3800 S VERMONT AVE 90037

Certificate Information: 3800 S VERMONT AVE 90037

Application / Permit
17010-10000-01465
Plan Check / Job No.
B17LA06087
Group
Building
Type
Bldg-New
Sub-Type
Commercial
Primary Use
(4) Museum non-profit
Work Description
NEW 5 STORY TYPE IA MUSEUM AND LANDSCAPING OVER 2 LEVELS OF SUBTERRANEAN PARKING. INCLUDES THEATER, EDUCATION, OFFICE, AND RESTAURANT USES. SEE COMMENTS FOR DEFERRED ITEMS.
Permit Issued
Issued on 10/26/2018
Issuing Office
Metro
Current Status
CofO Issued on 5/26/2026
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 4/18/2017 APPLICANT
Assigned to Plan Check Engineer 5/11/2017 MINYE PAK
Corrections Issued 6/8/2017 MINYE PAK
Quality Review Completed 6/8/2017 PETER KIM
Applicant returned to address corrections 6/14/2017 MINYE PAK
Applicant returned to address corrections 7/11/2017 MINYE PAK
Applicant returned to address corrections 7/12/2017 MINYE PAK
Applicant returned to address corrections 7/13/2017 MINYE PAK
Applicant returned to address corrections 7/19/2017 MINYE PAK
Applicant returned to address corrections 7/20/2017 MINYE PAK
Applicant returned to address corrections 8/11/2017 MINYE PAK
Applicant returned to address corrections 8/16/2017 MINYE PAK
Applicant returned to address corrections 1/30/2018 MINYE PAK
Applicant returned to address corrections 10/17/2018 MINYE PAK
Applicant returned to address corrections 10/23/2018 WING SUEN
Applicant returned to address corrections 10/24/2018 WING SUEN
Plan Check Approved 10/26/2018 WING SUEN
Issued 10/26/2018 LADBS
TCO Issued (Expire Date: 08-18-2026) 2/19/2026 ADAM BURGESS
CofO in Progress 5/26/2026 JAMES POWERS
Permit Finaled 5/26/2026 ADAM BURGESS
CofO Issued 5/26/2026 ADAM BURGESS
Permit Finaled 5/26/2026 ADAM BURGESS

Permit Application Clearance Information

Address approval Cleared 12/27/2017 STEVE MELGAR
Eng Process Fee Ord 176,300 Cleared 12/27/2017 STEVE MELGAR
Sewer availability Cleared 4/11/2018 MICHAEL CASTILLO
Driveway location Cleared 8/3/2018 EDUARDO HERMOSO
Hydrant and Access approval Cleared 8/3/2018 JOHN CONNEALLY
Transportation Demand Ord. Cleared 8/3/2018 EDUARDO HERMOSO
Project located in CRA area Cleared 8/7/2018 JIM URQUHART
Building over 3-story or 36-ft Cleared 8/9/2018 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 8/9/2018 CALOSHA APPROVED
Work Adjacent to Public Way Cleared 9/11/2018 CHIU TAM
Green Code Cleared 9/17/2018 DONALD CRICHLOW
Permit Cleared 9/18/2018 ADRIAN SANCHEZ
Drainage to Storm Drain Cleared 9/19/2018 SOPHEA EK
Encroachment in public way Cleared 9/19/2018 SOPHEA EK
Miscellaneous Cleared 9/19/2018 SOPHEA EK
Miscellaneous Cleared 9/19/2018 SOPHEA EK
Miscellaneous Cleared 9/19/2018 SOPHEA EK
Roof/Waste drainage to street Cleared 9/19/2018 SOPHEA EK
DAS Clearance Cleared 10/17/2018 MINYE PAK
Fire Marshall Fire Life Safety Cleared 10/18/2018 ANDREW KO
Food Service Establishment Cleared 10/18/2018 RAMESHBHAIR PATEL
Food establishment approval Cleared 10/22/2018 LACDHS APPROVED
Miscellaneous Cleared 10/25/2018 MARITZA PRZEKOP
Site Plan review Cleared 10/25/2018 MARITZA PRZEKOP
Specific Plan Cleared 10/25/2018 MARITZA PRZEKOP
ZA Case Cleared 10/25/2018 MARITZA PRZEKOP
ZI Cleared 10/25/2018 MARITZA PRZEKOP
Low Impact Development Cleared 10/26/2018 AMMAR ELTAWIL
Miscellaneous Cleared 10/26/2018 MARITZA PRZEKOP

Contact Information

Architect Makowicki, Paul R; Lic. No.: C33907 523 WEST SIXTH ST   SUITE 430    LOS ANGELES, CA 90014
Contractor Hathaway Dinwiddie Construction Company; Lic. No.: 729664-B 275 BATTERY STREET SUITE 300      SAN FRANCISCO, CA 941113330
Engineer Espinosa, Pedro J; Lic. No.: GE2954 210 HILLVIEW DR      FREMONT, CA 94536
Engineer Faschan, William James; Lic. No.: S2937 40 WALL STREET 23RD FLOOR      NEW YORK, NY 100051339
Engineer Lera, Associates, Rllp; Lic. No.: C87771 40 WALL STREET   23RD FLOOR    NEW YORK, NY 10005
Geologist Lam, Patrick; Lic. No.: EG2490 2010 CROW CANYON PLACE   SUITE 250    SAN RAMON, CA 94583
Landscape Architect Hutchins, Jeffrey P; Lic. No.: LA3815 625 N HALLOCK AVE      SAN DIMAS, CA 91773

Inspector Information

ALFREDO LOPEZ, (213) 482-0361 Office Hours: 7:00-8:00 AM MON-FRI
JAMES POWERS, (213) 482-0361 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Footing/Foundation/Slab 12/4/2018 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/5/2018 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/6/2018 Partial Approval JAMES POWERS
Drywall Nailing 12/6/2018 Not Ready for Inspection JAMES POWERS
Green Building Rough 12/6/2018 Not Ready for Inspection JAMES POWERS
Deputy Reinf. Concrete 12/7/2018 Partial Approval JAMES POWERS
Footing/Foundation/Slab 12/7/2018 Partial Approval JAMES POWERS
Excavation/Setback/Form/Re-Bar 12/8/2018 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/10/2018 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/11/2018 Partial Approval JAMES POWERS
Green Building Final 12/11/2018 Off-Hour Fees Due
Structural Steel Frame 12/11/2018 Off-Hour Fees Due
Verify Rec and Parks Fee Memo 12/11/2018 Off-Hour Fees Due
Deputy Reinf. Concrete 12/12/2018 Partial Approval JAMES POWERS
Reinforced Concrete Frame 12/12/2018 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/13/2018 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/14/2018 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/17/2018 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/18/2018 Partial Approval JAMES POWERS
Footing/Foundation/Slab 12/18/2018 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/19/2018 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/20/2018 Partial Approval JAMES POWERS
Footing/Foundation/Slab 12/20/2018 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/21/2018 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/24/2018 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/26/2018 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/27/2018 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/28/2018 Conditional Approval CHARLENE BUSTAMANTE
Deputy Reinf. Concrete 12/28/2018 Conditional Approval FRED WOHLFARTH
Deputy Reinf. Concrete 12/28/2018 Conditional Approval MARK FERRARI
Deputy Reinf. Concrete 12/31/2018 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/2/2019 Partial Approval JAMES POWERS
Footing/Foundation/Slab 1/2/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/3/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/4/2019 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 1/4/2019 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/7/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/8/2019 Partial Approval JAMES POWERS
Footing/Foundation/Slab 1/10/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/11/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/11/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/14/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/14/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/15/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/15/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/16/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/16/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/17/2019 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 1/17/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/17/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/18/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/22/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/23/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/24/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/25/2019 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 1/28/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/28/2019 Partial Approval JAMES POWERS
Footing/Foundation/Slab 1/28/2019 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 1/29/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/29/2019 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 1/30/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/30/2019 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 1/31/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 1/31/2019 No Access for Inspection LESLIE TRUJILLO
Deputy Reinf. Concrete 1/31/2019 Conditional Approval LESLIE TRUJILLO
Footing/Foundation/Slab 1/31/2019 No Access for Inspection LESLIE TRUJILLO
Deputy Pre-Stress Concrete 2/1/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/1/2019 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 2/4/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/4/2019 Conditional Approval JONATHAN QUACH
Deputy Reinf. Concrete 2/4/2019 Partial Approval JAMES POWERS
Reinforced Concrete Frame 2/4/2019 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 2/5/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/5/2019 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 2/6/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/6/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/7/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/8/2019 Partial Approval JAMES POWERS
Footing/Foundation/Slab 2/8/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/12/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/13/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/14/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/15/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/19/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/20/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/21/2019 Partial Approval JAMES POWERS
Floor/Roof Diaphrgm/Shear Wall 2/21/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/22/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/25/2019 Partial Approval JAMES POWERS
Footing/Foundation/Slab 2/25/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/26/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/27/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/28/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/1/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/4/2019 Partial Approval JAMES POWERS
Footing/Foundation/Slab 3/4/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/5/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/6/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/7/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/8/2019 Partial Approval JAMES POWERS
Floor/Roof Diaphrgm/Shear Wall 3/8/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/11/2019 No Access for Inspection KATY RAMIREZ
Green Building Rough 3/11/2019 Not Ready for Inspection JAMES POWERS
Reinforced Concrete Frame 3/11/2019 Partial Approval JAMES POWERS
Verify Sprinkler Sign Off 3/11/2019 Not Ready for Inspection JAMES POWERS
Deputy Pre-Stress Concrete 3/12/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/12/2019 Conditional Approval KATY RAMIREZ
Deputy Reinf. Concrete 3/12/2019 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 3/13/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/13/2019 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 3/14/2019 Approved JOEY BUCHANAN
Deputy Reinf. Concrete 3/14/2019 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 3/15/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/15/2019 Approved JOEY BUCHANAN
Deputy Reinf. Concrete 3/15/2019 Partial Approval JAMES POWERS
Footing/Foundation/Slab 3/15/2019 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 3/18/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/18/2019 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 3/19/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/19/2019 Partial Approval JAMES POWERS
Footing/Foundation/Slab 3/19/2019 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 3/20/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/20/2019 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 3/21/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/21/2019 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 3/22/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/22/2019 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 3/26/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/26/2019 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 3/27/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/27/2019 Partial Approval JAMES POWERS
Footing/Foundation/Slab 3/27/2019 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 3/28/2019 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 3/28/2019 Conditional Approval NICK DANERI
Deputy Pre-Stress Concrete 3/29/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/29/2019 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 4/1/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/1/2019 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 4/2/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/2/2019 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 4/3/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/3/2019 Partial Approval JAMES POWERS
Footing/Foundation/Slab 4/3/2019 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 4/4/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/4/2019 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 4/5/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/5/2019 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 4/8/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/8/2019 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 4/9/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/9/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/10/2019 Partial Approval JAMES POWERS
Footing/Foundation/Slab 4/10/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/12/2019 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 4/15/2019 Conditional Approval JAMES POWERS
Deputy Reinf. Concrete 4/15/2019 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 4/16/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/16/2019 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 4/17/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/17/2019 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 4/18/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/18/2019 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 4/19/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 4/19/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 4/22/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 4/22/2019 Conditional Approval LESLIE TRUJILLO
Footing/Foundation/Slab 4/22/2019 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 4/23/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 4/23/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 4/24/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 4/24/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 4/25/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 4/25/2019 Conditional Approval ERNESTO CORRAL
Deputy Pre-Stress Concrete 4/26/2019 Approved TED RIES
Deputy Reinf. Concrete 4/26/2019 Approved TED RIES
Deputy Pre-Stress Concrete 4/29/2019 Approved JOEY BUCHANAN
Deputy Reinf. Concrete 4/29/2019 Approved JOEY BUCHANAN
Deputy Drilled-In Anchors 5/6/2019 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 5/6/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/6/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 5/7/2019 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 5/7/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/7/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 5/8/2019 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 5/8/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/8/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 5/9/2019 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 5/9/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/9/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 5/10/2019 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 5/10/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/10/2019 Partial Approval JAMES POWERS
Reinforced Concrete Frame 5/10/2019 Partial Approval JAMES POWERS
Masonry Wall/Backfill 5/16/2019 Not Ready for Inspection JAMES POWERS
Deputy Pre-Stress Concrete 5/21/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/21/2019 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 5/22/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/22/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/22/2019 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 5/23/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/23/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/23/2019 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 5/24/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 5/24/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/24/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/24/2019 Partial Approval JAMES POWERS
