800 S HARVARD BLVD 1-131 90005

Certificate Information: 800 S HARVARD BLVD 1-131 90005

Application / Permit
17010-10000-02632
Plan Check / Job No.
B17LA12005
Group
Building
Type
Bldg-New
Sub-Type
Commercial
Primary Use
(5) Apartment
Work Description
New 6-story mixed-use building: 5 story, Type IIIA, 131-unit apartment building above Type IA podium; retail and parking at grade over 2 level subterranean parking garages.
Permit Issued
Issued on 6/4/2018
Issuing Office
Metro
Current Status
CofO Issued on 2/12/2021
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 7/10/2017 APPLICANT
Assigned to Plan Check Engineer 7/20/2017 KESETE HAREGOT
Corrections Issued 7/31/2017 SHUNYU ZHANG
Quality Review Completed 8/7/2017 BINH PHAN
Building Plans Picked Up 9/21/2017 APPLICANT
Applicant returned to address corrections 10/16/2017 SHUNYU ZHANG
Applicant returned to address corrections 12/5/2017 SHUNYU ZHANG
Applicant returned to address corrections 12/8/2017 SHUNYU ZHANG
Applicant returned to address corrections 12/11/2017 SHUNYU ZHANG
Applicant returned to address corrections 1/25/2018 SHUNYU ZHANG
Applicant returned to address corrections 2/2/2018 SHUNYU ZHANG
Applicant returned to address corrections 3/13/2018 SHUNYU ZHANG
Applicant returned to address corrections 3/28/2018 KESETE HAREGOT
Applicant returned to address corrections 4/17/2018 KESETE HAREGOT
Plan Check Approved 6/1/2018 KESETE HAREGOT
Issued 6/4/2018 LADBS
CofO in Progress 2/12/2021 ERNESTO CORRAL
CofO Issued 2/12/2021 ERNESTO CORRAL
Permit Finaled 2/12/2021 ERNESTO CORRAL

Permit Application Clearance Information

Address approval Cleared 12/13/2017 ADRIAN SANCHEZ
Eng Process Fee Ord 176,300 Cleared 12/13/2017 ADRIAN SANCHEZ
Permit Cleared 12/13/2017 ADRIAN SANCHEZ
Building over 3-story or 36-ft Cleared 1/5/2018 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 1/5/2018 CALOSHA APPROVED
Project located in CRA area Cleared 1/11/2018 JIM URQUHART
Hydrant and Access approval Cleared 1/19/2018 JOHN CONNEALLY
DAS Clearance Cleared 1/26/2018 SHUNYU ZHANG
Green Code Cleared 1/26/2018 DONALD CRICHLOW
Low Impact Development Cleared 2/8/2018 IDA MEISAMI-FARD
Roof/Waste drainage to street Cleared 2/8/2018 ALFREDO JARA
Bicycle Parking Cleared 2/23/2018 JAMES KHO
Encroachment in public way Cleared 2/23/2018 JAMES KHO
Highway dedication Cleared 2/28/2018 JAMES MORALEZ
Fire Marshall Fire Life Safety Cleared 3/9/2018 VIDAL GARCIA
Construction near power lines Cleared 3/27/2018 WALTER RAMIREZ
Construction within easement Cleared 3/27/2018 WALTER RAMIREZ
Miscellaneous Cleared 3/30/2018 DANALYNN DOMINGUEZ
ZA Case Cleared 3/30/2018 DANALYNN DOMINGUEZ
ZA Case Cleared 3/30/2018 DANALYNN DOMINGUEZ
ZA Case Cleared 3/30/2018 DANALYNN DOMINGUEZ
Density Bonus 12.22.A.25 Cleared 4/16/2018 MICHAEL ZIRBES
Sewer availability Cleared 4/24/2018 STEVE MELGAR
Frnt yard landscape/Water mgmt Cleared 5/17/2018 YOVANA PEREZ
Miscellaneous Cleared 5/17/2018 YOVANA PEREZ
Work Adjacent to Public Way Cleared 5/17/2018 HOK CHI CHIU
Miscellaneous Cleared 5/18/2018 YOVANA PEREZ
Opn space landscape/Water mgmt Cleared 5/18/2018 YOVANA PEREZ
Site Plan review Cleared 5/18/2018 YOVANA PEREZ

Contact Information

Architect Lagrega, Gregory Thomas; Lic. No.: C31444 880 WORCESTER AVENUE      PASADENA, CA 91104
Engineer Funk, David Lyle; Lic. No.: S5421 619 BERYL ST      REDONDO BEACH, CA 90277
Engineer Mc, Donald John Rutherford; Lic. No.: L6728 34052 MALAGA DR      DANA POINT, CA 92629
Engineer Nelson, William Mc Kee; Lic. No.: S3417 5 DELLWOOD      DOVE CANYON, CA 92679

Inspector Information

NICK DANERI, (213) 202-5615 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Steel/Welding 7/9/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 7/10/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 9/7/2018 Partial Approval LESLIE TRUJILLO
Pre-Inspection 9/14/2018 Partial Approval LESLIE TRUJILLO
Footing/Foundation/Slab 9/27/2018 Not Ready for Inspection WINSTON DUNNING
Deputy Reinf. Concrete 10/2/2018 Conditional Approval LESLIE TRUJILLO
