1250 W COURT ST 1-54 90026

Certificate Information: 1250 W COURT ST 1-54 90026

Application / Permit
17010-10000-02581
Plan Check / Job No.
B17LA11650
Group
Building
Type
Bldg-New
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
NEW 6-STORY 54-UNIT APARTMENT BUILDING WITH 2 LEVELS OF PARKING GARAGE AND POOL DECK PER DIR-2017-1127-SPP-WDI
Permit Issued
Issued on 11/5/2018
Issuing Office
Metro
Current Status
CofO Issued on 5/11/2021
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 7/3/2017 APPLICANT
Assigned to Plan Check Engineer 7/27/2017 MICHAEL PEREZ
Green Plans Picked Up 8/7/2017 APPLICANT
Corrections Issued 8/23/2017 RICARDO SUPAN
Quality Review Completed 8/24/2017 SUEN LIEU
Applicant returned to address corrections 9/6/2017 RICARDO SUPAN
Building Plans Picked Up 9/19/2017 APPLICANT
Applicant returned to address corrections 12/21/2017 RICARDO SUPAN
Applicant returned to address corrections 1/10/2018 RICARDO SUPAN
Applicant returned to address corrections 1/18/2018 RICARDO SUPAN
Applicant returned to address corrections 1/25/2018 RICARDO SUPAN
Plan Check Approved 11/5/2018 RICARDO SUPAN
Issued 11/5/2018 LADBS
CofO in Progress 5/11/2021 RAFAEL ESPINOZA
CofO Issued 5/11/2021 ERNESTO CORRAL
Permit Finaled 5/11/2021 ERNESTO CORRAL

Permit Application Clearance Information

Address approval Cleared 1/8/2018 STEVE MELGAR
Eng Process Fee Ord 176,300 Cleared 1/8/2018 STEVE MELGAR
Permit Cleared 1/8/2018 STEVE MELGAR
Grading Pre-Inspection Cleared 1/10/2018 RICARDO SUPAN
DAS Clearance Cleared 1/19/2018 SHINE LIN
Green Code Cleared 1/19/2018 RICARDO SUPAN
Building over 3-story or 36-ft Cleared 1/25/2018 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 1/25/2018 CALOSHA APPROVED
GPI Written Notices Cleared 1/25/2018 RICARDO SUPAN
Hydrant and Access approval Cleared 1/25/2018 JOHN CONNEALLY
Sewer availability Cleared 1/26/2018 ADRIAN SANCHEZ
Fire Marshall Fire Life Safety Cleared 3/13/2018 WILLIAM JOHNS
Frnt yard landscape/Water mgmt Cleared 3/15/2018 JESSE RAMOS
Highway dedication Cleared 3/15/2018 ARMENIA AGUILAR
Low Impact Development Cleared 3/15/2018 AMMAR ELTAWIL
Miscellaneous Cleared 3/15/2018 JESSE RAMOS
Opn space landscape/Water mgmt Cleared 3/15/2018 JESSE RAMOS
Prkng lot landscape/Water mgmt Cleared 3/15/2018 JESSE RAMOS
Roof/Waste drainage to street Cleared 3/15/2018 STEVE MELGAR
Site Plan review Cleared 3/15/2018 JESSE RAMOS
Specific Plan Cleared 3/15/2018 JESSE RAMOS
ZA Case Cleared 3/15/2018 JESSE RAMOS
ZA Case Cleared 3/15/2018 JESSE RAMOS
ZI Cleared 3/15/2018 JESSE RAMOS
Work Adjacent to Public Way Cleared 3/23/2018 NAZILA NOORIFAR
Specific Plan Cleared 9/20/2018 MOHAMMAD HASAN
Abandoned oil well Cleared 10/31/2018 ROBERT DUFF
Abandoned oil well approval Cleared 10/31/2018 ROBERT DUFF

Contact Information

Architect Patrick, J Tighe; Lic. No.: C27987 5747 VENICE BLVD      LOS ANGELES, CA 90019
Contractor 4site Construction; Lic. No.: 971233-B 1619 W TEMPLE ST      LOS ANGELES, CA 90026
