Excavation/Setback/Form/Re-Bar
|
11/6/2018
|
Partial Approval
|
WINSTON DUNNING
|
Deputy Reinf. Concrete
|
11/7/2018
|
Conditional Approval
|
WINSTON DUNNING
|
Deputy Reinf. Concrete
|
12/3/2018
|
Conditional Approval
|
WINSTON DUNNING
|
Deputy Methane Barrier
|
12/11/2018
|
Conditional Approval
|
WINSTON DUNNING
|
Deputy Methane Barrier
|
12/12/2018
|
Conditional Approval
|
WINSTON DUNNING
|
Green Building Rough
|
12/12/2018
|
Partial Inspection
|
WINSTON DUNNING
|
METHANE-Rough
|
12/12/2018
|
Partial Inspection
|
WINSTON DUNNING
|
Reinforced Concrete Frame
|
12/12/2018
|
Partial Approval
|
WINSTON DUNNING
|
Verify Sprinkler Sign Off
|
12/12/2018
|
Partial Inspection
|
WINSTON DUNNING
|
Deputy Methane Barrier
|
12/13/2018
|
Conditional Approval
|
WINSTON DUNNING
|
Deputy Methane Barrier
|
12/14/2018
|
Conditional Approval
|
WINSTON DUNNING
|
Deputy Shotcrete
|
12/18/2018
|
Conditional Approval
|
WINSTON DUNNING
|
Excavation/Setback/Form/Re-Bar
|
12/18/2018
|
Partial Approval
|
WINSTON DUNNING
|
Deputy Reinf. Concrete
|
12/19/2018
|
Conditional Approval
|
WINSTON DUNNING
|
Deputy Shotcrete
|
12/19/2018
|
Conditional Approval
|
WINSTON DUNNING
|
Green Building Rough
|
12/19/2018
|
Partial Inspection
|
WINSTON DUNNING
|
METHANE-Rough
|
12/19/2018
|
Partial Inspection
|
WINSTON DUNNING
|
Reinforced Concrete Frame
|
12/19/2018
|
Conditional Approval
|
WINSTON DUNNING
|
Verify Sprinkler Sign Off
|
12/19/2018
|
Partial Inspection
|
WINSTON DUNNING
|
Deputy Reinf. Concrete
|
12/20/2018
|
Conditional Approval
|
WINSTON DUNNING
|
Deputy Shotcrete
|
12/20/2018
|
Conditional Approval
|
WINSTON DUNNING
|
Reinforced Concrete Frame
|
12/20/2018
|
Partial Approval
|
WINSTON DUNNING
|
Deputy Shotcrete
|
12/21/2018
|
Conditional Approval
|
WINSTON DUNNING
|
Footing/Foundation/Slab
|
1/23/2019
|
Not Ready for Inspection
|
NICK DANERI
|
Green Building Rough
|
1/23/2019
|
Not Ready for Inspection
|
NICK DANERI
|
METHANE-Barrier
|
1/23/2019
|
Partial Inspection
|
NICK DANERI
|
METHANE-Rough
|
1/23/2019
|
Partial Inspection
|
NICK DANERI
|
METHANE-Subgrade
|
1/23/2019
|
Partial Inspection
|
NICK DANERI
|
Reinforced Concrete Frame
|
1/23/2019
|
Not Ready for Inspection
|
NICK DANERI
|
Verify Sprinkler Sign Off
|
1/23/2019
|
Not Ready for Inspection
|
NICK DANERI
|
Deputy Reinf. Concrete
|
1/24/2019
|
Conditional Approval
|
NICK DANERI
|
Excavation/Setback/Form/Re-Bar
|
1/24/2019
|
Partial Approval
|
NICK DANERI
|
Green Building Rough
|
2/1/2019
|
Not Ready for Inspection
|
NICK DANERI
|
METHANE-Rough
|
2/1/2019
|
Partial Inspection
|
NICK DANERI
|
Reinforced Concrete Frame
|
2/1/2019
|
Corrections Issued
|
NICK DANERI
|
Verify Sprinkler Sign Off
|
2/1/2019
|
Not Ready for Inspection
|
NICK DANERI
|
Green Building Rough
|
2/8/2019
|
Not Ready for Inspection
|
NICK DANERI
|
METHANE-Rough
|
2/8/2019
|
Not Ready for Inspection
|
NICK DANERI
|
Reinforced Concrete Frame
|
2/8/2019
|
Partial Approval
|
NICK DANERI
|
Verify Sprinkler Sign Off
|
2/8/2019
|
Not Ready for Inspection
|
NICK DANERI
|
Green Building Rough
|
2/14/2019
|
Not Ready for Inspection
|
NICK DANERI
|
METHANE-Rough
|
2/14/2019
|
Not Ready for Inspection
|
NICK DANERI
|
Structural Steel Frame
|
2/14/2019
|
Not Ready for Inspection
|
NICK DANERI
|
Verify Sprinkler Sign Off
|
2/14/2019
|
Not Ready for Inspection
|
NICK DANERI
|
