1101 S BEDFORD DR UNIT 1-10 90035
Certificate Information: 1101 S BEDFORD DR UNIT 1-10 90035
- Application / Permit
- 17010-10000-02038
- Plan Check / Job No.
- B17LA08816
- Group
- Building
- Type
- Bldg-New
- Sub-Type
- Apartment
- Primary Use
- (5) Apartment
- Work Description
- PROPOSED 5 STORY 10 UNIT APT OVER SUBTERRANEAN GARAGE (Affordable Housing Incentive Project)
- Permit Issued
- Issued on 7/3/2018
- Issuing Office
- Metro
- Current Status
- CofO Issued on 12/29/2023
- Certificate of Occupancy
- CofO Issued More Information
Permit Application Status History
| Submitted | 5/24/2017 | APPLICANT |
| Assigned to Plan Check Engineer | 6/22/2017 | YOUNG KIM |
| Green Plans Picked Up | 6/23/2017 | APPLICANT |
| Corrections Issued | 7/14/2017 | YOUNG KIM |
| Disabled Access Plans Picked Up | 7/17/2017 | APPLICANT |
| Quality Review Completed | 7/25/2017 | BINH PHAN |
| Building Plans Picked Up | 7/27/2017 | APPLICANT |
| Applicant returned to address corrections | 3/22/2018 | YOUNG KIM |
| Applicant returned to address corrections | 4/20/2018 | YOUNG KIM |
| Applicant returned to address corrections | 5/1/2018 | YOUNG KIM |
| Applicant returned to address corrections | 6/12/2018 | YOUNG KIM |
| Applicant returned to address corrections | 6/14/2018 | YOUNG KIM |
| Plan Check Approved | 6/15/2018 | YOUNG KIM |
| Issued | 7/3/2018 | LADBS |
| CofO in Progress | 12/29/2023 | DAVID TSAU |
| Permit Finaled | 12/29/2023 | HENRY BAGHDASSARIAN |
| CofO Issued | 12/29/2023 | HENRY BAGHDASSARIAN |
| Permit Finaled | 12/29/2023 | HENRY BAGHDASSARIAN |
Permit Application Clearance Information
| Highway dedication | Cleared | 1/26/2018 | NAZILA NOORIFAR |
| Address approval | Cleared | 2/20/2018 | ADRIAN SANCHEZ |
| Eng Process Fee Ord 176,300 | Cleared | 2/27/2018 | KAREN LE |
| Sewer availability | Cleared | 2/27/2018 | KAREN LE |
| Hydrant and Access approval | Cleared | 3/20/2018 | ROBERT DUFF |
| Construction near power lines | Cleared | 3/21/2018 | RIDWAN HARDY |
| Disturb/Remove Protected Trees | Cleared | 3/30/2018 | ADRIAN SANCHEZ |
| DAS Clearance | Cleared | 4/3/2018 | ELIZABETH TOMS |
| Fire Marshall Fire Life Safety | Cleared | 4/12/2018 | DAVE MYERS |
| Excavation more than 5-ft deep | Cleared | 5/1/2018 | CALOSHA APPROVED |
| Work Adjacent to Public Way | Cleared | 5/1/2018 | BOK GOH |
| Housing density bonus | Cleared | 5/15/2018 | NICHOLAS KAWAZOE |
| Housing density bonus | Cleared | 5/15/2018 | NICHOLAS KAWAZOE |
| Green Code | Cleared | 5/23/2018 | NEGAR NEJAD |
| "Q" conditions | Cleared | 5/31/2018 | AIDA KARAPETIAN |
| Miscellaneous | Cleared | 5/31/2018 | AIDA KARAPETIAN |
| Opn space landscape/Water mgmt | Cleared | 5/31/2018 | AIDA KARAPETIAN |
| Low Impact Development | Cleared | 6/11/2018 | MITESH PATEL |
| Roof/Waste drainage to street | Cleared | 6/11/2018 | STEVE MELGAR |
| Building over 3-story or 36-ft | Cleared | 6/12/2018 | CALOSHA APPROVED |
Contact Information
