100 S GRAND AVE 90012

Certificate Information: 100 S GRAND AVE 90012

Application / Permit
17010-10000-01468
Plan Check / Job No.
B17LA06098
Group
Building
Type
Bldg-New
Sub-Type
Commercial
Primary Use
(5) Apartment
Work Description
MIXED USE HIGHRISE BUILDING CONSISTING OF 2 TOWERS OVER PARKING. 20 STORY HOTEL AND A 39 STORY APARTMENT BUILDING WHICH INCLUDES **** AFFORDABLE UNITS. THE COMMERCIAL SPACES WILL BE APPROVED AS A CORE AND SHELL, THE HOTEL ROOMS WILL BE REVIEWED AND APPROVED UNDER THE 10008 PERMIT and ISSUED CONCURRENTLY. THE TENANT IMPROVEMENTS TO BE APPROVED UNDER SEPARATE PLAN CHECK/PERMIT. THE TRELLIS STRUCTURES ARE DEFERRED AND TO BE MADE OF STEEL. STEEL STAIRS AND RAILS, CURTAIN WALLS- ALL DOORS AND WINDOWS/STORE FRONTS, GLASS COVERED STRUCTURES ARE DEFERRED STRUCTURALLY
Permit Issued
Issued on 7/19/2019
Issuing Office
Metro
Current Status
CofO Issued on 2/27/2026
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 5/30/2017 APPLICANT
Assigned to Plan Check Engineer 6/15/2017 JOHN VASQUEZ
Corrections Issued 6/29/2017 MINYE PAK
Quality Review Completed 6/29/2017 MINYE PAK
Applicant returned to address corrections 6/29/2017 MINYE PAK
Applicant returned to address corrections 10/17/2017 MINYE PAK
Applicant returned to address corrections 10/18/2017 MINYE PAK
Applicant returned to address corrections 10/24/2017 MINYE PAK
Building Plans Picked Up 10/26/2017 APPLICANT
Applicant returned to address corrections 1/26/2018 MINYE PAK
Applicant returned to address corrections 3/20/2018 JOHN VASQUEZ
Applicant returned to address corrections 3/20/2018 MINYE PAK
Applicant returned to address corrections 5/15/2018 JOHN VASQUEZ
Applicant returned to address corrections 5/16/2018 JOHN VASQUEZ
Applicant returned to address corrections 6/11/2018 JOHN VASQUEZ
Applicant returned to address corrections 6/13/2018 ALLEN MANALANSAN
Applicant returned to address corrections 7/3/2018 JOHN VASQUEZ
Applicant returned to address corrections 7/10/2018 JOHN VASQUEZ
Applicant returned to address corrections 7/17/2018 JOHN VASQUEZ
Applicant returned to address corrections 7/25/2018 JOHN VASQUEZ
Applicant returned to address corrections 8/24/2018 JOHN VASQUEZ
Applicant returned to address corrections 10/4/2018 ALLEN MANALANSAN
Applicant returned to address corrections 10/22/2018 JOHN VASQUEZ
Applicant returned to address corrections 10/29/2018 JOHN VASQUEZ
Applicant returned to address corrections 11/8/2018 JOHN VASQUEZ
Applicant returned to address corrections 11/14/2018 JOHN VASQUEZ
Applicant returned to address corrections 11/20/2018 JOHN VASQUEZ
Applicant returned to address corrections 11/27/2018 JOHN VASQUEZ
Applicant returned to address corrections 12/3/2018 JOHN VASQUEZ
Applicant returned to address corrections 12/6/2018 JOHN VASQUEZ
Applicant returned to address corrections 12/17/2018 JOHN VASQUEZ
Applicant returned to address corrections 1/8/2019 JOHN VASQUEZ
Applicant returned to address corrections 2/5/2019 JOHN VASQUEZ
Applicant returned to address corrections 2/19/2019 JOHN VASQUEZ
Applicant returned to address corrections 2/25/2019 JOHN VASQUEZ
Applicant returned to address corrections 3/7/2019 JOHN VASQUEZ
Applicant returned to address corrections 3/21/2019 JOHN VASQUEZ
Applicant returned to address corrections 5/9/2019 JOHN VASQUEZ
Applicant returned to address corrections 5/14/2019 JOHN VASQUEZ
Applicant returned to address corrections 5/23/2019 JOHN VASQUEZ
Applicant returned to address corrections 5/29/2019 JOHN VASQUEZ
Applicant returned to address corrections 6/4/2019 JOHN VASQUEZ
Applicant returned to address corrections 6/28/2019 JOHN VASQUEZ
Applicant returned to address corrections 7/10/2019 JOHN VASQUEZ
Plan Check Approved 7/18/2019 JOHN VASQUEZ
Issued 7/19/2019 LADBS
TCO Issued (Expire Date: 12-24-2022) 6/27/2022 TERRY HERR
TCO Issued (Expire Date: 06-26-2023) 12/28/2022 TED RIES
TCO Issued (Expire Date: 12-13-2023) 6/16/2023 TED RIES
TCO Issued (Expire Date: 06-11-2024) 12/14/2023 ADAM BURGESS
TCO Issued (Expire Date: 12-07-2024) 6/10/2024 ADAM BURGESS
TCO Issued (Expire Date: 05-07-2025) 11/8/2024 ERNESTO CORRAL
TCO Issued (Expire Date: 11-25-2025) 5/29/2025 ADAM BURGESS
TCO Issued (Expire Date: 05-19-2026) 11/20/2025 ADAM BURGESS
Permit Finaled 2/27/2026 ADAM BURGESS
CofO Issued 2/27/2026 ADAM BURGESS
Permit Finaled 2/27/2026 ADAM BURGESS

Permit Application Clearance Information

Address approval Cleared 10/16/2017 ADRIAN SANCHEZ
Eng Process Fee Ord 176,300 Cleared 10/16/2017 ADRIAN SANCHEZ
GPI Written Notices Cleared 12/27/2017 MINYE PAK
Grading Pre-Inspection Cleared 12/27/2017 MINYE PAK
Construction near power lines Cleared 2/20/2018 WALTER RAMIREZ
Construction within easement Cleared 2/20/2018 WALTER RAMIREZ
Hydrant and Access approval Cleared 7/12/2018 GEORGE SUCHAND
Driveway location Cleared 8/30/2018 WESTON PRINGLE
Internal circulation Cleared 8/30/2018 WESTON PRINGLE
Food Service Establishment Cleared 10/17/2018 PAWAN VERMA
Sewer availability Cleared 10/17/2018 STEVE MELGAR
Building over 3-story or 36-ft Cleared 10/22/2018 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 10/22/2018 CALOSHA APPROVED
Miscellaneous Cleared 12/18/2018 TERRY PHAN
Miscellaneous Cleared 12/18/2018 TERRY PHAN
Miscellaneous Cleared 12/18/2018 TERRY PHAN
Permit Cleared 12/18/2018 TERRY PHAN
Metro Rail approval Cleared 4/3/2019 MINYE PAK
Highway dedication Cleared 4/9/2019 KARAN PATEL
Work Adjacent to Public Way Cleared 4/9/2019 CHIU TAM
DCP conditions approval Cleared 5/17/2019 MARITES CUNANAN
DCP conditions approval Cleared 5/17/2019 MARITES CUNANAN
Density Bonus 12.22.A.25 Cleared 5/17/2019 MARITES CUNANAN
Density Bonus 12.22.A.25 Cleared 5/17/2019 MARITES CUNANAN
Density Bonus 12.22.A.25 Cleared 5/17/2019 MARITES CUNANAN
Low Impact Development Cleared 5/23/2019 ORVAL HERNANDEZ-MARCI
Roof/Waste drainage to street Cleared 5/23/2019 KAREN LE
Bicycle Parking Cleared 7/10/2019 KAREN LE
DAS Clearance Cleared 7/10/2019 MINYE PAK
Encroachment in public way Cleared 7/10/2019 KAREN LE
Miscellaneous Cleared 7/10/2019 NGOC KIEM
Miscellaneous Cleared 7/11/2019 KAREN LE
Green Code Cleared 7/12/2019 MINYE PAK
"D" conditions Cleared 7/16/2019 DANALYNN DOMINGUEZ
"Q" conditions Cleared 7/16/2019 DANALYNN DOMINGUEZ
"T" removal Cleared 7/16/2019 DANALYNN DOMINGUEZ
CPC Cleared 7/16/2019 DANALYNN DOMINGUEZ
Fire Marshall Fire Life Safety Cleared 7/16/2019 ANDREW KO
Site Plan review Cleared 7/16/2019 DANALYNN DOMINGUEZ
Specific Plan Cleared 7/16/2019 DANALYNN DOMINGUEZ
Tract Map conditions Cleared 7/16/2019 DANALYNN DOMINGUEZ
Tract Map conditions Cleared 7/16/2019 DANALYNN DOMINGUEZ
Tract Map conditions Cleared 7/16/2019 DANALYNN DOMINGUEZ
Tract Map conditions Cleared 7/16/2019 DANALYNN DOMINGUEZ
Tract Map conditions Cleared 7/16/2019 DANALYNN DOMINGUEZ
ZA Case Cleared 7/16/2019 DANALYNN DOMINGUEZ
ZI Cleared 7/16/2019 DANALYNN DOMINGUEZ
Public Works-Sewers Cleared 5/9/2022 ANDRES MATA

Contact Information

Architect Takemori,, Tensho K; Lic. No.: C26283 12541 BEATRICE STREET      LOS ANGELES, CA 90066
Contractor Tishman Construction Corporation Of California; Lic. No.: 322670-B 300 S GRAND AVE      LOS ANGELES, CA 90071
Engineer Heeringa,, Roger L; Lic. No.: S4536 818 STEWART ST #1000      SEATTLE, WA 98101
Engineer Hershberg,, Mark Aaron; Lic. No.: S5078 6080 CENTER DR STE 300      LOS ANGELES, CA 90045

Inspector Information

DAVID BURKHEAD, (213) 482-7294 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Drilled-In Anchors 9/24/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 9/24/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 9/24/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 9/24/2019 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 9/25/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 9/25/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 9/25/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 9/25/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/15/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/16/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/17/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/18/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 11/1/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/1/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 11/1/2019 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 11/4/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/4/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 11/4/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 11/4/2019 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 11/5/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/5/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 11/5/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 11/5/2019 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 11/6/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/6/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 11/6/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 11/6/2019 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 11/7/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/7/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 11/7/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 11/7/2019 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 11/8/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/8/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 11/8/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 11/8/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/13/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/14/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/15/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/16/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/18/2019 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 11/19/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/19/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 11/19/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 11/19/2019 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 11/20/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 11/20/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/20/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 11/20/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 11/20/2019 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 11/21/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 11/21/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/21/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 11/21/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 11/21/2019 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 11/22/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 11/22/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/22/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 11/22/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 11/22/2019 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 11/25/2019 Conditional Approval DANIEL COLLINS
Deputy Pre-Stress Concrete 11/25/2019 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 11/25/2019 Conditional Approval DANIEL COLLINS
Deputy Reinf. Masonry 11/25/2019 Conditional Approval DANIEL COLLINS
Deputy Shotcrete 11/25/2019 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 11/26/2019 Conditional Approval DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 11/26/2019 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 11/26/2019 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Masonry 11/26/2019 Conditional Approval DANIEL MC AULIFFE
Deputy Shotcrete 11/26/2019 Conditional Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 11/27/2019 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 11/27/2019 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Masonry 11/27/2019 Conditional Approval DANIEL MC AULIFFE
Deputy Shotcrete 11/27/2019 Conditional Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 12/2/2019 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 12/2/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/2/2019 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 12/2/2019 Partial Approval JAMES POWERS
Deputy Shotcrete 12/2/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 12/3/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 12/3/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/3/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 12/3/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 12/3/2019 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 12/4/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 12/4/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/4/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 12/4/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 12/4/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 12/5/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/5/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 12/6/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/6/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/6/2019 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/9/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/10/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/11/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/12/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/13/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/16/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/17/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/18/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/19/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/20/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 12/23/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/23/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 12/24/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/24/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 12/26/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/26/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 12/27/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/27/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 12/30/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/30/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 12/31/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/31/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 1/2/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/2/2020 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 1/3/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/3/2020 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 1/3/2020 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 1/6/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/6/2020 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 1/7/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/7/2020 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 1/7/2020 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 1/8/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/8/2020 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 1/8/2020 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 1/9/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/9/2020 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 1/9/2020 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 1/10/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/10/2020 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 1/10/2020 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 1/13/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/13/2020 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 1/14/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/14/2020 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 1/15/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/15/2020 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 1/16/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/16/2020 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 1/17/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/17/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/21/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/22/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/23/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/24/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/27/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/28/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/29/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/30/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/31/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 2/3/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 2/4/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 2/5/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 2/6/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 2/7/2020 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 2/10/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 2/11/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 2/12/2020 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 2/12/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 2/13/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 2/14/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 2/18/2020 Conditional Approval LESLIE TRUJILLO