Footing/Foundation/Slab 5/24/2019 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 5/28/2019 Approved JOEY BUCHANAN
Deputy Reinf. Concrete 5/28/2019 Approved JOEY BUCHANAN
Deputy Steel/Welding 5/28/2019 Approved JOEY BUCHANAN
Deputy Pre-Stress Concrete 5/29/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/29/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/29/2019 Partial Approval JAMES POWERS
Reinforced Concrete Frame 5/29/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/30/2019 Approved JOHN CARPENTER
Pre-Inspection 5/30/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/31/2019 Partial Approval JAMES POWERS
Reinforced Concrete Frame 5/31/2019 Partial Approval JAMES POWERS
Reinforced Concrete Frame 6/3/2019 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 6/4/2019 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 6/4/2019 Conditional Approval WINSTON DUNNING
Deputy Steel/Welding 6/4/2019 Conditional Approval WINSTON DUNNING
Deputy Pre-Stress Concrete 6/5/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/5/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 6/5/2019 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 6/6/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/6/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 6/6/2019 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 6/10/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/10/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 6/10/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/11/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/12/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/13/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/14/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/17/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/18/2019 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 6/19/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/19/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 6/19/2019 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 6/20/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/20/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 6/20/2019 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 6/21/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/21/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 6/21/2019 Partial Approval JAMES POWERS
Reinforced Concrete Frame 6/21/2019 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 6/24/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/24/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 6/24/2019 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 6/25/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/25/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/26/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 6/26/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/27/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 6/27/2019 Partial Approval JAMES POWERS
Reinforced Concrete Frame 6/27/2019 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 6/28/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/28/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 6/28/2019 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 7/1/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/1/2019 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 7/2/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/2/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/2/2019 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 7/3/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/3/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/3/2019 Partial Approval JAMES POWERS
Reinforced Concrete Frame 7/3/2019 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 7/5/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/5/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/5/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/8/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/8/2019 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 7/9/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/9/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/9/2019 Partial Approval JAMES POWERS
Footing/Foundation/Slab 7/9/2019 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 7/10/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/10/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/10/2019 Partial Approval JAMES POWERS
Green Building Rough 7/10/2019 Not Ready for Inspection JAMES POWERS
Reinforced Concrete Frame 7/10/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/11/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/11/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/12/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/12/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/15/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/15/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/16/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/16/2019 Partial Approval JAMES POWERS
Reinforced Concrete Frame 7/16/2019 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 7/17/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/17/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/17/2019 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 7/18/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/18/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/18/2019 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 7/19/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/19/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/19/2019 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 7/22/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/22/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/22/2019 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 7/23/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/23/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/23/2019 Partial Approval JAMES POWERS
Drywall Nailing 7/23/2019 Not Ready for Inspection JAMES POWERS
Green Building Rough 7/23/2019 Not Ready for Inspection JAMES POWERS
Deputy Pre-Stress Concrete 7/24/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/24/2019 Partial Approval JAMES POWERS
Reinforced Concrete Frame 7/24/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/25/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/25/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/26/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/26/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/29/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/29/2019 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 7/30/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/30/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/30/2019 Partial Approval JAMES POWERS
Footing/Foundation/Slab 7/30/2019 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 7/31/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/31/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/31/2019 Partial Approval JAMES POWERS
Footing/Foundation/Slab 7/31/2019 Partial Approval JAMES POWERS
Green Building Rough 7/31/2019 Not Ready for Inspection JAMES POWERS
Deputy Pre-Stress Concrete 8/1/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/1/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/1/2019 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 8/2/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/2/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/2/2019 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 8/5/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/5/2019 Partial Approval JAMES POWERS
Reinforced Concrete Frame 8/5/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/6/2019 Partial Approval JAMES POWERS
Footing/Foundation/Slab 8/6/2019 Partial Approval JAMES POWERS
Green Building Rough 8/6/2019 Not Ready for Inspection JAMES POWERS
Deputy Reinf. Concrete 8/8/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/9/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/12/2019 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 8/13/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/13/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/13/2019 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 8/14/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/14/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/14/2019 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 8/15/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/15/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/15/2019 Partial Approval JAMES POWERS
Footing/Foundation/Slab 8/15/2019 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 8/16/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/16/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/16/2019 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 8/19/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/19/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/19/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/20/2019 Partial Approval JAMES POWERS
Reinforced Concrete Frame 8/20/2019 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 8/21/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/21/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/21/2019 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 8/22/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/22/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/22/2019 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 8/23/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/23/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/23/2019 Partial Approval JAMES POWERS
Reinforced Concrete Frame 8/23/2019 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 8/26/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/26/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/26/2019 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 8/27/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/27/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/27/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/28/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/29/2019 Partial Approval JAMES POWERS
Reinforced Concrete Frame 8/29/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/3/2019 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 9/4/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/4/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 9/4/2019 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 9/5/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 9/5/2019 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 9/5/2019 Conditional Approval LESLIE TRUJILLO
Footing/Foundation/Slab 9/5/2019 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 9/6/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 9/6/2019 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 9/6/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 9/9/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/9/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 9/9/2019 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 9/10/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/10/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 9/10/2019 Partial Approval JAMES POWERS
Pre-Inspection 9/11/2019 Not Ready for Inspection JAMES POWERS
Deputy Pre-Stress Concrete 9/13/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/13/2019 Partial Approval JAMES POWERS
Reinforced Concrete Frame 9/13/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/16/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/17/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/18/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/19/2019 Approved JOEY BUCHANAN
Footing/Foundation/Slab 9/19/2019 Not Ready for Inspection JAMES POWERS
Deputy Pre-Stress Concrete 9/20/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/20/2019 Partial Approval JAMES POWERS
Reinforced Concrete Frame 9/20/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/23/2019 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 9/23/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/23/2019 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 9/23/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/24/2019 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 9/24/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/24/2019 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 9/24/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/25/2019 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 9/25/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/25/2019 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 9/25/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/26/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/26/2019 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 9/26/2019 Partial Approval JAMES POWERS
Reinforced Concrete Frame 9/26/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/27/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/27/2019 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 9/27/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/30/2019 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 9/30/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/1/2019 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 10/1/2019 Partial Approval JAMES POWERS
Reinforced Concrete Frame 10/1/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/2/2019 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 10/2/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/3/2019 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 10/3/2019 Partial Approval JAMES POWERS
Reinforced Concrete Frame 10/3/2019 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 10/4/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/4/2019 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 10/4/2019 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 10/7/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/7/2019 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 10/7/2019 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 10/8/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/8/2019 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 10/8/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/8/2019 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 10/9/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/9/2019 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 10/9/2019 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 10/10/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/10/2019 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 10/10/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/11/2019 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 10/11/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/15/2019 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 10/15/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/15/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/16/2019 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 10/16/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/16/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/17/2019 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 10/17/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/17/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/18/2019 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 10/18/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/18/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/21/2019 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 10/21/2019 Partial Approval JAMES POWERS
Footing/Foundation/Slab 10/21/2019 Not Ready for Inspection JAMES POWERS
Deputy Reinf. Concrete 10/22/2019 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 10/22/2019 Partial Approval JAMES POWERS
Green Building Rough 10/22/2019 Not Ready for Inspection JAMES POWERS
Reinforced Concrete Frame 10/22/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/23/2019 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 10/23/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/24/2019 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 10/24/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/25/2019 Approved JOEY BUCHANAN
Deputy Reinf. Masonry 10/25/2019 Approved JOEY BUCHANAN
Deputy Reinf. Concrete 10/28/2019 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 10/28/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/29/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/30/2019 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 10/30/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/31/2019 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 10/31/2019 Partial Approval JAMES POWERS