Engineer Kim, Seung Su; Lic. No.: S5909 15808 APOLLO PLACE      GARDENA, CA 90249
Engineer Melvin, Russell Jr Nester; Lic. No.: C26324 2902 TYLER CT      SIMI VALLEY, CA 93063
Engineer Richard, Rybak; Lic. No.: GE2131 20312 TAU PLACE      CHATSWORTH, CA 91311
Engineer Scott, James Haggai; Lic. No.: L9290 19325 OPAL LANE      SANTA CLARITA, CA 91350
Geologist Eirik, Francis Haenschke; Lic. No.: EG1597 9616 GIERSON AVE      CHATSWORTH, CA 91311

Inspector Information

NICK DANERI, (213) 202-5615 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Excavation/Setback/Form/Re-Bar 11/6/2018 Partial Approval WINSTON DUNNING
Deputy Reinf. Concrete 11/7/2018 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 12/3/2018 Conditional Approval WINSTON DUNNING
Deputy Methane Barrier 12/11/2018 Conditional Approval WINSTON DUNNING
Deputy Methane Barrier 12/12/2018 Conditional Approval WINSTON DUNNING
Green Building Rough 12/12/2018 Partial Inspection WINSTON DUNNING
METHANE-Rough 12/12/2018 Partial Inspection WINSTON DUNNING
Reinforced Concrete Frame 12/12/2018 Partial Approval WINSTON DUNNING
Verify Sprinkler Sign Off 12/12/2018 Partial Inspection WINSTON DUNNING
Deputy Methane Barrier 12/13/2018 Conditional Approval WINSTON DUNNING
Deputy Methane Barrier 12/14/2018 Conditional Approval WINSTON DUNNING
Deputy Shotcrete 12/18/2018 Conditional Approval WINSTON DUNNING
Excavation/Setback/Form/Re-Bar 12/18/2018 Partial Approval WINSTON DUNNING
Deputy Reinf. Concrete 12/19/2018 Conditional Approval WINSTON DUNNING
Deputy Shotcrete 12/19/2018 Conditional Approval WINSTON DUNNING
Green Building Rough 12/19/2018 Partial Inspection WINSTON DUNNING
METHANE-Rough 12/19/2018 Partial Inspection WINSTON DUNNING
Reinforced Concrete Frame 12/19/2018 Conditional Approval WINSTON DUNNING
Verify Sprinkler Sign Off 12/19/2018 Partial Inspection WINSTON DUNNING
Deputy Reinf. Concrete 12/20/2018 Conditional Approval WINSTON DUNNING
Deputy Shotcrete 12/20/2018 Conditional Approval WINSTON DUNNING
Reinforced Concrete Frame 12/20/2018 Partial Approval WINSTON DUNNING
Deputy Shotcrete 12/21/2018 Conditional Approval WINSTON DUNNING
Footing/Foundation/Slab 1/23/2019 Not Ready for Inspection NICK DANERI
Green Building Rough 1/23/2019 Not Ready for Inspection NICK DANERI
METHANE-Barrier 1/23/2019 Partial Inspection NICK DANERI
METHANE-Rough 1/23/2019 Partial Inspection NICK DANERI
METHANE-Subgrade 1/23/2019 Partial Inspection NICK DANERI
Reinforced Concrete Frame 1/23/2019 Not Ready for Inspection NICK DANERI
Verify Sprinkler Sign Off 1/23/2019 Not Ready for Inspection NICK DANERI
Deputy Reinf. Concrete 1/24/2019 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 1/24/2019 Partial Approval NICK DANERI
Green Building Rough 2/1/2019 Not Ready for Inspection NICK DANERI
METHANE-Rough 2/1/2019 Partial Inspection NICK DANERI
Reinforced Concrete Frame 2/1/2019 Corrections Issued NICK DANERI
Verify Sprinkler Sign Off 2/1/2019 Not Ready for Inspection NICK DANERI
Green Building Rough 2/8/2019 Not Ready for Inspection NICK DANERI
