6041 N VARIEL AVE 1-274 91367

Certificate Information: 6041 N VARIEL AVE 1-274 91367

Application / Permit
17010-10000-02060
Plan Check / Job No.
B17LA08952
Group
Building
Type
Bldg-New
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
New 7-story apartment over subterrean parking garage.
Permit Issued
Issued on 6/21/2018
Issuing Office
Metro
Current Status
CofO Issued on 4/26/2022
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 6/12/2017 APPLICANT
Assigned to Plan Check Engineer 6/22/2017 LARRY LEE
Corrections Issued 6/26/2017 LARRY LEE
Quality Review Completed 6/27/2017 PETER KIM
Building Plans Picked Up 6/29/2017 APPLICANT
Applicant returned to address corrections 7/12/2017 LARRY LEE
Applicant returned to address corrections 9/15/2017 LARRY LEE
Applicant returned to address corrections 9/27/2017 LARRY LEE
Applicant returned to address corrections 9/28/2017 LARRY LEE
Applicant returned to address corrections 6/8/2018 LARRY LEE
Plan Check Approved 6/19/2018 LARRY LEE
Issued 6/21/2018 LADBS
Permit Closed-Status Void 9/2/2020 ROBERT DAVIS
Re-Activate Permit 9/2/2020 ROBERT DAVIS
TCO Issued (Expire Date: 01-09-2022) 7/13/2021 JEFFREY DURAN
TCO Issued (Expire Date: 03-06-2022) 9/7/2021 RICKEY JACKSON
TCO Issued (Expire Date: 08-31-2022) 3/4/2022 JEFFREY DURAN
CofO in Progress 4/5/2022 ROBERT DAVIS
Permit Finaled 4/26/2022 RICKEY JACKSON
CofO Issued 4/26/2022 RICKEY JACKSON
Permit Finaled 4/26/2022 RICKEY JACKSON

Permit Application Clearance Information

Address approval Cleared 6/27/2017 RAVIL MANAPOV
Highway dedication Cleared 8/3/2017 JOSEPH RHYU
Eng Process Fee Ord 176,300 Cleared 8/23/2017 ADRIAN SANCHEZ
Building over 3-story or 36-ft Cleared 11/13/2017 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 11/13/2017 CALOSHA APPROVED
Work Adjacent to Public Way Cleared 11/30/2017 BOK GOH
Hydrant and Access approval Cleared 12/1/2017 JOHN DALLAS
Internal circulation Cleared 12/14/2017 VICENTE CORDERO
Sewer availability Cleared 12/15/2017 ROSE MARIE SMITH
Low Impact Development Cleared 2/23/2018 RYAN HUDSON
Permit Cleared 2/23/2018 JAMES KHO
Roof/Waste drainage to street Cleared 2/23/2018 JAMES KHO
DAS Clearance Cleared 6/5/2018 LARRY LEE
Fire Marshall Fire Life Safety Cleared 6/12/2018 DOMINIQUE MEDINA
Green Code Cleared 6/12/2018 DONALD CRICHLOW
CPC Cleared 6/18/2018 JESSE RAMOS
Frnt yard landscape/Water mgmt Cleared 6/18/2018 JESSE RAMOS
Miscellaneous Cleared 6/18/2018 JESSE RAMOS
Miscellaneous Cleared 6/18/2018 JESSE RAMOS
Opn space landscape/Water mgmt Cleared 6/18/2018 JESSE RAMOS
Prkng lot landscape/Water mgmt Cleared 6/18/2018 JESSE RAMOS
Site Plan review Cleared 6/18/2018 JESSE RAMOS
Specific Plan Cleared 6/18/2018 JESSE RAMOS

Contact Information

Architect Suarez, Hugo; Lic. No.: C10561 1959 E OAKWOOD STREET      PASADENA, CA 91104
Contractor Build Group Construction Company Inc; Lic. No.: 1015855-B 700 S FLOWER ST STE 575      LOS ANGELES, CA 90017
Engineer Chen, Wei-Chih; Lic. No.: S5150 285 W 6TH ST 503      SAN PEDRO, CA 90731
Engineer Smith, Melvin Bruce; Lic. No.: GE2673 2165 N MARVEL AVE      SIMI VALLEY, CA 93065

Inspector Information

ROBERT DAVIS, (818) 374-1125 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Footing/Foundation/Slab 9/19/2018 Partial Inspection JEFFREY DURAN
Pre-Inspection 10/25/2018 Partial Inspection JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 5/2/2019 Partial Approval JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 5/6/2019 Partial Approval JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 5/21/2019 Conditional Approval JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 5/30/2019 Partial Approval JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 6/3/2019 Partial Approval JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 6/5/2019 Conditional Approval JEFFREY DURAN
Footing/Foundation/Slab 6/12/2019 Partial Approval JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 6/18/2019 Partial Approval ROBERT COLE
Excavation/Setback/Form/Re-Bar 6/20/2019 Partial Approval ROBERT COLE
Excavation/Setback/Form/Re-Bar 6/21/2019 Partial Approval DANIEL VARNUM
Excavation/Setback/Form/Re-Bar 6/24/2019 Partial Approval JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 6/25/2019 Partial Approval JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 6/26/2019 Partial Approval JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 6/27/2019 Partial Inspection JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 7/2/2019 Partial Approval JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 7/5/2019 Partial Approval JEFFREY DURAN
Footing/Foundation/Slab 7/9/2019 Partial Approval JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 7/10/2019 Partial Approval DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 7/15/2019 Partial Approval MILLARD ARDOIN
Excavation/Setback/Form/Re-Bar 7/17/2019 Partial Approval JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 7/23/2019 Partial Approval DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 7/25/2019 Conditional Approval JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 7/26/2019 Partial Approval JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 7/30/2019 Partial Approval JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 8/1/2019 Partial Approval JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 8/5/2019 Partial Approval JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 8/6/2019 Partial Approval JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 8/8/2019 Partial Approval JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 8/9/2019 Partial Approval JEFFREY DURAN
Deputy Reinf. Concrete 8/12/2019 Approved JEFFREY DURAN
Deputy Shotcrete 8/12/2019 Approved JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 8/12/2019 Partial Approval JEFFREY DURAN
Deputy Reinf. Concrete 8/13/2019 Conditional Approval JEFFREY DURAN
Deputy Shotcrete 8/13/2019 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 8/14/2019 Conditional Approval JEFFREY DURAN
Deputy Shotcrete 8/14/2019 Conditional Approval JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 8/14/2019 Partial Approval JEFFREY DURAN
Deputy Reinf. Concrete 8/15/2019 Approved DANIEL VARNUM
Deputy Shotcrete 8/15/2019 Conditional Approval DANIEL VARNUM
Footing/Foundation/Slab 8/15/2019 Partial Approval DANIEL VARNUM
Deputy Reinf. Concrete 8/16/2019 Approved MILLARD ARDOIN
Deputy Shotcrete 8/16/2019 Approved MILLARD ARDOIN
Excavation/Setback/Form/Re-Bar 8/20/2019 Partial Approval JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 8/22/2019 Partial Approval JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 8/26/2019 Partial Approval JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 8/29/2019 Partial Approval JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 8/30/2019 Conditional Approval JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 9/6/2019 Partial Approval JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 9/9/2019 Partial Approval ROBERT COLE