Footing/Foundation/Slab 10/2/2018 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/3/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/5/2018 Conditional Approval LESLIE TRUJILLO
Footing/Foundation/Slab 10/5/2018 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/10/2018 Conditional Approval LESLIE TRUJILLO
Footing/Foundation/Slab 10/10/2018 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/11/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/12/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/15/2018 Conditional Approval LESLIE TRUJILLO
Footing/Foundation/Slab 10/15/2018 Partial Approval LESLIE TRUJILLO
Green Building Rough 10/15/2018 Not Ready for Inspection LESLIE TRUJILLO
Reinforced Concrete Frame 10/15/2018 Partial Inspection LESLIE TRUJILLO
Verify Sprinkler Sign Off 10/15/2018 Not Ready for Inspection LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 10/16/2018 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/17/2018 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 10/17/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/18/2018 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 10/18/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/19/2018 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 10/19/2018 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 10/19/2018 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/22/2018 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 10/22/2018 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 10/22/2018 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/23/2018 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 10/23/2018 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 10/23/2018 Partial Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 10/24/2018 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/25/2018 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 10/25/2018 Conditional Approval LESLIE TRUJILLO
Green Building Rough 10/25/2018 Partial Approval LESLIE TRUJILLO
Reinforced Concrete Frame 10/25/2018 Partial Approval LESLIE TRUJILLO
Verify Sprinkler Sign Off 10/25/2018 Partial Inspection LESLIE TRUJILLO
Deputy Reinf. Concrete 10/26/2018 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 10/26/2018 Conditional Approval LESLIE TRUJILLO
Footing/Foundation/Slab 10/26/2018 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/29/2018 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 10/29/2018 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 10/29/2018 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/30/2018 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 10/30/2018 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 10/30/2018 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/31/2018 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 10/31/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/1/2018 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 11/1/2018 Conditional Approval LESLIE TRUJILLO
Footing/Foundation/Slab 11/1/2018 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/2/2018 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 11/2/2018 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 11/2/2018 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/5/2018 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 11/5/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/6/2018 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 11/6/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/16/2018 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 11/16/2018 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/19/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/20/2018 Conditional Approval LESLIE TRUJILLO
Footing/Foundation/Slab 11/20/2018 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/21/2018 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 12/7/2018 Partial Inspection LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 12/10/2018 Partial Approval LESLIE TRUJILLO