METHANE-Rough 2/8/2019 Not Ready for Inspection NICK DANERI
Reinforced Concrete Frame 2/8/2019 Partial Approval NICK DANERI
Verify Sprinkler Sign Off 2/8/2019 Not Ready for Inspection NICK DANERI
Green Building Rough 2/14/2019 Not Ready for Inspection NICK DANERI
METHANE-Rough 2/14/2019 Not Ready for Inspection NICK DANERI
Structural Steel Frame 2/14/2019 Not Ready for Inspection NICK DANERI
Verify Sprinkler Sign Off 2/14/2019 Not Ready for Inspection NICK DANERI
Reinforced Masonry Frame 2/15/2019 Partial Approval NICK DANERI
Deputy Shotcrete 2/19/2019 Conditional Approval NICK DANERI
Deputy Methane Barrier 2/22/2019 Conditional Approval NICK DANERI
Green Building Rough 2/25/2019 Partial Inspection LESLIE TRUJILLO
METHANE-Rough 2/25/2019 Partial Inspection LESLIE TRUJILLO
Reinforced Concrete Frame 2/25/2019 Partial Approval LESLIE TRUJILLO
Verify Sprinkler Sign Off 2/25/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 2/26/2019 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 2/27/2019 Conditional Approval NICK DANERI
Special/Order Compliance 2/28/2019 Partial Inspection NICK DANERI
Deputy Methane Barrier 4/3/2019 Conditional Approval LESLIE TRUJILLO
Deputy Methane Barrier 4/4/2019 Conditional Approval NICK DANERI
Deputy Methane Barrier 4/5/2019 Conditional Approval NICK DANERI
Deputy Methane Barrier 4/8/2019 Conditional Approval NICK DANERI
Deputy Methane Barrier 4/9/2019 Conditional Approval NICK DANERI
Green Building Rough 4/12/2019 Not Ready for Inspection NICK DANERI
METHANE-Barrier 4/12/2019 Approved NICK DANERI
METHANE-Final 4/12/2019 Not Ready for Inspection NICK DANERI
METHANE-Rough 4/12/2019 Approved NICK DANERI
Reinforced Concrete Frame 4/12/2019 Partial Approval NICK DANERI
Verify Sprinkler Sign Off 4/12/2019 Not Ready for Inspection NICK DANERI
Deputy Reinf. Concrete 4/15/2019 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 4/30/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/3/2019 Partial Approval JAMES POWERS
Green Building Rough 5/6/2019 Conditional Approval LESLIE TRUJILLO
METHANE-Rough 5/6/2019 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 5/6/2019 Partial Approval LESLIE TRUJILLO
Verify Sprinkler Sign Off 5/6/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 5/7/2019 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 5/13/2019 Partial Approval LESLIE TRUJILLO
Green Building Rough 5/13/2019 Conditional Approval LESLIE TRUJILLO
METHANE-Rough 5/13/2019 Approved LESLIE TRUJILLO
Verify Sprinkler Sign Off 5/13/2019 Approved LESLIE TRUJILLO
Deputy Reinf. Concrete 5/14/2019 Conditional Approval LESLIE TRUJILLO
Green Building Rough 5/22/2019 Partial Inspection LESLIE TRUJILLO
Reinforced Masonry Frame 5/22/2019 Partial Approval LESLIE TRUJILLO
Deputy Shotcrete 5/23/2019 Conditional Approval LESLIE TRUJILLO
Green Building Rough 5/28/2019 Partial Inspection LESLIE TRUJILLO