| Architect | Mashihi, Jacques; Lic. No.: C15922 | 10556 ASHTON AVENUE LOS ANGELES, CA 90024 |
| Contractor | Owner-Builder | , |
| Engineer | Berkoz, Ertunga; Lic. No.: S2504 | 4665 ELLENITA AVE TARZANA, CA 91356 |
| Engineer | Nazemi, Hassan Steve; Lic. No.: C44100 | 45 SOLSTICE IRVINE, CA 92602 |
Inspector Information
| PAUL DAVIDSON, (310) 914-3914 | Office Hours: 7:00-8:00 AM MON-FRI |
Pending Inspections
| No Data Available. |
Inspection Request History
| Excavation/Setback/Form/Re-Bar | 7/13/2018 | Partial Inspection | TONY HARTONO |
| Piling/Pier/Caisson | 1/11/2019 | Partial Inspection | TONY HARTONO |
| Pre-Inspection | 1/11/2019 | Partial Inspection | TONY HARTONO |
| Pre-Inspection | 10/21/2019 | Partial Inspection | SORIN CIRSTOIU |
| Special/Order Compliance | 10/21/2019 | Partial Inspection | TONY HARTONO |
| Pre-Inspection | 1/17/2020 | Partial Inspection | JEFF BYTHEWAY |
| Pre-Inspection | 1/22/2020 | Approved | SORIN CIRSTOIU |
| Deputy Grading | 1/23/2020 | Conditional Approval | SORIN CIRSTOIU |
| Pre-Inspection | 1/23/2020 | Approved | SORIN CIRSTOIU |
| Deputy Grading | 1/24/2020 | Approved | SORIN CIRSTOIU |
| Deputy Grading | 1/27/2020 | Approved | SORIN CIRSTOIU |
| Deputy Grading | 1/28/2020 | Approved | SORIN CIRSTOIU |
| Deputy Grading | 1/29/2020 | Conditional Approval | SORIN CIRSTOIU |
| Deputy Grading | 1/30/2020 | Approved | SORIN CIRSTOIU |
| Deputy Grading | 1/31/2020 | Approved | SORIN CIRSTOIU |
| Deputy Reinf. Concrete | 1/31/2020 | Approved | SORIN CIRSTOIU |
| Deputy Reinf. Concrete | 2/3/2020 | Approved | JEFF BYTHEWAY |
| Deputy Reinf. Concrete | 2/3/2020 | Conditional Approval | SORIN CIRSTOIU |
| Deputy Grading | 2/4/2020 | Approved | DERRICK SPENCER |
| Deputy Reinf. Concrete | 2/4/2020 | Approved | DERRICK SPENCER |
| Deputy Reinf. Concrete | 2/4/2020 | Conditional Approval | SORIN CIRSTOIU |
| Deputy Reinf. Concrete | 2/5/2020 | Approved | DERRICK SPENCER |
| Deputy Reinf. Concrete | 2/5/2020 | Conditional Approval | SORIN CIRSTOIU |
| Deputy Reinf. Concrete | 2/6/2020 | Approved | DERRICK SPENCER |
| Deputy Reinf. Concrete | 2/6/2020 | Conditional Approval | SORIN CIRSTOIU |
| Deputy Reinf. Concrete | 2/7/2020 | Conditional Approval | PAUL DAVIDSON |
| Deputy Reinf. Concrete | 2/7/2020 | Conditional Approval | SORIN CIRSTOIU |
| Deputy Grading | 2/11/2020 | Approved | DERRICK SPENCER |
| Deputy Grading | 2/19/2020 | Approved | SORIN CIRSTOIU |
| Deputy Grading | 2/20/2020 | Conditional Approval | SORIN CIRSTOIU |
| Deputy Grading | 2/21/2020 | Conditional Approval | SORIN CIRSTOIU |
| Deputy Grading | 2/24/2020 | Conditional Approval | SORIN CIRSTOIU |
| Deputy Grading | 2/25/2020 | Approved | SORIN CIRSTOIU |
| Deputy Grading | 2/27/2020 | Approved | SORIN CIRSTOIU |
| Deputy Grading | 2/28/2020 | Approved | SORIN CIRSTOIU |
| Footing/Foundation/Slab | 7/17/2020 | Partial Inspection | SORIN CIRSTOIU |
| METHANE-Barrier | 7/17/2020 | Partial Inspection | SORIN CIRSTOIU |