Deputy Other (see comments) 12/12/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/12/2018 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 12/12/2018 Partial Inspection LESLIE TRUJILLO
Deputy Reinf. Concrete 12/13/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/14/2018 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 12/17/2018 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/19/2018 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 12/19/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/20/2018 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 12/20/2018 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 12/20/2018 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/21/2018 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 12/21/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/24/2018 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 12/24/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/26/2018 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 12/26/2018 Conditional Approval LESLIE TRUJILLO
Deputy Other (see comments) 12/27/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/27/2018 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 12/27/2018 Partial Inspection LESLIE TRUJILLO
Deputy Reinf. Concrete 12/28/2018 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 12/28/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/31/2018 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 12/31/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/2/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 1/2/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/3/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 1/3/2019 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 1/3/2019 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/4/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 1/4/2019 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 1/4/2019 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/7/2019 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 1/18/2019 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/22/2019 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 1/25/2019 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/28/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 1/28/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/29/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 1/29/2019 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 1/29/2019 Partial Approval LESLIE TRUJILLO
Floor/Roof Diaphrgm/Shear Wall 1/29/2019 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/30/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 1/30/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/31/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 1/31/2019 Conditional Approval LESLIE TRUJILLO
Green Building Rough 1/31/2019 Partial Inspection LESLIE TRUJILLO
Reinforced Concrete Frame 1/31/2019 Partial Approval LESLIE TRUJILLO
Verify Sprinkler Sign Off 1/31/2019 Partial Inspection LESLIE TRUJILLO
Deputy Reinf. Concrete 2/1/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 2/1/2019 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 2/1/2019 Partial Approval LESLIE TRUJILLO
Deputy Other (see comments) 2/8/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 2/8/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 2/8/2019 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 2/11/2019 Partial Approval LESLIE TRUJILLO
Deputy Other (see comments) 2/12/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 2/12/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 2/13/2019 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 2/13/2019 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 2/15/2019 Conditional Approval LESLIE TRUJILLO