Excavation/Setback/Form/Re-Bar 9/12/2019 Partial Approval JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 9/16/2019 Partial Inspection JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 9/18/2019 Partial Inspection JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 9/20/2019 Corrections Issued JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 9/25/2019 Partial Inspection JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 9/26/2019 Partial Approval JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 10/1/2019 Partial Inspection JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 10/2/2019 Partial Inspection JEFFREY DURAN
Drywall Nailing 10/15/2019 Partial Approval JEFFREY DURAN
Deputy Other (see comments) 10/16/2019 Conditional Approval JEFFREY DURAN
Drywall Nailing 10/17/2019 Partial Approval JEFFREY DURAN
Drywall Nailing 10/21/2019 Partial Approval JEFFREY DURAN
Drywall Nailing 10/23/2019 Partial Approval JEFFREY DURAN
Wood Frame 10/23/2019 Corrections Issued JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 10/24/2019 Partial Inspection JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 10/28/2019 Partial Inspection JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 10/29/2019 Conditional Approval JEFFREY DURAN
Footing/Foundation/Slab 10/30/2019 Partial Approval JEFFREY DURAN
Floor/Roof Diaphrgm/Shear Wall 11/1/2019 Not Ready for Inspection JOHN KITCKO
Wall Anchors 11/1/2019 Not Ready for Inspection JOHN KITCKO
Wood Frame 11/1/2019 Partial Inspection JOHN KITCKO
Excavation/Setback/Form/Re-Bar 11/5/2019 Partial Inspection JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 11/12/2019 Partial Approval JEFFREY DURAN
Floor/Roof Diaphrgm/Shear Wall 11/13/2019 Partial Inspection JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 11/14/2019 Partial Inspection JEFFREY DURAN
Floor/Roof Diaphrgm/Shear Wall 11/14/2019 Partial Approval JEFFREY DURAN
Deputy Wood Construction 11/15/2019 Conditional Approval JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 11/15/2019 Partial Approval JEFFREY DURAN
Drywall Nailing 11/19/2019 Partial Approval JAMES STEPHENS
Drywall Nailing 11/21/2019 Partial Approval JEFFREY DURAN
Masonry Wall/Backfill 11/21/2019 Partial Approval JEFFREY DURAN
Drywall Nailing 11/22/2019 Partial Approval JEFFREY DURAN
Deputy Wood Construction 11/26/2019 Conditional Approval ROBERT COLE
Drywall Nailing 11/26/2019 Partial Approval ROBERT COLE
Floor/Roof Diaphrgm/Shear Wall 11/26/2019 Partial Approval ROBERT COLE
Drywall Nailing 11/27/2019 Partial Approval JEFF BYTHEWAY
Drywall Nailing 12/6/2019 Partial Approval JEFFREY DURAN
Drywall Nailing 12/9/2019 Partial Approval JEFFREY DURAN
Floor/Roof Diaphrgm/Shear Wall 12/9/2019 Not Ready for Inspection JEFFREY DURAN
Drywall Nailing 12/11/2019 Partial Approval JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 12/11/2019 Partial Approval JEFFREY DURAN
Floor/Roof Diaphrgm/Shear Wall 12/17/2019 Partial Approval JEFFREY DURAN
Deputy Wood Construction 12/18/2019 Conditional Approval JEFFREY DURAN
Drywall Nailing 12/19/2019 Partial Approval JEFFREY DURAN
Drywall Nailing 12/20/2019 Partial Approval RICKEY JACKSON
Excavation/Setback/Form/Re-Bar 12/20/2019 Partial Approval RICKEY JACKSON
Floor/Roof Diaphrgm/Shear Wall 12/27/2019 Partial Approval JEFFREY DURAN
Floor/Roof Diaphrgm/Shear Wall 12/30/2019 Partial Approval JEFFREY DURAN
Drywall Nailing 12/31/2019 Partial Approval JEFFREY DURAN
Floor/Roof Diaphrgm/Shear Wall 12/31/2019 Partial Approval JEFFREY DURAN
Deputy Wood Construction 1/2/2020 Conditional Approval JEFFREY DURAN
Drywall Nailing 1/3/2020 Partial Approval JEFFREY DURAN
Floor/Roof Diaphrgm/Shear Wall 1/3/2020 Partial Approval JEFFREY DURAN
Drywall Nailing 1/6/2020 Partial Approval JEFF BYTHEWAY
Floor/Roof Diaphrgm/Shear Wall 1/6/2020 Partial Approval JEFF BYTHEWAY
Drywall Nailing 1/8/2020 Partial Approval DANIEL VARNUM
Floor/Roof Diaphrgm/Shear Wall 1/8/2020 Partial Approval DANIEL VARNUM
Drywall Nailing 1/13/2020 Not Ready for Inspection JEFFREY DURAN
Floor/Roof Diaphrgm/Shear Wall 1/13/2020 Partial Approval JEFFREY DURAN
Masonry Wall/Backfill 1/13/2020 Partial Approval JEFFREY DURAN
Floor/Roof Diaphrgm/Shear Wall 1/16/2020 Conditional Approval JEFFREY DURAN
Drywall Nailing 1/17/2020 Partial Approval JEFFREY DURAN
Drywall Nailing 1/23/2020 Partial Approval JAMES STEPHENS
Floor/Roof Diaphrgm/Shear Wall 1/23/2020 Partial Approval JAMES STEPHENS
Floor/Roof Diaphrgm/Shear Wall 1/27/2020 Partial Approval JEFFREY DURAN
Insulation 1/27/2020 Not Ready for Inspection JEFFREY DURAN
Deputy Wood Construction 1/28/2020 Approved JEFFREY DURAN
Drywall Nailing 1/28/2020 Partial Approval JEFFREY DURAN
Floor/Roof Diaphrgm/Shear Wall 1/28/2020 Partial Approval JEFFREY DURAN
Drywall Nailing 1/29/2020 Partial Approval JEFFREY DURAN
Floor/Roof Diaphrgm/Shear Wall 1/29/2020 Conditional Approval JEFFREY DURAN
Insulation 1/29/2020 Not Ready for Inspection JEFFREY DURAN
Drywall Nailing 1/30/2020 Not Ready for Inspection JEFFREY DURAN
Masonry Wall/Backfill 1/30/2020 Partial Approval JEFFREY DURAN
Drywall Nailing 2/4/2020 Partial Approval JEFFREY DURAN
Floor/Roof Diaphrgm/Shear Wall 2/4/2020 Partial Approval JEFFREY DURAN
Deputy Wood Construction 2/5/2020 Conditional Approval JEFFREY DURAN
Floor/Roof Diaphrgm/Shear Wall 2/5/2020 Partial Approval JEFFREY DURAN
Drywall Nailing 2/7/2020 Partial Approval JEFFREY DURAN
Insulation 2/7/2020 Partial Approval JEFFREY DURAN
Floor/Roof Diaphrgm/Shear Wall 2/10/2020 Partial Approval ROBERT COLE
Masonry Wall/Backfill 2/10/2020 Partial Approval ROBERT COLE
Floor/Roof Diaphrgm/Shear Wall 2/11/2020 Not Ready for Inspection JEFFREY DURAN
Drywall Nailing 2/12/2020 Partial Approval JEFFREY DURAN
Drywall Nailing 2/13/2020 Partial Approval JEFFREY DURAN
Floor/Roof Diaphrgm/Shear Wall 2/18/2020 Partial Approval JEFFREY DURAN
Deputy Wood Construction 2/19/2020 Approved JEFFREY DURAN
Floor/Roof Diaphrgm/Shear Wall 2/19/2020 Partial Approval JEFFREY DURAN
Drywall Nailing 2/21/2020 Partial Approval JEFFREY DURAN
Floor/Roof Diaphrgm/Shear Wall 2/21/2020 Not Ready for Inspection JEFFREY DURAN
Drywall Nailing 2/24/2020 Not Ready for Inspection JEFFREY DURAN
Floor/Roof Diaphrgm/Shear Wall 2/24/2020 Partial Approval JEFFREY DURAN
Drywall Nailing 2/25/2020 Partial Approval JEFFREY DURAN
Masonry Wall/Backfill 2/25/2020 Partial Approval JEFFREY DURAN
Drywall Nailing 2/28/2020 Partial Approval JEFFREY DURAN
Floor/Roof Diaphrgm/Shear Wall 2/28/2020 Partial Approval JEFFREY DURAN
Floor/Roof Diaphrgm/Shear Wall 3/2/2020 Partial Inspection JEFFREY DURAN
Insulation 3/3/2020 Partial Approval JEFFREY DURAN
Masonry Wall/Backfill 3/3/2020 Partial Approval JEFFREY DURAN
Insulation 3/5/2020 Partial Approval JEFFREY DURAN