| METHANE-Subgrade | 7/17/2020 | Partial Inspection | SORIN CIRSTOIU |
| Deputy Reinf. Concrete | 7/20/2020 | Approved | SORIN CIRSTOIU |
| Deputy Reinf. Concrete | 7/21/2020 | Approved | SORIN CIRSTOIU |
| Deputy Reinf. Concrete | 7/22/2020 | Approved | SORIN CIRSTOIU |
| Footing/Foundation/Slab | 7/22/2020 | Partial Inspection | SORIN CIRSTOIU |
| METHANE-Barrier | 7/22/2020 | Partial Inspection | SORIN CIRSTOIU |
| METHANE-Subgrade | 7/22/2020 | Partial Inspection | SORIN CIRSTOIU |
| Footing/Foundation/Slab | 7/24/2020 | Partial Approval | SORIN CIRSTOIU |
| METHANE-Barrier | 7/24/2020 | Partial Inspection | SORIN CIRSTOIU |
| METHANE-Subgrade | 7/24/2020 | Partial Inspection | SORIN CIRSTOIU |
| Deputy Reinf. Concrete | 7/27/2020 | Approved | SORIN CIRSTOIU |
| Deputy Shotcrete | 7/29/2020 | Conditional Approval | SORIN CIRSTOIU |
| Deputy Shotcrete | 7/30/2020 | Approved | SORIN CIRSTOIU |
| Footing/Foundation/Slab | 7/30/2020 | Partial Inspection | SORIN CIRSTOIU |
| METHANE-Barrier | 7/30/2020 | Partial Inspection | SORIN CIRSTOIU |
| METHANE-Subgrade | 7/30/2020 | Partial Inspection | SORIN CIRSTOIU |
| Deputy Reinf. Concrete | 7/31/2020 | Approved | SORIN CIRSTOIU |
| Deputy Shotcrete | 7/31/2020 | Approved | SORIN CIRSTOIU |
| Deputy Shotcrete | 8/3/2020 | Approved | SORIN CIRSTOIU |
| Reinforced Concrete Frame | 8/3/2020 | Partial Approval | SORIN CIRSTOIU |
| Deputy Shotcrete | 8/4/2020 | Approved | SORIN CIRSTOIU |
| Deputy Shotcrete | 8/5/2020 | Conditional Approval | JOHN DODGE |
| Deputy Reinf. Masonry | 8/13/2020 | Approved | SORIN CIRSTOIU |
| Footing/Foundation/Slab | 8/17/2020 | Partial Approval | SORIN CIRSTOIU |
| METHANE-Barrier | 8/17/2020 | Partial Inspection | SORIN CIRSTOIU |
| METHANE-Subgrade | 8/17/2020 | Partial Inspection | SORIN CIRSTOIU |
| Deputy Reinf. Concrete | 8/18/2020 | Approved | SORIN CIRSTOIU |
| Deputy Methane Barrier | 8/19/2020 | Approved | SORIN CIRSTOIU |
| Deputy Methane Barrier | 8/20/2020 | Approved | DERRICK SPENCER |
| Deputy Reinf. Masonry | 8/20/2020 | Approved | DERRICK SPENCER |
| Deputy Methane Barrier | 8/21/2020 | Approved | SORIN CIRSTOIU |
| Footing/Foundation/Slab | 8/24/2020 | Partial Inspection | SORIN CIRSTOIU |
| METHANE-Barrier | 8/24/2020 | Partial Inspection | SORIN CIRSTOIU |
| METHANE-Subgrade | 8/24/2020 | Partial Inspection | SORIN CIRSTOIU |
| Footing/Foundation/Slab | 8/27/2020 | Partial Approval | SORIN CIRSTOIU |
| METHANE-Barrier | 8/27/2020 | Partial Inspection | SORIN CIRSTOIU |
| METHANE-Subgrade | 8/27/2020 | Partial Inspection | SORIN CIRSTOIU |
| Deputy Other (see comments) | 9/1/2020 | Conditional Approval | SORIN CIRSTOIU |
| Deputy Reinf. Concrete | 9/1/2020 | Conditional Approval | SORIN CIRSTOIU |
| Footing/Foundation/Slab | 9/10/2020 | Partial Inspection | SORIN CIRSTOIU |
| METHANE-Barrier | 9/10/2020 | Partial Inspection | SORIN CIRSTOIU |
| METHANE-Subgrade | 9/10/2020 | Partial Inspection | SORIN CIRSTOIU |