Deputy Other (see comments) 2/20/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 2/20/2019 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 2/28/2019 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 3/4/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 3/4/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 3/6/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 3/7/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 3/8/2019 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 3/12/2019 Partial Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 3/15/2019 Partial Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 3/18/2019 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 3/19/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 3/20/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 3/21/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 3/22/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 3/26/2019 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 3/26/2019 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 3/27/2019 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 3/27/2019 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 3/28/2019 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 3/28/2019 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 3/29/2019 Conditional Approval LESLIE TRUJILLO
Wood Frame 4/9/2019 Partial Inspection LESLIE TRUJILLO
Deputy Drilled-In Anchors 4/12/2019 Conditional Approval NICK DANERI
Deputy Wood Construction 4/12/2019 Conditional Approval LESLIE TRUJILLO
Floor/Roof Diaphrgm/Shear Wall 4/15/2019 Partial Inspection LESLIE TRUJILLO
Deputy Reinf. Masonry 4/25/2019 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 4/25/2019 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 4/26/2019 Conditional Approval LESLIE TRUJILLO
Green Building Rough 4/26/2019 Partial Inspection LESLIE TRUJILLO
Reinforced Masonry Frame 4/26/2019 Partial Approval LESLIE TRUJILLO
Verify Sprinkler Sign Off 4/26/2019 Conditional Approval LESLIE TRUJILLO
Wood Frame 4/26/2019 Corrections Issued LESLIE TRUJILLO
Deputy Reinf. Masonry 4/29/2019 Conditional Approval DANIEL COLLINS
Excavation/Setback/Form/Re-Bar 4/29/2019 Not Ready for Inspection ERNESTO CORRAL
Excavation/Setback/Form/Re-Bar 4/30/2019 Partial Inspection ERNESTO CORRAL
Wood Frame 4/30/2019 Partial Inspection ERNESTO CORRAL
Deputy Reinf. Masonry 5/1/2019 Conditional Approval ERNESTO CORRAL
Deputy Wood Construction 5/1/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 5/2/2019 Partial Approval JAMES POWERS
Deputy Wood Construction 5/2/2019 Partial Approval JAMES POWERS
Excavation/Setback/Form/Re-Bar 5/2/2019 Partial Approval JAMES POWERS
Floor/Roof Diaphrgm/Shear Wall 5/2/2019 Partial Approval JAMES POWERS
Green Building Rough 5/2/2019 Not Ready for Inspection JAMES POWERS
Reinforced Masonry Frame 5/2/2019 Partial Approval JAMES POWERS
Verify Sprinkler Sign Off 5/2/2019 Not Ready for Inspection JAMES POWERS
Deputy Reinf. Masonry 5/3/2019 Partial Approval JAMES POWERS
Deputy Wood Construction 5/3/2019 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 5/6/2019 Conditional Approval LESLIE TRUJILLO
Deputy Wood Construction 5/6/2019 Conditional Approval LESLIE TRUJILLO
Green Building Rough 5/6/2019 Conditional Approval LESLIE TRUJILLO
Reinforced Masonry Frame 5/6/2019 Partial Approval LESLIE TRUJILLO
Verify Sprinkler Sign Off 5/6/2019 Not Ready for Inspection LESLIE TRUJILLO
Deputy Reinf. Masonry 5/7/2019 Conditional Approval LESLIE TRUJILLO
Deputy Wood Construction 5/7/2019 Conditional Approval LESLIE TRUJILLO
Footing/Foundation/Slab 5/9/2019 Partial Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 5/10/2019 Partial Approval LESLIE TRUJILLO
Masonry Wall/Backfill 5/10/2019 Partial Approval LESLIE TRUJILLO
Wood Frame 5/10/2019 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 5/17/2019 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 5/21/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 5/22/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 5/23/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 5/24/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 5/28/2019 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 5/28/2019 Partial Approval LESLIE TRUJILLO
