|
Pre-Inspection
|
5/1/2019
|
Approved
|
ERNESTO CORRAL
|
|
Pre-Inspection
|
11/25/2019
|
Not Ready for Inspection
|
ERNESTO CORRAL
|
|
Pre-Inspection
|
1/8/2020
|
Approved
|
ERNESTO CORRAL
|
|
Piling/Pier/Caisson
|
1/10/2020
|
Partial Inspection
|
ERNESTO CORRAL
|
|
Piling/Pier/Caisson
|
1/22/2020
|
Partial Inspection
|
ERNESTO CORRAL
|
|
Excavation/Setback/Form/Re-Bar
|
2/14/2020
|
Partial Inspection
|
ERNESTO CORRAL
|
|
Piling/Pier/Caisson
|
2/14/2020
|
Partial Inspection
|
ERNESTO CORRAL
|
|
Excavation/Setback/Form/Re-Bar
|
3/2/2020
|
Partial Inspection
|
ERNESTO CORRAL
|
|
Excavation/Setback/Form/Re-Bar
|
3/10/2020
|
Partial Inspection
|
ERNESTO CORRAL
|
|
Excavation/Setback/Form/Re-Bar
|
3/23/2020
|
Partial Inspection
|
ERNESTO CORRAL
|
|
Excavation/Setback/Form/Re-Bar
|
5/19/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
5/19/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
5/26/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
5/27/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
5/28/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
5/28/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
5/29/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
6/2/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
6/5/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Excavation/Setback/Form/Re-Bar
|
6/5/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Green Building Rough
|
6/5/2020
|
Approved
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
6/5/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Verify Sprinkler Sign Off
|
6/5/2020
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
6/9/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
6/10/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
6/11/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Excavation/Setback/Form/Re-Bar
|
6/11/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
6/12/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
6/16/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
6/17/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Excavation/Setback/Form/Re-Bar
|
6/24/2020
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Reinforced Masonry Frame
|
6/24/2020
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
6/25/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
6/25/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
6/26/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Masonry Frame
|
6/29/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Masonry Frame
|
7/2/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
7/9/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
7/13/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Masonry Frame
|
7/13/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
7/20/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Masonry Frame
|
8/3/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
8/6/2020
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
8/7/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Reinf. Concrete
|
8/10/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
8/11/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
8/12/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
8/12/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
8/13/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
8/14/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
8/18/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
8/19/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
8/20/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
8/21/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
8/25/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
8/26/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
8/27/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
8/27/2020
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Verify Sprinkler Sign Off
|
8/27/2020
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
8/28/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Excavation/Setback/Form/Re-Bar
|
8/28/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
8/28/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
8/31/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
9/8/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
9/9/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
9/10/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
9/15/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
9/15/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
9/22/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
9/23/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
9/24/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
9/28/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
9/29/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
10/9/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
10/13/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
10/14/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
10/16/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
10/20/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
10/21/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
10/22/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Excavation/Setback/Form/Re-Bar
|
10/23/2020
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
10/26/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Excavation/Setback/Form/Re-Bar
|
10/26/2020
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Excavation/Setback/Form/Re-Bar
|
10/26/2020
|
Partial Approval
|
NICK DANERI
|
|
Footing/Foundation/Slab
|
10/26/2020
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
10/27/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Excavation/Setback/Form/Re-Bar
|
10/27/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Masonry Frame
|
11/4/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
11/5/2020
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Footing/Foundation/Slab
|
11/9/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Masonry Frame
|
11/9/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
11/13/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Masonry Frame
|
11/17/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
11/23/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
11/24/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
11/24/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
11/25/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
12/8/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
12/16/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Drywall Nailing
