1901 W BLAKE AVE 90039

Certificate Information: 1901 W BLAKE AVE 90039

Application / Permit
17010-10000-01880
Plan Check / Job No.
B17LA08056
Group
Building
Type
Bldg-New
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
New Apartment with three levels of Type VA building for live/work units (52 units total)over one level of type IA subterranean parking)
Permit Issued
Issued on 4/9/2019
Issuing Office
Metro
Current Status
CofO Issued on 8/1/2022
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 6/1/2017 APPLICANT
Assigned to Plan Check Engineer 6/15/2017 LARRY LEE
Corrections Issued 6/20/2017 LARRY LEE
Quality Review Completed 6/22/2017 PETER KIM
Building Plans Picked Up 6/26/2017 APPLICANT
Applicant returned to address corrections 10/3/2018 LARRY LEE
Plan Check Approved 3/4/2019 LARRY LEE
Issued 4/9/2019 LADBS
CofO in Progress 7/29/2022 RAFAEL ESPINOZA
CofO Issued 8/1/2022 ERNESTO CORRAL
Permit Finaled 8/1/2022 ERNESTO CORRAL

Permit Application Clearance Information

Hydrant and Access approval Cleared 3/8/2018 JOHN CONNEALLY
Address approval Cleared 5/15/2018 CELINA MORENO
Eng Process Fee Ord 176,300 Cleared 5/30/2018 LEE GUILBEAUX
Building over 3-story or 36-ft Cleared 7/9/2018 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 7/9/2018 CALOSHA APPROVED
Green Code Cleared 8/7/2018 LARRY LEE
Sewer availability Cleared 10/18/2018 RUDY TERRIQUEZ.
Housing density bonus Cleared 11/5/2018 RICHARD TRUONG
Highway dedication Cleared 12/7/2018 NAZILA NOORIFAR
DAS Clearance Cleared 1/15/2019 LARRY LEE
Low Impact Development Cleared 1/25/2019 RYAN HUDSON
Fire Marshall Fire Life Safety Cleared 1/28/2019 DOMINIQUE MEDINA
"Q" conditions Cleared 2/1/2019 EDBER MACEDO
CPC Cleared 2/1/2019 EDBER MACEDO
CPC Cleared 2/1/2019 EDBER MACEDO
Miscellaneous Cleared 2/1/2019 EDBER MACEDO
Opn space landscape/Water mgmt Cleared 2/1/2019 EDBER MACEDO
Site Plan review Cleared 2/1/2019 EDBER MACEDO
ZI Cleared 2/1/2019 EDBER MACEDO
Permit Cleared 2/12/2019 DANIEL KOZUBAL
Roof/Waste drainage to street Cleared 2/12/2019 DANIEL KOZUBAL
Miscellaneous Cleared 2/25/2019 DANIEL KOZUBAL
Work Adjacent to Public Way Cleared 2/28/2019 BOK GOH

Contact Information

Architect Bornstein,, Lise Michelle; Lic. No.: C30835 1625 OLYMPIC BLVD      SANTA MONICA, CA 90404
Contractor Uncommon Builders Llc; Lic. No.: 1046026-B 16380 ROSCOE BLVD STE 120      VAN NUYS, CA 91406
Engineer Funk, David Lyle; Lic. No.: S5421 619 BERYL ST      REDONDO BEACH, CA 90277
Engineer Irvine,, Jon Alan; Lic. No.: GE2891 145 N SIERRA MADRE BLVD STE 1      PASADENA, CA 91107