Reinforced Masonry Frame
|
2/15/2019
|
Partial Approval
|
NICK DANERI
|
Deputy Shotcrete
|
2/19/2019
|
Conditional Approval
|
NICK DANERI
|
Deputy Methane Barrier
|
2/22/2019
|
Conditional Approval
|
NICK DANERI
|
Green Building Rough
|
2/25/2019
|
Partial Inspection
|
LESLIE TRUJILLO
|
METHANE-Rough
|
2/25/2019
|
Partial Inspection
|
LESLIE TRUJILLO
|
Reinforced Concrete Frame
|
2/25/2019
|
Partial Approval
|
LESLIE TRUJILLO
|
Verify Sprinkler Sign Off
|
2/25/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
2/26/2019
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
2/27/2019
|
Conditional Approval
|
NICK DANERI
|
Special/Order Compliance
|
2/28/2019
|
Partial Inspection
|
NICK DANERI
|
Deputy Methane Barrier
|
4/3/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Methane Barrier
|
4/4/2019
|
Conditional Approval
|
NICK DANERI
|
Deputy Methane Barrier
|
4/5/2019
|
Conditional Approval
|
NICK DANERI
|
Deputy Methane Barrier
|
4/8/2019
|
Conditional Approval
|
NICK DANERI
|
Deputy Methane Barrier
|
4/9/2019
|
Conditional Approval
|
NICK DANERI
|
Green Building Rough
|
4/12/2019
|
Not Ready for Inspection
|
NICK DANERI
|
METHANE-Barrier
|
4/12/2019
|
Approved
|
NICK DANERI
|
METHANE-Final
|
4/12/2019
|
Not Ready for Inspection
|
NICK DANERI
|
METHANE-Rough
|
4/12/2019
|
Approved
|
NICK DANERI
|
Reinforced Concrete Frame
|
4/12/2019
|
Partial Approval
|
NICK DANERI
|
Verify Sprinkler Sign Off
|
4/12/2019
|
Not Ready for Inspection
|
NICK DANERI
|
Deputy Reinf. Concrete
|
4/15/2019
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
4/30/2019
|
Partial Approval
|
JAMES POWERS
|
Deputy Reinf. Concrete
|
5/3/2019
|
Partial Approval
|
JAMES POWERS
|
Green Building Rough
|
5/6/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
METHANE-Rough
|
5/6/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
Reinforced Concrete Frame
|
5/6/2019
|
Partial Approval
|
LESLIE TRUJILLO
|
Verify Sprinkler Sign Off
|
5/6/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
5/7/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
Excavation/Setback/Form/Re-Bar
|
5/13/2019
|
Partial Approval
|
LESLIE TRUJILLO
|
Green Building Rough
|
5/13/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
METHANE-Rough
|
5/13/2019
|
Approved
|
LESLIE TRUJILLO
|
Verify Sprinkler Sign Off
|
5/13/2019
|
Approved
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
5/14/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
Green Building Rough
|
5/22/2019
|
Partial Inspection
|
LESLIE TRUJILLO
|
Reinforced Masonry Frame
|
5/22/2019
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Shotcrete
|
5/23/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
Green Building Rough
|
5/28/2019
|
Partial Inspection
|
LESLIE TRUJILLO
|
Reinforced Masonry Frame
|
5/28/2019
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
5/29/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Shotcrete
|
5/29/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
6/21/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
6/24/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
Green Building Rough
|
6/24/2019
|
Partial Inspection
|
LESLIE TRUJILLO
|
Reinforced Concrete Frame
|
6/24/2019
|
Partial Inspection
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
6/26/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