Drywall Nailing 3/6/2020 Partial Approval JEFFREY DURAN
Drywall Nailing 3/9/2020 Partial Approval ROBERT COLE
Masonry Wall/Backfill 3/9/2020 Not Ready for Inspection ROBERT COLE
Drywall Nailing 3/10/2020 Partial Approval JEFFREY DURAN
Green Building Rough 3/10/2020 Partial Approval JEFFREY DURAN
Insulation 3/10/2020 Partial Approval JEFFREY DURAN
Reinforced Masonry Frame 3/10/2020 Partial Approval JEFFREY DURAN
Verify Sprinkler Sign Off 3/10/2020 Not Ready for Inspection JEFFREY DURAN
Drywall Nailing 3/12/2020 Not Ready for Inspection JEFFREY DURAN
Floor/Roof Diaphrgm/Shear Wall 3/12/2020 Partial Approval JEFFREY DURAN
Masonry Wall/Backfill 3/12/2020 Partial Approval JEFFREY DURAN
Masonry Wall/Backfill 3/17/2020 Partial Approval JEFFREY DURAN
Insulation 3/19/2020 Partial Approval ROBERT COLE
Drywall Nailing 3/20/2020 Partial Approval JEFFREY DURAN
Masonry Wall/Backfill 3/20/2020 Not Ready for Inspection JEFFREY DURAN
Masonry Wall/Backfill 3/23/2020 Conditional Approval JEFFREY DURAN
Floor/Roof Diaphrgm/Shear Wall 3/25/2020 Partial Approval JEFFREY DURAN
Floor/Roof Diaphrgm/Shear Wall 3/26/2020 Partial Approval JEFFREY DURAN
Drywall Nailing 3/31/2020 Partial Approval JEFFREY DURAN
Floor/Roof Diaphrgm/Shear Wall 3/31/2020 Partial Approval JEFFREY DURAN
Masonry Wall/Backfill 3/31/2020 Partial Approval JEFFREY DURAN
Insulation 4/1/2020 Partial Approval JEFFREY DURAN
Masonry Wall/Backfill 4/1/2020 Not Ready for Inspection JEFFREY DURAN
Special/Order Compliance 4/1/2020 Conditional Approval JEFFREY DURAN
Drywall Nailing 4/2/2020 Partial Approval JEFFREY DURAN
Floor/Roof Diaphrgm/Shear Wall 4/2/2020 Partial Approval JEFFREY DURAN
Masonry Wall/Backfill 4/2/2020 Partial Approval JEFFREY DURAN
Floor/Roof Diaphrgm/Shear Wall 4/6/2020 Not Ready for Inspection JEFFREY DURAN
Insulation 4/6/2020 Not Ready for Inspection JEFFREY DURAN
Drywall Nailing 4/8/2020 Partial Approval ROBERT COLE
Floor/Roof Diaphrgm/Shear Wall 4/8/2020 Not Ready for Inspection ROBERT COLE
Deputy Reinf. Masonry 4/14/2020 Approved DANNY RODRIGUEZ
Floor/Roof Diaphrgm/Shear Wall 4/14/2020 Partial Approval DANNY RODRIGUEZ
Insulation 4/14/2020 Corrections Issued DANNY RODRIGUEZ
Insulation 4/16/2020 Partial Approval ROBERT DAVIS
Floor/Roof Diaphrgm/Shear Wall 4/20/2020 Partial Approval DANIEL VARNUM
Masonry Wall/Backfill 4/20/2020 Partial Approval DANIEL VARNUM
Deputy Steel/Welding 4/21/2020 Conditional Approval JEFFREY DURAN
Masonry Wall/Backfill 4/22/2020 Partial Approval DANIEL VARNUM
Floor/Roof Diaphrgm/Shear Wall 4/24/2020 Partial Approval DANIEL VARNUM
Insulation 4/29/2020 Approved HAMID PISHEHVAR
Floor/Roof Diaphrgm/Shear Wall 5/1/2020 Partial Inspection JEFFREY FULTON
Insulation 5/1/2020 Partial Inspection JEFFREY FULTON
Masonry Wall/Backfill 5/1/2020 Partial Inspection JEFFREY FULTON
Insulation 5/4/2020 Partial Approval DANIEL VARNUM
Wood Frame 5/4/2020 Partial Approval DANIEL VARNUM
Deputy Reinf. Masonry 5/5/2020 Conditional Approval JEFFREY DURAN
Floor/Roof Diaphrgm/Shear Wall 5/5/2020 Partial Inspection JEFFREY FULTON
Wood Frame 5/5/2020 Partial Inspection JEFFREY FULTON
Drywall Nailing 5/7/2020 Partial Inspection JEFFREY FULTON
Insulation 5/8/2020 Partial Inspection JEFFREY FULTON
Wood Frame 5/8/2020 Partial Inspection JEFFREY FULTON
Floor/Roof Diaphrgm/Shear Wall 5/13/2020 Partial Inspection JEFFREY FULTON
Insulation 5/13/2020 Partial Inspection JEFFREY FULTON
Wood Frame 5/13/2020 Partial Inspection JEFFREY FULTON
Insulation 5/14/2020 Partial Inspection JEFFREY FULTON
Drywall Nailing 5/18/2020 Approved HAMID PISHEHVAR
Floor/Roof Diaphrgm/Shear Wall 5/18/2020 Approved HAMID PISHEHVAR
Wood Frame 5/19/2020 Conditional Approval ROBERT COLE
Drywall Nailing 5/21/2020 Approved HAMID PISHEHVAR
Drywall Nailing 5/22/2020 Partial Approval DANIEL VARNUM
Floor/Roof Diaphrgm/Shear Wall 5/22/2020 Not Ready for Inspection DANIEL VARNUM
Wood Frame 5/22/2020 Partial Approval DANIEL VARNUM
Drywall Nailing 5/26/2020 Not Ready for Inspection ROBERT COLE
Floor/Roof Diaphrgm/Shear Wall 5/26/2020 Partial Approval ROBERT COLE
Drywall Nailing 5/27/2020 Approved HAMID PISHEHVAR
Floor/Roof Diaphrgm/Shear Wall 5/27/2020 Approved HAMID PISHEHVAR
Insulation 5/27/2020 Approved HAMID PISHEHVAR
Drywall Nailing 5/28/2020 Approved HAMID PISHEHVAR
Insulation 5/28/2020 Approved HAMID PISHEHVAR
Drywall Nailing 5/29/2020 Approved HAMID PISHEHVAR
Floor/Roof Diaphrgm/Shear Wall 6/2/2020 Approved HAMID PISHEHVAR
Insulation 6/2/2020 Approved HAMID PISHEHVAR
Wood Frame 6/2/2020 Approved HAMID PISHEHVAR
Floor/Roof Diaphrgm/Shear Wall 6/3/2020 Not Ready for Inspection JEFFREY FULTON
Light Gage Steel Frame 6/3/2020 Not Ready for Inspection JEFFREY FULTON
Floor/Roof Diaphrgm/Shear Wall 6/5/2020 Approved HAMID PISHEHVAR
Light Gage Steel Frame 6/5/2020 Approved HAMID PISHEHVAR
Light Gage Steel Frame 6/8/2020 Conditional Approval DANIEL VARNUM
Wood Frame 6/8/2020 Conditional Approval DANIEL VARNUM
Floor/Roof Diaphrgm/Shear Wall 6/10/2020 Approved HAMID PISHEHVAR
Insulation 6/10/2020 Approved HAMID PISHEHVAR
Drywall Nailing 6/11/2020 Not Ready for Inspection ROBERT COLE
Floor/Roof Diaphrgm/Shear Wall 6/11/2020 Not Ready for Inspection ROBERT COLE
Insulation 6/11/2020 Partial Approval ROBERT COLE
Light Gage Steel Frame 6/11/2020 Partial Approval ROBERT COLE
Wood Frame 6/11/2020 Not Ready for Inspection ROBERT COLE
Drywall Nailing 6/12/2020 Partial Inspection JEFFREY FULTON
Light Gage Steel Frame 6/12/2020 Not Ready for Inspection JEFFREY FULTON
Drywall Nailing 6/15/2020 Approved HAMID PISHEHVAR
Floor/Roof Diaphrgm/Shear Wall 6/15/2020 Approved HAMID PISHEHVAR
Floor/Roof Diaphrgm/Shear Wall 6/16/2020 Approved HAMID PISHEHVAR
Insulation 6/16/2020 Approved HAMID PISHEHVAR
Wood Frame 6/16/2020 Approved HAMID PISHEHVAR
Floor/Roof Diaphrgm/Shear Wall 6/17/2020 Approved HAMID PISHEHVAR
Insulation 6/17/2020 Approved HAMID PISHEHVAR
Wood Frame 6/17/2020 Approved HAMID PISHEHVAR
Drywall Nailing 6/19/2020 Partial Approval VAHE KELEDJIAN
Insulation 6/19/2020 Partial Approval VAHE KELEDJIAN
Wood Frame 6/19/2020 Partial Approval VAHE KELEDJIAN
Insulation 6/22/2020 Partial Inspection ROBERT DAVIS
Wood Frame 6/22/2020 Partial Approval ROBERT DAVIS
Floor/Roof Diaphrgm/Shear Wall 6/23/2020 Partial Approval ROBERT DAVIS
Wood Frame 6/23/2020 Partial Approval ROBERT DAVIS
Drywall Nailing 6/24/2020 Partial Approval ROBERT DAVIS
Insulation 6/24/2020 Partial Approval ROBERT DAVIS
Wood Frame 6/24/2020 Order to Comply Issued ROBERT DAVIS
Drywall Nailing 6/25/2020 Not Ready for Inspection ROBERT DAVIS
Floor/Roof Diaphrgm/Shear Wall 6/25/2020 Not Ready for Inspection ROBERT DAVIS
Insulation 6/25/2020 Partial Inspection ROBERT DAVIS
Wood Frame 6/25/2020 Partial Approval ROBERT DAVIS
Floor/Roof Diaphrgm/Shear Wall 6/26/2020 Partial Approval ROBERT DAVIS
Insulation 6/26/2020 Partial Approval ROBERT DAVIS
Wood Frame 6/26/2020 Partial Approval ROBERT DAVIS