Inspector Information

RONALD JIMENEZ, (213) 482-0307 Office Hours: 7:00-8:00 AM MON-FRI
LARRY ARNICK, (213) 482-0307 Office Hours: 7:00-8:00 AM MON-FRI
JOEY BUCHANAN, (213) 482-0307 Office Hours: 7:00-8:00 AM MON-FRI
ERNESTO CORRAL, (213) 482-0307 Office Hours: 7:00-8:00 AM MON-FRI
RAFAEL ESPINOZA, (213) 482-0307 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 5/1/2019 Approved ERNESTO CORRAL
Pre-Inspection 11/25/2019 Not Ready for Inspection ERNESTO CORRAL
Pre-Inspection 1/8/2020 Approved ERNESTO CORRAL
Piling/Pier/Caisson 1/10/2020 Partial Inspection ERNESTO CORRAL
Piling/Pier/Caisson 1/22/2020 Partial Inspection ERNESTO CORRAL
Excavation/Setback/Form/Re-Bar 2/14/2020 Partial Inspection ERNESTO CORRAL
Piling/Pier/Caisson 2/14/2020 Partial Inspection ERNESTO CORRAL
Excavation/Setback/Form/Re-Bar 3/2/2020 Partial Inspection ERNESTO CORRAL
Excavation/Setback/Form/Re-Bar 3/10/2020 Partial Inspection ERNESTO CORRAL
Excavation/Setback/Form/Re-Bar 3/23/2020 Partial Inspection ERNESTO CORRAL
Excavation/Setback/Form/Re-Bar 5/19/2020 Partial Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 5/19/2020 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 5/26/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 5/27/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 5/28/2020 Conditional Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 5/28/2020 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 5/29/2020 Conditional Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 6/2/2020 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 6/5/2020 Conditional Approval RAFAEL ESPINOZA
Excavation/Setback/Form/Re-Bar 6/5/2020 Partial Approval RAFAEL ESPINOZA
Green Building Rough 6/5/2020 Approved RAFAEL ESPINOZA
Reinforced Concrete Frame 6/5/2020 Partial Approval RAFAEL ESPINOZA
Verify Sprinkler Sign Off 6/5/2020 Not Ready for Inspection RAFAEL ESPINOZA
Deputy Reinf. Concrete 6/9/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 6/10/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 6/11/2020 Conditional Approval RAFAEL ESPINOZA
Excavation/Setback/Form/Re-Bar 6/11/2020 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 6/12/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 6/16/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 6/17/2020 Conditional Approval RAFAEL ESPINOZA
Excavation/Setback/Form/Re-Bar 6/24/2020 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Masonry Frame 6/24/2020 Not Ready for Inspection RAFAEL ESPINOZA
Deputy Reinf. Concrete 6/25/2020 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 6/25/2020 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 6/26/2020 Conditional Approval RAFAEL ESPINOZA
Reinforced Masonry Frame 6/29/2020 Partial Approval RAFAEL ESPINOZA
Reinforced Masonry Frame 7/2/2020 Partial Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 7/9/2020 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 7/13/2020 Conditional Approval RAFAEL ESPINOZA
Reinforced Masonry Frame 7/13/2020 Partial Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 7/20/2020 Partial Approval RAFAEL ESPINOZA
Reinforced Masonry Frame 8/3/2020 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 8/6/2020 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 8/7/2020 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 8/10/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 8/11/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 8/12/2020 Conditional Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 8/12/2020 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 8/13/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 8/14/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 8/18/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 8/19/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 8/20/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 8/21/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 8/25/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 8/26/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 8/27/2020 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 8/27/2020 Partial Inspection RAFAEL ESPINOZA
Verify Sprinkler Sign Off 8/27/2020 Not Ready for Inspection RAFAEL ESPINOZA