Footing/Foundation/Slab 10/31/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 11/1/2019 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 11/1/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 11/4/2019 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 11/4/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 11/5/2019 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 11/5/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 11/5/2019 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 11/5/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 11/6/2019 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 11/6/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 11/6/2019 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 11/6/2019 Partial Approval JAMES POWERS
Footing/Foundation/Slab 11/6/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 11/7/2019 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 11/7/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 11/7/2019 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 11/7/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 11/7/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 11/8/2019 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 11/8/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 11/8/2019 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 11/8/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 11/8/2019 Partial Approval JAMES POWERS
Green Building Rough 11/8/2019 Not Ready for Inspection JAMES POWERS
Reinforced Concrete Frame 11/8/2019 Not Ready for Inspection JAMES POWERS
Verify Sprinkler Sign Off 11/8/2019 Not Ready for Inspection JAMES POWERS
Deputy Reinf. Concrete 11/12/2019 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 11/12/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 11/12/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 11/13/2019 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 11/13/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 11/13/2019 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 11/13/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 11/13/2019 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 11/14/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 11/14/2019 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 11/14/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 11/14/2019 Partial Approval JAMES POWERS
Reinforced Concrete Frame 11/14/2019 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 11/15/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 11/15/2019 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 11/15/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 11/15/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 11/18/2019 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 11/18/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 11/18/2019 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 11/18/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 11/19/2019 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 11/19/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 11/19/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 11/20/2019 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 11/20/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 11/20/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 11/21/2019 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 11/21/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 11/21/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 11/22/2019 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 11/22/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 11/22/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 11/25/2019 Approved JOEY BUCHANAN
Deputy Steel/Welding 11/25/2019 Approved JOEY BUCHANAN
Deputy Reinf. Concrete 11/26/2019 Approved JOEY BUCHANAN
Deputy Reinf. Masonry 11/26/2019 Approved JOEY BUCHANAN
Deputy Steel/Welding 11/26/2019 Approved JOEY BUCHANAN
Deputy Reinf. Concrete 11/27/2019 Approved JOEY BUCHANAN
Deputy Reinf. Masonry 11/27/2019 Approved JOEY BUCHANAN
Deputy Steel/Welding 11/27/2019 Approved JOEY BUCHANAN
Deputy Pre-Stress Concrete 12/2/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/2/2019 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 12/2/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/2/2019 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 12/3/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/3/2019 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 12/3/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/3/2019 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 12/4/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/4/2019 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 12/4/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/4/2019 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 12/5/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/5/2019 Partial Approval JAMES POWERS
Reinforced Concrete Frame 12/5/2019 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 12/6/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/6/2019 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 12/9/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/9/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/9/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 12/10/2019 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 12/10/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/10/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/10/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 12/11/2019 Approved JOEY BUCHANAN
Deputy Pre-Stress Concrete 12/11/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/11/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/11/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 12/12/2019 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 12/12/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/12/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/12/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 12/13/2019 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 12/13/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/13/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/13/2019 Partial Approval JAMES POWERS
Reinforced Concrete Frame 12/13/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 12/16/2019 Approved JOEY BUCHANAN
Deputy Pre-Stress Concrete 12/16/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/16/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/16/2019 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 12/17/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/17/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/17/2019 Partial Approval JAMES POWERS
Reinforced Concrete Frame 12/17/2019 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 12/18/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/18/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/18/2019 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 12/19/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/19/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/19/2019 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 12/20/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/20/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/20/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/23/2019 Partial Approval JAMES POWERS
Footing/Foundation/Slab 12/23/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/24/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/24/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/26/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/27/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/27/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/30/2019 Approved JOEY BUCHANAN
Deputy Steel/Welding 12/30/2019 Approved JOEY BUCHANAN
Deputy Pre-Stress Concrete 12/31/2019 Approved JOEY BUCHANAN
Deputy Reinf. Concrete 12/31/2019 Approved JOEY BUCHANAN
Deputy Steel/Welding 12/31/2019 Approved JOEY BUCHANAN
Deputy Pre-Stress Concrete 1/2/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/2/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/2/2020 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 1/3/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/3/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/3/2020 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 1/6/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/6/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 1/6/2020 Conditional Approval RUSSELL BONVOULOIR
Deputy Steel/Welding 1/6/2020 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 1/7/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/7/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 1/7/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/7/2020 Partial Approval JAMES POWERS
Reinforced Concrete Frame 1/7/2020 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 1/8/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/8/2020 Conditional Approval BRUCE CAMPBELL
Deputy Reinf. Concrete 1/8/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 1/8/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/8/2020 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 1/9/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/9/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 1/9/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/9/2020 Partial Approval DARRYL ARNOLD
Deputy Drilled-In Anchors 1/10/2020 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 1/10/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/10/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 1/10/2020 Approved FELIX CEBALLOS
Deputy Steel/Welding 1/10/2020 Approved HAMID PISHEHVAR
Green Building Rough 1/10/2020 Not Ready for Inspection JAMES POWERS
Reinforced Concrete Frame 1/10/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 1/13/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/13/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 1/14/2020 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 1/14/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/14/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 1/14/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 1/15/2020 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 1/15/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/15/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 1/15/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 1/16/2020 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 1/16/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/16/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 1/16/2020 Conditional Approval DANIEL VARNUM
Reinforced Concrete Frame 1/16/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 1/17/2020 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 1/17/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/17/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 1/17/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 1/21/2020 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 1/21/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/21/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 1/21/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/21/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 1/22/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/22/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 1/22/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/22/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 1/23/2020 Partial Approval JAMES POWERS
Deputy Fireproofing 1/23/2020 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 1/23/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/23/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 1/23/2020 Partial Approval JAMES POWERS
Deputy Shotcrete 1/23/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/23/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 1/24/2020 Partial Approval JAMES POWERS
Deputy Fireproofing 1/24/2020 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 1/24/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/24/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 1/24/2020 Partial Approval JAMES POWERS
Deputy Shotcrete 1/24/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/24/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 1/27/2020 Partial Approval JAMES POWERS
Deputy Fireproofing 1/27/2020 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 1/27/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/27/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 1/27/2020 Partial Approval JAMES POWERS
Deputy Shotcrete 1/27/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/27/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/28/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/28/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 1/29/2020 Partial Approval JAMES POWERS
Deputy Fireproofing 1/29/2020 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 1/29/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/29/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 1/29/2020 Partial Approval JAMES POWERS
Deputy Shotcrete 1/29/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/29/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 1/30/2020 Partial Approval JAMES POWERS
Deputy Fireproofing 1/30/2020 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 1/30/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/30/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 1/30/2020 Partial Approval JAMES POWERS
Deputy Shotcrete 1/30/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/30/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 1/31/2020 Partial Approval JAMES POWERS
Deputy Fireproofing 1/31/2020 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 1/31/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/31/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 1/31/2020 Partial Approval JAMES POWERS
Deputy Shotcrete 1/31/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/31/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 2/3/2020 Partial Approval JAMES POWERS
Deputy Fireproofing 2/3/2020 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 2/3/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/3/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 2/3/2020 Partial Approval JAMES POWERS
Deputy Shotcrete 2/3/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/3/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 2/4/2020 Partial Approval JAMES POWERS
Deputy Fireproofing 2/4/2020 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 2/4/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/4/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 2/4/2020 Partial Approval JAMES POWERS
Deputy Shotcrete 2/4/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/4/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 2/5/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/5/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 2/5/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/5/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 2/6/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/6/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 2/6/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/6/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 2/7/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/7/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 2/7/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/7/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 2/10/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/10/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 2/10/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/10/2020 Partial Approval JAMES POWERS
Footing/Foundation/Slab 2/10/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 2/11/2020 Partial Approval JAMES POWERS
Deputy Fireproofing 2/11/2020 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 2/11/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/11/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 2/11/2020 Partial Approval JAMES POWERS
Deputy Shotcrete 2/11/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/11/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 2/12/2020 Partial Approval JAMES POWERS
Deputy Fireproofing 2/12/2020 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 2/12/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/12/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 2/12/2020 Partial Approval JAMES POWERS