Deputy Other (see comments) 2/19/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 2/19/2020 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 2/19/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 2/20/2020 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 2/20/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 2/21/2020 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 2/21/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 2/24/2020 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 2/24/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 2/25/2020 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 2/25/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 2/26/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/26/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 2/27/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/27/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/27/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 2/28/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/28/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/28/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/2/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/3/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 3/3/2020 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 3/4/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/4/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 3/4/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/5/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 3/5/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/6/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 3/6/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 3/9/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 3/9/2020 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 3/9/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 3/10/2020 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 3/10/2020 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 3/11/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 3/11/2020 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 3/11/2020 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 3/12/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 3/12/2020 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 3/12/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 3/13/2020 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 3/13/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 3/16/2020 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 3/16/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 3/17/2020 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 3/17/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 3/18/2020 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 3/18/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 3/19/2020 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 3/19/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 3/20/2020 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 3/20/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 3/23/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 3/24/2020 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 3/24/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 3/25/2020 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 3/25/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 3/26/2020 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 3/26/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 3/27/2020 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 3/27/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 3/31/2020 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 4/1/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 4/1/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 4/1/2020 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 4/1/2020 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 4/2/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 4/2/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 4/2/2020 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 4/2/2020 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 4/3/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 4/3/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 4/3/2020 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 4/3/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 4/6/2020 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 4/6/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 4/7/2020 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 4/7/2020 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 4/8/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 4/8/2020 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 4/8/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 4/9/2020 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 4/9/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 4/10/2020 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 4/10/2020 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 4/13/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 4/13/2020 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 4/14/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 4/14/2020 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 4/15/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 4/15/2020 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 4/15/2020 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 4/16/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 4/16/2020 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 4/16/2020 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 4/17/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 4/17/2020 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 4/17/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 4/20/2020 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 4/20/2020 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 4/21/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 4/21/2020 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 4/21/2020 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 4/22/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 4/22/2020 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 4/22/2020 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 4/23/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 4/23/2020 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 4/23/2020 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 4/24/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 4/24/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 4/24/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 4/27/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 4/27/2020 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 4/28/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 4/28/2020 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 4/28/2020 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 4/29/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 4/29/2020 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 4/29/2020 Conditional Approval LESLIE TRUJILLO
Insulation 4/29/2020 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 4/30/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 4/30/2020 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 4/30/2020 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 5/1/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 5/1/2020 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 5/1/2020 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 5/5/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 5/5/2020 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 5/6/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 5/6/2020 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 5/7/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 5/7/2020 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 5/8/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 5/8/2020 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 5/11/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 5/11/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 5/12/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 5/12/2020 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 5/13/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 5/13/2020 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 5/13/2020 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 5/14/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 5/14/2020 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 5/14/2020 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 5/15/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 5/15/2020 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 5/15/2020 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 5/18/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 5/18/2020 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 5/19/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 5/19/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 5/19/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 5/19/2020 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 5/20/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 5/20/2020 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 5/20/2020 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 5/21/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 5/21/2020 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 5/21/2020 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 5/22/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 5/22/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 5/22/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 5/22/2020 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 5/26/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Masonry 5/26/2020 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 5/27/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Masonry 5/27/2020 Approved DANIEL MC AULIFFE
Footing/Foundation/Slab 5/27/2020 Partial Approval DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 5/28/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 5/28/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Masonry 5/28/2020 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 5/29/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 5/29/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Masonry 5/29/2020 Approved DANIEL MC AULIFFE
Pre-Inspection 5/29/2020 Not Ready for Inspection DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 6/1/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 6/2/2020 Approved DANIEL MC AULIFFE
Pre-Inspection 6/2/2020 Partial Inspection DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 6/3/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 6/3/2020 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 6/4/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 6/4/2020 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 6/5/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 6/5/2020 Conditional Approval DANIEL MC AULIFFE
Light Gage Steel Frame 6/5/2020 Partial Approval DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 6/8/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 6/8/2020 Approved DANIEL MC AULIFFE
Drywall Nailing 6/8/2020 Partial Inspection DANIEL MC AULIFFE
Green Building Rough 6/8/2020 Approved DANIEL MC AULIFFE
Insulation 6/8/2020 Partial Inspection DANIEL MC AULIFFE
Light Gage Steel Frame 6/8/2020 Partial Inspection DANIEL MC AULIFFE
Pre-Inspection 6/8/2020 Partial Inspection DANIEL MC AULIFFE
SWPPP-Const. Storm Water 6/8/2020 Completed DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 6/9/2020 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 6/9/2020 Approved DANIEL MC AULIFFE
Deputy Drilled-In Anchors 6/10/2020 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 6/10/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 6/10/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Masonry 6/10/2020 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 6/10/2020 Approved DANIEL MC AULIFFE
Insulation 6/10/2020 Partial Inspection DANIEL MC AULIFFE
Deputy Drilled-In Anchors 6/11/2020 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 6/11/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 6/11/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Masonry 6/11/2020 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 6/11/2020 Approved DANIEL MC AULIFFE
Deputy Drilled-In Anchors 6/12/2020 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 6/12/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 6/12/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Masonry 6/12/2020 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 6/12/2020 Approved DANIEL MC AULIFFE
Deputy Drilled-In Anchors 6/15/2020 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 6/15/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 6/15/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Masonry 6/15/2020 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 6/15/2020 Approved DANIEL MC AULIFFE
Insulation 6/15/2020 Partial Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 6/16/2020 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 6/16/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 6/16/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Masonry 6/16/2020 Approved DANIEL MC AULIFFE
Deputy Drilled-In Anchors 6/17/2020 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 6/17/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 6/17/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Masonry 6/17/2020 Approved DANIEL MC AULIFFE
Deputy Drilled-In Anchors 6/18/2020 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 6/18/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 6/18/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Masonry 6/18/2020 Conditional Approval DANIEL MC AULIFFE
Insulation 6/18/2020 Partial Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 6/19/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 6/19/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 6/19/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Masonry 6/19/2020 Conditional Approval DANIEL MC AULIFFE
Drywall Nailing 6/19/2020 Partial Inspection DANIEL MC AULIFFE
Light Gage Steel Frame 6/19/2020 Partial Inspection DANIEL MC AULIFFE
SWPPP-Const. Storm Water 6/19/2020 Completed DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 6/22/2020 Approved DANIEL MC AULIFFE
Insulation 6/22/2020 Partial Inspection DANIEL MC AULIFFE
Deputy Drilled-In Anchors 6/23/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 6/23/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 6/23/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Masonry 6/23/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Shotcrete 6/23/2020 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 6/23/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 6/24/2020 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 6/24/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 6/24/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Masonry 6/24/2020 Approved DANIEL MC AULIFFE
Deputy Shotcrete 6/24/2020 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 6/24/2020 Approved DANIEL MC AULIFFE
Insulation 6/24/2020 Partial Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 6/25/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 6/25/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 6/25/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Masonry 6/25/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Shotcrete 6/25/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 6/25/2020 Approved DANIEL MC AULIFFE
Light Gage Steel Frame 6/25/2020 Not Ready for Inspection DANIEL MC AULIFFE
Deputy Drilled-In Anchors 6/26/2020 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 6/26/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 6/26/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Masonry 6/26/2020 Approved DANIEL MC AULIFFE
Deputy Shotcrete 6/26/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 6/26/2020 Approved DANIEL MC AULIFFE
Drywall Nailing 6/26/2020 Partial Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 6/29/2020 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 6/29/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 6/29/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Masonry 6/29/2020 Approved DANIEL MC AULIFFE
Deputy Shotcrete 6/29/2020 Approved DANIEL MC AULIFFE
Pre-Inspection 6/29/2020 Partial Inspection DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 6/30/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 7/1/2020 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 7/2/2020 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 7/6/2020 Approved DANIEL MC AULIFFE
Insulation 7/6/2020 Partial Approval DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 7/7/2020 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 7/7/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Masonry 7/8/2020 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 7/8/2020 Approved DANIEL MC AULIFFE
Drywall Nailing 7/8/2020 Partial Approval DANIEL MC AULIFFE
SWPPP-Const. Storm Water 7/8/2020 Completed DANIEL MC AULIFFE
Deputy Reinf. Masonry 7/9/2020 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 7/9/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Masonry 7/10/2020 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 7/10/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Masonry 7/13/2020 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 7/13/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Masonry 7/14/2020 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 7/14/2020 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 7/15/2020 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 7/15/2020 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 7/16/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 7/16/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 7/17/2020 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 7/17/2020 Approved DANIEL MC AULIFFE