Deputy Reinf. Concrete 8/28/2020 Conditional Approval RAFAEL ESPINOZA
Excavation/Setback/Form/Re-Bar 8/28/2020 Partial Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 8/28/2020 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 8/31/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 9/8/2020 Conditional Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 9/9/2020 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 9/10/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 9/15/2020 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 9/15/2020 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 9/22/2020 Conditional Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 9/23/2020 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 9/24/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 9/28/2020 Conditional Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 9/29/2020 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 10/9/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 10/13/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 10/14/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 10/16/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 10/20/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 10/21/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 10/22/2020 Conditional Approval RAFAEL ESPINOZA
Excavation/Setback/Form/Re-Bar 10/23/2020 Not Ready for Inspection RAFAEL ESPINOZA
Deputy Reinf. Concrete 10/26/2020 Conditional Approval RAFAEL ESPINOZA
Excavation/Setback/Form/Re-Bar 10/26/2020 Not Ready for Inspection RAFAEL ESPINOZA
Excavation/Setback/Form/Re-Bar 10/26/2020 Partial Approval NICK DANERI
Footing/Foundation/Slab 10/26/2020 Not Ready for Inspection RAFAEL ESPINOZA
Deputy Reinf. Concrete 10/27/2020 Conditional Approval RAFAEL ESPINOZA
Excavation/Setback/Form/Re-Bar 10/27/2020 Partial Approval RAFAEL ESPINOZA
Reinforced Masonry Frame 11/4/2020 Partial Approval RAFAEL ESPINOZA
Deputy Steel/Welding 11/5/2020 Conditional Approval ERNESTO CORRAL
Footing/Foundation/Slab 11/9/2020 Partial Approval RAFAEL ESPINOZA
Reinforced Masonry Frame 11/9/2020 Partial Approval RAFAEL ESPINOZA
Deputy Steel/Welding 11/13/2020 Conditional Approval RAFAEL ESPINOZA
Reinforced Masonry Frame 11/17/2020 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 11/23/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 11/24/2020 Conditional Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 11/24/2020 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 11/25/2020 Conditional Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 12/8/2020 Conditional Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 12/16/2020 Partial Approval RAFAEL ESPINOZA
Drywall Nailing 1/14/2021 Partial Inspection RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 1/19/2021 Partial Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 2/5/2021 Partial Approval RAFAEL ESPINOZA
Deputy Wood Construction 2/17/2021 Conditional Approval NICK DANERI
Floor/Roof Diaphrgm/Shear Wall 2/17/2021 Partial Approval NICK DANERI
Floor/Roof Diaphrgm/Shear Wall 2/23/2021 Partial Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 3/4/2021 Not Ready for Inspection RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 3/9/2021 Partial Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 3/16/2021 Partial Approval RONALD PACHECO
Pre-Inspection 3/17/2021 Partial Inspection RAFAEL ESPINOZA
Verify Sprinkler Sign Off 4/5/2021 Not Ready for Inspection RAFAEL ESPINOZA
Wood Frame 4/5/2021 Partial Inspection RAFAEL ESPINOZA
Wood Frame 4/22/2021 Partial Approval RAFAEL ESPINOZA
Insulation 4/26/2021 Partial Approval RAFAEL ESPINOZA
Wood Frame 4/26/2021 Partial Approval RAFAEL ESPINOZA
Insulation 4/27/2021 Partial Approval RAFAEL ESPINOZA
Wood Frame 4/27/2021 Partial Approval RAFAEL ESPINOZA
Insulation 4/29/2021 Partial Approval RAFAEL ESPINOZA
Wood Frame 4/29/2021 Partial Approval RAFAEL ESPINOZA
Insulation 5/1/2021 Partial Approval EDWIN GREGORYONA
Insulation 5/5/2021 Partial Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 5/6/2021 Partial Approval RAFAEL ESPINOZA
Insulation 5/6/2021 Partial Inspection LANNY MERRICK
Excavation/Setback/Form/Re-Bar 5/13/2021 Partial Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 5/13/2021 Partial Approval RAFAEL ESPINOZA