Masonry Wall/Backfill 5/29/2019 Partial Approval LESLIE TRUJILLO
Wood Frame 5/29/2019 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 5/30/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 5/31/2019 Conditional Approval LESLIE TRUJILLO
Insulation 6/3/2019 Partial Approval LESLIE TRUJILLO
Insulation 6/5/2019 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 6/7/2019 Conditional Approval LESLIE TRUJILLO
Wall Anchors 6/11/2019 Partial Inspection LESLIE TRUJILLO
Deputy Reinf. Masonry 6/14/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 6/17/2019 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 6/17/2019 Partial Approval LESLIE TRUJILLO
Wood Frame 6/17/2019 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 6/18/2019 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 6/18/2019 Partial Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 6/27/2019 Partial Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 6/28/2019 Partial Approval LESLIE TRUJILLO
Insulation 6/28/2019 Partial Approval LESLIE TRUJILLO
Insulation 7/2/2019 Partial Approval LESLIE TRUJILLO
Floor/Roof Diaphrgm/Shear Wall 7/3/2019 Partial Approval LESLIE TRUJILLO
Pre-Inspection 7/8/2019 Partial Approval LESLIE TRUJILLO
Insulation 7/9/2019 Partial Approval LESLIE TRUJILLO
Deputy Steel/Welding 7/12/2019 Conditional Approval LESLIE TRUJILLO
Deputy Wood Construction 7/12/2019 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 7/15/2019 Conditional Approval LESLIE TRUJILLO
Deputy Wood Construction 7/15/2019 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 7/16/2019 Conditional Approval LESLIE TRUJILLO
Deputy Wood Construction 7/16/2019 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 7/17/2019 Conditional Approval LESLIE TRUJILLO
Deputy Wood Construction 7/17/2019 Conditional Approval LESLIE TRUJILLO
Floor/Roof Diaphrgm/Shear Wall 7/17/2019 Partial Approval LESLIE TRUJILLO
Deputy Steel/Welding 7/18/2019 Conditional Approval LESLIE TRUJILLO
Deputy Wood Construction 7/18/2019 Conditional Approval LESLIE TRUJILLO
Floor/Roof Diaphrgm/Shear Wall 7/22/2019 Partial Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 7/24/2019 Partial Inspection LESLIE TRUJILLO
Floor/Roof Diaphrgm/Shear Wall 7/24/2019 Partial Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 7/25/2019 Partial Approval LESLIE TRUJILLO
Floor/Roof Diaphrgm/Shear Wall 7/30/2019 Partial Approval LESLIE TRUJILLO
Insulation 7/30/2019 Partial Approval LESLIE TRUJILLO
Wood Frame 8/5/2019 Partial Approval LESLIE TRUJILLO
Wood Frame 8/7/2019 Partial Approval LESLIE TRUJILLO
Deputy Steel/Welding 8/8/2019 Conditional Approval LESLIE TRUJILLO
Insulation 8/15/2019 Partial Approval LESLIE TRUJILLO
Wood Frame 8/15/2019 Partial Approval LESLIE TRUJILLO
Wood Frame 8/19/2019 Partial Approval LESLIE TRUJILLO
Insulation 8/20/2019 Partial Approval LESLIE TRUJILLO
Wood Frame 8/22/2019 Partial Approval LESLIE TRUJILLO
Wood Frame 8/23/2019 Partial Approval LESLIE TRUJILLO
Wood Frame 8/28/2019 Partial Approval LESLIE TRUJILLO
Insulation 9/6/2019 Partial Approval LESLIE TRUJILLO
Wood Frame 9/12/2019 Partial Approval LESLIE TRUJILLO
Wood Frame 9/13/2019 Partial Approval LESLIE TRUJILLO
Insulation 9/16/2019 Partial Inspection LESLIE TRUJILLO
Insulation 9/18/2019 Partial Approval LESLIE TRUJILLO
Wood Frame 9/23/2019 Partial Approval LESLIE TRUJILLO
Insulation 9/24/2019 Partial Approval LESLIE TRUJILLO
Insulation 9/26/2019 Partial Approval LESLIE TRUJILLO
Wood Frame 9/26/2019 Partial Approval LESLIE TRUJILLO
Interior/Exterior Lathing 10/1/2019 Partial Approval LESLIE TRUJILLO
Insulation 10/3/2019 Partial Approval LESLIE TRUJILLO
Drywall Nailing 10/4/2019 Partial Approval LESLIE TRUJILLO
Drywall Nailing 10/7/2019 Partial Approval LESLIE TRUJILLO
Insulation 10/15/2019 Partial Approval DANIEL MC AULIFFE
Wood Frame 10/15/2019 Partial Approval DANIEL MC AULIFFE
Final 10/17/2019 Not Ready for Inspection JAMES POWERS