Deputy Shotcrete 2/12/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/12/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 2/13/2020 Partial Approval JAMES POWERS
Deputy Fireproofing 2/13/2020 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 2/13/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/13/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 2/13/2020 Partial Approval JAMES POWERS
Deputy Shotcrete 2/13/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/13/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 2/14/2020 Partial Approval JAMES POWERS
Deputy Fireproofing 2/14/2020 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 2/14/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/14/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 2/14/2020 Partial Approval JAMES POWERS
Deputy Shotcrete 2/14/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/14/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 2/18/2020 Partial Approval JAMES POWERS
Deputy Fireproofing 2/18/2020 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 2/18/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/18/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 2/18/2020 Partial Approval JAMES POWERS
Deputy Shotcrete 2/18/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/18/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 2/19/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/19/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/19/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 2/20/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 2/20/2020 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 2/20/2020 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 2/21/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/21/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/21/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 2/24/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/24/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/24/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 2/25/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/25/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/25/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 2/26/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/26/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/26/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 2/27/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/27/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/27/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 2/28/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/28/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/28/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 3/2/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/2/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 3/2/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 3/3/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/3/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 3/3/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 3/4/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/4/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 3/4/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 3/5/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/5/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 3/5/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 3/6/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/6/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 3/6/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 3/9/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/9/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 3/9/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 3/10/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/10/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 3/10/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 3/11/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/11/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 3/11/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 3/12/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/12/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 3/12/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 3/13/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 3/13/2020 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 3/13/2020 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 3/16/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/16/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 3/16/2020 Partial Approval JAMES POWERS
Reinforced Concrete Frame 3/16/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 3/17/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/17/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 3/17/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 3/17/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 3/18/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/18/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 3/18/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 3/18/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 3/19/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/19/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 3/19/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 3/19/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 3/20/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/20/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 3/20/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 3/20/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 3/23/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 3/23/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 3/24/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 3/25/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 3/26/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 3/27/2020 No Access for Inspection JAMES POWERS
Deputy Steel/Welding 3/27/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/8/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/9/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 4/9/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 4/9/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 4/10/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/13/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 4/13/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 4/13/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/14/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 4/14/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 4/14/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/15/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 4/15/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 4/15/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 4/16/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/16/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 4/16/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 4/17/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/17/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 4/17/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 4/20/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/20/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 4/20/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 4/20/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/21/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 4/21/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 4/21/2020 Partial Approval JAMES POWERS
Reinforced Concrete Frame 4/21/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/22/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 4/22/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 4/22/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/23/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 4/23/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 4/23/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/24/2020 Conditional Approval RONALD PACHECO
Deputy Reinf. Masonry 4/24/2020 Conditional Approval RONALD PACHECO
Deputy Steel/Welding 4/24/2020 Conditional Approval RONALD PACHECO
Deputy Reinf. Concrete 4/27/2020 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 4/27/2020 Conditional Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 4/28/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/28/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 4/28/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 4/28/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 4/29/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/29/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 4/29/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 4/29/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 4/30/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/30/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 4/30/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 4/30/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 5/1/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/1/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 5/1/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/1/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 5/4/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/4/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 5/4/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/4/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 5/5/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/5/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 5/5/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/5/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 5/6/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/6/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 5/6/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/6/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 5/7/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/7/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 5/7/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/7/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 5/8/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/8/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 5/8/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/8/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/11/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/11/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 5/12/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/12/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 5/12/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/12/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 5/13/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/13/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 5/13/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/13/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 5/14/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/14/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 5/14/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/14/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 5/15/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/15/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 5/15/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/15/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 5/18/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/18/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 5/18/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/18/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 5/19/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/19/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 5/19/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/19/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 5/20/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/20/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 5/20/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/20/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 5/21/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/21/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 5/21/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/21/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 5/22/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/22/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 5/22/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/22/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 5/26/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/26/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 5/26/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/26/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 5/27/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/27/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 5/27/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/27/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 5/28/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/28/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 5/28/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/28/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 5/29/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/29/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 5/29/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/29/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 6/1/2020 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 6/1/2020 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 6/1/2020 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 6/1/2020 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 6/2/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/2/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 6/2/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 6/2/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 6/3/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/3/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 6/3/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 6/3/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 6/4/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/4/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 6/4/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 6/4/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 6/5/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/5/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 6/5/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 6/5/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 6/8/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/8/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 6/8/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 6/8/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 6/9/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/9/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 6/9/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 6/9/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 6/10/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/10/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 6/10/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 6/10/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 6/11/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/11/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 6/11/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 6/11/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 6/12/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/12/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 6/12/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 6/12/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/15/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 6/15/2020 Partial Approval JAMES POWERS
Footing/Foundation/Slab 6/15/2020 Not Ready for Inspection JAMES POWERS