|
1/14/2021
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
1/19/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
2/5/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Wood Construction
|
2/17/2021
|
Conditional Approval
|
NICK DANERI
|
|
Floor/Roof Diaphrgm/Shear Wall
|
2/17/2021
|
Partial Approval
|
NICK DANERI
|
|
Floor/Roof Diaphrgm/Shear Wall
|
2/23/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/4/2021
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/9/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/16/2021
|
Partial Approval
|
RONALD PACHECO
|
|
Pre-Inspection
|
3/17/2021
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Verify Sprinkler Sign Off
|
4/5/2021
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Wood Frame
|
4/5/2021
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Wood Frame
|
4/22/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Insulation
|
4/26/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Wood Frame
|
4/26/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Insulation
|
4/27/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Wood Frame
|
4/27/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Insulation
|
4/29/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Wood Frame
|
4/29/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Insulation
|
5/1/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Insulation
|
5/5/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/6/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Insulation
|
5/6/2021
|
Partial Inspection
|
LANNY MERRICK
|
|
Excavation/Setback/Form/Re-Bar
|
5/13/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/13/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Insulation
|
5/13/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Insulation
|
5/18/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/21/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Insulation
|
5/21/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Insulation
|
5/25/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Insulation
|
6/2/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Drywall Nailing
|
6/15/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Insulation
|
6/15/2021
|
Approved
|
RAFAEL ESPINOZA
|
|
Light Gage Steel Frame
|
6/21/2021
|
Not Ready for Inspection
|
LANNY MERRICK
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/24/2021
|
Partial Approval
|
LANNY MERRICK
|
|
Light Gage Steel Frame
|
6/28/2021
|
Partial Approval
|
JONATHAN QUACH
|
|
Insulation
|
6/29/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Light Gage Steel Frame
|
6/29/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Light Gage Steel Frame
|
6/30/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Drywall Nailing
|
7/1/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Light Gage Steel Frame
|
7/1/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Drywall Nailing
|
7/6/2021
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Special/Order Compliance
|
7/16/2021
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Insulation
|
8/12/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Light Gage Steel Frame
|
8/20/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Light Gage Steel Frame
|
8/23/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Light Gage Steel Frame
|
9/2/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Interior/Exterior Lathing
|
9/23/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Interior/Exterior Lathing
|
9/28/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Interior/Exterior Lathing
|
10/5/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Interior/Exterior Lathing
|
11/19/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Light Gage Steel Frame
|
12/16/2021
|
Partial Approval
|
MARK FERRARI
|
|
Special/Order Compliance
|
12/16/2021
|
Partial Inspection
|
MARK FERRARI
|
|
Pre-Inspection
|
12/17/2021
|
Partial Approval
|
MARK FERRARI
|
|
Interior/Exterior Lathing
|
12/20/2021
|
Partial Approval
|
SORIN CIRSTOIU
|
|
Interior/Exterior Lathing
|
2/1/2022
|
Approved
|
RAFAEL ESPINOZA
|
|
Drywall Nailing
|
5/20/2022
|
Approved
|
RAFAEL ESPINOZA
|
|
Final
|
5/20/2022
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
5/20/2022
|
Approved
|
RAFAEL ESPINOZA
|
|
Green Building Final
|
5/20/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
5/20/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
SGSOV-Seismic Gas S/O Valve
|
5/20/2022
|
SGSOV Not Ready
|
RAFAEL ESPINOZA
|
|
Smoke Detectors
|
5/20/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Verify Sprinkler Sign Off
|
5/20/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Wood Frame
|
5/20/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Final
|
5/24/2022
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Green Building Final
|
5/24/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
5/24/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
SGSOV-Seismic Gas S/O Valve
|
5/24/2022
|
SGSOV Approved
|
RAFAEL ESPINOZA
|
|
Smoke Detectors
|
5/24/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Verify Sprinkler Sign Off
|
5/24/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Wood Frame
|
5/24/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Final
|
5/26/2022
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Pre-Inspection
|
5/31/2022
|
Corrections Issued
|
RAFAEL ESPINOZA
|
|
Verify Sprinkler Sign Off
|
6/13/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Final
|
6/23/2022
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Green Building Final
|
6/23/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
6/23/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Smoke Detectors
|
6/23/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Verify Sprinkler Sign Off
|
6/23/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Wood Frame
|
6/23/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Final
|
7/20/2022
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Green Building Final
|
7/20/2022
|
Approved
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
7/20/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Smoke Detectors
|
7/20/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Verify Sprinkler Sign Off
|
7/20/2022
|
Approved
|
RAFAEL ESPINOZA
|
|
Wood Frame
|
7/20/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Final
|
7/28/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
7/28/2022
|
Approved
|
RAFAEL ESPINOZA
|
|
Smoke Detectors
|
7/28/2022
|
Approved
|
RAFAEL ESPINOZA
|
|
Wood Frame
|
7/28/2022
|
Approved
|
RAFAEL ESPINOZA
|