7/2/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
Green Building Rough
|
7/9/2019
|
Partial Approval
|
LESLIE TRUJILLO
|
Reinforced Concrete Frame
|
7/9/2019
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
7/11/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
Green Building Rough
|
8/12/2019
|
Partial Approval
|
LESLIE TRUJILLO
|
Wood Frame
|
8/12/2019
|
Partial Approval
|
LESLIE TRUJILLO
|
Green Building Rough
|
9/9/2019
|
Partial Inspection
|
LESLIE TRUJILLO
|
Wood Frame
|
9/9/2019
|
Partial Approval
|
LESLIE TRUJILLO
|
Green Building Rough
|
9/30/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
Wood Frame
|
9/30/2019
|
Partial Approval
|
LESLIE TRUJILLO
|
Green Building Rough
|
10/24/2019
|
Partial Inspection
|
LESLIE TRUJILLO
|
Wood Frame
|
10/24/2019
|
Not Ready for Inspection
|
LESLIE TRUJILLO
|
Floor/Roof Diaphrgm/Shear Wall
|
10/30/2019
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Wood Construction
|
11/22/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
Green Building Rough
|
12/6/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
Wood Frame
|
12/6/2019
|
Partial Inspection
|
LESLIE TRUJILLO
|
Deputy Wood Construction
|
12/18/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
Insulation
|
12/24/2019
|
Partial Inspection
|
LESLIE TRUJILLO
|
Insulation
|
12/30/2019
|
Partial Approval
|
LESLIE TRUJILLO
|
Drywall Nailing
|
1/21/2020
|
Partial Approval
|
LESLIE TRUJILLO
|
Green Building Rough
|
1/21/2020
|
Conditional Approval
|
LESLIE TRUJILLO
|
Drywall Nailing
|
2/7/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
Green Building Rough
|
2/7/2020
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
Wood Frame
|
2/7/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
Wood Frame
|
2/10/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
Insulation
|
2/14/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
Drywall Nailing
|
3/9/2020
|
Partial Approval
|
LESLIE TRUJILLO
|
Green Building Rough
|
3/9/2020
|
Not Ready for Inspection
|
LESLIE TRUJILLO
|
Drywall Nailing
|
3/11/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
Interior/Exterior Lathing
|
3/11/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
Wood Frame
|
3/11/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
Drywall Nailing
|
4/2/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
Green Building Rough
|
4/2/2020
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
Insulation
|
4/2/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
Wood Frame
|
4/2/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
Drywall Nailing
|
4/20/2020
|
Corrections Issued
|
RAFAEL ESPINOZA
|
Green Building Rough
|
4/20/2020
|
Approved
|
RAFAEL ESPINOZA
|
Interior/Exterior Lathing
|
4/20/2020
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
Drywall Nailing
|
4/28/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
Interior/Exterior Lathing
|
4/28/2020
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
Special/Order Compliance
|
5/18/2020
|
Not Ready for Inspection
|
NICK DANERI
|
Drywall Nailing
|
5/21/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
Interior/Exterior Lathing
|
5/21/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
Special/Order Compliance
|
5/21/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Interior/Exterior Lathing