Drywall Nailing 7/17/2020 Partial Approval DANIEL MC AULIFFE
SWPPP-Const. Storm Water 7/17/2020 Completed DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 7/20/2020 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 7/21/2020 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 7/22/2020 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 7/23/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 7/24/2020 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 7/27/2020 Approved DANIEL MC AULIFFE
Drywall Nailing 7/27/2020 Partial Inspection DANIEL MC AULIFFE
Light Gage Steel Frame 7/27/2020 Partial Inspection DANIEL MC AULIFFE
SWPPP-Const. Storm Water 7/27/2020 Completed DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 7/28/2020 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 7/28/2020 Approved DANIEL MC AULIFFE
Insulation 7/28/2020 Not Ready for Inspection DANIEL MC AULIFFE
Light Gage Steel Frame 7/28/2020 Partial Approval DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 7/29/2020 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 7/29/2020 Approved DANIEL MC AULIFFE
Insulation 7/29/2020 Partial Approval DANIEL MC AULIFFE
Light Gage Steel Frame 7/29/2020 Partial Approval DANIEL MC AULIFFE
Pre-Inspection 7/29/2020 Partial Inspection DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 7/30/2020 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 7/30/2020 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 7/31/2020 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 7/31/2020 Approved DANIEL MC AULIFFE
Reinforced Concrete Frame 8/1/2020 Partial Approval DANIEL MC AULIFFE
SWPPP-Const. Storm Water 8/1/2020 Completed DANIEL MC AULIFFE
Verify Sprinkler Sign Off 8/1/2020 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 8/3/2020 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 8/3/2020 Approved DANIEL MC AULIFFE
Structural Steel Frame 8/3/2020 Not Ready for Inspection DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 8/4/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 8/4/2020 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 8/4/2020 Approved DANIEL MC AULIFFE
Footing/Foundation/Slab 8/4/2020 Partial Approval DANIEL MC AULIFFE
Light Gage Steel Frame 8/4/2020 Partial Approval DANIEL MC AULIFFE
Reinforced Concrete Frame 8/4/2020 Not Ready for Inspection JAMES POWERS
SWPPP-Const. Storm Water 8/4/2020 Completed JAMES POWERS
Verify Sprinkler Sign Off 8/4/2020 Not Ready for Inspection JAMES POWERS
Deputy Pre-Stress Concrete 8/5/2020 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 8/5/2020 Approved DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 8/5/2020 Partial Approval DAVID BURKHEAD
Footing/Foundation/Slab 8/5/2020 Off-Hour Fees Due
Insulation 8/5/2020 Partial Approval DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 8/6/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 8/6/2020 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 8/6/2020 Approved DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 8/6/2020 Not Ready for Inspection DANIEL MC AULIFFE
Insulation 8/6/2020 Partial Approval DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 8/7/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 8/7/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 8/7/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/7/2020 Approved DANIEL MC AULIFFE
Drywall Nailing 8/7/2020 Partial Approval DANIEL MC AULIFFE
Insulation 8/7/2020 Partial Inspection DANIEL MC AULIFFE
Light Gage Steel Frame 8/7/2020 Partial Approval DANIEL MC AULIFFE
SWPPP-Const. Storm Water 8/7/2020 Not Required DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 8/10/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 8/10/2020 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 8/10/2020 Approved DANIEL MC AULIFFE
Footing/Foundation/Slab 8/10/2020 Partial Inspection DANIEL MC AULIFFE
Insulation 8/10/2020 Not Ready for Inspection DANIEL MC AULIFFE
Light Gage Steel Frame 8/10/2020 Not Ready for Inspection DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 8/11/2020 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 8/11/2020 Approved DANIEL MC AULIFFE
Insulation 8/11/2020 Partial Inspection DANIEL MC AULIFFE
Light Gage Steel Frame 8/11/2020 Partial Inspection DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 8/12/2020 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 8/12/2020 Approved DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 8/12/2020 Partial Approval DANIEL MC AULIFFE
Light Gage Steel Frame 8/12/2020 Partial Inspection DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 8/13/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 8/13/2020 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 8/13/2020 Approved DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 8/13/2020 Not Ready for Inspection DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 8/14/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 8/14/2020 Conditional Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 8/14/2020 No Access for Inspection RAFAEL ESPINOZA
Insulation 8/14/2020 No Access for Inspection RAFAEL ESPINOZA
Light Gage Steel Frame 8/14/2020 No Access for Inspection RAFAEL ESPINOZA
Reinforced Concrete Frame 8/14/2020 Partial Approval JAMES POWERS
Reinforced Concrete Frame 8/14/2020 Partial Approval RAFAEL ESPINOZA
SWPPP-Const. Storm Water 8/14/2020 Completed JAMES POWERS
Floor/Roof Diaphrgm/Shear Wall 8/15/2020 Partial Approval DAVID TSAU
Deputy Pre-Stress Concrete 8/17/2020 Conditional Approval DAVID BURKHEAD
Piling/Pier/Caisson 8/17/2020 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 8/17/2020 Partial Approval DAVID BURKHEAD
SWPPP-Const. Storm Water 8/17/2020 Completed DAVID BURKHEAD
Verify Sprinkler Sign Off 8/17/2020 Not Ready for Inspection DAVID BURKHEAD
Deputy Pre-Stress Concrete 8/18/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 8/18/2020 Conditional Approval NICK DANERI
Piling/Pier/Caisson 8/18/2020 Partial Inspection RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 8/19/2020 Conditional Approval RAFAEL ESPINOZA
Drywall Nailing 8/19/2020 Partial Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 8/19/2020 Not Ready for Inspection RAFAEL ESPINOZA
Insulation 8/19/2020 Not Ready for Inspection RAFAEL ESPINOZA
Light Gage Steel Frame 8/19/2020 Partial Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 8/19/2020 Not Ready for Inspection RAFAEL ESPINOZA
SWPPP-Const. Storm Water 8/19/2020 Completed RAFAEL ESPINOZA
Verify Sprinkler Sign Off 8/19/2020 Not Ready for Inspection RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 8/20/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 8/21/2020 Conditional Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 8/21/2020 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Concrete Frame 8/21/2020 Partial Approval RAFAEL ESPINOZA
Reinforced Masonry Frame 8/21/2020 Partial Approval NICK DANERI
SWPPP-Const. Storm Water 8/21/2020 Completed RAFAEL ESPINOZA
Verify Sprinkler Sign Off 8/21/2020 Not Ready for Inspection RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 8/22/2020 Off-Hour Fees Due
Deputy Pre-Stress Concrete 8/24/2020 Approved DANIEL MC AULIFFE
Drywall Nailing 8/24/2020 Partial Inspection DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 8/24/2020 Partial Approval DANIEL MC AULIFFE
Reinforced Masonry Frame 8/24/2020 Partial Inspection DANIEL MC AULIFFE
Deputy Drilled-In Anchors 8/25/2020 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 8/25/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 8/25/2020 Approved DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 8/25/2020 Partial Approval DANIEL MC AULIFFE
Footing/Foundation/Slab 8/25/2020 Partial Inspection DANIEL MC AULIFFE
Insulation 8/25/2020 Partial Approval DANIEL MC AULIFFE
Light Gage Steel Frame 8/25/2020 Partial Approval DANIEL MC AULIFFE
SWPPP-Const. Storm Water 8/25/2020 Completed DANIEL MC AULIFFE
Deputy Drilled-In Anchors 8/26/2020 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 8/26/2020 Approved DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 8/26/2020 Partial Approval DANIEL MC AULIFFE
Insulation 8/26/2020 Partial Inspection DANIEL MC AULIFFE
Light Gage Steel Frame 8/26/2020 Partial Inspection DANIEL MC AULIFFE
Deputy Drilled-In Anchors 8/27/2020 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 8/27/2020 Approved DANIEL MC AULIFFE
Drywall Nailing 8/27/2020 Partial Approval DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 8/27/2020 Partial Inspection DANIEL MC AULIFFE
Grading Pre-Inspection 8/27/2020 Partial Approval DANIEL MC AULIFFE
Insulation 8/27/2020 Partial Approval DANIEL MC AULIFFE
Light Gage Steel Frame 8/27/2020 Partial Approval DANIEL MC AULIFFE
Special/Order Compliance 8/27/2020 Partial Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 8/28/2020 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 8/28/2020 Approved DANIEL MC AULIFFE
Insulation 8/28/2020 Partial Approval DANIEL MC AULIFFE
Light Gage Steel Frame 8/28/2020 Partial Approval DANIEL MC AULIFFE
Reinforced Concrete Frame 8/28/2020 Partial Approval RAFAEL ESPINOZA
SWPPP-Const. Storm Water 8/28/2020 Completed RAFAEL ESPINOZA
Structural Steel Frame 8/28/2020 Partial Approval DANIEL MC AULIFFE
Verify Sprinkler Sign Off 8/28/2020 Not Ready for Inspection RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 8/31/2020 Approved DANIEL MC AULIFFE
Insulation 8/31/2020 Partial Inspection DANIEL MC AULIFFE
Light Gage Steel Frame 8/31/2020 Partial Approval DANIEL MC AULIFFE
Wall Anchors 8/31/2020 Partial Approval DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 9/1/2020 Conditional Approval DANIEL MC AULIFFE
Drywall Nailing 9/1/2020 Partial Inspection DANIEL MC AULIFFE
SWPPP-Const. Storm Water 9/1/2020 Completed DANIEL MC AULIFFE
Structural Steel Frame 9/1/2020 Partial Inspection DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 9/2/2020 Approved DANIEL MC AULIFFE
Interior/Exterior Lathing 9/2/2020 Partial Approval DANIEL MC AULIFFE
Light Gage Steel Frame 9/2/2020 Partial Approval DANIEL MC AULIFFE
Reinforced Concrete Frame 9/2/2020 Partial Approval DANIEL MC AULIFFE
Verify Sprinkler Sign Off 9/2/2020 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 9/3/2020 Approved DANIEL MC AULIFFE
Drywall Nailing 9/3/2020 Partial Approval DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 9/3/2020 Partial Approval DANIEL MC AULIFFE
Footing/Foundation/Slab 9/3/2020 Partial Approval DANIEL MC AULIFFE
Insulation 9/3/2020 Partial Inspection DANIEL MC AULIFFE
Light Gage Steel Frame 9/3/2020 Partial Approval DANIEL MC AULIFFE
SWPPP-Const. Storm Water 9/3/2020 Completed DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 9/4/2020 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 9/8/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 9/8/2020 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 9/9/2020 Approved DANIEL MC AULIFFE
Drywall Nailing 9/9/2020 Partial Approval DANIEL MC AULIFFE
Footing/Foundation/Slab 9/9/2020 Partial Approval DANIEL MC AULIFFE
Reinforced Concrete Frame 9/9/2020 Partial Approval DANIEL MC AULIFFE
SWPPP-Const. Storm Water 9/9/2020 Not Required DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 9/10/2020 Approved DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 9/10/2020 Not Ready for Inspection DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 9/11/2020 Approved DANIEL MC AULIFFE
Drywall Nailing 9/11/2020 Partial Approval DANIEL MC AULIFFE
Footing/Foundation/Slab 9/11/2020 Partial Approval DANIEL MC AULIFFE
Light Gage Steel Frame 9/11/2020 Partial Approval DANIEL MC AULIFFE
SWPPP-Const. Storm Water 9/11/2020 Not Required DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 9/14/2020 Conditional Approval DANIEL MC AULIFFE
Insulation 9/14/2020 Partial Inspection DANIEL MC AULIFFE
Deputy Drilled-In Anchors 9/15/2020 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 9/15/2020 Approved DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 9/15/2020 Partial Approval DANIEL MC AULIFFE
Footing/Foundation/Slab 9/15/2020 Partial Approval DANIEL MC AULIFFE
Light Gage Steel Frame 9/15/2020 Partial Approval DANIEL MC AULIFFE
Pre-Inspection 9/15/2020 Partial Approval DANIEL MC AULIFFE
SWPPP-Const. Storm Water 9/15/2020 Not Required DANIEL MC AULIFFE
Deputy Drilled-In Anchors 9/16/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 9/16/2020 Conditional Approval DANIEL MC AULIFFE
Drywall Nailing 9/16/2020 Conditional Approval DANIEL MC AULIFFE
Insulation 9/16/2020 Conditional Approval DANIEL MC AULIFFE
Reinforced Concrete Frame 9/16/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 9/17/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 9/17/2020 Conditional Approval DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 9/17/2020 Not Ready for Inspection DANIEL MC AULIFFE
Deputy Drilled-In Anchors 9/18/2020 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 9/18/2020 Approved DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 9/18/2020 Partial Approval DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 9/18/2020 Partial Inspection DANIEL MC AULIFFE
Footing/Foundation/Slab 9/18/2020 Partial Inspection DANIEL MC AULIFFE
SWPPP-Const. Storm Water 9/18/2020 Not Required DANIEL MC AULIFFE
Special/Order Compliance 9/18/2020 Partial Approval DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 9/21/2020 Approved DANIEL MC AULIFFE
Drywall Nailing 9/21/2020 Partial Inspection DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 9/21/2020 Partial Approval DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 9/22/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 9/22/2020 Approved DANIEL MC AULIFFE
Insulation 9/22/2020 Not Ready for Inspection DANIEL MC AULIFFE
Interior/Exterior Lathing 9/22/2020 Partial Approval DANIEL MC AULIFFE
Light Gage Steel Frame 9/22/2020 Partial Inspection DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 9/23/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 9/23/2020 Approved DANIEL MC AULIFFE
Drywall Nailing 9/23/2020 Partial Approval DANIEL MC AULIFFE
Interior/Exterior Lathing 9/23/2020 Partial Approval DANIEL MC AULIFFE
SWPPP-Const. Storm Water 9/23/2020 Not Required DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 9/24/2020 Conditional Approval DANIEL MC AULIFFE
Insulation 9/24/2020 Not Ready for Inspection DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 9/25/2020 Approved DANIEL MC AULIFFE
Insulation 9/25/2020 Partial Approval DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 9/28/2020 Approved DANIEL MC AULIFFE
Drywall Nailing 9/28/2020 Partial Inspection DANIEL MC AULIFFE
Reinforced Concrete Frame 9/28/2020 Partial Approval DANIEL MC AULIFFE
SWPPP-Const. Storm Water 9/28/2020 Not Required DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 9/29/2020 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 9/29/2020 Approved DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 9/29/2020 Partial Approval DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 9/29/2020 Partial Approval DANIEL MC AULIFFE
Insulation 9/29/2020 Partial Approval DANIEL MC AULIFFE
Interior/Exterior Lathing 9/29/2020 Partial Approval DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 9/30/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 9/30/2020 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 9/30/2020 Approved DANIEL MC AULIFFE
Drywall Nailing 9/30/2020 Partial Inspection DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 9/30/2020 Partial Approval DANIEL MC AULIFFE
SWPPP-Const. Storm Water 9/30/2020 Not Required DANIEL MC AULIFFE
Structural Steel Frame 9/30/2020 Partial Inspection DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 10/1/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 10/1/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 10/1/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 10/2/2020 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 10/2/2020 Approved DANIEL MC AULIFFE
Drywall Nailing 10/2/2020 Partial Inspection DANIEL MC AULIFFE
Footing/Foundation/Slab 10/2/2020 Partial Approval DANIEL MC AULIFFE
Insulation 10/2/2020 Partial Inspection DANIEL MC AULIFFE
Light Gage Steel Frame 10/2/2020 Partial Approval DANIEL MC AULIFFE
SWPPP-Const. Storm Water 10/2/2020 Not Required DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 10/5/2020 Conditional Approval DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 10/5/2020 Partial Approval DANIEL MC AULIFFE
Insulation 10/5/2020 Partial Approval DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 10/6/2020 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 10/6/2020 Approved DANIEL MC AULIFFE
Footing/Foundation/Slab 10/6/2020 Partial Inspection DANIEL MC AULIFFE
Insulation 10/6/2020 Partial Approval DANIEL MC AULIFFE
Pre-Inspection 10/6/2020 Partial Approval DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 10/7/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 10/7/2020 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 10/7/2020 Conditional Approval DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 10/7/2020 Partial Approval DANIEL MC AULIFFE
Insulation 10/7/2020 Partial Inspection DANIEL MC AULIFFE
Pre-Inspection 10/7/2020 Partial Inspection DANIEL MC AULIFFE
Reinforced Concrete Frame 10/7/2020 Partial Approval DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 10/8/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 10/8/2020 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 10/8/2020 Approved DANIEL MC AULIFFE