Deputy Drilled-In Anchors 6/16/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/16/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 6/16/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 6/16/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 6/17/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/17/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 6/17/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 6/17/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 6/18/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/18/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 6/18/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 6/18/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 6/19/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/19/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 6/19/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 6/19/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 6/22/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/22/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 6/22/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 6/22/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 6/23/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/23/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 6/23/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 6/23/2020 Partial Approval JAMES POWERS
Green Building Rough 6/23/2020 Not Ready for Inspection JAMES POWERS
Structural Steel Frame 6/23/2020 Not Ready for Inspection JAMES POWERS
Verify Sprinkler Sign Off 6/23/2020 Not Ready for Inspection JAMES POWERS
Deputy Drilled-In Anchors 6/24/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/24/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 6/24/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 6/24/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 6/25/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/25/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 6/25/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 6/25/2020 Partial Approval JAMES POWERS
Pre-Inspection 6/25/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 6/26/2020 Conditional Approval JONATHAN QUACH
Deputy Reinf. Concrete 6/26/2020 Conditional Approval JONATHAN QUACH
Deputy Reinf. Masonry 6/26/2020 Conditional Approval JONATHAN QUACH
Deputy Steel/Welding 6/26/2020 Conditional Approval JONATHAN QUACH
Deputy Reinf. Concrete 6/29/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 6/29/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 6/30/2020 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 6/30/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/30/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 6/30/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 6/30/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/1/2020 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 7/1/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/1/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 7/1/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/1/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/2/2020 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 7/2/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/2/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 7/2/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/2/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/6/2020 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 7/6/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/6/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 7/6/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/6/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/7/2020 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 7/7/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/7/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 7/7/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/7/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/8/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/8/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 7/8/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/8/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/9/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/9/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 7/9/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/9/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/10/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/10/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 7/10/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/10/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/13/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/13/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 7/13/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/13/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/14/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/14/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 7/14/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/14/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/15/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/15/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 7/15/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/15/2020 Partial Approval JAMES POWERS
Light Gage Steel Frame 7/15/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/16/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/16/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 7/16/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/16/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/17/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/17/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 7/17/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/17/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/20/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/20/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 7/20/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/20/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/21/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/21/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 7/21/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/21/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/22/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/22/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 7/22/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/22/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/23/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/23/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 7/23/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/23/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/24/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/24/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 7/24/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/24/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/27/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/27/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 7/27/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/27/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/28/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/28/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 7/28/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/28/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/29/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/29/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 7/29/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/29/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/30/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/30/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 7/30/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/30/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/31/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/31/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 7/31/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/31/2020 Partial Approval JAMES POWERS
Deputy Grading 8/3/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/3/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/3/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/4/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 8/4/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/4/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/5/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 8/5/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/5/2020 Partial Approval JAMES POWERS
Deputy Grading 8/6/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/6/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 8/6/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/6/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/10/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/10/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 8/10/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/10/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/11/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/11/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 8/11/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/11/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/12/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/12/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 8/12/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/12/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/13/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/13/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 8/13/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/13/2020 Partial Approval JAMES POWERS
Drywall Nailing 8/13/2020 Partial Approval JAMES POWERS
Green Building Rough 8/13/2020 Not Ready for Inspection JAMES POWERS
Light Gage Steel Frame 8/13/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/14/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/14/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 8/14/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/14/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/17/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/17/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/18/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/18/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 8/18/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/18/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/19/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/19/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 8/19/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/19/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/20/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/20/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 8/20/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/20/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/21/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/21/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 8/21/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/21/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/24/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/24/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 8/24/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/25/2020 Partial Approval JAMES POWERS
Deputy Fireproofing 8/25/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/25/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 8/25/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/25/2020 Partial Approval JAMES POWERS
Light Gage Steel Frame 8/25/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/26/2020 Partial Approval JAMES POWERS
Deputy Fireproofing 8/26/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/26/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 8/26/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/26/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/27/2020 Partial Approval JAMES POWERS
Deputy Fireproofing 8/27/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/27/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 8/27/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/27/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/28/2020 Partial Approval JAMES POWERS
Deputy Fireproofing 8/28/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/28/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 8/28/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/28/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/31/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/31/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 8/31/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/31/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/1/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/1/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 9/1/2020 Partial Approval JAMES POWERS
Deputy Shotcrete 9/1/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 9/1/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/2/2020 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 9/2/2020 Conditional Approval NICK DANERI
Deputy Reinf. Masonry 9/2/2020 Conditional Approval NICK DANERI
Deputy Shotcrete 9/2/2020 Conditional Approval NICK DANERI
Deputy Steel/Welding 9/2/2020 Conditional Approval NICK DANERI
Floor/Roof Diaphrgm/Shear Wall 9/2/2020 Partial Approval NICK DANERI
Deputy Drilled-In Anchors 9/3/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/3/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 9/3/2020 Partial Approval JAMES POWERS
Deputy Shotcrete 9/3/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 9/3/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/4/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/4/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 9/4/2020 Partial Approval JAMES POWERS
Deputy Shotcrete 9/4/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 9/4/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/8/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/8/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 9/8/2020 Partial Approval JAMES POWERS
Deputy Shotcrete 9/8/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 9/8/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/9/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/9/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 9/9/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/10/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/10/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 9/10/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/11/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/11/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 9/11/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/14/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/14/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 9/14/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/15/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/15/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 9/15/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/16/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/16/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 9/16/2020 Order to Comply Issued JAMES POWERS
Deputy Steel/Welding 9/16/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/17/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/17/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 9/17/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/18/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/18/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 9/18/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/21/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/21/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 9/21/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/22/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/22/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 9/22/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/23/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/23/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 9/23/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/24/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/24/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 9/24/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/25/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/25/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 9/25/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/28/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/28/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 9/28/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/29/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/29/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 9/29/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/30/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/30/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 9/30/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 10/1/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/1/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/1/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 10/2/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/2/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/2/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 10/5/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/5/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 10/5/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/5/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 10/6/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/6/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 10/6/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/6/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 10/7/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/7/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 10/7/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/7/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 10/8/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/8/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 10/8/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/8/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 10/9/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/9/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 10/9/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/9/2020 Partial Approval JAMES POWERS