Reinforced Masonry Frame 5/28/2019 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 5/29/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 5/29/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 6/21/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 6/24/2019 Conditional Approval LESLIE TRUJILLO
Green Building Rough 6/24/2019 Partial Inspection LESLIE TRUJILLO
Reinforced Concrete Frame 6/24/2019 Partial Inspection LESLIE TRUJILLO
Deputy Reinf. Concrete 6/26/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/2/2019 Conditional Approval LESLIE TRUJILLO
Green Building Rough 7/9/2019 Partial Approval LESLIE TRUJILLO
Reinforced Concrete Frame 7/9/2019 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/11/2019 Conditional Approval LESLIE TRUJILLO
Green Building Rough 8/12/2019 Partial Approval LESLIE TRUJILLO
Wood Frame 8/12/2019 Partial Approval LESLIE TRUJILLO
Green Building Rough 9/9/2019 Partial Inspection LESLIE TRUJILLO
Wood Frame 9/9/2019 Partial Approval LESLIE TRUJILLO
Green Building Rough 9/30/2019 Conditional Approval LESLIE TRUJILLO
Wood Frame 9/30/2019 Partial Approval LESLIE TRUJILLO
Green Building Rough 10/24/2019 Partial Inspection LESLIE TRUJILLO
Wood Frame 10/24/2019 Not Ready for Inspection LESLIE TRUJILLO
Floor/Roof Diaphrgm/Shear Wall 10/30/2019 Partial Approval LESLIE TRUJILLO
Deputy Wood Construction 11/22/2019 Conditional Approval LESLIE TRUJILLO
Green Building Rough 12/6/2019 Conditional Approval LESLIE TRUJILLO
Wood Frame 12/6/2019 Partial Inspection LESLIE TRUJILLO
Deputy Wood Construction 12/18/2019 Conditional Approval LESLIE TRUJILLO
Insulation 12/24/2019 Partial Inspection LESLIE TRUJILLO
Insulation 12/30/2019 Partial Approval LESLIE TRUJILLO
Drywall Nailing 1/21/2020 Partial Approval LESLIE TRUJILLO
Green Building Rough 1/21/2020 Conditional Approval LESLIE TRUJILLO
Drywall Nailing 2/7/2020 Partial Approval RAFAEL ESPINOZA
Green Building Rough 2/7/2020 Not Ready for Inspection RAFAEL ESPINOZA
Wood Frame 2/7/2020 Partial Approval RAFAEL ESPINOZA
Wood Frame 2/10/2020 Partial Approval RAFAEL ESPINOZA
Insulation 2/14/2020 Partial Approval RAFAEL ESPINOZA
Drywall Nailing 3/9/2020 Partial Approval LESLIE TRUJILLO
Green Building Rough 3/9/2020 Not Ready for Inspection LESLIE TRUJILLO
Drywall Nailing 3/11/2020 Partial Approval RAFAEL ESPINOZA
Interior/Exterior Lathing 3/11/2020 Partial Approval RAFAEL ESPINOZA
Wood Frame 3/11/2020 Partial Approval RAFAEL ESPINOZA
Drywall Nailing 4/2/2020 Partial Approval RAFAEL ESPINOZA
Green Building Rough 4/2/2020 Not Ready for Inspection RAFAEL ESPINOZA
Insulation 4/2/2020 Partial Approval RAFAEL ESPINOZA
Wood Frame 4/2/2020 Partial Approval RAFAEL ESPINOZA
Drywall Nailing 4/20/2020 Corrections Issued RAFAEL ESPINOZA
Green Building Rough 4/20/2020 Approved RAFAEL ESPINOZA
Interior/Exterior Lathing 4/20/2020 Not Ready for Inspection RAFAEL ESPINOZA
Drywall Nailing 4/28/2020 Partial Approval RAFAEL ESPINOZA
Interior/Exterior Lathing 4/28/2020 Not Ready for Inspection RAFAEL ESPINOZA
Special/Order Compliance 5/18/2020 Not Ready for Inspection NICK DANERI
Drywall Nailing 5/21/2020 Partial Approval RAFAEL ESPINOZA