|
6/24/2020
|
Approved
|
RAFAEL ESPINOZA
|
Drywall Nailing
|
9/28/2020
|
Partial Inspection
|
RAFAEL ESPINOZA
|
Special/Order Compliance
|
9/29/2020
|
Partial Inspection
|
RAFAEL ESPINOZA
|
Special/Order Compliance
|
11/23/2020
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
Special/Order Compliance
|
11/24/2020
|
Approved
|
RAFAEL ESPINOZA
|
Drywall Nailing
|
12/8/2020
|
Approved
|
RAFAEL ESPINOZA
|
Final
|
12/8/2020
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
Footing/Foundation/Slab
|
12/8/2020
|
Approved
|
RAFAEL ESPINOZA
|
Green Building Final
|
12/8/2020
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
METHANE-Subgrade
|
12/8/2020
|
Approved
|
RAFAEL ESPINOZA
|
Reinforced Concrete Frame
|
12/8/2020
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
Reinforced Masonry Frame
|
12/8/2020
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
SGSOV-Seismic Gas S/O Valve
|
12/8/2020
|
SGSOV Not Ready
|
RAFAEL ESPINOZA
|
Smoke Detectors
|
12/8/2020
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
Structural Steel Frame
|
12/8/2020
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
Wood Frame
|
12/8/2020
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
Final
|
12/22/2020
|
Corrections Issued
|
RAFAEL ESPINOZA
|
Green Building Final
|
12/22/2020
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
Reinforced Concrete Frame
|
12/22/2020
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
Reinforced Masonry Frame
|
12/22/2020
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
SGSOV-Seismic Gas S/O Valve
|
12/22/2020
|
SGSOV Not Ready
|
RAFAEL ESPINOZA
|
Smoke Detectors
|
12/22/2020
|
No Access for Inspection
|
RAFAEL ESPINOZA
|
Structural Steel Frame
|
12/22/2020
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
Wood Frame
|
12/22/2020
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
Final
|
2/8/2021
|
Partial Inspection
|
RAFAEL ESPINOZA
|
Green Building Final
|
2/8/2021
|
Approved
|
RAFAEL ESPINOZA
|
Reinforced Concrete Frame
|
2/8/2021
|
Approved
|
RAFAEL ESPINOZA
|
Reinforced Masonry Frame
|
2/8/2021
|
Approved
|
RAFAEL ESPINOZA
|
SGSOV-Seismic Gas S/O Valve
|
2/8/2021
|
SGSOV Not Ready
|
RAFAEL ESPINOZA
|
Smoke Detectors
|
2/8/2021
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
Structural Steel Frame
|
2/8/2021
|
Approved
|
RAFAEL ESPINOZA
|
Wood Frame
|
2/8/2021
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
Pre-Inspection
|
2/9/2021
|
Partial Inspection
|
RAFAEL ESPINOZA
|
Masonry Wall/Backfill
|
2/10/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
Smoke Detectors
|
2/11/2021
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
Final
|
2/16/2021
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
SGSOV-Seismic Gas S/O Valve
|
2/16/2021
|
SGSOV Not Ready
|
RAFAEL ESPINOZA
|
Masonry Wall/Backfill
|
2/17/2021
|
Partial Inspection
|
RAFAEL ESPINOZA
|
Final
|
2/22/2021
|
Corrections Issued
|
RAFAEL ESPINOZA
|
Final
|
4/20/2021
|
Partial Inspection
|
RAFAEL ESPINOZA
|
SGSOV-Seismic Gas S/O Valve
|
4/20/2021
|
SGSOV Approved
|
RAFAEL ESPINOZA
|
Smoke Detectors
|
4/20/2021
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
Wood Frame
|
4/20/2021
|
Approved
|
RAFAEL ESPINOZA
|
Final
|
4/27/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Smoke Detectors
|
4/27/2021
|
Approved
|
RAFAEL ESPINOZA
|