Floor/Roof Diaphrgm/Shear Wall 6/29/2020 Not Ready for Inspection ROBERT DAVIS
Insulation 6/29/2020 Partial Approval ROBERT DAVIS
Wood Frame 6/29/2020 Partial Approval ROBERT DAVIS
Drywall Nailing 6/30/2020 Partial Approval DANIEL VARNUM
Insulation 6/30/2020 Partial Approval DANIEL VARNUM
Wood Frame 6/30/2020 Partial Approval DANIEL VARNUM
Drywall Nailing 7/1/2020 Not Ready for Inspection ROBERT DAVIS
Floor/Roof Diaphrgm/Shear Wall 7/1/2020 Partial Approval ROBERT DAVIS
Insulation 7/1/2020 Not Ready for Inspection ROBERT DAVIS
Wood Frame 7/1/2020 Not Ready for Inspection ROBERT DAVIS
Floor/Roof Diaphrgm/Shear Wall 7/2/2020 Not Ready for Inspection ROBERT DAVIS
Insulation 7/2/2020 Partial Approval ROBERT DAVIS
Wood Frame 7/2/2020 Partial Approval ROBERT DAVIS
Drywall Nailing 7/6/2020 Partial Approval ROBERT DAVIS
Floor/Roof Diaphrgm/Shear Wall 7/6/2020 Not Ready for Inspection ROBERT DAVIS
Insulation 7/6/2020 Partial Approval ROBERT DAVIS
Wood Frame 7/6/2020 Partial Approval ROBERT DAVIS
Drywall Nailing 7/7/2020 Not Ready for Inspection JEFFREY FULTON
Floor/Roof Diaphrgm/Shear Wall 7/7/2020 Not Ready for Inspection JEFFREY FULTON
Insulation 7/7/2020 Partial Inspection JEFFREY FULTON
Wood Frame 7/7/2020 Not Ready for Inspection JEFFREY FULTON
Floor/Roof Diaphrgm/Shear Wall 7/8/2020 Partial Approval ROBERT DAVIS
Wood Frame 7/8/2020 Partial Approval ROBERT DAVIS
Insulation 7/9/2020 Partial Inspection ROBERT DAVIS
Drywall Nailing 7/10/2020 Not Ready for Inspection ROBERT DAVIS
Floor/Roof Diaphrgm/Shear Wall 7/10/2020 Not Ready for Inspection ROBERT DAVIS
Insulation 7/10/2020 Partial Approval ROBERT DAVIS
Wood Frame 7/10/2020 Not Ready for Inspection ROBERT DAVIS
Drywall Nailing 7/13/2020 Partial Approval ROBERT DAVIS
Floor/Roof Diaphrgm/Shear Wall 7/13/2020 Partial Approval ROBERT DAVIS
Insulation 7/13/2020 Not Ready for Inspection ROBERT DAVIS
Wood Frame 7/13/2020 Partial Approval ROBERT DAVIS
Floor/Roof Diaphrgm/Shear Wall 7/14/2020 Partial Inspection JEFFREY FULTON
Insulation 7/14/2020 Partial Inspection JEFFREY FULTON
Wood Frame 7/14/2020 Not Ready for Inspection JEFFREY FULTON
Floor/Roof Diaphrgm/Shear Wall 7/15/2020 Not Ready for Inspection ROBERT DAVIS
Insulation 7/15/2020 Partial Approval ROBERT DAVIS
Wood Frame 7/15/2020 Partial Approval ROBERT DAVIS
Floor/Roof Diaphrgm/Shear Wall 7/16/2020 Not Ready for Inspection ROBERT DAVIS
Insulation 7/16/2020 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 7/16/2020 Conditional Approval ROBERT DAVIS
Floor/Roof Diaphrgm/Shear Wall 7/17/2020 Partial Inspection JEFFREY FULTON
Insulation 7/17/2020 Partial Inspection JEFFREY FULTON
Wood Frame 7/17/2020 Partial Inspection JEFFREY FULTON
Floor/Roof Diaphrgm/Shear Wall 7/20/2020 Not Ready for Inspection ROBERT DAVIS
Insulation 7/20/2020 Partial Approval ROBERT DAVIS
Wood Frame 7/20/2020 Partial Approval ROBERT DAVIS
Floor/Roof Diaphrgm/Shear Wall 7/21/2020 Partial Approval ROBERT DAVIS
Insulation 7/21/2020 No Access for Inspection ROBERT DAVIS
Wood Frame 7/21/2020 Not Ready for Inspection ROBERT DAVIS
Insulation 7/22/2020 Partial Approval ROBERT DAVIS
Wood Frame 7/22/2020 Partial Approval ROBERT DAVIS
Floor/Roof Diaphrgm/Shear Wall 7/27/2020 Not Ready for Inspection JEFFREY FULTON
Insulation 7/27/2020 Partial Inspection JEFFREY FULTON
Light Gage Steel Frame 7/27/2020 Not Ready for Inspection JEFFREY FULTON
Wood Frame 7/27/2020 Partial Inspection JEFFREY FULTON
Drywall Nailing 7/29/2020 Partial Approval ROBERT DAVIS
Floor/Roof Diaphrgm/Shear Wall 7/29/2020 Partial Approval ROBERT DAVIS
Insulation 7/29/2020 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 7/29/2020 Not Ready for Inspection ROBERT DAVIS
Wood Frame 7/29/2020 Not Ready for Inspection ROBERT DAVIS
Drywall Nailing 7/30/2020 Partial Approval ROBERT DAVIS
Floor/Roof Diaphrgm/Shear Wall 7/30/2020 Partial Approval ROBERT DAVIS
Insulation 7/30/2020 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 7/30/2020 Partial Approval ROBERT DAVIS
Wood Frame 7/30/2020 Partial Approval ROBERT DAVIS
Drywall Nailing 7/31/2020 Partial Approval ROBERT DAVIS
Floor/Roof Diaphrgm/Shear Wall 7/31/2020 Not Ready for Inspection ROBERT DAVIS
Insulation 7/31/2020 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 7/31/2020 Not Ready for Inspection ROBERT DAVIS
Wood Frame 7/31/2020 Partial Approval ROBERT DAVIS
Drywall Nailing 8/3/2020 Partial Approval ROBERT DAVIS
Floor/Roof Diaphrgm/Shear Wall 8/3/2020 Not Ready for Inspection ROBERT DAVIS
Insulation 8/3/2020 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 8/3/2020 Not Ready for Inspection ROBERT DAVIS
Wood Frame 8/3/2020 Partial Approval ROBERT DAVIS
Drywall Nailing 8/4/2020 Partial Approval ROBERT DAVIS
Floor/Roof Diaphrgm/Shear Wall 8/4/2020 Not Ready for Inspection ROBERT DAVIS
Insulation 8/4/2020 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 8/4/2020 Not Ready for Inspection ROBERT DAVIS
Wood Frame 8/4/2020 Not Ready for Inspection ROBERT DAVIS
Drywall Nailing 8/5/2020 Not Ready for Inspection JEFFREY FULTON
Floor/Roof Diaphrgm/Shear Wall 8/5/2020 Not Ready for Inspection JEFFREY FULTON
Insulation 8/5/2020 Partial Inspection JEFFREY FULTON
Light Gage Steel Frame 8/5/2020 Not Ready for Inspection JEFFREY FULTON
Wood Frame 8/5/2020 Partial Inspection JEFFREY FULTON
Drywall Nailing 8/6/2020 Not Ready for Inspection ROBERT DAVIS
Floor/Roof Diaphrgm/Shear Wall 8/6/2020 Partial Approval ROBERT DAVIS
Insulation 8/6/2020 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 8/6/2020 Not Ready for Inspection ROBERT DAVIS
Wood Frame 8/6/2020 Partial Approval ROBERT DAVIS
Drywall Nailing 8/10/2020 Partial Inspection JEFFREY FULTON
Floor/Roof Diaphrgm/Shear Wall 8/10/2020 Partial Inspection JEFFREY FULTON
Insulation 8/10/2020 Partial Inspection JEFFREY FULTON
Light Gage Steel Frame 8/10/2020 Not Ready for Inspection JEFFREY FULTON
Wood Frame 8/10/2020 Not Ready for Inspection JEFFREY FULTON
Drywall Nailing 8/11/2020 Partial Approval ROBERT DAVIS
Floor/Roof Diaphrgm/Shear Wall 8/11/2020 Partial Approval ROBERT DAVIS
Insulation 8/11/2020 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 8/11/2020 Partial Approval ROBERT DAVIS
Wood Frame 8/11/2020 Partial Inspection ROBERT DAVIS
Drywall Nailing 8/12/2020 Not Ready for Inspection ROBERT DAVIS
Floor/Roof Diaphrgm/Shear Wall 8/12/2020 Not Ready for Inspection ROBERT DAVIS
Insulation 8/12/2020 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 8/12/2020 Not Ready for Inspection ROBERT DAVIS
Wood Frame 8/12/2020 Partial Approval ROBERT DAVIS
Drywall Nailing 8/13/2020 Not Ready for Inspection DANIEL VARNUM
Floor/Roof Diaphrgm/Shear Wall 8/13/2020 Not Ready for Inspection DANIEL VARNUM
Insulation 8/13/2020 Partial Approval DANIEL VARNUM
Light Gage Steel Frame 8/13/2020 Not Ready for Inspection DANIEL VARNUM
Wood Frame 8/13/2020 Not Ready for Inspection DANIEL VARNUM
Drywall Nailing 8/14/2020 Partial Approval ROBERT DAVIS