Reinforced Concrete Frame 10/9/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 10/13/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/13/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 10/14/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/14/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 10/14/2020 Partial Approval JAMES POWERS
Deputy Shotcrete 10/14/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/14/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 10/15/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/15/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 10/15/2020 Partial Approval JAMES POWERS
Deputy Shotcrete 10/15/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/15/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 10/16/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/16/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 10/16/2020 Partial Approval JAMES POWERS
Deputy Shotcrete 10/16/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/16/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 10/19/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/19/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 10/19/2020 Partial Approval JAMES POWERS
Deputy Shotcrete 10/19/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/19/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 10/20/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/20/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 10/20/2020 Partial Approval JAMES POWERS
Deputy Shotcrete 10/20/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/20/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 10/21/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/21/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 10/21/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/21/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 10/22/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/22/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 10/22/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/22/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 10/23/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/23/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 10/23/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/23/2020 Partial Approval JAMES POWERS
Reinforced Concrete Frame 10/23/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 10/26/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/26/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 10/26/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/26/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 10/27/2020 Partial Approval JAMES POWERS
Deputy Fireproofing 10/27/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/27/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 10/27/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/27/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 10/28/2020 Partial Approval JAMES POWERS
Deputy Fireproofing 10/28/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/28/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 10/28/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/28/2020 Partial Approval JAMES POWERS
Reinforced Concrete Frame 10/28/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 10/29/2020 Partial Approval JAMES POWERS
Deputy Fireproofing 10/29/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/29/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 10/29/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/29/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 10/30/2020 Partial Approval JAMES POWERS
Deputy Fireproofing 10/30/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/30/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 10/30/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/30/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 11/2/2020 Partial Approval JAMES POWERS
Deputy Fireproofing 11/2/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 11/2/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 11/4/2020 Partial Approval JAMES POWERS
Deputy Fireproofing 11/4/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 11/4/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 11/4/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 11/5/2020 Partial Approval JAMES POWERS
Deputy Fireproofing 11/5/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 11/5/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 11/5/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 11/6/2020 Partial Approval JAMES POWERS
Deputy Fireproofing 11/6/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 11/6/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 11/6/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 11/9/2020 Partial Approval JAMES POWERS
Deputy Fireproofing 11/9/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 11/9/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 11/9/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 11/10/2020 Partial Approval JAMES POWERS
Deputy Fireproofing 11/10/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 11/10/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 11/10/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 11/12/2020 Conditional Approval NICK DANERI
Deputy Fireproofing 11/12/2020 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 11/12/2020 Conditional Approval NICK DANERI
Deputy Steel/Welding 11/12/2020 Conditional Approval NICK DANERI
Deputy Drilled-In Anchors 11/13/2020 Conditional Approval DANIEL COLLINS
Deputy Fireproofing 11/13/2020 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 11/13/2020 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 11/13/2020 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 11/16/2020 Conditional Approval NICK DANERI
Deputy Fireproofing 11/16/2020 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 11/16/2020 Conditional Approval NICK DANERI
Deputy Steel/Welding 11/16/2020 Conditional Approval NICK DANERI
Deputy Drilled-In Anchors 11/17/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Fireproofing 11/17/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 11/17/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 11/17/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 11/18/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Fireproofing 11/18/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 11/18/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 11/18/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Fireproofing 11/19/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 11/19/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 11/19/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 11/19/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Fireproofing 11/20/2020 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 11/20/2020 Conditional Approval NICK DANERI
Deputy Reinf. Masonry 11/20/2020 Conditional Approval NICK DANERI
Deputy Steel/Welding 11/20/2020 Conditional Approval NICK DANERI
Deputy Fireproofing 11/23/2020 Partial Approval JAMES POWERS
Deputy Grading 11/23/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 11/23/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 11/23/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 11/23/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 11/24/2020 Partial Approval JAMES POWERS
Deputy Fireproofing 11/24/2020 Partial Approval JAMES POWERS
Deputy Grading 11/24/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 11/24/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 11/24/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 11/24/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 11/25/2020 Partial Approval JAMES POWERS
Deputy Fireproofing 11/25/2020 Partial Approval JAMES POWERS
Deputy Grading 11/25/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 11/25/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 11/25/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 11/25/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 11/30/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 11/30/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 11/30/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 12/1/2020 Partial Approval JAMES POWERS
Deputy Fireproofing 12/1/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/1/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 12/1/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/1/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 12/2/2020 Partial Approval JAMES POWERS
Deputy Fireproofing 12/2/2020 Partial Approval JAMES POWERS
Deputy Grading 12/2/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/2/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 12/2/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/2/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 12/3/2020 Partial Approval JAMES POWERS
Deputy Fireproofing 12/3/2020 Partial Approval JAMES POWERS
Deputy Grading 12/3/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/3/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 12/3/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/3/2020 Partial Approval JAMES POWERS
Reinforced Concrete Frame 12/3/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 12/4/2020 Partial Approval JAMES POWERS
Deputy Fireproofing 12/4/2020 Partial Approval JAMES POWERS
Deputy Grading 12/4/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/4/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 12/4/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/4/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 12/7/2020 Partial Approval JAMES POWERS
Deputy Fireproofing 12/7/2020 Partial Approval JAMES POWERS
Deputy Grading 12/7/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/7/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/7/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 12/8/2020 Partial Approval JAMES POWERS
Deputy Fireproofing 12/8/2020 Partial Approval JAMES POWERS
Deputy Grading 12/8/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/8/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 12/8/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/8/2020 Partial Approval JAMES POWERS
Reinforced Concrete Frame 12/8/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 12/9/2020 Partial Approval JAMES POWERS
Deputy Fireproofing 12/9/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/9/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 12/9/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/9/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 12/10/2020 Partial Approval JAMES POWERS
Deputy Fireproofing 12/10/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/10/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 12/10/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/10/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 12/11/2020 Partial Approval JAMES POWERS
Deputy Fireproofing 12/11/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/11/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 12/11/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/11/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 12/14/2020 Partial Approval JAMES POWERS
Deputy Fireproofing 12/14/2020 Partial Approval JAMES POWERS
Deputy Grading 12/14/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/14/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 12/14/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/14/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 12/15/2020 Partial Approval JAMES POWERS
Deputy Fireproofing 12/15/2020 Partial Approval JAMES POWERS
Deputy Grading 12/15/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/15/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 12/15/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/15/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 12/16/2020 Partial Approval JAMES POWERS
Deputy Fireproofing 12/16/2020 Partial Approval JAMES POWERS
Deputy Grading 12/16/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/16/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 12/16/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/16/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 12/17/2020 Partial Approval JAMES POWERS
Deputy Grading 12/17/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/17/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 12/17/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/17/2020 Partial Approval JAMES POWERS
Footing/Foundation/Slab 12/17/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 12/18/2020 Partial Approval JAMES POWERS
Deputy Fireproofing 12/18/2020 Partial Approval JAMES POWERS
Deputy Grading 12/18/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/18/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 12/18/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/18/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 12/21/2020 Partial Approval JAMES POWERS
Deputy Fireproofing 12/21/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/21/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/21/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 12/22/2020 Partial Approval JAMES POWERS
Deputy Fireproofing 12/22/2020 Partial Approval JAMES POWERS
Deputy Grading 12/22/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/22/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/22/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 12/23/2020 Partial Approval JAMES POWERS
Deputy Fireproofing 12/23/2020 Partial Approval JAMES POWERS
Deputy Grading 12/23/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/23/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/23/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 12/24/2020 Partial Approval JAMES POWERS
Deputy Fireproofing 12/24/2020 Partial Approval JAMES POWERS
Deputy Grading 12/24/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/24/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/24/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 12/28/2020 Partial Approval JAMES POWERS
Deputy Grading 12/28/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/28/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/28/2020 Partial Approval JAMES POWERS
Reinforced Concrete Frame 12/28/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 12/29/2020 Partial Approval JAMES POWERS
Deputy Fireproofing 12/29/2020 Partial Approval JAMES POWERS
Deputy Grading 12/29/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/29/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/29/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 12/30/2020 Partial Approval JAMES POWERS
Deputy Fireproofing 12/30/2020 Partial Approval JAMES POWERS
Deputy Grading 12/30/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/30/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/30/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 12/31/2020 Partial Approval JAMES POWERS
Deputy Fireproofing 12/31/2020 Partial Approval JAMES POWERS
Deputy Grading 12/31/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/31/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/31/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 1/4/2021 Partial Approval JAMES POWERS
