputy Drilled-In Anchors 8/18/2022 Conditional Approval ERNESTO CORRAL
Excavation/Setback/Form/Re-Bar 8/19/2022 Partial Approval NICK DANERI
Light Gage Steel Frame 9/6/2022 Partial Approval GREGORY POMISH
Excavation/Setback/Form/Re-Bar 10/11/2022 Partial Approval GREGORY POMISH
Deputy Methane Barrier 10/13/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 10/28/2022 Conditional Approval MICHAEL ROSENBERG
Light Gage Steel Frame 11/1/2022 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 11/3/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Masonry 11/15/2022 Conditional Approval MICHAEL ROSENBERG
Pre-Inspection 11/29/2022 Partial Approval NICK DANERI
Interior/Exterior Lathing 12/19/2022 Partial Approval NICK DANERI
Structural Steel Frame 12/27/2022 Partial Approval NICK DANERI
Drywall Nailing 3/17/2023 Partial Approval NICK DANERI
Drywall Nailing 3/29/2023 Partial Approval GREGORY POMISH
Pre-Inspection 5/5/2023 Approved RAFAEL ESPINOZA
Pre-Inspection 7/17/2023 Partial Inspection NICK DANERI
Special/Order Compliance 11/17/2023 Partial Approval LARRY ARNICK
Special/Order Compliance 12/4/2023 Partial Inspection NICK DANERI
Drywall Nailing 12/7/2023 Approved NICK DANERI
Final 12/7/2023 Not Ready for Inspection NICK DANERI
Footing/Foundation/Slab 12/7/2023 Approved NICK DANERI
Green Building Final 12/7/2023 Not Ready for Inspection NICK DANERI
Reinforced Concrete Frame 12/7/2023 Approved NICK DANERI
Reinforced Masonry Frame 12/7/2023 Approved NICK DANERI
SGSOV-Seismic Gas S/O Valve 12/7/2023 SGSOV Not Ready NICK DANERI
Smoke Detectors 12/7/2023 Not Ready for Inspection NICK DANERI
Structural Steel Frame 12/7/2023 Approved NICK DANERI
Wood Frame 12/7/2023 Approved NICK DANERI
Final 12/13/2023 Partial Inspection NICK DANERI
Green Building Final 12/13/2023 Partial Inspection NICK DANERI
SGSOV-Seismic Gas S/O Valve 12/13/2023 SGSOV Not Ready NICK DANERI
Smoke Detectors 12/13/2023 Partial Inspection NICK DANERI
Special/Order Compliance 12/15/2023 Partial Inspection NICK DANERI
Final 12/18/2023 Not Ready for Inspection NICK DANERI
Green Building Final 12/18/2023 Not Ready for Inspection NICK DANERI
SGSOV-Seismic Gas S/O Valve 12/18/2023 SGSOV Not Ready NICK DANERI
Smoke Detectors 12/18/2023 Approved NICK DANERI
Special/Order Compliance 12/20/2023 Partial Inspection NICK DANERI
Special/Order Compliance 12/21/2023 Partial Inspection NICK DANERI
Deputy Drilled-In Anchors 1/16/2024 Conditional Approval MICHAEL ROSENBERG
Deputy Methane Barrier 1/16/2024 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Masonry 1/16/2024 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 1/16/2024 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 1/16/2024 Conditional Approval MICHAEL ROSENBERG
Deputy Wood Construction 1/16/2024 Conditional Approval MICHAEL ROSENBERG
Final 1/26/2024 Not Ready for Inspection NICK DANERI
Green Building Final 1/26/2024 Approved NICK DANERI
SGSOV-Seismic Gas S/O Valve 1/26/2024 SGSOV Approved NICK DANERI
Final 2/12/2024 OK to Issue CofO NICK DANERI