Floor/Roof Diaphrgm/Shear Wall 8/14/2020 Partial Approval ROBERT DAVIS
Insulation 8/14/2020 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 8/14/2020 Not Ready for Inspection ROBERT DAVIS
Wood Frame 8/14/2020 Partial Approval ROBERT DAVIS
Drywall Nailing 8/17/2020 Partial Approval DANIEL VARNUM
Floor/Roof Diaphrgm/Shear Wall 8/17/2020 Not Ready for Inspection DANIEL VARNUM
Insulation 8/17/2020 Partial Approval DANIEL VARNUM
Light Gage Steel Frame 8/17/2020 Partial Approval DANIEL VARNUM
Wood Frame 8/17/2020 Partial Approval DANIEL VARNUM
Drywall Nailing 8/18/2020 Partial Approval ROBERT DAVIS
Floor/Roof Diaphrgm/Shear Wall 8/18/2020 Not Ready for Inspection ROBERT DAVIS
Insulation 8/18/2020 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 8/18/2020 Not Ready for Inspection ROBERT DAVIS
Wood Frame 8/18/2020 Partial Approval ROBERT DAVIS
Drywall Nailing 8/19/2020 Partial Approval DANIEL VARNUM
Floor/Roof Diaphrgm/Shear Wall 8/19/2020 Partial Approval DANIEL VARNUM
Insulation 8/19/2020 Partial Approval DANIEL VARNUM
Light Gage Steel Frame 8/19/2020 Not Ready for Inspection DANIEL VARNUM
Wood Frame 8/19/2020 Partial Approval DANIEL VARNUM
Drywall Nailing 8/20/2020 Partial Approval ROBERT DAVIS
Floor/Roof Diaphrgm/Shear Wall 8/20/2020 Not Ready for Inspection ROBERT DAVIS
Insulation 8/20/2020 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 8/20/2020 Not Ready for Inspection ROBERT DAVIS
Wood Frame 8/20/2020 Not Ready for Inspection ROBERT DAVIS
Drywall Nailing 8/21/2020 Partial Approval DANIEL VARNUM
Floor/Roof Diaphrgm/Shear Wall 8/21/2020 Partial Approval DANIEL VARNUM
Insulation 8/21/2020 Partial Approval DANIEL VARNUM
Light Gage Steel Frame 8/21/2020 Not Ready for Inspection DANIEL VARNUM
Wood Frame 8/21/2020 Not Ready for Inspection DANIEL VARNUM
Drywall Nailing 8/24/2020 Not Ready for Inspection DANIEL VARNUM
Floor/Roof Diaphrgm/Shear Wall 8/24/2020 Not Ready for Inspection DANIEL VARNUM
Insulation 8/24/2020 Partial Approval DANIEL VARNUM
Light Gage Steel Frame 8/24/2020 Not Ready for Inspection DANIEL VARNUM
Wood Frame 8/24/2020 Partial Approval DANIEL VARNUM
Drywall Nailing 8/25/2020 Not Ready for Inspection JEFFREY FULTON
Floor/Roof Diaphrgm/Shear Wall 8/25/2020 Not Ready for Inspection JEFFREY FULTON
Insulation 8/25/2020 Partial Inspection JEFFREY FULTON
Light Gage Steel Frame 8/25/2020 Not Ready for Inspection JEFFREY FULTON
Wood Frame 8/25/2020 Not Ready for Inspection JEFFREY FULTON
Drywall Nailing 8/26/2020 Not Ready for Inspection JEFFREY FULTON
Floor/Roof Diaphrgm/Shear Wall 8/26/2020 Not Ready for Inspection JEFFREY FULTON
Insulation 8/26/2020 Partial Inspection JEFFREY FULTON
Light Gage Steel Frame 8/26/2020 Not Ready for Inspection JEFFREY FULTON
Wood Frame 8/26/2020 Not Ready for Inspection JEFFREY FULTON
Drywall Nailing 8/27/2020 Partial Approval DANIEL VARNUM
Floor/Roof Diaphrgm/Shear Wall 8/27/2020 Not Ready for Inspection DANIEL VARNUM
Insulation 8/27/2020 Not Ready for Inspection DANIEL VARNUM
Light Gage Steel Frame 8/27/2020 Partial Approval DANIEL VARNUM
Wood Frame 8/27/2020 Partial Approval DANIEL VARNUM
Drywall Nailing 8/28/2020 Partial Approval ROBERT DAVIS
Floor/Roof Diaphrgm/Shear Wall 8/28/2020 Not Ready for Inspection ROBERT DAVIS
Insulation 8/28/2020 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 8/28/2020 Partial Approval ROBERT DAVIS
Wood Frame 8/28/2020 Partial Approval ROBERT DAVIS
Drywall Nailing 8/29/2020 Not Ready for Inspection JEFFREY DURAN
Floor/Roof Diaphrgm/Shear Wall 8/29/2020 Not Ready for Inspection JEFFREY DURAN
Insulation 8/29/2020 Partial Approval JEFFREY DURAN
Light Gage Steel Frame 8/29/2020 Not Ready for Inspection JEFFREY DURAN
Wood Frame 8/29/2020 Not Ready for Inspection JEFFREY DURAN
Drywall Nailing 8/31/2020 No Access for Inspection DANIEL VARNUM
Floor/Roof Diaphrgm/Shear Wall 8/31/2020 Not Ready for Inspection DANIEL VARNUM
Insulation 8/31/2020 Partial Approval DANIEL VARNUM
Light Gage Steel Frame 8/31/2020 Partial Approval DANIEL VARNUM
Wood Frame 8/31/2020 Partial Approval DANIEL VARNUM
Drywall Nailing 9/1/2020 Partial Approval ROBERT DAVIS
Floor/Roof Diaphrgm/Shear Wall 9/1/2020 Partial Approval ROBERT DAVIS
Insulation 9/1/2020 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 9/1/2020 Partial Approval ROBERT DAVIS
Wood Frame 9/1/2020 Partial Approval ROBERT DAVIS
Drywall Nailing 9/2/2020 Partial Approval ROBERT DAVIS
Floor/Roof Diaphrgm/Shear Wall 9/2/2020 Order to Comply Issued ROBERT DAVIS
Insulation 9/2/2020 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 9/2/2020 Not Ready for Inspection ROBERT DAVIS
Wood Frame 9/2/2020 Order to Comply Issued ROBERT DAVIS
Drywall Nailing 9/3/2020 Partial Approval DANIEL VARNUM
Floor/Roof Diaphrgm/Shear Wall 9/3/2020 Not Ready for Inspection DANIEL VARNUM
Insulation 9/3/2020 Partial Approval DANIEL VARNUM
Interior/Exterior Lathing 9/3/2020 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 9/3/2020 Not Ready for Inspection DANIEL VARNUM
Wood Frame 9/3/2020 Partial Approval DANIEL VARNUM
Drywall Nailing 9/4/2020 Partial Approval ROBERT DAVIS
Floor/Roof Diaphrgm/Shear Wall 9/4/2020 Partial Approval ROBERT DAVIS
Insulation 9/4/2020 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 9/4/2020 Partial Approval ROBERT DAVIS
Wood Frame 9/4/2020 Partial Approval ROBERT DAVIS
Drywall Nailing 9/8/2020 Partial Approval ROBERT DAVIS
Floor/Roof Diaphrgm/Shear Wall 9/8/2020 Partial Approval ROBERT DAVIS
Insulation 9/8/2020 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 9/8/2020 Partial Approval ROBERT DAVIS
Wood Frame 9/8/2020 Partial Approval ROBERT DAVIS
Drywall Nailing 9/9/2020 Partial Approval DANIEL VARNUM
Floor/Roof Diaphrgm/Shear Wall 9/9/2020 Partial Approval DANIEL VARNUM
Insulation 9/9/2020 Partial Approval DANIEL VARNUM
Light Gage Steel Frame 9/9/2020 Partial Approval DANIEL VARNUM
Wood Frame 9/9/2020 Partial Approval DANIEL VARNUM
Drywall Nailing 9/10/2020 Partial Approval ROBERT DAVIS
Floor/Roof Diaphrgm/Shear Wall 9/10/2020 Partial Approval ROBERT DAVIS
Insulation 9/10/2020 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 9/10/2020 Not Ready for Inspection ROBERT DAVIS
Wood Frame 9/10/2020 Partial Approval ROBERT DAVIS
Drywall Nailing 9/14/2020 Partial Approval ROBERT DAVIS
Floor/Roof Diaphrgm/Shear Wall 9/14/2020 Not Ready for Inspection ROBERT DAVIS
Insulation 9/14/2020 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 9/14/2020 Partial Approval ROBERT DAVIS
Wood Frame 9/14/2020 Not Ready for Inspection ROBERT DAVIS
Drywall Nailing 9/15/2020 Not Ready for Inspection HAMID PISHEHVAR
Floor/Roof Diaphrgm/Shear Wall 9/15/2020 Approved HAMID PISHEHVAR
Insulation 9/15/2020 Approved HAMID PISHEHVAR
Light Gage Steel Frame 9/15/2020 Approved HAMID PISHEHVAR
Wood Frame 9/15/2020 Approved HAMID PISHEHVAR
Drywall Nailing 9/16/2020 Off-Hour Fees Due
Drywall Nailing 9/16/2020 Partial Approval DANIEL VARNUM