Deputy Fireproofing 1/4/2021 Partial Approval JAMES POWERS
Deputy Grading 1/4/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/4/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/4/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 1/5/2021 Partial Approval JAMES POWERS
Deputy Fireproofing 1/5/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/5/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 1/11/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 1/12/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/12/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/12/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 1/13/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/13/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/13/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 1/14/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/14/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/14/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 1/15/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/15/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/15/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 1/19/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/19/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/19/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 1/20/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/20/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/20/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 1/21/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/21/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/21/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 1/22/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/22/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/22/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 1/25/2021 Partial Approval JAMES POWERS
Deputy Grading 1/25/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/25/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/25/2021 Partial Approval JAMES POWERS
Reinforced Concrete Frame 1/25/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 1/26/2021 Partial Approval JAMES POWERS
Deputy Grading 1/26/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/26/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/26/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 1/27/2021 Partial Approval JAMES POWERS
Deputy Grading 1/27/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/27/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/27/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 1/28/2021 Partial Approval JAMES POWERS
Deputy Grading 1/28/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/28/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/28/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 1/29/2021 Partial Approval JAMES POWERS
Deputy Grading 1/29/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/29/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/29/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 2/1/2021 Partial Approval JAMES POWERS
Deputy Fireproofing 2/1/2021 Partial Approval JAMES POWERS
Deputy Grading 2/1/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/1/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/1/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 2/2/2021 Partial Approval JAMES POWERS
Deputy Fireproofing 2/2/2021 Partial Approval JAMES POWERS
Deputy Grading 2/2/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/2/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/2/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 2/3/2021 Partial Approval JAMES POWERS
Deputy Fireproofing 2/3/2021 Partial Approval JAMES POWERS
Deputy Grading 2/3/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/3/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/3/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 2/4/2021 Partial Approval JAMES POWERS
Deputy Fireproofing 2/4/2021 Partial Approval JAMES POWERS
Deputy Grading 2/4/2021 Partial Approval JAMES POWERS
Deputy Other (see comments) 2/4/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/4/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/4/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 2/5/2021 Partial Approval JAMES POWERS
Deputy Fireproofing 2/5/2021 Partial Approval JAMES POWERS
Deputy Grading 2/5/2021 Partial Approval JAMES POWERS
Deputy Other (see comments) 2/5/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/5/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/5/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 2/8/2021 Partial Approval JAMES POWERS
Deputy Grading 2/8/2021 Partial Approval JAMES POWERS
Deputy Other (see comments) 2/8/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/8/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/8/2021 Partial Approval JAMES POWERS
Reinforced Concrete Frame 2/8/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 2/9/2021 Partial Approval JAMES POWERS
Deputy Grading 2/9/2021 Partial Approval JAMES POWERS
Deputy Other (see comments) 2/9/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/9/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/9/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 2/10/2021 Partial Approval JAMES POWERS
Deputy Grading 2/10/2021 Partial Approval JAMES POWERS
Deputy Other (see comments) 2/10/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/10/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/10/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 2/11/2021 Partial Approval JAMES POWERS
Deputy Grading 2/11/2021 Partial Approval JAMES POWERS
Deputy Other (see comments) 2/11/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/11/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/11/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 2/12/2021 Partial Approval JAMES POWERS
Deputy Other (see comments) 2/12/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/12/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/12/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 2/16/2021 Partial Approval JAMES POWERS
Deputy Grading 2/16/2021 Partial Approval JAMES POWERS
Deputy Other (see comments) 2/16/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/16/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/16/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 2/17/2021 Partial Approval JAMES POWERS
Deputy Fireproofing 2/17/2021 Partial Approval JAMES POWERS
Deputy Grading 2/17/2021 Partial Approval JAMES POWERS
Deputy Other (see comments) 2/17/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/17/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/17/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 2/18/2021 Partial Approval JAMES POWERS
Deputy Fireproofing 2/18/2021 Partial Approval JAMES POWERS
Deputy Grading 2/18/2021 Partial Approval JAMES POWERS
Deputy Other (see comments) 2/18/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/18/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/18/2021 Partial Approval JAMES POWERS
Reinforced Concrete Frame 2/18/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 2/19/2021 Partial Approval JAMES POWERS
Deputy Fireproofing 2/19/2021 Partial Approval JAMES POWERS
Deputy Grading 2/19/2021 Partial Approval JAMES POWERS
Deputy Other (see comments) 2/19/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/19/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/19/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 2/22/2021 Partial Approval JAMES POWERS
Deputy Grading 2/22/2021 Partial Approval JAMES POWERS
Deputy Other (see comments) 2/22/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/22/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/22/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 2/23/2021 Partial Approval JAMES POWERS
Deputy Fireproofing 2/23/2021 Partial Approval JAMES POWERS
Deputy Other (see comments) 2/23/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/23/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/23/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 2/24/2021 Partial Approval JAMES POWERS
Deputy Fireproofing 2/24/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/24/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/24/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 2/25/2021 Partial Approval JAMES POWERS
Deputy Fireproofing 2/25/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/25/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/25/2021 Partial Approval JAMES POWERS
Reinforced Concrete Frame 2/25/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 2/26/2021 Partial Approval JAMES POWERS
Deputy Fireproofing 2/26/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/26/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/26/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 3/1/2021 Partial Approval JAMES POWERS
Deputy Fireproofing 3/1/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/1/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 3/1/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 3/2/2021 Partial Approval JAMES POWERS
Deputy Fireproofing 3/2/2021 Partial Approval JAMES POWERS
Deputy Other (see comments) 3/2/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/2/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 3/2/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 3/3/2021 Partial Approval JAMES POWERS
Deputy Fireproofing 3/3/2021 Partial Approval JAMES POWERS
Deputy Other (see comments) 3/3/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/3/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 3/3/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 3/4/2021 Partial Approval JAMES POWERS
Deputy Fireproofing 3/4/2021 Partial Approval JAMES POWERS
Deputy Other (see comments) 3/4/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/4/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 3/4/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 3/5/2021 Partial Approval JAMES POWERS
Deputy Fireproofing 3/5/2021 Partial Approval JAMES POWERS
Deputy Other (see comments) 3/5/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/5/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 3/5/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 3/8/2021 Partial Approval JAMES POWERS
Deputy Other (see comments) 3/8/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/8/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 3/8/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 3/9/2021 Partial Approval JAMES POWERS
Deputy Fireproofing 3/9/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/9/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 3/10/2021 Partial Approval JAMES POWERS
Deputy Fireproofing 3/10/2021 Partial Approval JAMES POWERS
Deputy Other (see comments) 3/10/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/10/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 3/10/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 3/11/2021 Partial Approval JAMES POWERS
Deputy Fireproofing 3/11/2021 Partial Approval JAMES POWERS
Deputy Other (see comments) 3/11/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/11/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 3/11/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 3/12/2021 Partial Approval JAMES POWERS
Deputy Fireproofing 3/12/2021 Partial Approval JAMES POWERS
Deputy Other (see comments) 3/12/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/12/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 3/12/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 3/15/2021 Partial Approval JAMES POWERS
Deputy Fireproofing 3/15/2021 Partial Approval JAMES POWERS
Deputy Other (see comments) 3/15/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/15/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 3/15/2021 Order to Comply Issued JAMES POWERS
Deputy Drilled-In Anchors 3/16/2021 Partial Approval JAMES POWERS
Deputy Other (see comments) 3/16/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/16/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 3/16/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 3/17/2021 Partial Approval JAMES POWERS
Deputy Other (see comments) 3/17/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/17/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 3/17/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 3/18/2021 Conditional Approval NICK DANERI
Deputy Other (see comments) 3/18/2021 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 3/18/2021 Conditional Approval NICK DANERI
Deputy Steel/Welding 3/18/2021 Conditional Approval NICK DANERI
Deputy Drilled-In Anchors 3/19/2021 Partial Approval JAMES POWERS
Deputy Other (see comments) 3/19/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/19/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 3/19/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 3/22/2021 Partial Approval JAMES POWERS
Deputy Fireproofing 3/22/2021 Partial Approval JAMES POWERS
Deputy Other (see comments) 3/22/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/22/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 3/22/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 3/23/2021 Partial Approval JAMES POWERS
Deputy Fireproofing 3/23/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/23/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 3/24/2021 Partial Approval JAMES POWERS
Deputy Fireproofing 3/24/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/24/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 3/25/2021 Partial Approval JAMES POWERS
Deputy Fireproofing 3/25/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/25/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 3/26/2021 Partial Approval JAMES POWERS
Deputy Fireproofing 3/26/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/26/2021 Partial Approval JAMES POWERS
Footing/Foundation/Slab 3/26/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 3/30/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/30/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 3/31/2021 Partial Approval JAMES POWERS
Deputy Fireproofing 3/31/2021 Partial Approval JAMES POWERS
Deputy Other (see comments) 3/31/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/31/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 3/31/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 4/1/2021 Partial Approval JAMES POWERS
Deputy Fireproofing 4/1/2021 Partial Approval JAMES POWERS
Deputy Other (see comments) 4/1/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/1/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 4/1/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 4/5/2021 Partial Approval JAMES POWERS
Deputy Fireproofing 4/5/2021 Partial Approval JAMES POWERS
Deputy Other (see comments) 4/5/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/5/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 4/5/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 4/6/2021 Partial Approval JAMES POWERS
Deputy Fireproofing 4/6/2021 Partial Approval JAMES POWERS
Deputy Other (see comments) 4/6/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/6/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 4/6/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 4/7/2021 Partial Approval JAMES POWERS
Deputy Fireproofing 4/7/2021 Partial Approval JAMES POWERS
Deputy Other (see comments) 4/7/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/7/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 4/7/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 4/8/2021 Partial Approval JAMES POWERS
Deputy Fireproofing 4/8/2021 Partial Approval JAMES POWERS
Deputy Other (see comments) 4/8/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/8/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 4/8/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 4/9/2021 Partial Approval JAMES POWERS
Deputy Fireproofing 4/9/2021 Partial Approval JAMES POWERS
Deputy Other (see comments) 4/9/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/9/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 4/9/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 4/12/2021 Partial Approval JAMES POWERS
Deputy Fireproofing 4/12/2021 Partial Approval JAMES POWERS
Deputy Other (see comments) 4/12/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/12/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 4/12/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 4/13/2021 Partial Approval JAMES POWERS
Deputy Other (see comments) 4/13/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/13/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 4/13/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 4/14/2021 Partial Approval JAMES POWERS