Drywall Nailing 10/8/2020 Partial Approval DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 10/8/2020 Partial Approval DANIEL MC AULIFFE
Light Gage Steel Frame 10/8/2020 Partial Approval DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 10/9/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/9/2020 Partial Approval JAMES POWERS
Insulation 10/9/2020 Partial Approval JAMES POWERS
Wood Frame 10/9/2020 Not Ready for Inspection JAMES POWERS
Deputy Pre-Stress Concrete 10/13/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/13/2020 Partial Approval JAMES POWERS
Reinforced Concrete Frame 10/13/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 10/14/2020 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 10/14/2020 Approved DANIEL MC AULIFFE
Drywall Nailing 10/14/2020 Partial Approval DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 10/14/2020 Partial Approval DANIEL MC AULIFFE
Footing/Foundation/Slab 10/14/2020 Partial Approval DANIEL MC AULIFFE
Insulation 10/14/2020 Partial Inspection DANIEL MC AULIFFE
Pre-Inspection 10/14/2020 Partial Approval DANIEL MC AULIFFE
Reinforced Concrete Frame 10/14/2020 Partial Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 10/15/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 10/15/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 10/15/2020 Conditional Approval DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 10/15/2020 Partial Approval NICK DANERI
Floor/Roof Diaphrgm/Shear Wall 10/15/2020 Not Ready for Inspection DANIEL MC AULIFFE
Insulation 10/15/2020 Partial Inspection DANIEL MC AULIFFE
Special/Order Compliance 10/15/2020 Not Ready for Inspection DANIEL MC AULIFFE
Deputy Drilled-In Anchors 10/16/2020 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 10/16/2020 Approved DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 10/16/2020 Off-Hour Fees Due
Floor/Roof Diaphrgm/Shear Wall 10/16/2020 Not Ready for Inspection DANIEL MC AULIFFE
Insulation 10/16/2020 Partial Approval DANIEL MC AULIFFE
Interior/Exterior Lathing 10/16/2020 Conditional Approval DANIEL MC AULIFFE
Light Gage Steel Frame 10/16/2020 Partial Approval DANIEL MC AULIFFE
Pre-Inspection 10/16/2020 Partial Approval DANIEL MC AULIFFE
Special/Order Compliance 10/16/2020 Partial Inspection DANIEL MC AULIFFE
Wood Frame 10/16/2020 Off-Hour Fees Due
Deputy Drilled-In Anchors 10/19/2020 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 10/19/2020 Approved DANIEL MC AULIFFE
Insulation 10/19/2020 Partial Approval DANIEL MC AULIFFE
Wood Frame 10/19/2020 Partial Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 10/20/2020 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 10/20/2020 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 10/20/2020 Approved DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 10/20/2020 Partial Approval DANIEL MC AULIFFE
Light Gage Steel Frame 10/20/2020 Partial Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 10/21/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 10/21/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 10/21/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 10/21/2020 Conditional Approval DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 10/21/2020 Not Ready for Inspection DANIEL MC AULIFFE
Light Gage Steel Frame 10/21/2020 Not Ready for Inspection DANIEL MC AULIFFE
Deputy Drilled-In Anchors 10/22/2020 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 10/22/2020 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 10/22/2020 Approved DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 10/22/2020 Partial Approval DANIEL MC AULIFFE
Reinforced Concrete Frame 10/22/2020 Partial Approval DANIEL MC AULIFFE
Wall Anchors 10/22/2020 Partial Inspection DANIEL MC AULIFFE
Deputy Drilled-In Anchors 10/23/2020 Conditional Approval DANIEL COLLINS
Deputy Pre-Stress Concrete 10/23/2020 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 10/23/2020 Conditional Approval DANIEL COLLINS
Drywall Nailing 10/23/2020 Partial Approval DANIEL COLLINS
Insulation 10/23/2020 Partial Approval DANIEL COLLINS
Light Gage Steel Frame 10/23/2020 Partial Approval DANIEL COLLINS
Deputy Pre-Stress Concrete 10/26/2020 Approved DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 10/26/2020 Partial Inspection DANIEL MC AULIFFE
Footing/Foundation/Slab 10/26/2020 Partial Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 10/27/2020 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 10/27/2020 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 10/27/2020 Approved DANIEL MC AULIFFE
Drywall Nailing 10/27/2020 Partial Inspection DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 10/27/2020 Partial Inspection DANIEL MC AULIFFE
Insulation 10/27/2020 Partial Inspection DANIEL MC AULIFFE
Light Gage Steel Frame 10/27/2020 Partial Approval DANIEL MC AULIFFE
Reinforced Concrete Frame 10/27/2020 Partial Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 10/28/2020 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 10/28/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 10/28/2020 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 10/28/2020 Approved DANIEL MC AULIFFE
Interior/Exterior Lathing 10/28/2020 Partial Inspection DANIEL MC AULIFFE
Light Gage Steel Frame 10/28/2020 Partial Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 10/29/2020 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 10/29/2020 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 10/29/2020 Approved DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 10/29/2020 Partial Approval DANIEL MC AULIFFE
Insulation 10/29/2020 Partial Inspection DANIEL MC AULIFFE
Light Gage Steel Frame 10/29/2020 Partial Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 10/30/2020 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 10/30/2020 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 10/30/2020 Approved DANIEL MC AULIFFE
Deputy Drilled-In Anchors 11/2/2020 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 11/2/2020 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 11/2/2020 Approved DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 11/2/2020 Partial Approval DANIEL MC AULIFFE
Piling/Pier/Caisson 11/2/2020 Partial Approval DANIEL MC AULIFFE
Reinforced Concrete Frame 11/2/2020 Partial Approval DANIEL MC AULIFFE
Special/Order Compliance 11/2/2020 Partial Approval DANIEL MC AULIFFE
Wall Anchors 11/2/2020 Partial Inspection DANIEL MC AULIFFE
Deputy Drilled-In Anchors 11/4/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 11/4/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 11/4/2020 Conditional Approval DANIEL MC AULIFFE
Drywall Nailing 11/4/2020 Partial Inspection DANIEL MC AULIFFE
Footing/Foundation/Slab 11/4/2020 Partial Approval LARRY ARNICK
Insulation 11/4/2020 Partial Inspection DANIEL MC AULIFFE
Interior/Exterior Lathing 11/4/2020 Partial Inspection DANIEL MC AULIFFE
Light Gage Steel Frame 11/4/2020 Partial Inspection DANIEL MC AULIFFE
Deputy Drilled-In Anchors 11/5/2020 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 11/5/2020 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 11/5/2020 Approved DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 11/5/2020 Partial Approval DANIEL MC AULIFFE
Insulation 11/5/2020 Partial Approval DANIEL MC AULIFFE
Interior/Exterior Lathing 11/5/2020 Partial Approval DANIEL MC AULIFFE
Light Gage Steel Frame 11/5/2020 Partial Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 11/6/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 11/6/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 11/6/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 11/6/2020 Conditional Approval DANIEL MC AULIFFE
Insulation 11/6/2020 Not Ready for Inspection DANIEL MC AULIFFE
Light Gage Steel Frame 11/6/2020 Conditional Approval DANIEL MC AULIFFE
Piling/Pier/Caisson 11/6/2020 Not Ready for Inspection DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 11/9/2020 Approved DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 11/9/2020 Partial Approval DANIEL MC AULIFFE
Interior/Exterior Lathing 11/9/2020 Partial Inspection DANIEL MC AULIFFE
Light Gage Steel Frame 11/9/2020 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 11/10/2020 Approved DANIEL MC AULIFFE
Footing/Foundation/Slab 11/10/2020 Partial Approval DANIEL MC AULIFFE
Light Gage Steel Frame 11/10/2020 Partial Approval DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 11/12/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 11/12/2020 Conditional Approval DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 11/12/2020 Partial Inspection DANIEL MC AULIFFE
Insulation 11/12/2020 Partial Inspection DANIEL MC AULIFFE
Light Gage Steel Frame 11/12/2020 Partial Inspection DANIEL MC AULIFFE
Wall Anchors 11/12/2020 Partial Inspection DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 11/13/2020 Approved DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 11/13/2020 Partial Approval DANIEL MC AULIFFE
Insulation 11/13/2020 Partial Approval DANIEL MC AULIFFE
Light Gage Steel Frame 11/13/2020 Not Ready for Inspection DANIEL MC AULIFFE
Special/Order Compliance 11/13/2020 Not Ready for Inspection DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 11/14/2020 Off-Hour Fees Due
Floor/Roof Diaphrgm/Shear Wall 11/14/2020 Partial Approval DAVID BURKHEAD
Deputy Pre-Stress Concrete 11/16/2020 Approved DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 11/16/2020 Not Ready for Inspection DANIEL MC AULIFFE
Insulation 11/16/2020 Partial Inspection DANIEL MC AULIFFE
Light Gage Steel Frame 11/16/2020 Partial Inspection DANIEL MC AULIFFE
Reinforced Concrete Frame 11/16/2020 Not Ready for Inspection DANIEL MC AULIFFE
Deputy Drilled-In Anchors 11/17/2020 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 11/17/2020 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 11/17/2020 Approved DANIEL MC AULIFFE
Drywall Nailing 11/17/2020 Partial Approval DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 11/17/2020 Partial Approval DANIEL MC AULIFFE
Light Gage Steel Frame 11/17/2020 Partial Inspection DANIEL MC AULIFFE
Deputy Drilled-In Anchors 11/18/2020 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 11/18/2020 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 11/18/2020 Approved DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 11/18/2020 Partial Approval DANIEL MC AULIFFE
Footing/Foundation/Slab 11/18/2020 Off-Hour Fees Due
Light Gage Steel Frame 11/18/2020 Partial Inspection DANIEL MC AULIFFE
Deputy Drilled-In Anchors 11/19/2020 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 11/19/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 11/19/2020 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 11/19/2020 Approved DANIEL MC AULIFFE
Footing/Foundation/Slab 11/19/2020 Partial Approval DANIEL MC AULIFFE
Insulation 11/19/2020 Partial Approval DANIEL MC AULIFFE
Light Gage Steel Frame 11/19/2020 Partial Approval DANIEL MC AULIFFE
Wall Anchors 11/19/2020 Partial Inspection DANIEL MC AULIFFE
Deputy Drilled-In Anchors 11/20/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 11/20/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 11/20/2020 Conditional Approval DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 11/20/2020 Partial Inspection DANIEL MC AULIFFE
Insulation 11/20/2020 Partial Inspection DANIEL MC AULIFFE
Light Gage Steel Frame 11/20/2020 Partial Inspection DANIEL MC AULIFFE
Pre-Inspection 11/20/2020 Partial Inspection DANIEL MC AULIFFE
Wall Anchors 11/20/2020 Partial Inspection DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 11/21/2020 Partial Approval NICK DANERI
Deputy Pre-Stress Concrete 11/23/2020 Approved DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 11/23/2020 Partial Approval DANIEL MC AULIFFE
Insulation 11/23/2020 Partial Inspection DANIEL MC AULIFFE
Light Gage Steel Frame 11/23/2020 Partial Approval DANIEL MC AULIFFE
Pre-Inspection 11/23/2020 Partial Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 11/24/2020 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 11/24/2020 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 11/24/2020 Approved DANIEL MC AULIFFE
Interior/Exterior Lathing 11/24/2020 Partial Approval DANIEL MC AULIFFE
Pre-Inspection 11/24/2020 Partial Approval DANIEL MC AULIFFE
Wall Anchors 11/24/2020 Not Ready for Inspection DANIEL MC AULIFFE
Deputy Drilled-In Anchors 11/25/2020 Conditional Approval NICK DANERI
Deputy Pre-Stress Concrete 11/25/2020 Conditional Approval NICK DANERI
Deputy Steel/Welding 11/25/2020 Conditional Approval NICK DANERI
Light Gage Steel Frame 11/25/2020 Not Ready for Inspection NICK DANERI
Deputy Drilled-In Anchors 11/30/2020 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 11/30/2020 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 11/30/2020 Approved DANIEL MC AULIFFE
Drywall Nailing 11/30/2020 Partial Approval DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 11/30/2020 Partial Approval DANIEL MC AULIFFE
Insulation 11/30/2020 Partial Approval DANIEL MC AULIFFE
Light Gage Steel Frame 11/30/2020 Partial Approval DANIEL MC AULIFFE
Pre-Inspection 11/30/2020 Partial Approval DANIEL MC AULIFFE
Wall Anchors 11/30/2020 Partial Approval DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 12/1/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 12/1/2020 Conditional Approval DANIEL MC AULIFFE
Footing/Foundation/Slab 12/1/2020 Partial Approval DANIEL MC AULIFFE
Insulation 12/1/2020 Partial Inspection DANIEL MC AULIFFE
Light Gage Steel Frame 12/1/2020 Partial Approval DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 12/2/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 12/2/2020 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 12/2/2020 Approved DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 12/2/2020 Partial Approval DANIEL MC AULIFFE
Insulation 12/2/2020 Partial Approval DANIEL MC AULIFFE
Light Gage Steel Frame 12/2/2020 Partial Approval DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 12/3/2020 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 12/3/2020 Approved DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 12/3/2020 Partial Approval DANIEL MC AULIFFE
Insulation 12/3/2020 Partial Approval DANIEL MC AULIFFE
Light Gage Steel Frame 12/3/2020 Partial Approval DANIEL MC AULIFFE
Reinforced Concrete Frame 12/3/2020 Off-Hour Fees Due
Reinforced Concrete Frame 12/3/2020 Partial Approval NICK DANERI
Reinforced Masonry Frame 12/3/2020 Off-Hour Fees Due
Deputy Pre-Stress Concrete 12/4/2020 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 12/4/2020 Approved DANIEL MC AULIFFE
Drywall Nailing 12/4/2020 Partial Approval DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 12/7/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 12/7/2020 Conditional Approval DANIEL MC AULIFFE
Light Gage Steel Frame 12/7/2020 Partial Inspection DANIEL MC AULIFFE
Reinforced Concrete Frame 12/7/2020 Partial Inspection DANIEL MC AULIFFE
Deputy Drilled-In Anchors 12/8/2020 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 12/8/2020 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 12/8/2020 Approved DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 12/8/2020 Partial Approval DANIEL MC AULIFFE
Insulation 12/8/2020 Partial Approval DANIEL MC AULIFFE
Light Gage Steel Frame 12/8/2020 Partial Approval DANIEL MC AULIFFE
Pre-Inspection 12/8/2020 Partial Approval DANIEL MC AULIFFE
Special/Order Compliance 12/8/2020 Partial Approval DANIEL MC AULIFFE
Wall Anchors 12/8/2020 Partial Inspection DANIEL MC AULIFFE
Deputy Drilled-In Anchors 12/9/2020 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 12/9/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 12/9/2020 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 12/9/2020 Approved DANIEL MC AULIFFE
Drywall Nailing 12/9/2020 Partial Approval DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 12/9/2020 Partial Approval DANIEL MC AULIFFE
Light Gage Steel Frame 12/9/2020 Partial Inspection DANIEL MC AULIFFE
Deputy Drilled-In Anchors 12/10/2020 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 12/10/2020 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 12/10/2020 Approved DANIEL MC AULIFFE
Insulation 12/10/2020 Partial Approval DANIEL MC AULIFFE
Interior/Exterior Lathing 12/10/2020 Partial Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 12/11/2020 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 12/11/2020 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 12/11/2020 Approved DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 12/11/2020 Partial Approval DANIEL MC AULIFFE
Footing/Foundation/Slab 12/11/2020 Partial Approval DANIEL MC AULIFFE
Insulation 12/11/2020 Partial Approval DANIEL MC AULIFFE
Interior/Exterior Lathing 12/11/2020 Partial Approval DANIEL MC AULIFFE
Light Gage Steel Frame 12/11/2020 Partial Approval DANIEL MC AULIFFE
Pre-Inspection 12/11/2020 Partial Approval DANIEL MC AULIFFE
Special/Order Compliance 12/11/2020 Partial Approval DANIEL MC AULIFFE
Structural Steel Frame 12/11/2020 Partial Approval DANIEL MC AULIFFE
T-Bar Ceiling 12/11/2020 Partial Approval DANIEL MC AULIFFE
Wall Anchors 12/11/2020 Partial Inspection DANIEL MC AULIFFE
Wood Frame 12/11/2020 Partial Approval DANIEL MC AULIFFE
Pre-Inspection 12/12/2020 Not Ready for Inspection DAVID BURKHEAD
Pre-Inspection 12/12/2020 Off-Hour Fees Due
Deputy Drilled-In Anchors 12/14/2020 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 12/14/2020 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 12/14/2020 Approved DANIEL MC AULIFFE
Drywall Nailing 12/14/2020 Partial Inspection DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 12/14/2020 Partial Approval DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 12/14/2020 Off-Hour Fees Due
Light Gage Steel Frame 12/14/2020 Partial Approval DANIEL MC AULIFFE