Floor/Roof Diaphrgm/Shear Wall 9/16/2020 Not Ready for Inspection DANIEL VARNUM
Floor/Roof Diaphrgm/Shear Wall 9/16/2020 Off-Hour Fees Due
Insulation 9/16/2020 Off-Hour Fees Due
Insulation 9/16/2020 Partial Approval DANIEL VARNUM
Interior/Exterior Lathing 9/16/2020 Off-Hour Fees Due
Light Gage Steel Frame 9/16/2020 Not Ready for Inspection DANIEL VARNUM
Light Gage Steel Frame 9/16/2020 Off-Hour Fees Due
Wood Frame 9/16/2020 Not Ready for Inspection DANIEL VARNUM
Wood Frame 9/16/2020 Off-Hour Fees Due
Drywall Nailing 9/17/2020 Off-Hour Fees Due
Drywall Nailing 9/17/2020 Partial Approval ROBERT DAVIS
Floor/Roof Diaphrgm/Shear Wall 9/17/2020 Not Ready for Inspection ROBERT DAVIS
Floor/Roof Diaphrgm/Shear Wall 9/17/2020 Off-Hour Fees Due
Insulation 9/17/2020 Not Ready for Inspection ROBERT DAVIS
Insulation 9/17/2020 Off-Hour Fees Due
Interior/Exterior Lathing 9/17/2020 Not Ready for Inspection ROBERT DAVIS
Interior/Exterior Lathing 9/17/2020 Off-Hour Fees Due
Light Gage Steel Frame 9/17/2020 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 9/17/2020 Off-Hour Fees Due
Wood Frame 9/17/2020 Off-Hour Fees Due
Wood Frame 9/17/2020 Partial Approval ROBERT DAVIS
Drywall Nailing 9/18/2020 Off-Hour Fees Due
Floor/Roof Diaphrgm/Shear Wall 9/18/2020 Off-Hour Fees Due
Insulation 9/18/2020 Off-Hour Fees Due
Interior/Exterior Lathing 9/18/2020 Off-Hour Fees Due
Light Gage Steel Frame 9/18/2020 Off-Hour Fees Due
Wood Frame 9/18/2020 Off-Hour Fees Due
Drywall Nailing 9/19/2020 Partial Approval JOHN DODGE
Floor/Roof Diaphrgm/Shear Wall 9/19/2020 Partial Approval JOHN DODGE
Insulation 9/19/2020 Partial Approval JOHN DODGE
Interior/Exterior Lathing 9/19/2020 Partial Approval JOHN DODGE
Light Gage Steel Frame 9/19/2020 Partial Approval JOHN DODGE
Wood Frame 9/19/2020 Partial Approval JOHN DODGE
Drywall Nailing 9/21/2020 Partial Approval ROBERT DAVIS
Floor/Roof Diaphrgm/Shear Wall 9/21/2020 Partial Approval ROBERT DAVIS
Insulation 9/21/2020 Partial Approval ROBERT DAVIS
Interior/Exterior Lathing 9/21/2020 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 9/21/2020 Not Ready for Inspection ROBERT DAVIS
Wood Frame 9/21/2020 Partial Approval ROBERT DAVIS
Drywall Nailing 9/23/2020 Order to Comply Issued DANIEL VARNUM
Floor/Roof Diaphrgm/Shear Wall 9/23/2020 No Access for Inspection DANIEL VARNUM
Insulation 9/23/2020 Partial Approval DANIEL VARNUM
Light Gage Steel Frame 9/23/2020 Partial Approval DANIEL VARNUM
Structural Steel Frame 9/23/2020 No Access for Inspection DANIEL VARNUM
Wood Frame 9/23/2020 No Access for Inspection DANIEL VARNUM
Drywall Nailing 9/24/2020 Not Ready for Inspection ROBERT DAVIS
Floor/Roof Diaphrgm/Shear Wall 9/24/2020 Not Ready for Inspection ROBERT DAVIS
Green Building Rough 9/24/2020 Approved ROBERT DAVIS
Insulation 9/24/2020 Not Ready for Inspection ROBERT DAVIS
Interior/Exterior Lathing 9/24/2020 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 9/24/2020 Not Ready for Inspection ROBERT DAVIS
Structural Steel Frame 9/24/2020 Not Ready for Inspection ROBERT DAVIS
Wood Frame 9/24/2020 Not Ready for Inspection ROBERT DAVIS
Drywall Nailing 9/26/2020 Partial Inspection ANDREW DORSO
Insulation 9/26/2020 Partial Inspection ANDREW DORSO
Light Gage Steel Frame 9/26/2020 Partial Inspection ANDREW DORSO
Drywall Nailing 9/29/2020 Partial Approval ROBERT DAVIS
Floor/Roof Diaphrgm/Shear Wall 9/29/2020 Not Ready for Inspection ROBERT DAVIS
Insulation 9/29/2020 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 9/29/2020 Partial Approval ROBERT DAVIS
Structural Steel Frame 9/29/2020 Partial Approval ROBERT DAVIS
Wood Frame 9/29/2020 Not Ready for Inspection ROBERT DAVIS
Drywall Nailing 9/30/2020 Partial Approval RONALD PACHECO
Insulation 9/30/2020 Partial Approval RONALD PACHECO
Drywall Nailing 10/1/2020 Partial Approval ROBERT DAVIS
Insulation 10/2/2020 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 10/2/2020 Partial Approval ROBERT DAVIS
Drywall Nailing 10/5/2020 Partial Approval ROBERT DAVIS
Insulation 10/5/2020 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 10/5/2020 Not Ready for Inspection ROBERT DAVIS
Drywall Nailing 10/6/2020 Not Ready for Inspection ROBERT DAVIS
Wood Frame 10/6/2020 Partial Approval ROBERT DAVIS
Drywall Nailing 10/7/2020 Partial Approval ROBERT DAVIS
Floor/Roof Diaphrgm/Shear Wall 10/7/2020 Not Ready for Inspection ROBERT DAVIS
Drywall Nailing 10/8/2020 Not Ready for Inspection ROBERT DAVIS
Floor/Roof Diaphrgm/Shear Wall 10/8/2020 Partial Approval ROBERT DAVIS
Insulation 10/8/2020 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 10/8/2020 Partial Approval ROBERT DAVIS
Interior/Exterior Lathing 10/9/2020 Partial Approval ROBERT DAVIS
Drywall Nailing 10/14/2020 Partial Approval ROBERT DAVIS
Floor/Roof Diaphrgm/Shear Wall 10/14/2020 Not Ready for Inspection ROBERT DAVIS
Insulation 10/14/2020 Partial Approval ROBERT DAVIS
Interior/Exterior Lathing 10/14/2020 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 10/14/2020 Partial Approval ROBERT DAVIS
Wood Frame 10/14/2020 Not Ready for Inspection ROBERT DAVIS
Insulation 10/15/2020 Partial Approval ROBERT DAVIS
Interior/Exterior Lathing 10/15/2020 Partial Approval ROBERT DAVIS
Drywall Nailing 10/16/2020 Partial Approval ROBERT DAVIS
Insulation 10/16/2020 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 10/16/2020 Partial Approval ROBERT DAVIS
Wood Frame 10/16/2020 Not Ready for Inspection ROBERT DAVIS
Drywall Nailing 10/19/2020 Approved HAMID PISHEHVAR
Floor/Roof Diaphrgm/Shear Wall 10/19/2020 Approved HAMID PISHEHVAR
Insulation 10/19/2020 Approved HAMID PISHEHVAR
Interior/Exterior Lathing 10/19/2020 Not Ready for Inspection HAMID PISHEHVAR
Light Gage Steel Frame 10/19/2020 Partial Approval HAMID PISHEHVAR
Wood Frame 10/19/2020 Partial Approval HAMID PISHEHVAR
Drywall Nailing 10/20/2020 Partial Approval ROBERT DAVIS
Insulation 10/20/2020 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 10/20/2020 Partial Approval ROBERT DAVIS
Drywall Nailing 10/21/2020 Approved HAMID PISHEHVAR
Insulation 10/21/2020 Approved HAMID PISHEHVAR
Light Gage Steel Frame 10/21/2020 Approved HAMID PISHEHVAR
Drywall Nailing 10/22/2020 Partial Approval ROBERT DAVIS
Floor/Roof Diaphrgm/Shear Wall 10/22/2020 Partial Approval ROBERT DAVIS
Insulation 10/22/2020 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 10/22/2020 Not Ready for Inspection ROBERT DAVIS
Structural Steel Frame 10/22/2020 Partial Approval ROBERT DAVIS
Drywall Nailing 10/23/2020 Partial Approval SORIN CIRSTOIU
Insulation 10/23/2020 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 10/23/2020 Partial Inspection SORIN CIRSTOIU
Structural Steel Frame 10/23/2020 Partial Inspection SORIN CIRSTOIU
Drywall Nailing 10/26/2020 Off-Hour Fees Due
Drywall Nailing 10/26/2020 Partial Approval ROBERT DAVIS
Insulation 10/26/2020 Off-Hour Fees Due
Insulation 10/26/2020 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 10/26/2020 Partial Approval ROBERT DAVIS