Footing/Foundation/Slab 10/17/2019 Approved JAMES POWERS
Green Building Final 10/17/2019 Not Ready for Inspection JAMES POWERS
Green Building Rough 10/17/2019 Not Ready for Inspection JAMES POWERS
Interior/Exterior Lathing 10/17/2019 Partial Approval JAMES POWERS
Reinforced Concrete Frame 10/17/2019 Not Ready for Inspection JAMES POWERS
Reinforced Masonry Frame 10/17/2019 Not Ready for Inspection JAMES POWERS
SGSOV-Seismic Gas S/O Valve 10/17/2019 SGSOV Not Required JAMES POWERS
Verify Sprinkler Sign Off 10/17/2019 Not Ready for Inspection JAMES POWERS
Drywall Nailing 10/22/2019 Partial Approval LESLIE TRUJILLO
Drywall Nailing 10/28/2019 Partial Approval LESLIE TRUJILLO
Wood Frame 10/29/2019 Partial Approval LESLIE TRUJILLO
Insulation 11/1/2019 Partial Inspection LESLIE TRUJILLO
Insulation 11/4/2019 Partial Approval LESLIE TRUJILLO
Interior/Exterior Lathing 11/4/2019 Partial Approval LESLIE TRUJILLO
Wood Frame 11/5/2019 Partial Inspection LESLIE TRUJILLO
Insulation 11/7/2019 Partial Approval LESLIE TRUJILLO
Wood Frame 11/7/2019 Partial Approval LESLIE TRUJILLO
Drywall Nailing 11/9/2019 Partial Approval JAMES POWERS
Drywall Nailing 11/12/2019 Partial Approval LESLIE TRUJILLO
Wood Frame 11/12/2019 Partial Approval LESLIE TRUJILLO
Insulation 11/13/2019 Partial Inspection LESLIE TRUJILLO
Insulation 11/14/2019 Not Ready for Inspection LESLIE TRUJILLO
Insulation 11/15/2019 Partial Approval LESLIE TRUJILLO
Drywall Nailing 11/18/2019 Partial Approval LESLIE TRUJILLO
Insulation 11/18/2019 Partial Approval LESLIE TRUJILLO
Drywall Nailing 11/21/2019 Partial Approval LESLIE TRUJILLO
Pre-Inspection 12/2/2019 No Access for Inspection ERNESTO CORRAL
Insulation 12/4/2019 Partial Approval LESLIE TRUJILLO
Pre-Inspection 12/4/2019 Partial Approval LESLIE TRUJILLO
Insulation 12/13/2019 Partial Approval LESLIE TRUJILLO
Wood Frame 12/13/2019 Partial Approval LESLIE TRUJILLO
Wood Frame 12/16/2019 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 12/31/2019 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 1/7/2020 Not Ready for Inspection LESLIE TRUJILLO
Light Gage Steel Frame 1/8/2020 Partial Approval LESLIE TRUJILLO
Drywall Nailing 1/9/2020 Partial Approval LESLIE TRUJILLO
Drywall Nailing 1/17/2020 Partial Inspection LESLIE TRUJILLO
Drywall Nailing 1/21/2020 Not Ready for Inspection LESLIE TRUJILLO
Light Gage Steel Frame 1/22/2020 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 1/24/2020 Partial Approval LESLIE TRUJILLO
Wood Frame 1/29/2020 Not Ready for Inspection RAFAEL ESPINOZA
Wood Frame 1/31/2020 Partial Approval RAFAEL ESPINOZA
Drywall Nailing 2/3/2020 Partial Approval RAFAEL ESPINOZA
Wood Frame 2/4/2020 Corrections Issued RAFAEL ESPINOZA
Wood Frame 2/5/2020 Partial Approval RAFAEL ESPINOZA
Insulation 2/7/2020 Partial Approval RAFAEL ESPINOZA
Insulation 2/11/2020 Partial Approval RAFAEL ESPINOZA
Drywall Nailing 2/12/2020 Partial Approval RAFAEL ESPINOZA
Light Gage Steel Frame 2/12/2020 Partial Approval RAFAEL ESPINOZA
Drywall Nailing 2/14/2020 Partial Approval RAFAEL ESPINOZA
Drywall Nailing 2/19/2020 Partial Approval RAFAEL ESPINOZA
Light Gage Steel Frame 2/19/2020 Partial Approval RAFAEL ESPINOZA
Drywall Nailing 2/20/2020 Partial Approval RAFAEL ESPINOZA
Insulation 2/25/2020 Partial Approval RAFAEL ESPINOZA
Light Gage Steel Frame 2/25/2020 Partial Approval RAFAEL ESPINOZA
Drywall Nailing 2/26/2020 Partial Approval RAFAEL ESPINOZA
Drywall Nailing 3/6/2020 Partial Approval RAFAEL ESPINOZA
Wood Frame 3/13/2020 Partial Inspection DANIEL COLLINS
Insulation 3/18/2020 Partial Approval RAFAEL ESPINOZA
Drywall Nailing 3/26/2020 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 4/1/2020 Conditional Approval RAFAEL ESPINOZA
Light Gage Steel Frame 4/1/2020 Partial Approval RAFAEL ESPINOZA
Drywall Nailing 4/8/2020 Partial Approval RAFAEL ESPINOZA
Drywall Nailing 4/13/2020 Partial Approval RAFAEL ESPINOZA
Drywall Nailing 4/17/2020 Partial Approval RAFAEL ESPINOZA
Insulation 4/20/2020 Partial Approval RAFAEL ESPINOZA