Pre-Inspection 12/14/2020 Partial Inspection DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 12/15/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 12/15/2020 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 12/15/2020 Approved DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 12/15/2020 Partial Approval LARRY ARNICK
Interior/Exterior Lathing 12/15/2020 Partial Inspection DANIEL MC AULIFFE
Light Gage Steel Frame 12/15/2020 Partial Approval DANIEL MC AULIFFE
Pre-Inspection 12/15/2020 Off-Hour Fees Due
Pre-Inspection 12/15/2020 Partial Approval DANIEL MC AULIFFE
Reinforced Concrete Frame 12/15/2020 Partial Inspection DANIEL MC AULIFFE
Special/Order Compliance 12/15/2020 Partial Approval LARRY ARNICK
Wall Anchors 12/15/2020 Partial Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 12/16/2020 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 12/16/2020 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 12/16/2020 Approved DANIEL MC AULIFFE
Interior/Exterior Lathing 12/16/2020 Partial Approval DANIEL MC AULIFFE
Pre-Inspection 12/16/2020 Off-Hour Fees Due
Deputy Drilled-In Anchors 12/17/2020 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 12/17/2020 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 12/17/2020 Approved DANIEL MC AULIFFE
Drywall Nailing 12/17/2020 Partial Approval DANIEL MC AULIFFE
Footing/Foundation/Slab 12/17/2020 Not Ready for Inspection DANIEL MC AULIFFE
Insulation 12/17/2020 Partial Inspection DANIEL MC AULIFFE
Deputy Drilled-In Anchors 12/18/2020 Conditional Approval DAVID BURKHEAD
Deputy Pre-Stress Concrete 12/18/2020 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 12/18/2020 Conditional Approval DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 12/18/2020 Not Ready for Inspection DAVID BURKHEAD
Insulation 12/18/2020 Partial Approval DAVID BURKHEAD
Interior/Exterior Lathing 12/18/2020 Partial Inspection DAVID BURKHEAD
Light Gage Steel Frame 12/18/2020 Partial Approval DAVID BURKHEAD
Pre-Inspection 12/19/2020 Off-Hour Fees Due
Deputy Drilled-In Anchors 12/21/2020 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 12/21/2020 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 12/21/2020 Approved DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 12/21/2020 Partial Approval DANIEL MC AULIFFE
Light Gage Steel Frame 12/21/2020 Partial Approval DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 12/22/2020 Approved DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 12/22/2020 Partial Inspection DANIEL MC AULIFFE
Insulation 12/22/2020 Partial Approval DANIEL MC AULIFFE
Interior/Exterior Lathing 12/22/2020 Partial Approval DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 12/23/2020 Approved DANIEL MC AULIFFE
Footing/Foundation/Slab 12/23/2020 Partial Approval DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 12/28/2020 Conditional Approval DANIEL MC AULIFFE
Drywall Nailing 12/28/2020 Partial Inspection DANIEL MC AULIFFE
Insulation 12/28/2020 Conditional Approval DANIEL MC AULIFFE
Interior/Exterior Lathing 12/28/2020 Partial Inspection DANIEL MC AULIFFE
Reinforced Concrete Frame 12/28/2020 Not Ready for Inspection DANIEL MC AULIFFE
Special/Order Compliance 12/28/2020 Partial Inspection DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 12/29/2020 Approved DANIEL MC AULIFFE
Insulation 12/29/2020 Partial Approval DANIEL MC AULIFFE
Light Gage Steel Frame 12/29/2020 Partial Approval DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 12/30/2020 Approved DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 12/30/2020 Partial Approval DANIEL MC AULIFFE
Light Gage Steel Frame 12/30/2020 Partial Approval DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 12/31/2020 Conditional Approval DANIEL MC AULIFFE
Drywall Nailing 12/31/2020 Partial Approval DANIEL MC AULIFFE
Insulation 12/31/2020 Partial Approval DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 1/4/2021 Conditional Approval DANIEL MC AULIFFE
Drywall Nailing 1/4/2021 Partial Inspection DANIEL MC AULIFFE
Insulation 1/4/2021 Partial Inspection DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 1/5/2021 Approved DANIEL MC AULIFFE
Drywall Nailing 1/5/2021 Partial Approval DANIEL MC AULIFFE
Reinforced Concrete Frame 1/5/2021 Partial Approval DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 1/6/2021 Approved DANIEL MC AULIFFE
Insulation 1/6/2021 Partial Inspection DANIEL MC AULIFFE
Reinforced Concrete Frame 1/6/2021 Partial Approval DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 1/7/2021 Approved DANIEL MC AULIFFE
Drywall Nailing 1/7/2021 Partial Approval DANIEL MC AULIFFE
Insulation 1/7/2021 Partial Approval DANIEL MC AULIFFE
Light Gage Steel Frame 1/7/2021 Partial Approval DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 1/8/2021 Conditional Approval DAVID BURKHEAD
Insulation 1/8/2021 Partial Inspection DAVID BURKHEAD
Deputy Pre-Stress Concrete 1/11/2021 Approved DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 1/11/2021 Partial Approval DANIEL MC AULIFFE
Footing/Foundation/Slab 1/11/2021 Partial Approval DANIEL MC AULIFFE
T-Bar Ceiling 1/11/2021 Not Ready for Inspection DANIEL MC AULIFFE
Deputy Drilled-In Anchors 1/12/2021 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 1/12/2021 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 1/12/2021 Approved DANIEL MC AULIFFE
Drywall Nailing 1/12/2021 Partial Approval DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 1/12/2021 Partial Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 1/13/2021 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 1/13/2021 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 1/13/2021 Approved DANIEL MC AULIFFE
Footing/Foundation/Slab 1/13/2021 Partial Approval DANIEL MC AULIFFE
Insulation 1/13/2021 Partial Approval DANIEL MC AULIFFE
Reinforced Concrete Frame 1/13/2021 Partial Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 1/14/2021 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 1/14/2021 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 1/14/2021 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 1/14/2021 Approved DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 1/14/2021 Not Ready for Inspection DANIEL MC AULIFFE
Insulation 1/14/2021 Partial Inspection DANIEL MC AULIFFE
Light Gage Steel Frame 1/14/2021 Partial Approval DANIEL MC AULIFFE
Special/Order Compliance 1/14/2021 Partial Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 1/15/2021 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 1/15/2021 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 1/15/2021 Approved DANIEL MC AULIFFE
Drywall Nailing 1/15/2021 Partial Approval DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 1/15/2021 Not Ready for Inspection DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 1/15/2021 Partial Approval DANIEL MC AULIFFE
Insulation 1/15/2021 Partial Inspection DANIEL MC AULIFFE
Special/Order Compliance 1/15/2021 Partial Approval DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 1/16/2021 Off-Hour Fees Due
Floor/Roof Diaphrgm/Shear Wall 1/16/2021 Partial Approval LARRY ARNICK
Deputy Pre-Stress Concrete 1/19/2021 Conditional Approval DANIEL MC AULIFFE
Insulation 1/19/2021 Partial Inspection DANIEL MC AULIFFE
Deputy Drilled-In Anchors 1/20/2021 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 1/20/2021 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 1/20/2021 Approved DANIEL MC AULIFFE
Drywall Nailing 1/20/2021 Partial Approval DANIEL MC AULIFFE
Insulation 1/20/2021 Partial Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 1/21/2021 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 1/21/2021 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 1/21/2021 Approved DANIEL MC AULIFFE
Drywall Nailing 1/21/2021 Partial Approval DANIEL MC AULIFFE
Footing/Foundation/Slab 1/21/2021 Not Ready for Inspection DANIEL MC AULIFFE
Insulation 1/21/2021 Partial Approval DANIEL MC AULIFFE
Interior/Exterior Lathing 1/21/2021 Partial Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 1/22/2021 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 1/22/2021 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 1/22/2021 Approved DANIEL MC AULIFFE
Drywall Nailing 1/22/2021 Partial Approval DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 1/22/2021 Partial Approval DANIEL MC AULIFFE
Insulation 1/22/2021 Partial Approval DANIEL MC AULIFFE
Light Gage Steel Frame 1/22/2021 Partial Inspection DANIEL MC AULIFFE
Structural Steel Frame 1/22/2021 Partial Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 1/25/2021 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 1/25/2021 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 1/25/2021 Approved DANIEL MC AULIFFE
Reinforced Concrete Frame 1/25/2021 Partial Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 1/26/2021 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 1/26/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 1/26/2021 Approved DANIEL MC AULIFFE
Deputy Fireproofing 1/27/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 1/27/2021 Approved DANIEL MC AULIFFE
Interior/Exterior Lathing 1/27/2021 Partial Approval DANIEL MC AULIFFE
Light Gage Steel Frame 1/27/2021 Partial Approval DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 1/28/2021 Conditional Approval DANIEL MC AULIFFE
Drywall Nailing 1/28/2021 Partial Approval DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 1/28/2021 Partial Approval DANIEL MC AULIFFE
Footing/Foundation/Slab 1/28/2021 Partial Approval DANIEL MC AULIFFE
Insulation 1/28/2021 Partial Approval DANIEL MC AULIFFE
Interior/Exterior Lathing 1/28/2021 Partial Approval DANIEL MC AULIFFE
Light Gage Steel Frame 1/28/2021 Partial Approval DANIEL MC AULIFFE
Pre-Inspection 1/28/2021 Partial Approval DANIEL MC AULIFFE
Reinforced Concrete Frame 1/28/2021 Partial Approval DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 1/29/2021 Conditional Approval DANIEL MC AULIFFE
T-Bar Ceiling 1/29/2021 Not Ready for Inspection DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 2/1/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 2/2/2021 Approved DANIEL MC AULIFFE
Insulation 2/2/2021 Partial Approval DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 2/3/2021 Approved DANIEL MC AULIFFE
Drywall Nailing 2/3/2021 Partial Approval DANIEL MC AULIFFE
Insulation 2/3/2021 Partial Approval DANIEL MC AULIFFE
Light Gage Steel Frame 2/3/2021 Partial Approval DANIEL MC AULIFFE
Pre-Inspection 2/3/2021 Not Ready for Inspection DANIEL MC AULIFFE
Special/Order Compliance 2/3/2021 Not Ready for Inspection DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 2/4/2021 Approved DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 2/4/2021 Partial Approval DANIEL MC AULIFFE
Light Gage Steel Frame 2/4/2021 Partial Approval DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 2/5/2021 Approved DANIEL MC AULIFFE
Light Gage Steel Frame 2/5/2021 Partial Approval DANIEL MC AULIFFE
Reinforced Concrete Frame 2/5/2021 Partial Approval DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 2/8/2021 Approved DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 2/8/2021 Partial Inspection DANIEL MC AULIFFE
Insulation 2/8/2021 Not Ready for Inspection DANIEL MC AULIFFE
Light Gage Steel Frame 2/8/2021 Partial Inspection DANIEL MC AULIFFE
Pre-Inspection 2/8/2021 Not Ready for Inspection DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 2/9/2021 Approved DANIEL MC AULIFFE
Drywall Nailing 2/9/2021 Partial Approval DANIEL MC AULIFFE
Interior/Exterior Lathing 2/9/2021 Partial Approval DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 2/10/2021 Approved DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 2/10/2021 Off-Hour Fees Due
Light Gage Steel Frame 2/10/2021 Partial Approval DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 2/11/2021 Approved DANIEL MC AULIFFE
Drywall Nailing 2/11/2021 Partial Approval DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 2/11/2021 Partial Approval DANIEL MC AULIFFE
Insulation 2/11/2021 Partial Approval DANIEL MC AULIFFE
Light Gage Steel Frame 2/11/2021 Partial Approval DANIEL MC AULIFFE
Special/Order Compliance 2/11/2021 Partial Approval DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 2/12/2021 Approved DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 2/12/2021 Partial Approval DANIEL MC AULIFFE
Footing/Foundation/Slab 2/12/2021 Partial Approval DANIEL MC AULIFFE
Insulation 2/12/2021 Partial Approval DANIEL MC AULIFFE
Interior/Exterior Lathing 2/12/2021 Partial Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 2/17/2021 Conditional Approval DANIEL MC AULIFFE
Drywall Nailing 2/17/2021 Partial Inspection DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 2/17/2021 Partial Approval DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 2/17/2021 Not Ready for Inspection DANIEL MC AULIFFE
Footing/Foundation/Slab 2/17/2021 Partial Approval DANIEL MC AULIFFE
Insulation 2/17/2021 Partial Inspection DANIEL MC AULIFFE
Light Gage Steel Frame 2/17/2021 Partial Approval DANIEL MC AULIFFE
Reinforced Concrete Frame 2/17/2021 Partial Approval DANIEL MC AULIFFE
Wall Anchors 2/17/2021 Partial Inspection DANIEL MC AULIFFE
Deputy Drilled-In Anchors 2/18/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 2/18/2021 Conditional Approval DANIEL MC AULIFFE
Insulation 2/22/2021 Partial Inspection DANIEL MC AULIFFE
Reinforced Concrete Frame 2/22/2021 Not Ready for Inspection DANIEL MC AULIFFE
Insulation 2/23/2021 Partial Inspection DANIEL MC AULIFFE
Special/Order Compliance 2/23/2021 Partial Approval DANIEL MC AULIFFE
Insulation 2/24/2021 Partial Approval DANIEL MC AULIFFE
Light Gage Steel Frame 2/24/2021 Partial Approval DANIEL MC AULIFFE
Drywall Nailing 2/25/2021 Not Ready for Inspection DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 2/25/2021 Not Ready for Inspection DANIEL MC AULIFFE
Insulation 2/25/2021 Not Ready for Inspection DANIEL MC AULIFFE
Light Gage Steel Frame 2/25/2021 Not Ready for Inspection DANIEL MC AULIFFE
Structural Steel Frame 2/25/2021 Not Ready for Inspection DANIEL MC AULIFFE
Wall Anchors 2/25/2021 Not Ready for Inspection DANIEL MC AULIFFE
Interior/Exterior Lathing 2/26/2021 Partial Inspection DANIEL MC AULIFFE
Light Gage Steel Frame 3/2/2021 Partial Approval DANIEL MC AULIFFE
Footing/Foundation/Slab 3/3/2021 No Access for Inspection DANIEL MC AULIFFE
Insulation 3/3/2021 Not Ready for Inspection DANIEL MC AULIFFE
Light Gage Steel Frame 3/3/2021 Not Ready for Inspection DANIEL MC AULIFFE
Insulation 3/4/2021 Partial Approval DANIEL MC AULIFFE
Drywall Nailing 3/5/2021 Partial Approval DANIEL MC AULIFFE
Light Gage Steel Frame 3/5/2021 Partial Approval DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 3/8/2021 Partial Approval DANIEL MC AULIFFE
Insulation 3/8/2021 Partial Inspection DANIEL MC AULIFFE
Light Gage Steel Frame 3/8/2021 Partial Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 3/9/2021 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 3/9/2021 Approved DANIEL MC AULIFFE
Interior/Exterior Lathing 3/9/2021 Partial Approval DANIEL MC AULIFFE
Light Gage Steel Frame 3/9/2021 Partial Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 3/10/2021 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 3/10/2021 Conditional Approval DANIEL MC AULIFFE
Drywall Nailing 3/10/2021 Partial Inspection DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 3/10/2021 Partial Inspection DANIEL MC AULIFFE
Insulation 3/10/2021 Partial Inspection DANIEL MC AULIFFE
Light Gage Steel Frame 3/10/2021 Partial Inspection DANIEL MC AULIFFE
Reinforced Concrete Frame 3/10/2021 Partial Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 3/11/2021 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 3/11/2021 Approved DANIEL MC AULIFFE
Deputy Drilled-In Anchors 3/12/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 3/12/2021 Conditional Approval DANIEL MC AULIFFE
Drywall Nailing 3/12/2021 Partial Inspection DANIEL MC AULIFFE
Deputy Drilled-In Anchors 3/15/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 3/15/2021 Conditional Approval DANIEL MC AULIFFE
Light Gage Steel Frame 3/15/2021 Partial Inspection DANIEL MC AULIFFE
Deputy Drilled-In Anchors 3/16/2021 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 3/16/2021 Approved DANIEL MC AULIFFE
Insulation 3/16/2021 Partial Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 3/17/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 3/17/2021 Conditional Approval DANIEL MC AULIFFE
Drywall Nailing 3/17/2021 Partial Inspection DANIEL MC AULIFFE
Interior/Exterior Lathing 3/17/2021 Partial Approval DANIEL MC AULIFFE
Light Gage Steel Frame 3/17/2021 Partial Inspection DANIEL MC AULIFFE
Reinforced Concrete Frame 3/17/2021 Partial Approval DANIEL MC AULIFFE
Special/Order Compliance 3/17/2021 Partial Approval DANIEL MC AULIFFE
Wall Anchors 3/17/2021 Partial Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 3/18/2021 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 3/18/2021 Approved DANIEL MC AULIFFE
Insulation 3/18/2021 Partial Approval DANIEL MC AULIFFE
Light Gage Steel Frame 3/18/2021 Partial Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 3/19/2021 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 3/19/2021 Approved DANIEL MC AULIFFE
Drywall Nailing 3/19/2021 Partial Approval DANIEL MC AULIFFE
Reinforced Concrete Frame 3/19/2021 Partial Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 3/22/2021 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 3/22/2021 Approved DANIEL MC AULIFFE
Drywall Nailing 3/22/2021 Partial Approval DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 3/22/2021 Partial Inspection DANIEL MC AULIFFE
Insulation 3/22/2021 Partial Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 3/23/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 3/23/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 3/24/2021 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 3/24/2021 Approved DANIEL MC AULIFFE