Wood Frame 10/26/2020 Not Ready for Inspection ROBERT DAVIS
Wood Frame 10/26/2020 Off-Hour Fees Due
Drywall Nailing 10/27/2020 Partial Approval ROBERT DAVIS
Interior/Exterior Lathing 10/27/2020 Partial Approval ROBERT DAVIS
Drywall Nailing 10/28/2020 No Access for Inspection DANIEL VARNUM
Insulation 10/28/2020 No Access for Inspection DANIEL VARNUM
Light Gage Steel Frame 10/28/2020 Partial Approval DANIEL VARNUM
Structural Steel Frame 10/28/2020 Partial Approval DANIEL VARNUM
Drywall Nailing 10/29/2020 Partial Inspection ROBERT DAVIS
Insulation 10/29/2020 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 10/29/2020 Not Ready for Inspection ROBERT DAVIS
Drywall Nailing 11/2/2020 Partial Approval ROBERT DAVIS
Insulation 11/2/2020 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 11/2/2020 Partial Approval ROBERT DAVIS
Structural Steel Frame 11/2/2020 Partial Approval ROBERT DAVIS
Drywall Nailing 11/5/2020 Partial Approval JEFFREY DURAN
Interior/Exterior Lathing 11/5/2020 Partial Approval JEFFREY DURAN
Drywall Nailing 11/9/2020 Not Ready for Inspection ROBERT DAVIS
Floor/Roof Diaphrgm/Shear Wall 11/9/2020 Not Ready for Inspection ROBERT DAVIS
Insulation 11/9/2020 Not Ready for Inspection ROBERT DAVIS
Interior/Exterior Lathing 11/9/2020 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 11/9/2020 Partial Approval ROBERT DAVIS
Structural Steel Frame 11/9/2020 Partial Approval ROBERT DAVIS
Wood Frame 11/9/2020 Order to Comply Issued ROBERT DAVIS
Drywall Nailing 11/10/2020 Partial Approval ROBERT DAVIS
Insulation 11/10/2020 Partial Approval ROBERT DAVIS
Interior/Exterior Lathing 11/10/2020 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 11/10/2020 Not Ready for Inspection ROBERT DAVIS
Wood Frame 11/10/2020 Not Ready for Inspection ROBERT DAVIS
Drywall Nailing 11/12/2020 Partial Approval DANIEL VARNUM
Insulation 11/12/2020 Partial Approval DANIEL VARNUM
Interior/Exterior Lathing 11/12/2020 Not Ready for Inspection DANIEL VARNUM
Light Gage Steel Frame 11/12/2020 Not Ready for Inspection DANIEL VARNUM
Structural Steel Frame 11/12/2020 Not Ready for Inspection DANIEL VARNUM
Drywall Nailing 11/16/2020 Partial Approval ROBERT DAVIS
Floor/Roof Diaphrgm/Shear Wall 11/16/2020 Not Ready for Inspection ROBERT DAVIS
Insulation 11/16/2020 Partial Approval ROBERT DAVIS
Interior/Exterior Lathing 11/16/2020 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 11/16/2020 Partial Approval ROBERT DAVIS
Wood Frame 11/16/2020 Partial Approval ROBERT DAVIS
Drywall Nailing 11/18/2020 Partial Approval JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 11/18/2020 Not Ready for Inspection JOHN KITCKO
Insulation 11/18/2020 Partial Approval JOHN KITCKO
Interior/Exterior Lathing 11/18/2020 Not Ready for Inspection JOHN KITCKO
Light Gage Steel Frame 11/18/2020 Not Ready for Inspection JOHN KITCKO
Wood Frame 11/18/2020 Not Ready for Inspection JOHN KITCKO
Drywall Nailing 11/19/2020 Partial Approval ROBERT DAVIS
Insulation 11/19/2020 Not Ready for Inspection ROBERT DAVIS
Interior/Exterior Lathing 11/19/2020 Partial Approval ROBERT DAVIS
Drywall Nailing 11/20/2020 Partial Approval DANIEL VARNUM
Floor/Roof Diaphrgm/Shear Wall 11/20/2020 No Access for Inspection DANIEL VARNUM
Insulation 11/20/2020 Partial Approval DANIEL VARNUM
Interior/Exterior Lathing 11/20/2020 No Access for Inspection DANIEL VARNUM
Light Gage Steel Frame 11/20/2020 Partial Approval DANIEL VARNUM
Structural Steel Frame 11/20/2020 No Access for Inspection DANIEL VARNUM
Wood Frame 11/20/2020 No Access for Inspection DANIEL VARNUM
Drywall Nailing 11/30/2020 Partial Approval DANIEL VARNUM
Floor/Roof Diaphrgm/Shear Wall 11/30/2020 Not Ready for Inspection DANIEL VARNUM
Insulation 11/30/2020 Partial Approval DANIEL VARNUM
Interior/Exterior Lathing 11/30/2020 Not Ready for Inspection DANIEL VARNUM
Light Gage Steel Frame 11/30/2020 Not Ready for Inspection DANIEL VARNUM
Masonry Wall/Backfill 11/30/2020 Not Ready for Inspection DANIEL VARNUM
Structural Steel Frame 11/30/2020 Not Ready for Inspection DANIEL VARNUM
Wood Frame 11/30/2020 Not Ready for Inspection DANIEL VARNUM
Drywall Nailing 12/1/2020 No Access for Inspection ROBERT DAVIS
Insulation 12/1/2020 Partial Approval ROBERT DAVIS
Interior/Exterior Lathing 12/1/2020 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 12/1/2020 Not Ready for Inspection ROBERT DAVIS
Drywall Nailing 12/3/2020 Partial Approval HAMID PISHEHVAR
Insulation 12/3/2020 Partial Approval HAMID PISHEHVAR
Light Gage Steel Frame 12/3/2020 Partial Approval HAMID PISHEHVAR
Drywall Nailing 12/4/2020 Partial Approval ROBERT DAVIS
Interior/Exterior Lathing 12/4/2020 Partial Approval ROBERT DAVIS
Drywall Nailing 12/7/2020 Partial Approval ROBERT DAVIS
Floor/Roof Diaphrgm/Shear Wall 12/7/2020 Not Ready for Inspection ROBERT DAVIS
Insulation 12/7/2020 Not Ready for Inspection ROBERT DAVIS
Interior/Exterior Lathing 12/7/2020 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 12/7/2020 Partial Approval ROBERT DAVIS
Structural Steel Frame 12/7/2020 Not Ready for Inspection ROBERT DAVIS
Wood Frame 12/7/2020 Not Ready for Inspection ROBERT DAVIS
Drywall Nailing 12/9/2020 Partial Approval ROBERT DAVIS
Insulation 12/9/2020 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 12/9/2020 Not Ready for Inspection ROBERT DAVIS
Drywall Nailing 12/10/2020 Not Ready for Inspection JEFFREY FULTON
Floor/Roof Diaphrgm/Shear Wall 12/10/2020 Not Ready for Inspection JEFFREY FULTON
Insulation 12/10/2020 Not Ready for Inspection JEFFREY FULTON
Masonry Wall/Backfill 12/10/2020 Partial Inspection JEFFREY FULTON
Wood Frame 12/10/2020 Not Ready for Inspection JEFFREY FULTON
Drywall Nailing 12/11/2020 Partial Approval ROBERT DAVIS
Insulation 12/11/2020 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 12/11/2020 Not Ready for Inspection ROBERT DAVIS
Masonry Wall/Backfill 12/11/2020 Not Ready for Inspection ROBERT DAVIS
Drywall Nailing 12/17/2020 Partial Approval ROBERT DAVIS
Interior/Exterior Lathing 12/18/2020 Partial Approval DANIEL VARNUM
Drywall Nailing 12/21/2020 Partial Approval ROBERT DAVIS
Insulation 12/21/2020 Not Ready for Inspection ROBERT DAVIS
Interior/Exterior Lathing 12/21/2020 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 12/21/2020 Not Ready for Inspection ROBERT DAVIS
Wood Frame 12/21/2020 Partial Approval ROBERT DAVIS
Drywall Nailing 12/24/2020 Not Ready for Inspection ROBERT DAVIS
Insulation 12/24/2020 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 12/24/2020 Not Ready for Inspection ROBERT DAVIS
Drywall Nailing 12/30/2020 Partial Approval ROBERT DAVIS
Insulation 12/30/2020 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 12/30/2020 Not Ready for Inspection ROBERT DAVIS
Drywall Nailing 1/4/2021 Partial Approval ROBERT DAVIS
Interior/Exterior Lathing 1/4/2021 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 1/4/2021 Partial Approval ROBERT DAVIS