Insulation 5/13/2021 Partial Approval RAFAEL ESPINOZA
Insulation 5/18/2021 Partial Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 5/21/2021 Partial Approval RAFAEL ESPINOZA
Insulation 5/21/2021 Partial Approval RAFAEL ESPINOZA
Insulation 5/25/2021 Partial Approval RAFAEL ESPINOZA
Insulation 6/2/2021 Partial Approval RAFAEL ESPINOZA
Drywall Nailing 6/15/2021 Partial Approval RAFAEL ESPINOZA
Insulation 6/15/2021 Approved RAFAEL ESPINOZA
Light Gage Steel Frame 6/21/2021 Not Ready for Inspection LANNY MERRICK
Floor/Roof Diaphrgm/Shear Wall 6/24/2021 Partial Approval LANNY MERRICK
Light Gage Steel Frame 6/28/2021 Partial Approval JONATHAN QUACH
Insulation 6/29/2021 Partial Approval RAFAEL ESPINOZA
Light Gage Steel Frame 6/29/2021 Partial Approval RAFAEL ESPINOZA
Light Gage Steel Frame 6/30/2021 Partial Approval RAFAEL ESPINOZA
Drywall Nailing 7/1/2021 Partial Approval RAFAEL ESPINOZA
Light Gage Steel Frame 7/1/2021 Partial Approval RAFAEL ESPINOZA
Drywall Nailing 7/6/2021 Partial Inspection RAFAEL ESPINOZA
Special/Order Compliance 7/16/2021 Partial Inspection RAFAEL ESPINOZA
Insulation 8/12/2021 Partial Approval RAFAEL ESPINOZA
Light Gage Steel Frame 8/20/2021 Partial Approval RAFAEL ESPINOZA
Light Gage Steel Frame 8/23/2021 Partial Approval RAFAEL ESPINOZA
Light Gage Steel Frame 9/2/2021 Partial Approval RAFAEL ESPINOZA
Interior/Exterior Lathing 9/23/2021 Partial Approval EDWIN GREGORYONA
Interior/Exterior Lathing 9/28/2021 Partial Approval RAFAEL ESPINOZA
Interior/Exterior Lathing 10/5/2021 Partial Approval RAFAEL ESPINOZA
Interior/Exterior Lathing 11/19/2021 Partial Approval RAFAEL ESPINOZA
Light Gage Steel Frame 12/16/2021 Partial Approval MARK FERRARI
Special/Order Compliance 12/16/2021 Partial Inspection MARK FERRARI
Pre-Inspection 12/17/2021 Partial Approval MARK FERRARI
Interior/Exterior Lathing 12/20/2021 Partial Approval SORIN CIRSTOIU
Interior/Exterior Lathing 2/1/2022 Approved RAFAEL ESPINOZA
Drywall Nailing 5/20/2022 Approved RAFAEL ESPINOZA
Final 5/20/2022 Partial Inspection RAFAEL ESPINOZA
Footing/Foundation/Slab 5/20/2022 Approved RAFAEL ESPINOZA
Green Building Final 5/20/2022 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Concrete Frame 5/20/2022 Not Ready for Inspection RAFAEL ESPINOZA
SGSOV-Seismic Gas S/O Valve 5/20/2022 SGSOV Not Ready RAFAEL ESPINOZA
Smoke Detectors 5/20/2022 Not Ready for Inspection RAFAEL ESPINOZA
Verify Sprinkler Sign Off 5/20/2022 Not Ready for Inspection RAFAEL ESPINOZA
Wood Frame 5/20/2022 Not Ready for Inspection RAFAEL ESPINOZA
Final 5/24/2022 Partial Inspection RAFAEL ESPINOZA
Green Building Final 5/24/2022 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Concrete Frame 5/24/2022 Not Ready for Inspection RAFAEL ESPINOZA
SGSOV-Seismic Gas S/O Valve 5/24/2022 SGSOV Approved RAFAEL ESPINOZA
Smoke Detectors 5/24/2022 Not Ready for Inspection RAFAEL ESPINOZA
Verify Sprinkler Sign Off 5/24/2022 Not Ready for Inspection RAFAEL ESPINOZA
Wood Frame 5/24/2022 Not Ready for Inspection RAFAEL ESPINOZA
Final 5/26/2022 Partial Inspection RAFAEL ESPINOZA
Pre-Inspection 5/31/2022 Corrections Issued RAFAEL ESPINOZA
Verify Sprinkler Sign Off 6/13/2022 Not Ready for Inspection RAFAEL ESPINOZA
Final 6/23/2022 Partial Inspection RAFAEL ESPINOZA
Green Building Final 6/23/2022 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Concrete Frame 6/23/2022 Not Ready for Inspection RAFAEL ESPINOZA
Smoke Detectors 6/23/2022 Not Ready for Inspection RAFAEL ESPINOZA
Verify Sprinkler Sign Off 6/23/2022 Not Ready for Inspection RAFAEL ESPINOZA
Wood Frame 6/23/2022 Not Ready for Inspection RAFAEL ESPINOZA
Final 7/20/2022 Partial Inspection RAFAEL ESPINOZA
Green Building Final 7/20/2022 Approved RAFAEL ESPINOZA
Reinforced Concrete Frame 7/20/2022 Not Ready for Inspection RAFAEL ESPINOZA
Smoke Detectors 7/20/2022 Not Ready for Inspection RAFAEL ESPINOZA
Verify Sprinkler Sign Off 7/20/2022 Approved RAFAEL ESPINOZA
Wood Frame 7/20/2022 Not Ready for Inspection RAFAEL ESPINOZA
Final 7/28/2022 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 7/28/2022 Approved RAFAEL ESPINOZA
Smoke Detectors 7/28/2022 Approved RAFAEL ESPINOZA
Wood Frame 7/28/2022 Approved RAFAEL ESPINOZA