Drywall Nailing 3/24/2021 Partial Approval DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 3/24/2021 Partial Approval DANIEL MC AULIFFE
Footing/Foundation/Slab 3/24/2021 Off-Hour Fees Due
Insulation 3/24/2021 Partial Approval DANIEL MC AULIFFE
Interior/Exterior Lathing 3/24/2021 Partial Approval DANIEL MC AULIFFE
Light Gage Steel Frame 3/24/2021 Partial Approval DANIEL MC AULIFFE
Reinforced Concrete Frame 3/24/2021 Partial Approval DANIEL MC AULIFFE
Wall Anchors 3/24/2021 Partial Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 3/25/2021 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 3/25/2021 Approved DANIEL MC AULIFFE
Light Gage Steel Frame 3/25/2021 Partial Approval DANIEL MC AULIFFE
Reinforced Concrete Frame 3/25/2021 Partial Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 3/26/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 3/26/2021 Conditional Approval DANIEL MC AULIFFE
Insulation 3/26/2021 Partial Inspection DANIEL MC AULIFFE
Light Gage Steel Frame 3/26/2021 Partial Inspection DANIEL MC AULIFFE
Deputy Drilled-In Anchors 3/30/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 3/30/2021 Approved DANIEL MC AULIFFE
Insulation 3/30/2021 Partial Approval DANIEL MC AULIFFE
Drywall Nailing 3/31/2021 Partial Approval DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 3/31/2021 Partial Approval DANIEL MC AULIFFE
Insulation 3/31/2021 Partial Approval DANIEL MC AULIFFE
Interior/Exterior Lathing 3/31/2021 Partial Approval DANIEL MC AULIFFE
Light Gage Steel Frame 3/31/2021 Partial Approval DANIEL MC AULIFFE
Pre-Inspection 3/31/2021 Partial Inspection DANIEL MC AULIFFE
Special/Order Compliance 3/31/2021 Partial Inspection DANIEL MC AULIFFE
Wall Anchors 3/31/2021 Partial Inspection DANIEL MC AULIFFE
Insulation 4/5/2021 Partial Inspection DANIEL MC AULIFFE
Deputy Drilled-In Anchors 4/6/2021 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 4/6/2021 Approved DANIEL MC AULIFFE
Drywall Nailing 4/6/2021 Partial Approval DANIEL MC AULIFFE
Insulation 4/6/2021 Partial Approval DANIEL MC AULIFFE
Interior/Exterior Lathing 4/6/2021 Partial Approval DANIEL MC AULIFFE
Light Gage Steel Frame 4/6/2021 Partial Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 4/7/2021 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 4/7/2021 Approved DANIEL MC AULIFFE
Drywall Nailing 4/7/2021 Partial Approval DANIEL MC AULIFFE
Wall Anchors 4/7/2021 Partial Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 4/8/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 4/8/2021 Conditional Approval DANIEL MC AULIFFE
Drywall Nailing 4/8/2021 Partial Inspection DANIEL MC AULIFFE
Interior/Exterior Lathing 4/8/2021 Partial Inspection DANIEL MC AULIFFE
Light Gage Steel Frame 4/8/2021 Partial Inspection DANIEL MC AULIFFE
Deputy Drilled-In Anchors 4/9/2021 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 4/9/2021 Approved DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 4/9/2021 Partial Approval DANIEL MC AULIFFE
Light Gage Steel Frame 4/9/2021 Partial Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 4/12/2021 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 4/12/2021 Approved DANIEL MC AULIFFE
Light Gage Steel Frame 4/12/2021 Partial Approval DANIEL MC AULIFFE
Reinforced Concrete Frame 4/12/2021 Partial Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 4/13/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Fireproofing 4/13/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 4/13/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Masonry 4/13/2021 Conditional Approval DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 4/13/2021 Partial Inspection DANIEL MC AULIFFE
Insulation 4/13/2021 Partial Inspection DANIEL MC AULIFFE
Light Gage Steel Frame 4/13/2021 Partial Inspection DANIEL MC AULIFFE
Deputy Drilled-In Anchors 4/14/2021 Approved DANIEL MC AULIFFE
Deputy Fireproofing 4/14/2021 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 4/14/2021 Approved DANIEL MC AULIFFE
Deputy Reinf. Masonry 4/14/2021 Approved DANIEL MC AULIFFE
Drywall Nailing 4/14/2021 Partial Approval DANIEL MC AULIFFE
Light Gage Steel Frame 4/14/2021 Partial Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 4/15/2021 Approved DANIEL MC AULIFFE
Deputy Fireproofing 4/15/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 4/15/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Masonry 4/15/2021 Conditional Approval DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 4/15/2021 Partial Approval DANIEL MC AULIFFE
Insulation 4/15/2021 Partial Approval DANIEL MC AULIFFE
Light Gage Steel Frame 4/15/2021 Partial Approval DANIEL MC AULIFFE
Special/Order Compliance 4/15/2021 Partial Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 4/16/2021 Approved DANIEL MC AULIFFE
Deputy Fireproofing 4/16/2021 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 4/16/2021 Approved DANIEL MC AULIFFE
Deputy Reinf. Masonry 4/16/2021 Approved DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 4/16/2021 Partial Inspection DANIEL MC AULIFFE
Insulation 4/16/2021 Partial Inspection DANIEL MC AULIFFE
Interior/Exterior Lathing 4/16/2021 Partial Approval DANIEL MC AULIFFE
Light Gage Steel Frame 4/16/2021 Partial Approval DANIEL MC AULIFFE
Reinforced Concrete Frame 4/16/2021 Partial Inspection DANIEL MC AULIFFE
Deputy Drilled-In Anchors 4/19/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Fireproofing 4/19/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 4/19/2021 Approved DANIEL MC AULIFFE
Deputy Reinf. Masonry 4/19/2021 Conditional Approval DANIEL MC AULIFFE
Drywall Nailing 4/19/2021 Partial Approval DANIEL MC AULIFFE
Insulation 4/19/2021 Partial Inspection DANIEL MC AULIFFE
Pre-Inspection 4/19/2021 Partial Approval DANIEL MC AULIFFE
T-Bar Ceiling 4/19/2021 Partial Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 4/20/2021 Approved DANIEL MC AULIFFE
Deputy Fireproofing 4/20/2021 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 4/20/2021 Approved DANIEL MC AULIFFE
Deputy Reinf. Masonry 4/20/2021 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 4/20/2021 Approved DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 4/20/2021 Partial Approval DANIEL MC AULIFFE
Light Gage Steel Frame 4/20/2021 Partial Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 4/21/2021 Approved DANIEL MC AULIFFE
Deputy Fireproofing 4/21/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 4/21/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Masonry 4/21/2021 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 4/21/2021 Approved DANIEL MC AULIFFE
Insulation 4/21/2021 Partial Inspection DANIEL MC AULIFFE
Light Gage Steel Frame 4/21/2021 Partial Approval DANIEL MC AULIFFE
Reinforced Concrete Frame 4/21/2021 Not Ready for Inspection DANIEL MC AULIFFE
T-Bar Ceiling 4/21/2021 Partial Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 4/22/2021 Approved DANIEL MC AULIFFE
Deputy Fireproofing 4/22/2021 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 4/22/2021 Approved DANIEL MC AULIFFE
Deputy Reinf. Masonry 4/22/2021 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 4/22/2021 Approved DANIEL MC AULIFFE
Footing/Foundation/Slab 4/22/2021 Partial Approval DANIEL MC AULIFFE
Insulation 4/22/2021 Partial Inspection DANIEL MC AULIFFE
Light Gage Steel Frame 4/22/2021 Partial Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 4/23/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Fireproofing 4/23/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 4/23/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Masonry 4/23/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 4/23/2021 Conditional Approval DANIEL MC AULIFFE
Insulation 4/23/2021 Partial Inspection DANIEL MC AULIFFE
Light Gage Steel Frame 4/23/2021 Partial Inspection DANIEL MC AULIFFE
Deputy Drilled-In Anchors 4/26/2021 Approved DANIEL MC AULIFFE
Deputy Fireproofing 4/26/2021 Approved DANIEL MC AULIFFE
Deputy Fireproofing 4/26/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 4/26/2021 Approved DANIEL MC AULIFFE
Drywall Nailing 4/26/2021 Partial Approval DANIEL MC AULIFFE
Light Gage Steel Frame 4/26/2021 Partial Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 4/27/2021 Approved DANIEL MC AULIFFE
Deputy Fireproofing 4/27/2021 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 4/27/2021 Approved DANIEL MC AULIFFE
Deputy Reinf. Masonry 4/27/2021 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 4/27/2021 Approved DANIEL MC AULIFFE
Drywall Nailing 4/27/2021 Partial Approval DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 4/27/2021 Partial Approval DANIEL MC AULIFFE
Light Gage Steel Frame 4/27/2021 Partial Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 4/28/2021 Approved DANIEL MC AULIFFE
Deputy Fireproofing 4/28/2021 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 4/28/2021 Approved DANIEL MC AULIFFE
Insulation 4/28/2021 Partial Inspection DANIEL MC AULIFFE
Interior/Exterior Lathing 4/28/2021 Partial Approval DANIEL MC AULIFFE
Light Gage Steel Frame 4/28/2021 Partial Approval DANIEL MC AULIFFE
Special/Order Compliance 4/28/2021 Partial Approval DANIEL MC AULIFFE
T-Bar Ceiling 4/28/2021 Not Ready for Inspection DANIEL MC AULIFFE
Deputy Drilled-In Anchors 4/29/2021 Approved DANIEL MC AULIFFE
Deputy Fireproofing 4/29/2021 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 4/29/2021 Approved DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 4/29/2021 Partial Approval DANIEL MC AULIFFE
Insulation 4/29/2021 Partial Approval DANIEL MC AULIFFE
Light Gage Steel Frame 4/29/2021 Partial Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 4/30/2021 Approved DANIEL MC AULIFFE
Deputy Fireproofing 4/30/2021 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 4/30/2021 Approved DANIEL MC AULIFFE
Drywall Nailing 4/30/2021 Partial Approval DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 4/30/2021 Partial Inspection DANIEL MC AULIFFE
Insulation 4/30/2021 Partial Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 5/3/2021 Approved DANIEL MC AULIFFE
Deputy Fireproofing 5/3/2021 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 5/3/2021 Approved DANIEL MC AULIFFE
Deputy Drilled-In Anchors 5/4/2021 Approved DANIEL MC AULIFFE
Deputy Fireproofing 5/4/2021 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 5/4/2021 Approved DANIEL MC AULIFFE
Insulation 5/4/2021 Partial Approval DANIEL MC AULIFFE
Light Gage Steel Frame 5/4/2021 Partial Approval DANIEL MC AULIFFE
Wall Anchors 5/4/2021 Partial Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 5/5/2021 Approved DANIEL MC AULIFFE
Deputy Fireproofing 5/5/2021 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 5/5/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 5/5/2021 Approved DANIEL MC AULIFFE
Insulation 5/5/2021 Partial Approval DANIEL MC AULIFFE
Light Gage Steel Frame 5/5/2021 Partial Approval DANIEL MC AULIFFE
Special/Order Compliance 5/5/2021 Partial Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 5/6/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Fireproofing 5/6/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 5/6/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 5/7/2021 Approved DANIEL MC AULIFFE
Deputy Fireproofing 5/7/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 5/7/2021 Approved DANIEL MC AULIFFE
Drywall Nailing 5/7/2021 Partial Approval DANIEL MC AULIFFE
Insulation 5/7/2021 Partial Approval DANIEL MC AULIFFE
Light Gage Steel Frame 5/7/2021 Partial Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 5/10/2021 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 5/10/2021 Approved DANIEL MC AULIFFE
Drywall Nailing 5/10/2021 Partial Approval DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 5/10/2021 Partial Approval DANIEL MC AULIFFE
Light Gage Steel Frame 5/10/2021 Partial Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 5/11/2021 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 5/11/2021 Approved DANIEL MC AULIFFE
Drywall Nailing 5/11/2021 Partial Approval DANIEL MC AULIFFE
Light Gage Steel Frame 5/11/2021 Not Ready for Inspection DANIEL MC AULIFFE
Deputy Drilled-In Anchors 5/12/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 5/12/2021 Conditional Approval DANIEL MC AULIFFE
Insulation 5/12/2021 Partial Inspection DANIEL MC AULIFFE
Light Gage Steel Frame 5/12/2021 Partial Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 5/13/2021 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 5/13/2021 Approved DANIEL MC AULIFFE
Footing/Foundation/Slab 5/13/2021 Partial Approval DANIEL MC AULIFFE
Insulation 5/13/2021 Partial Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 5/14/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 5/14/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 5/17/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 5/17/2021 Conditional Approval DANIEL MC AULIFFE
Insulation 5/17/2021 Partial Approval DANIEL MC AULIFFE
Light Gage Steel Frame 5/17/2021 Partial Approval DANIEL MC AULIFFE
Special/Order Compliance 5/17/2021 Partial Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 5/18/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 5/18/2021 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 5/18/2021 Conditional Approval DANIEL MC AULIFFE
Drywall Nailing 5/18/2021 Partial Inspection DANIEL MC AULIFFE
Insulation 5/18/2021 Partial Approval DANIEL MC AULIFFE
Wall Anchors 5/18/2021 Partial Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 5/19/2021 Approved DANIEL MC AULIFFE
Deputy Drilled-In Anchors 5/19/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 5/19/2021 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 5/19/2021 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 5/19/2021 Conditional Approval DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 5/19/2021 Partial Inspection DANIEL MC AULIFFE
Footing/Foundation/Slab 5/19/2021 Not Ready for Inspection DANIEL MC AULIFFE
Insulation 5/19/2021 Partial Approval DANIEL MC AULIFFE
Light Gage Steel Frame 5/19/2021 Not Ready for Inspection DANIEL MC AULIFFE
T-Bar Ceiling 5/19/2021 Partial Approval DANIEL MC AULIFFE
Wall Anchors 5/19/2021 Partial Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 5/20/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 5/20/2021 Conditional Approval DANIEL MC AULIFFE
Drywall Nailing 5/20/2021 Partial Inspection DANIEL MC AULIFFE
Interior/Exterior Lathing 5/20/2021 Partial Inspection DANIEL MC AULIFFE
Light Gage Steel Frame 5/20/2021 Partial Inspection DANIEL MC AULIFFE
Reinforced Concrete Frame 5/20/2021 Not Ready for Inspection DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 5/21/2021 Partial Approval DANIEL MC AULIFFE
Deputy Fireproofing 5/24/2021 Conditional Approval DANIEL MC AULIFFE
Drywall Nailing 5/24/2021 Partial Inspection DANIEL MC AULIFFE
Deputy Fireproofing 5/25/2021 Approved DANIEL MC AULIFFE
Insulation 5/25/2021 Partial Approval DANIEL MC AULIFFE
Light Gage Steel Frame 5/25/2021 Partial Approval DANIEL MC AULIFFE
Deputy Fireproofing 5/26/2021 Conditional Approval DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 5/26/2021 Partial Inspection DANIEL MC AULIFFE
Light Gage Steel Frame 5/26/2021 Partial Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 5/27/2021 Approved DANIEL MC AULIFFE
Deputy Fireproofing 5/27/2021 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 5/27/2021 Approved DANIEL MC AULIFFE
Drywall Nailing 5/27/2021 Partial Approval DANIEL MC AULIFFE
Insulation 5/27/2021 Partial Approval DANIEL MC AULIFFE
Light Gage Steel Frame 5/27/2021 Partial Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 5/28/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Fireproofing 5/28/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 5/28/2021 Conditional Approval DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 5/28/2021 Partial Inspection DANIEL MC AULIFFE
Deputy Drilled-In Anchors 6/1/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 6/1/2021 Conditional Approval RAFAEL ESPINOZA
Drywall Nailing 6/1/2021 Partial Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 6/2/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 6/2/2021 Conditional Approval RAFAEL ESPINOZA
Insulation 6/2/2021 Not Ready for Inspection RAFAEL ESPINOZA
Light Gage Steel Frame 6/2/2021 Partial Approval RAFAEL ESPINOZA
Special/Order Compliance 6/2/2021 No Access for Inspection RAFAEL ESPINOZA
Wood Frame 6/2/2021 Partial Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 6/3/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 6/3/2021 Conditional Approval RAFAEL ESPINOZA
Drywall Nailing 6/3/2021 Partial Approval RAFAEL ESPINOZA
Insulation 6/3/2021 Partial Approval RAFAEL ESPINOZA
Light Gage Steel Frame 6/3/2021 Partial Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 6/15/2021 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 6/15/2021 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 6/15/2021 Approved DANIEL MC AULIFFE
Deputy Drilled-In Anchors 6/16/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 6/16/2021 Conditional Approval DANIEL MC AULIFFE
Interior/Exterior Lathing 6/16/2021 Partial Inspection DANIEL MC AULIFFE
Light Gage Steel Frame 6/16/2021 Partial Inspection DANIEL MC AULIFFE
Deputy Drilled-In Anchors 6/17/2021 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 6/17/2021 Conditional Approval DAVID BURKHEAD
Drywall Nailing 6/17/2021 Not Ready for Inspection DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 6/17/2021 Not Ready for Inspection DAVID BURKHEAD
Interior/Exterior Lathing 6/17/2021 Not Ready for Inspection DAVID BURKHEAD
Light Gage Steel Frame 6/17/2021 Not Ready for Inspection DAVID BURKHEAD