Green Building Rough 4/22/2020 Approved RAFAEL ESPINOZA
Reinforced Concrete Frame 4/22/2020 Partial Approval RAFAEL ESPINOZA
Verify Sprinkler Sign Off 4/22/2020 Not Ready for Inspection RAFAEL ESPINOZA
Drywall Nailing 4/24/2020 Partial Approval RAFAEL ESPINOZA
Insulation 5/22/2020 Partial Approval RAFAEL ESPINOZA
Reinforced Masonry Frame 5/26/2020 Partial Approval RAFAEL ESPINOZA
Verify Sprinkler Sign Off 5/26/2020 Not Ready for Inspection RAFAEL ESPINOZA
Deputy Reinf. Masonry 5/27/2020 Conditional Approval RAFAEL ESPINOZA
Drywall Nailing 6/8/2020 Partial Approval RAFAEL ESPINOZA
Masonry Wall/Backfill 6/8/2020 Partial Approval RAFAEL ESPINOZA
Light Gage Steel Frame 6/11/2020 Partial Approval RAFAEL ESPINOZA
Reinforced Masonry Frame 6/11/2020 Partial Approval RAFAEL ESPINOZA
Verify Sprinkler Sign Off 6/11/2020 Not Ready for Inspection RAFAEL ESPINOZA
Deputy Other (see comments) 6/12/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 6/12/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 6/12/2020 Conditional Approval RAFAEL ESPINOZA
Light Gage Steel Frame 6/12/2020 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 6/15/2020 Conditional Approval RAFAEL ESPINOZA
Light Gage Steel Frame 6/15/2020 Partial Approval RAFAEL ESPINOZA
Final 6/17/2020 Not Ready for Inspection RAFAEL ESPINOZA
Green Building Final 6/17/2020 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Concrete Frame 6/17/2020 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Masonry Frame 6/17/2020 Not Ready for Inspection RAFAEL ESPINOZA
Smoke Detectors 6/17/2020 Not Ready for Inspection RAFAEL ESPINOZA
Verify Sprinkler Sign Off 6/17/2020 Not Ready for Inspection RAFAEL ESPINOZA
Drywall Nailing 6/19/2020 Partial Approval RAFAEL ESPINOZA
Drywall Nailing 6/22/2020 Not Ready for Inspection RAFAEL ESPINOZA
Drywall Nailing 6/26/2020 Partial Approval RAFAEL ESPINOZA
Pre-Inspection 7/2/2020 Partial Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 7/6/2020 Partial Approval RAFAEL ESPINOZA
Drywall Nailing 7/8/2020 Partial Approval RAFAEL ESPINOZA
Light Gage Steel Frame 7/8/2020 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 7/10/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 7/14/2020 Conditional Approval RAFAEL ESPINOZA
Interior/Exterior Lathing 7/15/2020 Partial Approval RAFAEL ESPINOZA
Wood Frame 7/31/2020 Partial Approval RAFAEL ESPINOZA
Insulation 8/4/2020 Partial Approval RAFAEL ESPINOZA
Light Gage Steel Frame 8/10/2020 Partial Inspection RAFAEL ESPINOZA
Drywall Nailing 8/11/2020 Partial Approval RAFAEL ESPINOZA
Light Gage Steel Frame 8/11/2020 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 8/19/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 8/20/2020 Conditional Approval NICK DANERI
Light Gage Steel Frame 8/24/2020 Partial Approval RAFAEL ESPINOZA
Drywall Nailing 8/26/2020 Approved RAFAEL ESPINOZA
Pre-Inspection 9/4/2020 Partial Inspection RAFAEL ESPINOZA
Pre-Inspection 9/30/2020 Partial Inspection RAFAEL ESPINOZA
Special/Order Compliance 10/26/2020 Not Ready for Inspection RAFAEL ESPINOZA
Pre-Inspection 10/30/2020 Partial Inspection RAFAEL ESPINOZA
Light Gage Steel Frame 11/12/2020 Partial Approval RAFAEL ESPINOZA
Special/Order Compliance 12/4/2020 Partial Inspection RAFAEL ESPINOZA
Final 1/12/2021 Not Ready for Inspection RAFAEL ESPINOZA
Green Building Final 1/12/2021 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Concrete Frame 1/12/2021 Approved RAFAEL ESPINOZA
Reinforced Masonry Frame 1/12/2021 Approved RAFAEL ESPINOZA
Smoke Detectors 1/12/2021 Not Ready for Inspection RAFAEL ESPINOZA
Verify Sprinkler Sign Off 1/12/2021 Approved RAFAEL ESPINOZA
Pre-Inspection 1/13/2021 Partial Inspection RAFAEL ESPINOZA
Final 2/8/2021 Not Ready for Inspection RAFAEL ESPINOZA
Green Building Final 2/8/2021 Approved RAFAEL ESPINOZA
Smoke Detectors 2/8/2021 Not Ready for Inspection RAFAEL ESPINOZA
Special/Order Compliance 2/9/2021 Approved RAFAEL ESPINOZA
Final 2/12/2021 OK to Issue CofO ERNESTO CORRAL
Smoke Detectors 2/12/2021 Approved ERNESTO CORRAL