Drywall Nailing 1/5/2021 Approved HAMID PISHEHVAR
Insulation 1/5/2021 Approved HAMID PISHEHVAR
Light Gage Steel Frame 1/5/2021 Approved HAMID PISHEHVAR
Drywall Nailing 1/6/2021 Partial Approval ROBERT DAVIS
Insulation 1/6/2021 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 1/6/2021 Not Ready for Inspection ROBERT DAVIS
Drywall Nailing 1/8/2021 Not Ready for Inspection ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 1/8/2021 Partial Approval ROBERT DAVIS
Footing/Foundation/Slab 1/8/2021 Partial Approval ROBERT DAVIS
Insulation 1/8/2021 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 1/8/2021 Not Ready for Inspection ROBERT DAVIS
Masonry Wall/Backfill 1/12/2021 Partial Approval ROBERT DAVIS
Piling/Pier/Caisson 1/12/2021 Conditional Approval ROBERT DAVIS
Interior/Exterior Lathing 1/19/2021 Partial Approval HAMID PISHEHVAR
Drywall Nailing 1/20/2021 Partial Approval ROBERT DAVIS
Insulation 1/20/2021 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 1/20/2021 Not Ready for Inspection ROBERT DAVIS
Drywall Nailing 1/21/2021 Not Ready for Inspection ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 1/21/2021 Partial Approval ROBERT DAVIS
Footing/Foundation/Slab 1/21/2021 Partial Approval ROBERT DAVIS
Drywall Nailing 1/22/2021 Partial Approval ROBERT DAVIS
Drywall Nailing 1/25/2021 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 1/25/2021 Not Ready for Inspection ROBERT DAVIS
Drywall Nailing 1/29/2021 Partial Approval ROBERT DAVIS
Masonry Wall/Backfill 1/29/2021 Partial Approval ROBERT DAVIS
Drywall Nailing 2/1/2021 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 2/1/2021 Partial Approval ROBERT DAVIS
Drywall Nailing 2/3/2021 Partial Approval ROBERT DAVIS
Insulation 2/3/2021 Partial Approval ROBERT DAVIS
Wood Frame 2/3/2021 Not Ready for Inspection ROBERT DAVIS
Drywall Nailing 2/8/2021 Partial Approval ROBERT DAVIS
Insulation 2/8/2021 Not Ready for Inspection ROBERT DAVIS
Drywall Nailing 2/12/2021 Partial Approval ROBERT DAVIS
Pre-Inspection 2/12/2021 Partial Inspection ROBERT DAVIS
Drywall Nailing 2/18/2021 Partial Approval ROBERT DAVIS
Insulation 2/18/2021 Partial Approval ROBERT DAVIS
Reinforced Concrete Frame 2/18/2021 Partial Approval ROBERT DAVIS
Drywall Nailing 2/22/2021 Partial Approval ROBERT DAVIS
Drywall Nailing 3/4/2021 Partial Approval ROBERT DAVIS
Reinforced Masonry Frame 3/4/2021 Partial Approval ROBERT DAVIS
Drywall Nailing 3/8/2021 Not Ready for Inspection ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 3/8/2021 Partial Approval ROBERT DAVIS
Floor/Roof Diaphrgm/Shear Wall 3/8/2021 Not Ready for Inspection ROBERT DAVIS
Footing/Foundation/Slab 3/8/2021 Partial Approval ROBERT DAVIS
Insulation 3/8/2021 Partial Approval ROBERT DAVIS
Drywall Nailing 3/17/2021 Partial Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 3/17/2021 Partial Approval ROBERT DAVIS
Footing/Foundation/Slab 3/17/2021 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 3/20/2021 Partial Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 3/25/2021 Not Ready for Inspection ROBERT DAVIS
Insulation 3/25/2021 Off-Hour Fees Due
Insulation 3/25/2021 Partial Approval ROBERT DAVIS
Interior/Exterior Lathing 3/25/2021 Not Ready for Inspection ROBERT DAVIS
Interior/Exterior Lathing 3/27/2021 Partial Approval ROBERT DAVIS
Drywall Nailing 4/6/2021 Partial Approval CAMERON CHABAN
Final 4/7/2021 Not Ready for Inspection ROBERT DAVIS
Footing/Foundation/Slab 4/7/2021 Approved ROBERT DAVIS
Green Building Final 4/7/2021 Not Ready for Inspection ROBERT DAVIS
Reinforced Concrete Frame 4/7/2021 Not Ready for Inspection ROBERT DAVIS
Reinforced Masonry Frame 4/7/2021 Not Ready for Inspection ROBERT DAVIS
SGSOV-Seismic Gas S/O Valve 4/7/2021 SGSOV Not Ready ROBERT DAVIS
Smoke Detectors 4/7/2021 Partial Approval ROBERT DAVIS
Verify Sprinkler Sign Off 4/7/2021 Partial Inspection ROBERT DAVIS
Insulation 4/8/2021 Not Ready for Inspection ROBERT DAVIS
Special/Order Compliance 4/8/2021 Partial Approval ROBERT DAVIS
Final 4/14/2021 Partial Inspection ROBERT DAVIS
Green Building Final 4/14/2021 Not Ready for Inspection ROBERT DAVIS
Reinforced Concrete Frame 4/14/2021 Not Ready for Inspection ROBERT DAVIS
Reinforced Masonry Frame 4/14/2021 Not Ready for Inspection ROBERT DAVIS
SGSOV-Seismic Gas S/O Valve 4/14/2021 SGSOV Not Ready ROBERT DAVIS
Smoke Detectors 4/14/2021 Partial Approval ROBERT DAVIS
Verify Sprinkler Sign Off 4/14/2021 Partial Approval ROBERT DAVIS
Pre-Inspection 4/24/2021 Partial Inspection ROBERT DAVIS
Insulation 4/28/2021 Partial Approval CAMERON CHABAN
Drywall Nailing 5/3/2021 Conditional Approval ROBERT DAVIS
Final 5/7/2021 Not Ready for Inspection ROBERT DAVIS
Green Building Final 5/7/2021 Partial Approval ROBERT DAVIS
Reinforced Concrete Frame 5/7/2021 Partial Approval ROBERT DAVIS
Reinforced Masonry Frame 5/7/2021 Partial Approval ROBERT DAVIS
SGSOV-Seismic Gas S/O Valve 5/7/2021 SGSOV Approved ROBERT DAVIS
Smoke Detectors 5/7/2021 Partial Approval ROBERT DAVIS
Verify Sprinkler Sign Off 5/7/2021 Partial Approval ROBERT DAVIS
Drywall Nailing 5/20/2021 Partial Approval ROBERT DAVIS
Pre-Inspection 5/20/2021 Partial Approval ROBERT DAVIS
Final 7/20/2021 Corrections Issued ROBERT DAVIS
Green Building Final 7/20/2021 Not Ready for Inspection ROBERT DAVIS
Reinforced Concrete Frame 7/20/2021 Not Ready for Inspection ROBERT DAVIS
Reinforced Masonry Frame 7/20/2021 Not Ready for Inspection ROBERT DAVIS
Smoke Detectors 7/20/2021 Approved ROBERT DAVIS
Verify Sprinkler Sign Off 7/20/2021 Not Ready for Inspection ROBERT DAVIS
Final 8/12/2021 Not Ready for Inspection ROBERT DAVIS
Green Building Final 8/12/2021 Partial Approval ROBERT DAVIS
Reinforced Concrete Frame 8/12/2021 Not Ready for Inspection ROBERT DAVIS
Reinforced Masonry Frame 8/12/2021 Not Ready for Inspection ROBERT DAVIS
Verify Sprinkler Sign Off 8/12/2021 Not Ready for Inspection ROBERT DAVIS
Final 9/3/2021 Not Ready for Inspection ROBERT DAVIS
Green Building Final 9/3/2021 Approved ROBERT DAVIS
Reinforced Concrete Frame 9/3/2021 Partial Approval ROBERT DAVIS
Reinforced Masonry Frame 9/3/2021 Not Ready for Inspection ROBERT DAVIS
Verify Sprinkler Sign Off 9/3/2021 Partial Approval ROBERT DAVIS
Final 10/18/2021 Not Ready for Inspection ROBERT DAVIS
Reinforced Concrete Frame 10/18/2021 Partial Inspection ROBERT DAVIS
Reinforced Masonry Frame 10/18/2021 Partial Inspection ROBERT DAVIS
Verify Sprinkler Sign Off 10/18/2021 Not Ready for Inspection ROBERT DAVIS
Special/Order Compliance 12/15/2021 Partial Inspection ROBERT DAVIS
Special/Order Compliance 2/9/2022 Partial Inspection ROBERT DAVIS
Final 3/10/2022 Not Ready for Inspection ROBERT DAVIS
Reinforced Concrete Frame 3/10/2022 Approved ROBERT DAVIS
Reinforced Masonry Frame 3/10/2022 Approved ROBERT DAVIS
Verify Sprinkler Sign Off 3/10/2022 Approved ROBERT DAVIS
Final 4/5/2022 OK to Issue CofO ROBERT DAVIS