Deputy Drilled-In Anchors 6/18/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Fireproofing 6/18/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 6/18/2021 Conditional Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 6/18/2021 Partial Approval RAFAEL ESPINOZA
Interior/Exterior Lathing 6/18/2021 Partial Approval RAFAEL ESPINOZA
Light Gage Steel Frame 6/18/2021 Partial Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 6/21/2021 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 6/21/2021 Approved DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 6/21/2021 Partial Approval DANIEL MC AULIFFE
Insulation 6/21/2021 Partial Inspection DANIEL MC AULIFFE
Light Gage Steel Frame 6/21/2021 Partial Approval DANIEL MC AULIFFE
Reinforced Concrete Frame 6/21/2021 Partial Approval DANIEL MC AULIFFE
Interior/Exterior Lathing 6/22/2021 Partial Inspection DANIEL MC AULIFFE
Light Gage Steel Frame 6/24/2021 Partial Approval DANIEL MC AULIFFE
Drywall Nailing 6/25/2021 Not Ready for Inspection JONATHAN QUACH
Floor/Roof Diaphrgm/Shear Wall 6/25/2021 Conditional Approval JONATHAN QUACH
Light Gage Steel Frame 6/25/2021 Not Ready for Inspection JONATHAN QUACH
Reinforced Concrete Frame 6/25/2021 Not Ready for Inspection JONATHAN QUACH
Deputy Reinf. Concrete 6/28/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 6/29/2021 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 6/29/2021 Approved DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 6/29/2021 Partial Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 6/30/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 6/30/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 7/1/2021 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 7/1/2021 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 7/1/2021 Approved DANIEL MC AULIFFE
Footing/Foundation/Slab 7/1/2021 Partial Approval DANIEL MC AULIFFE
Interior/Exterior Lathing 7/1/2021 Approved DANIEL MC AULIFFE
Reinforced Concrete Frame 7/1/2021 Approved DANIEL MC AULIFFE
Deputy Drilled-In Anchors 7/2/2021 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 7/2/2021 Approved DANIEL MC AULIFFE
Drywall Nailing 7/2/2021 Partial Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 7/6/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Masonry 7/6/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 7/6/2021 Conditional Approval DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 7/6/2021 Partial Inspection DANIEL MC AULIFFE
Deputy Reinf. Masonry 7/7/2021 Conditional Approval DANIEL MC AULIFFE
Drywall Nailing 7/7/2021 Partial Inspection DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 7/7/2021 Partial Inspection DANIEL MC AULIFFE
Deputy Reinf. Masonry 7/8/2021 Approved DANIEL MC AULIFFE
Light Gage Steel Frame 7/8/2021 Partial Approval DANIEL MC AULIFFE
Deputy Reinf. Masonry 7/9/2021 Conditional Approval DANIEL MC AULIFFE
Insulation 7/9/2021 Partial Approval DANIEL MC AULIFFE
Deputy Reinf. Masonry 7/12/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 7/13/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Masonry 7/13/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 7/13/2021 Conditional Approval DANIEL MC AULIFFE
Light Gage Steel Frame 7/13/2021 Partial Inspection DANIEL MC AULIFFE
Deputy Reinf. Masonry 7/14/2021 Conditional Approval DANIEL MC AULIFFE
Interior/Exterior Lathing 7/14/2021 Partial Approval DANIEL MC AULIFFE
Footing/Foundation/Slab 7/15/2021 Partial Inspection DANIEL MC AULIFFE
Deputy Drilled-In Anchors 7/16/2021 Approved DANIEL MC AULIFFE
Deputy Reinf. Masonry 7/16/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 7/16/2021 Approved DANIEL MC AULIFFE
Deputy Drilled-In Anchors 7/19/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 7/19/2021 Approved DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 7/19/2021 Partial Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 7/20/2021 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 7/20/2021 Approved DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 7/20/2021 Partial Approval DANIEL MC AULIFFE
Insulation 7/20/2021 Partial Approval DANIEL MC AULIFFE
Light Gage Steel Frame 7/20/2021 Partial Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 7/21/2021 Conditional Approval DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 7/21/2021 Partial Inspection DANIEL MC AULIFFE
Insulation 7/21/2021 Partial Inspection DANIEL MC AULIFFE
Special/Order Compliance 7/21/2021 Partial Approval DANIEL MC AULIFFE
Insulation 7/22/2021 Partial Inspection DANIEL MC AULIFFE
Special/Order Compliance 7/22/2021 Partial Inspection DANIEL MC AULIFFE
Drywall Nailing 7/23/2021 Partial Approval DANIEL MC AULIFFE
Insulation 7/23/2021 Partial Inspection DANIEL MC AULIFFE
Light Gage Steel Frame 7/23/2021 Order to Comply Issued DANIEL MC AULIFFE
Deputy Drilled-In Anchors 7/26/2021 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 7/26/2021 Approved DANIEL MC AULIFFE
Interior/Exterior Lathing 7/26/2021 Partial Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 7/27/2021 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 7/27/2021 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 7/27/2021 Approved DANIEL MC AULIFFE
Light Gage Steel Frame 7/27/2021 Partial Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 7/28/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 7/28/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 7/29/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 7/29/2021 Conditional Approval DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 7/29/2021 Partial Inspection DANIEL MC AULIFFE
Deputy Drilled-In Anchors 7/30/2021 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 7/30/2021 Approved DANIEL MC AULIFFE
Insulation 7/30/2021 Partial Approval DANIEL MC AULIFFE
Light Gage Steel Frame 7/30/2021 Partial Approval DANIEL MC AULIFFE
Wall Anchors 7/30/2021 Partial Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 8/2/2021 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 8/2/2021 Approved DANIEL MC AULIFFE
Light Gage Steel Frame 8/2/2021 Partial Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 8/3/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 8/3/2021 Conditional Approval DANIEL MC AULIFFE
Drywall Nailing 8/3/2021 Partial Approval DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 8/3/2021 Partial Inspection DANIEL MC AULIFFE
Light Gage Steel Frame 8/3/2021 Partial Inspection DANIEL MC AULIFFE
Deputy Drilled-In Anchors 8/4/2021 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 8/4/2021 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 8/4/2021 Approved DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 8/4/2021 Partial Approval DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 8/4/2021 Partial Inspection DANIEL MC AULIFFE
Deputy Drilled-In Anchors 8/5/2021 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 8/5/2021 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 8/5/2021 Approved DANIEL MC AULIFFE
Deputy Drilled-In Anchors 8/6/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 8/6/2021 Conditional Approval DANIEL MC AULIFFE
Drywall Nailing 8/6/2021 Partial Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 8/9/2021 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 8/9/2021 Approved DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 8/9/2021 Partial Inspection DANIEL MC AULIFFE
Deputy Drilled-In Anchors 8/10/2021 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 8/10/2021 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 8/10/2021 Approved DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 8/10/2021 Partial Inspection DANIEL MC AULIFFE
Deputy Drilled-In Anchors 8/11/2021 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 8/11/2021 Approved DANIEL MC AULIFFE
Drywall Nailing 8/11/2021 Partial Approval DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 8/11/2021 Partial Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 8/12/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 8/12/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 8/13/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 8/13/2021 Conditional Approval RAFAEL ESPINOZA
Light Gage Steel Frame 8/13/2021 Not Ready for Inspection RAFAEL ESPINOZA
Deputy Drilled-In Anchors 8/16/2021 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 8/16/2021 Conditional Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 8/17/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 8/17/2021 Conditional Approval RAFAEL ESPINOZA
Interior/Exterior Lathing 8/17/2021 Partial Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 8/18/2021 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 8/18/2021 Conditional Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 8/19/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 8/19/2021 Conditional Approval RAFAEL ESPINOZA
Light Gage Steel Frame 8/19/2021 Partial Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 8/20/2021 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 8/20/2021 Conditional Approval DAVID BURKHEAD
Drywall Nailing 8/23/2021 Partial Approval EDWIN GREGORYONA
Insulation 8/23/2021 Not Ready for Inspection EDWIN GREGORYONA
Light Gage Steel Frame 8/23/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 8/24/2021 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 8/24/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 8/24/2021 Conditional Approval DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 8/24/2021 Partial Approval DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 8/24/2021 Partial Approval DANIEL MC AULIFFE
Light Gage Steel Frame 8/24/2021 Partial Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 8/25/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 8/25/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 8/26/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 8/26/2021 Approved DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 8/26/2021 Partial Inspection DANIEL MC AULIFFE
Light Gage Steel Frame 8/26/2021 Partial Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 8/27/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 8/27/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 8/27/2021 Conditional Approval DANIEL MC AULIFFE
Drywall Nailing 8/27/2021 Partial Inspection DANIEL MC AULIFFE
Deputy Drilled-In Anchors 8/30/2021 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 8/30/2021 Approved DANIEL MC AULIFFE
Light Gage Steel Frame 8/30/2021 Partial Approval DANIEL MC AULIFFE
Wall Anchors 8/30/2021 Partial Inspection DANIEL MC AULIFFE
Insulation 9/1/2021 Partial Approval DANIEL MC AULIFFE
Interior/Exterior Lathing 9/1/2021 Partial Approval DANIEL MC AULIFFE
Drywall Nailing 9/2/2021 Partial Approval DANIEL MC AULIFFE
Insulation 9/3/2021 Partial Approval DANIEL MC AULIFFE
Insulation 9/7/2021 Partial Inspection DANIEL MC AULIFFE
Deputy Drilled-In Anchors 9/8/2021 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 9/8/2021 Approved DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 9/8/2021 Partial Approval DANIEL MC AULIFFE
Interior/Exterior Lathing 9/8/2021 Partial Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 9/9/2021 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 9/9/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 9/10/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 9/10/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 9/10/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 9/13/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 9/13/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 9/14/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 9/14/2021 Conditional Approval RAFAEL ESPINOZA
Excavation/Setback/Form/Re-Bar 9/14/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 9/15/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 9/15/2021 Conditional Approval DANIEL MC AULIFFE
Drywall Nailing 9/15/2021 Partial Inspection DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 9/15/2021 Partial Inspection DANIEL MC AULIFFE
Insulation 9/15/2021 Partial Inspection DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 9/16/2021 Partial Inspection DANIEL MC AULIFFE
Deputy Drilled-In Anchors 9/17/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 9/17/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 9/20/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 9/20/2021 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 9/20/2021 Approved DANIEL MC AULIFFE
Insulation 9/20/2021 Partial Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 9/21/2021 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 9/21/2021 Approved DANIEL MC AULIFFE
Drywall Nailing 9/21/2021 Partial Approval DANIEL MC AULIFFE
Light Gage Steel Frame 9/21/2021 Partial Inspection DANIEL MC AULIFFE
Deputy Drilled-In Anchors 9/22/2021 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 9/22/2021 Approved DANIEL MC AULIFFE
Interior/Exterior Lathing 9/22/2021 Partial Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 9/23/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 9/23/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 9/24/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 9/24/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 9/27/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 9/27/2021 Conditional Approval DANIEL MC AULIFFE
Drywall Nailing 9/27/2021 Partial Approval DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 9/27/2021 Partial Approval DANIEL MC AULIFFE
Light Gage Steel Frame 9/27/2021 Partial Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 9/28/2021 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 9/28/2021 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 9/29/2021 Approved DANIEL MC AULIFFE
Structural Steel Frame 9/29/2021 Partial Inspection DANIEL MC AULIFFE
Deputy Drilled-In Anchors 9/30/2021 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 9/30/2021 Approved DANIEL MC AULIFFE
Deputy Reinf. Masonry 9/30/2021 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 9/30/2021 Approved DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 9/30/2021 Partial Approval DANIEL MC AULIFFE
Insulation 9/30/2021 Partial Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 10/1/2021 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 10/1/2021 Approved DANIEL MC AULIFFE
Deputy Reinf. Masonry 10/1/2021 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 10/1/2021 Approved DANIEL MC AULIFFE
Deputy Drilled-In Anchors 10/4/2021 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 10/4/2021 Approved DANIEL MC AULIFFE
Footing/Foundation/Slab 10/4/2021 Partial Inspection DANIEL MC AULIFFE
Insulation 10/4/2021 Partial Inspection DANIEL MC AULIFFE
Interior/Exterior Lathing 10/4/2021 Partial Inspection DANIEL MC AULIFFE
Light Gage Steel Frame 10/4/2021 Partial Approval DANIEL MC AULIFFE
Pre-Inspection 10/4/2021 Partial Inspection DANIEL MC AULIFFE
SWPPP-Const. Storm Water 10/4/2021 Completed DANIEL MC AULIFFE
Wall Anchors 10/4/2021 Partial Inspection DANIEL MC AULIFFE
Deputy Drilled-In Anchors 10/5/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 10/5/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 10/6/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 10/6/2021 Conditional Approval DANIEL MC AULIFFE
Drywall Nailing 10/6/2021 Partial Inspection DANIEL MC AULIFFE
Deputy Drilled-In Anchors 10/7/2021 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 10/7/2021 Approved DANIEL MC AULIFFE
Pre-Inspection 10/7/2021 Partial Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 10/8/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 10/8/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 10/13/2021 Conditional Approval RAFAEL ESPINOZA
Drywall Nailing 10/13/2021 Partial Approval RAFAEL ESPINOZA
Insulation 10/13/2021 Not Ready for Inspection RAFAEL ESPINOZA
Special/Order Compliance 10/13/2021 Not Ready for Inspection RAFAEL ESPINOZA
Deputy Reinf. Concrete 10/14/2021 Conditional Approval RAFAEL ESPINOZA
Drywall Nailing 10/18/2021 Partial Inspection DANIEL MC AULIFFE
Deputy Drilled-In Anchors 10/19/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 10/19/2021 Approved DANIEL MC AULIFFE
Light Gage Steel Frame 10/19/2021 Partial Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 10/20/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 10/20/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 10/21/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 10/21/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 10/22/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 10/22/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 10/25/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 10/25/2021 Approved DANIEL MC AULIFFE
Deputy Drilled-In Anchors 10/26/2021 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 10/26/2021 Approved DANIEL MC AULIFFE
Deputy Reinf. Masonry 10/26/2021 Approved DANIEL MC AULIFFE
Drywall Nailing 10/26/2021 Partial Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 10/27/2021 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 10/27/2021 Approved DANIEL MC AULIFFE
Deputy Reinf. Masonry 10/27/2021 Approved DANIEL MC AULIFFE
Deputy Drilled-In Anchors 10/28/2021 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 10/28/2021 Approved DANIEL MC AULIFFE
Deputy Reinf. Masonry 10/28/2021 Approved DANIEL MC AULIFFE
Insulation 10/28/2021 Partial Inspection DANIEL MC AULIFFE
Deputy Reinf. Concrete 10/29/2021 Approved DANIEL MC AULIFFE
Drywall Nailing 10/29/2021 Partial Inspection DANIEL MC AULIFFE
Light Gage Steel Frame 10/29/2021 Partial Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 11/1/2021 Conditional Approval DANIEL MC AULIFFE
Pre-Inspection 11/1/2021 Partial Inspection DANIEL MC AULIFFE