| Footing/Foundation/Slab | 9/15/2020 | Partial Approval | SORIN CIRSTOIU |
| METHANE-Barrier | 9/15/2020 | Partial Inspection | SORIN CIRSTOIU |
| METHANE-Subgrade | 9/15/2020 | Partial Inspection | SORIN CIRSTOIU |
| Deputy Reinf. Concrete | 9/16/2020 | Approved | SORIN CIRSTOIU |
| Deputy Reinf. Masonry | 9/25/2020 | Approved | SORIN CIRSTOIU |
| Footing/Foundation/Slab | 9/25/2020 | Partial Inspection | SORIN CIRSTOIU |
| METHANE-Barrier | 9/25/2020 | Partial Inspection | SORIN CIRSTOIU |
| METHANE-Subgrade | 9/25/2020 | Partial Inspection | SORIN CIRSTOIU |
| Deputy Reinf. Masonry | 9/29/2020 | Approved | SORIN CIRSTOIU |
| Footing/Foundation/Slab | 9/30/2020 | Partial Inspection | SORIN CIRSTOIU |
| METHANE-Barrier | 9/30/2020 | Partial Inspection | SORIN CIRSTOIU |
| METHANE-Subgrade | 9/30/2020 | Partial Inspection | SORIN CIRSTOIU |
| Reinforced Concrete Frame | 12/30/2020 | Partial Approval | DERRICK SPENCER |
| Footing/Foundation/Slab | 1/19/2021 | Partial Approval | JEFF BYTHEWAY |
| METHANE-Barrier | 1/19/2021 | Partial Approval | JEFF BYTHEWAY |
| METHANE-Subgrade | 1/19/2021 | Partial Approval | JEFF BYTHEWAY |
| Deputy Reinf. Concrete | 1/20/2021 | Conditional Approval | PAUL DAVIDSON |
| Footing/Foundation/Slab | 2/23/2021 | Partial Approval | JEFF BYTHEWAY |
| METHANE-Barrier | 2/23/2021 | Approved | JEFF BYTHEWAY |
| METHANE-Subgrade | 2/23/2021 | Approved | JEFF BYTHEWAY |
| Deputy Drilled-In Anchors | 3/23/2021 | Conditional Approval | LEOPOLDO MENDOZA |
| Deputy Reinf. Concrete | 4/19/2021 | Approved | JEFF BYTHEWAY |
| Footing/Foundation/Slab | 4/19/2021 | Conditional Approval | JEFF BYTHEWAY |
| Deputy Reinf. Concrete | 4/21/2021 | Conditional Approval | LEOPOLDO MENDOZA |
| Deputy Steel/Welding | 5/24/2021 | Approved | SORIN CIRSTOIU |
| Deputy Wood Construction | 6/4/2021 | Approved | SORIN CIRSTOIU |
| Green Building Rough | 6/4/2021 | Partial Inspection | SORIN CIRSTOIU |
| METHANE-Rough | 6/4/2021 | Partial Inspection | SORIN CIRSTOIU |
| Verify Sprinkler Sign Off | 6/4/2021 | Partial Inspection | SORIN CIRSTOIU |
| Wood Frame | 6/4/2021 | Corrections Issued | SORIN CIRSTOIU |
| Green Building Rough | 6/23/2021 | Partial Inspection | SORIN CIRSTOIU |
| METHANE-Rough | 6/23/2021 | Partial Inspection | SORIN CIRSTOIU |
| Verify Sprinkler Sign Off | 6/23/2021 | Partial Inspection | SORIN CIRSTOIU |
| Wood Frame | 6/23/2021 | Partial Approval | SORIN CIRSTOIU |
| Green Building Rough | 7/13/2021 | Partial Inspection | SORIN CIRSTOIU |
| METHANE-Rough | 7/13/2021 | Partial Inspection | SORIN CIRSTOIU |
| Verify Sprinkler Sign Off | 7/13/2021 | Partial Inspection | SORIN CIRSTOIU |
| Wood Frame | 7/13/2021 | Partial Inspection | SORIN CIRSTOIU |
| Floor/Roof Diaphrgm/Shear Wall | 7/14/2021 | Partial Approval | SORIN CIRSTOIU |
| Deputy Wood Construction | 7/30/2021 | Conditional Approval | JOHN DODGE |
| Green Building Rough | 8/4/2021 | Partial Inspection | SORIN CIRSTOIU |
| METHANE-Rough | 8/4/2021 | Partial Inspection | SORIN CIRSTOIU |