Interior/Exterior Lathing 5/21/2020 Partial Approval RAFAEL ESPINOZA
Special/Order Compliance 5/21/2020 Conditional Approval RAFAEL ESPINOZA
Interior/Exterior Lathing 6/24/2020 Approved RAFAEL ESPINOZA
Drywall Nailing 9/28/2020 Partial Inspection RAFAEL ESPINOZA
Special/Order Compliance 9/29/2020 Partial Inspection RAFAEL ESPINOZA
Special/Order Compliance 11/23/2020 Not Ready for Inspection RAFAEL ESPINOZA
Special/Order Compliance 11/24/2020 Approved RAFAEL ESPINOZA
Drywall Nailing 12/8/2020 Approved RAFAEL ESPINOZA
Final 12/8/2020 Not Ready for Inspection RAFAEL ESPINOZA
Footing/Foundation/Slab 12/8/2020 Approved RAFAEL ESPINOZA
Green Building Final 12/8/2020 Not Ready for Inspection RAFAEL ESPINOZA
METHANE-Subgrade 12/8/2020 Approved RAFAEL ESPINOZA
Reinforced Concrete Frame 12/8/2020 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Masonry Frame 12/8/2020 Not Ready for Inspection RAFAEL ESPINOZA
SGSOV-Seismic Gas S/O Valve 12/8/2020 SGSOV Not Ready RAFAEL ESPINOZA
Smoke Detectors 12/8/2020 Not Ready for Inspection RAFAEL ESPINOZA
Structural Steel Frame 12/8/2020 Not Ready for Inspection RAFAEL ESPINOZA
Wood Frame 12/8/2020 Not Ready for Inspection RAFAEL ESPINOZA
Final 12/22/2020 Corrections Issued RAFAEL ESPINOZA
Green Building Final 12/22/2020 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Concrete Frame 12/22/2020 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Masonry Frame 12/22/2020 Not Ready for Inspection RAFAEL ESPINOZA
SGSOV-Seismic Gas S/O Valve 12/22/2020 SGSOV Not Ready RAFAEL ESPINOZA
Smoke Detectors 12/22/2020 No Access for Inspection RAFAEL ESPINOZA
Structural Steel Frame 12/22/2020 Not Ready for Inspection RAFAEL ESPINOZA
Wood Frame 12/22/2020 Not Ready for Inspection RAFAEL ESPINOZA
Final 2/8/2021 Partial Inspection RAFAEL ESPINOZA
Green Building Final 2/8/2021 Approved RAFAEL ESPINOZA
Reinforced Concrete Frame 2/8/2021 Approved RAFAEL ESPINOZA
Reinforced Masonry Frame 2/8/2021 Approved RAFAEL ESPINOZA
SGSOV-Seismic Gas S/O Valve 2/8/2021 SGSOV Not Ready RAFAEL ESPINOZA
Smoke Detectors 2/8/2021 Not Ready for Inspection RAFAEL ESPINOZA
Structural Steel Frame 2/8/2021 Approved RAFAEL ESPINOZA
Wood Frame 2/8/2021 Not Ready for Inspection RAFAEL ESPINOZA
Pre-Inspection 2/9/2021 Partial Inspection RAFAEL ESPINOZA
Masonry Wall/Backfill 2/10/2021 Partial Approval RAFAEL ESPINOZA
Smoke Detectors 2/11/2021 Not Ready for Inspection RAFAEL ESPINOZA
Final 2/16/2021 Not Ready for Inspection RAFAEL ESPINOZA
SGSOV-Seismic Gas S/O Valve 2/16/2021 SGSOV Not Ready RAFAEL ESPINOZA
Masonry Wall/Backfill 2/17/2021 Partial Inspection RAFAEL ESPINOZA
Final 2/22/2021 Corrections Issued RAFAEL ESPINOZA
Final 4/20/2021 Partial Inspection RAFAEL ESPINOZA
SGSOV-Seismic Gas S/O Valve 4/20/2021 SGSOV Approved RAFAEL ESPINOZA
Smoke Detectors 4/20/2021 Not Ready for Inspection RAFAEL ESPINOZA
Wood Frame 4/20/2021 Approved RAFAEL ESPINOZA
Final 4/27/2021 Conditional Approval RAFAEL ESPINOZA
Smoke Detectors 4/27/2021 Approved RAFAEL ESPINOZA