Deputy Drilled-In Anchors 11/2/2021 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 11/2/2021 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 11/2/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 11/3/2021 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 11/3/2021 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 11/3/2021 Approved DANIEL MC AULIFFE
Drywall Nailing 11/3/2021 Partial Approval DANIEL MC AULIFFE
Structural Steel Frame 11/3/2021 Partial Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 11/4/2021 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 11/4/2021 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 11/4/2021 Approved DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 11/4/2021 Partial Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 11/5/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 11/5/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 11/5/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 11/8/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 11/8/2021 Conditional Approval DANIEL MC AULIFFE
Drywall Nailing 11/8/2021 Partial Approval DANIEL MC AULIFFE
Light Gage Steel Frame 11/8/2021 Partial Approval DANIEL MC AULIFFE
Wall Anchors 11/8/2021 Partial Inspection DANIEL MC AULIFFE
Deputy Reinf. Concrete 11/9/2021 Approved DANIEL MC AULIFFE
Interior/Exterior Lathing 11/9/2021 Partial Approval DANIEL MC AULIFFE
Light Gage Steel Frame 11/9/2021 Partial Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 11/10/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 11/12/2021 Conditional Approval DANIEL MC AULIFFE
Drywall Nailing 11/15/2021 Partial Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 11/16/2021 Conditional Approval DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 11/16/2021 Partial Inspection DANIEL MC AULIFFE
Deputy Reinf. Concrete 11/17/2021 Approved DANIEL MC AULIFFE
Drywall Nailing 11/17/2021 Partial Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 11/18/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 11/19/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 11/22/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 11/22/2021 Conditional Approval DANIEL MC AULIFFE
Light Gage Steel Frame 11/22/2021 Partial Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 11/23/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 11/23/2021 Order to Comply Issued DANIEL MC AULIFFE
Deputy Steel/Welding 11/23/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 11/24/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 11/24/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 11/24/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 11/29/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 11/29/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 11/29/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 11/30/2021 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 11/30/2021 Approved DANIEL MC AULIFFE
Deputy Reinf. Masonry 11/30/2021 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 11/30/2021 Approved DANIEL MC AULIFFE
Special/Order Compliance 11/30/2021 Not Ready for Inspection DANIEL MC AULIFFE
Deputy Drilled-In Anchors 12/1/2021 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 12/1/2021 Approved DANIEL MC AULIFFE
Deputy Reinf. Masonry 12/1/2021 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 12/1/2021 Approved DANIEL MC AULIFFE
Pre-Inspection 12/1/2021 Partial Inspection DANIEL MC AULIFFE
Deputy Drilled-In Anchors 12/2/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 12/2/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Masonry 12/2/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 12/2/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 12/3/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 12/3/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Masonry 12/3/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 12/3/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 12/6/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 12/7/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 12/7/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 12/7/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 12/8/2021 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 12/8/2021 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 12/8/2021 Approved DANIEL MC AULIFFE
Drywall Nailing 12/8/2021 Conditional Approval DANIEL MC AULIFFE
Drywall Nailing 12/8/2021 Partial Approval DANIEL MC AULIFFE
Interior/Exterior Lathing 12/8/2021 Partial Approval DANIEL MC AULIFFE
Special/Order Compliance 12/8/2021 Partial Inspection DANIEL MC AULIFFE
Deputy Drilled-In Anchors 12/9/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 12/9/2021 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 12/9/2021 Approved DANIEL MC AULIFFE
Deputy Drilled-In Anchors 12/10/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 12/10/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 12/10/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 12/13/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 12/13/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 12/15/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 12/16/2021 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 12/17/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 12/20/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 12/20/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 12/20/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 12/21/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 12/21/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 12/21/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 12/22/2021 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 12/22/2021 Conditional Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 12/23/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 12/23/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 12/27/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 12/27/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 12/28/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 12/29/2021 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 12/29/2021 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 12/29/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 12/30/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 12/30/2021 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 12/30/2021 Conditional Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 1/3/2022 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 1/3/2022 Approved DANIEL MC AULIFFE
Deputy Drilled-In Anchors 1/4/2022 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 1/4/2022 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 1/4/2022 Approved DANIEL MC AULIFFE
Pre-Inspection 1/4/2022 Partial Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 1/5/2022 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 1/5/2022 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 1/5/2022 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 1/6/2022 Conditional Approval DAVID BURKHEAD
Deputy Grading 1/7/2022 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 1/7/2022 Conditional Approval DAVID BURKHEAD
Special/Order Compliance 1/10/2022 Partial Inspection DANIEL MC AULIFFE
Deputy Drilled-In Anchors 1/11/2022 Approved DANIEL MC AULIFFE
Deputy Grading 1/11/2022 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 1/11/2022 Approved DANIEL MC AULIFFE
Deputy Shotcrete 1/11/2022 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 1/11/2022 Approved DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 1/11/2022 Partial Inspection DANIEL MC AULIFFE
Deputy Drilled-In Anchors 1/12/2022 Approved DANIEL MC AULIFFE
Deputy Grading 1/12/2022 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 1/12/2022 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 1/12/2022 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 1/12/2022 Approved DANIEL MC AULIFFE
Deputy Drilled-In Anchors 1/13/2022 Conditional Approval DANIEL MC AULIFFE
Deputy Grading 1/13/2022 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 1/13/2022 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 1/13/2022 Conditional Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 1/14/2022 Conditional Approval DANIEL MC AULIFFE
Deputy Grading 1/14/2022 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 1/14/2022 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 1/14/2022 Conditional Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 1/18/2022 Conditional Approval DANIEL MC AULIFFE
Deputy Grading 1/18/2022 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 1/18/2022 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 1/18/2022 Conditional Approval DANIEL MC AULIFFE
Deputy Grading 1/19/2022 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 1/19/2022 Conditional Approval DANIEL MC AULIFFE
Pre-Inspection 1/19/2022 Partial Approval DANIEL MC AULIFFE
Deputy Grading 1/20/2022 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 1/20/2022 Approved DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 1/20/2022 Partial Approval DANIEL MC AULIFFE
Grading Pre-Inspection 1/20/2022 Partial Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 1/21/2022 Approved DANIEL MC AULIFFE
Deputy Grading 1/21/2022 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 1/21/2022 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 1/21/2022 Approved DANIEL MC AULIFFE
Drywall Nailing 1/21/2022 Partial Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 1/24/2022 Conditional Approval DANIEL MC AULIFFE
Deputy Grading 1/24/2022 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 1/24/2022 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 1/24/2022 Conditional Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 1/25/2022 Conditional Approval DANIEL MC AULIFFE
Deputy Grading 1/25/2022 Conditional Approval DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 1/25/2022 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 1/25/2022 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 1/25/2022 Conditional Approval DANIEL MC AULIFFE
Pre-Inspection 1/25/2022 Partial Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 1/26/2022 Conditional Approval DANIEL MC AULIFFE
Deputy Grading 1/26/2022 Conditional Approval DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 1/26/2022 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 1/26/2022 Conditional Approval DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 1/26/2022 Partial Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 1/27/2022 Approved DANIEL MC AULIFFE
Deputy Grading 1/27/2022 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 1/27/2022 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 1/27/2022 Approved DANIEL MC AULIFFE
Light Gage Steel Frame 1/27/2022 Partial Approval DANIEL MC AULIFFE
Deputy Grading 1/28/2022 Conditional Approval DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 1/28/2022 Conditional Approval DANIEL MC AULIFFE
Deputy Grading 1/31/2022 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 1/31/2022 Approved DANIEL MC AULIFFE
Pre-Inspection 1/31/2022 Partial Inspection DANIEL MC AULIFFE
Deputy Grading 2/1/2022 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 2/1/2022 Approved DANIEL MC AULIFFE
Deputy Grading 2/2/2022 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 2/2/2022 Approved DANIEL MC AULIFFE
Special/Order Compliance 2/2/2022 Partial Inspection DANIEL MC AULIFFE
Deputy Grading 2/3/2022 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 2/3/2022 Approved DANIEL MC AULIFFE
Special/Order Compliance 2/4/2022 Partial Approval DANIEL MC AULIFFE
Deputy Grading 2/7/2022 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 2/7/2022 Conditional Approval DANIEL MC AULIFFE
Deputy Grading 2/8/2022 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 2/8/2022 Approved DANIEL MC AULIFFE
Special/Order Compliance 2/8/2022 Partial Inspection DANIEL MC AULIFFE
Deputy Grading 2/9/2022 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 2/9/2022 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 2/15/2022 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 2/16/2022 Approved DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 2/16/2022 Partial Inspection DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 2/16/2022 Partial Inspection DANIEL MC AULIFFE
Pre-Inspection 2/16/2022 Partial Inspection DANIEL MC AULIFFE
Deputy Reinf. Concrete 2/17/2022 Approved DANIEL MC AULIFFE
Pre-Inspection 2/17/2022 Partial Approval DANIEL MC AULIFFE
Special/Order Compliance 2/17/2022 Partial Inspection DANIEL MC AULIFFE
Deputy Reinf. Concrete 2/18/2022 Approved DANIEL MC AULIFFE
Pre-Inspection 2/18/2022 Partial Inspection DANIEL MC AULIFFE
Deputy Drilled-In Anchors 2/23/2022 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 2/23/2022 Approved DANIEL MC AULIFFE
Deputy Drilled-In Anchors 2/24/2022 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 2/24/2022 Approved DANIEL MC AULIFFE
Deputy Drilled-In Anchors 2/25/2022 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 2/25/2022 Approved DANIEL MC AULIFFE
Deputy Drilled-In Anchors 2/28/2022 Approved DANIEL MC AULIFFE
Deputy Grading 2/28/2022 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 2/28/2022 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 2/28/2022 Approved DANIEL MC AULIFFE
Deputy Grading 3/1/2022 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 3/1/2022 Approved DANIEL MC AULIFFE
Deputy Grading 3/2/2022 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 3/2/2022 Approved DANIEL MC AULIFFE
Special/Order Compliance 3/2/2022 Partial Inspection DANIEL MC AULIFFE
Deputy Grading 3/3/2022 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 3/3/2022 Approved DANIEL MC AULIFFE
Deputy Grading 3/4/2022 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 3/4/2022 Approved DANIEL MC AULIFFE
Deputy Grading 3/7/2022 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 3/7/2022 Approved DANIEL MC AULIFFE
Pre-Inspection 3/7/2022 Partial Approval DANIEL MC AULIFFE
Deputy Grading 3/8/2022 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 3/8/2022 Approved DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 3/8/2022 Partial Approval DANIEL MC AULIFFE
Deputy Grading 3/9/2022 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 3/9/2022 Approved DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 3/9/2022 Partial Approval DANIEL MC AULIFFE
Deputy Grading 3/10/2022 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 3/10/2022 Conditional Approval DANIEL MC AULIFFE
Deputy Grading 3/11/2022 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 3/11/2022 Conditional Approval DANIEL MC AULIFFE
Deputy Grading 3/14/2022 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 3/14/2022 Conditional Approval DANIEL MC AULIFFE
Deputy Grading 3/15/2022 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 3/15/2022 Conditional Approval DANIEL MC AULIFFE
Deputy Grading 3/16/2022 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 3/16/2022 Conditional Approval DANIEL MC AULIFFE
Deputy Grading 3/17/2022 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 3/17/2022 Conditional Approval DAVID BURKHEAD
Pre-Inspection 3/18/2022 Approved DAVID BURKHEAD
Pre-Inspection 3/21/2022 Partial Inspection DANIEL MC AULIFFE
Special/Order Compliance 3/21/2022 Partial Inspection DANIEL MC AULIFFE
Deputy Grading 3/22/2022 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 3/22/2022 Conditional Approval DANIEL MC AULIFFE
Deputy Grading 3/23/2022 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 3/23/2022 Conditional Approval DANIEL MC AULIFFE
Light Gage Steel Frame 3/23/2022 Partial Approval DANIEL MC AULIFFE
Pre-Inspection 3/23/2022 Partial Approval DANIEL MC AULIFFE
Deputy Grading 3/24/2022 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 3/24/2022 Approved DANIEL MC AULIFFE
Deputy Grading 3/25/2022 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 3/25/2022 Conditional Approval DANIEL MC AULIFFE
Special/Order Compliance 4/5/2022 Partial Inspection DANIEL MC AULIFFE
Pre-Inspection 4/8/2022 Partial Inspection DANIEL MC AULIFFE
Pre-Inspection 4/13/2022 Not Ready for Inspection DANIEL MC AULIFFE
Special/Order Compliance 4/26/2022 Partial Approval DANIEL MC AULIFFE
Pre-Inspection 5/6/2022 Approved TED RIES
Deputy Drilled-In Anchors 5/19/2022 Conditional Approval TED RIES
Special/Order Compliance 6/2/2022 Approved TED RIES
Special/Order Compliance 11/30/2022 Approved TED RIES
Special/Order Compliance 5/31/2023 Approved TED RIES
Special/Order Compliance 11/15/2023 Conditional Approval NICK DANERI
Drywall Nailing 3/6/2024 Not Ready for Inspection DAVID BURKHEAD
Final 3/6/2024 Not Ready for Inspection DAVID BURKHEAD
Footing/Foundation/Slab 3/6/2024 Not Ready for Inspection DAVID BURKHEAD
Green Building Final 3/6/2024 Not Ready for Inspection DAVID BURKHEAD
SGSOV-Seismic Gas S/O Valve 3/6/2024 SGSOV Not Ready DAVID BURKHEAD
SWPPP-Const. Storm Water 3/6/2024 Completed DAVID BURKHEAD
Smoke Detectors 3/6/2024 Not Ready for Inspection DAVID BURKHEAD
Special/Order Compliance 5/14/2024 Approved ERNESTO CORRAL
Special/Order Compliance 4/8/2025 Conditional Approval NICK DANERI
Drywall Nailing 8/21/2025 Approved JAMES POWERS
Final 8/21/2025 Not Ready for Inspection JAMES POWERS
Footing/Foundation/Slab 8/21/2025 Approved JAMES POWERS
Green Building Final 8/21/2025 Approved JAMES POWERS
SGSOV-Seismic Gas S/O Valve 8/21/2025 SGSOV Approved JAMES POWERS
SWPPP-Const. Storm Water 8/21/2025 Completed JAMES POWERS
Smoke Detectors 8/21/2025 Approved JAMES POWERS
Special/Order Compliance 10/28/2025 Approved DAVID BURKHEAD
Final 12/17/2025 Partial Inspection DAVID BURKHEAD
SWPPP-Const. Storm Water 12/17/2025 Completed DAVID BURKHEAD
Final 2/19/2026 Conditional Approval DAVID BURKHEAD