| Verify Sprinkler Sign Off | 8/4/2021 | Partial Inspection | SORIN CIRSTOIU |
| Wood Frame | 8/4/2021 | Partial Inspection | SORIN CIRSTOIU |
| Green Building Rough | 8/6/2021 | Partial Inspection | SORIN CIRSTOIU |
| METHANE-Rough | 8/6/2021 | Partial Inspection | SORIN CIRSTOIU |
| Verify Sprinkler Sign Off | 8/6/2021 | Partial Inspection | SORIN CIRSTOIU |
| Wood Frame | 8/6/2021 | Partial Approval | SORIN CIRSTOIU |
| Green Building Rough | 9/20/2021 | Partial Inspection | SORIN CIRSTOIU |
| METHANE-Rough | 9/20/2021 | Partial Inspection | SORIN CIRSTOIU |
| Verify Sprinkler Sign Off | 9/20/2021 | Partial Inspection | SORIN CIRSTOIU |
| Wood Frame | 9/20/2021 | Partial Inspection | SORIN CIRSTOIU |
| Floor/Roof Diaphrgm/Shear Wall | 9/22/2021 | Partial Approval | SORIN CIRSTOIU |
| Floor/Roof Diaphrgm/Shear Wall | 4/15/2022 | Partial Approval | JEFF BYTHEWAY |
| Green Building Rough | 4/18/2022 | Approved | JEFF BYTHEWAY |
| METHANE-Rough | 4/18/2022 | Approved | JEFF BYTHEWAY |
| Verify Sprinkler Sign Off | 4/18/2022 | Not Ready for Inspection | JEFF BYTHEWAY |
| Wood Frame | 4/18/2022 | Partial Approval | JEFF BYTHEWAY |
| Verify Sprinkler Sign Off | 5/3/2022 | Approved | JEFF BYTHEWAY |
| Wood Frame | 5/3/2022 | Partial Approval | JEFF BYTHEWAY |
| Drywall Nailing | 5/12/2022 | Partial Approval | JEFF BYTHEWAY |
| Drywall Nailing | 6/15/2022 | Partial Approval | JEFF BYTHEWAY |
| Deputy Drilled-In Anchors | 8/9/2022 | Approved | JEFF BYTHEWAY |
| Wood Frame | 8/9/2022 | Partial Inspection | JEFF BYTHEWAY |
| Wood Frame | 8/16/2022 | Partial Approval | JEFF BYTHEWAY |
| Insulation | 8/23/2022 | Partial Approval | DERRICK SPENCER |
| Wood Frame | 8/25/2022 | Partial Inspection | JEFF BYTHEWAY |
| Wood Frame | 8/31/2022 | Partial Approval | JEFF BYTHEWAY |
| Insulation | 9/20/2022 | Partial Approval | DERRICK SPENCER |
| Drywall Nailing | 10/25/2022 | Partial Approval | SORIN CIRSTOIU |
| Interior/Exterior Lathing | 11/8/2022 | Approved | DERRICK SPENCER |
| Interior/Exterior Lathing | 12/27/2022 | Approved | DERRICK SPENCER |
| Drywall Nailing | 6/1/2023 | Approved | DERRICK SPENCER |
| Final | 6/1/2023 | Not Ready for Inspection | DERRICK SPENCER |
| Footing/Foundation/Slab | 6/1/2023 | Approved | DERRICK SPENCER |
| Green Building Final | 6/1/2023 | Not Ready for Inspection | DERRICK SPENCER |
| Interior/Exterior Lathing | 6/1/2023 | Approved | DERRICK SPENCER |
| Reinforced Masonry Frame | 6/1/2023 | Approved | DERRICK SPENCER |
| SGSOV-Seismic Gas S/O Valve | 6/1/2023 | SGSOV Approved | DERRICK SPENCER |
| Smoke Detectors | 6/1/2023 | Approved | DERRICK SPENCER |
| Structural Steel Frame | 6/1/2023 | Approved | DERRICK SPENCER |
| Wood Frame | 6/1/2023 | Approved | DERRICK SPENCER |
| Special/Order Compliance | 9/12/2023 | Approved | DERRICK SPENCER |
| Final | 11/8/2023 | OK to Issue CofO | DERRICK SPENCER |
| Green Building Final | 11/8/2023 | Approved | DERRICK SPENCER |