Deputy Other (see comments) 4/14/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/14/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 4/14/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 4/15/2021 Partial Approval JAMES POWERS
Deputy Other (see comments) 4/15/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/15/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 4/15/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 4/16/2021 Partial Approval JAMES POWERS
Deputy Other (see comments) 4/16/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/16/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 4/16/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 4/19/2021 Partial Approval JAMES POWERS
Deputy Other (see comments) 4/19/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/19/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 4/19/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 4/20/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/20/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 4/20/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 4/21/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/21/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 4/21/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 4/22/2021 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 4/22/2021 Conditional Approval NICK DANERI
Deputy Steel/Welding 4/22/2021 Conditional Approval NICK DANERI
Deputy Drilled-In Anchors 4/23/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 4/23/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 4/23/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 4/26/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 4/26/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 4/26/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 4/27/2021 Approved JOEY BUCHANAN
Deputy Reinf. Concrete 4/27/2021 Approved JOEY BUCHANAN
Deputy Drilled-In Anchors 4/28/2021 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 4/28/2021 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 4/28/2021 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 4/29/2021 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 4/29/2021 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 4/29/2021 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 4/30/2021 Conditional Approval LEOPOLDO MENDOZA
Deputy Reinf. Concrete 4/30/2021 Conditional Approval LEOPOLDO MENDOZA
Deputy Steel/Welding 4/30/2021 Conditional Approval LEOPOLDO MENDOZA
Deputy Drilled-In Anchors 5/3/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/3/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/3/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 5/4/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/4/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/4/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 5/5/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/5/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/5/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 5/6/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/6/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/6/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 5/7/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/7/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/7/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 5/10/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/10/2021 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 5/10/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/10/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 5/11/2021 Conditional Approval LEOPOLDO MENDOZA
Deputy Reinf. Concrete 5/11/2021 Conditional Approval LEOPOLDO MENDOZA
Deputy Reinf. Masonry 5/11/2021 Conditional Approval LEOPOLDO MENDOZA
Deputy Drilled-In Anchors 5/12/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/12/2021 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 5/12/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 5/13/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/13/2021 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 5/13/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 5/14/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/14/2021 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 5/14/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 5/17/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/17/2021 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 5/17/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 5/18/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/18/2021 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 5/18/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/18/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 5/19/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/19/2021 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 5/19/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/19/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 5/20/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/20/2021 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 5/20/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/20/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 5/21/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/21/2021 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 5/21/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/21/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 5/24/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/24/2021 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 5/24/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/24/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 5/25/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/25/2021 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 5/25/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/25/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 5/26/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/26/2021 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 5/26/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/26/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 5/27/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/27/2021 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 5/27/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/27/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 5/28/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/28/2021 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 5/28/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/28/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 6/1/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/1/2021 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 6/1/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 6/1/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 6/2/2021 Partial Approval JAMES POWERS
Deputy Fireproofing 6/2/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/2/2021 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 6/2/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 6/2/2021 Partial Approval JAMES POWERS
Pre-Inspection 6/2/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 6/3/2021 Partial Approval JAMES POWERS
Deputy Fireproofing 6/3/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/3/2021 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 6/3/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 6/3/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 6/4/2021 Partial Approval JAMES POWERS
Deputy Fireproofing 6/4/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/4/2021 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 6/4/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 6/4/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 6/7/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/7/2021 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 6/7/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 6/7/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 6/8/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/8/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 6/8/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 6/9/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/9/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 6/10/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/10/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 6/11/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/11/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 6/14/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/14/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 6/15/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/15/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 6/16/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/16/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 6/16/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 6/17/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/17/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 6/17/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 6/18/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/18/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 6/18/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 6/21/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/21/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 6/21/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 6/22/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/22/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 6/22/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 6/23/2021 Partial Approval JAMES POWERS
Deputy Other (see comments) 6/23/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/23/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 6/23/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 6/24/2021 Partial Approval JAMES POWERS
Deputy Other (see comments) 6/24/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/24/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 6/24/2021 Partial Approval JAMES POWERS
Reinforced Concrete Frame 6/24/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 6/25/2021 Conditional Approval LEOPOLDO MENDOZA
Deputy Other (see comments) 6/25/2021 Conditional Approval LEOPOLDO MENDOZA
Deputy Reinf. Concrete 6/25/2021 Conditional Approval LEOPOLDO MENDOZA
Deputy Steel/Welding 6/25/2021 Conditional Approval LEOPOLDO MENDOZA
Deputy Drilled-In Anchors 6/28/2021 Partial Approval JAMES POWERS
Deputy Other (see comments) 6/28/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/28/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 6/28/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 6/29/2021 Partial Approval JAMES POWERS
Deputy Other (see comments) 6/29/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/29/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 6/29/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 6/30/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/30/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 6/30/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/1/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/1/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/1/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/2/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/2/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/2/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/6/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/6/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/6/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/7/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/7/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/7/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/8/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/8/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/8/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/9/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/9/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/9/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/12/2021 Conditional Approval DAVID TSAU
Deputy Reinf. Concrete 7/12/2021 Conditional Approval DAVID TSAU
Deputy Steel/Welding 7/12/2021 Conditional Approval DAVID TSAU
Deputy Drilled-In Anchors 7/13/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/13/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/13/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/14/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/14/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/15/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/15/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/16/2021 Approved JOEY BUCHANAN
Deputy Reinf. Concrete 7/16/2021 Approved JOEY BUCHANAN
Deputy Drilled-In Anchors 7/19/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/19/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/20/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/20/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/20/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/21/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/21/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/21/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/22/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/22/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/22/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/23/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/23/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/23/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/26/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/26/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/26/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/27/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/27/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/28/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/28/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/29/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/29/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/30/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/30/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/2/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/2/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/3/2021 Conditional Approval DAVID TSAU
Deputy Reinf. Concrete 8/3/2021 Conditional Approval DAVID TSAU
Deputy Drilled-In Anchors 8/4/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/4/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/5/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/5/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/5/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/6/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/6/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/6/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/9/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/9/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/9/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/10/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/10/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/10/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/11/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/11/2021 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 8/11/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/11/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/12/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/12/2021 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 8/12/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/12/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/13/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/13/2021 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 8/13/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/13/2021 Partial Approval JAMES POWERS
Reinforced Concrete Frame 8/13/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/16/2021 Partial Approval JAMES POWERS
Deputy Fireproofing 8/17/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/17/2021 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 8/17/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/17/2021 Partial Approval JAMES POWERS
Deputy Fireproofing 8/18/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/18/2021 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 8/18/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/18/2021 Partial Approval JAMES POWERS
Reinforced Concrete Frame 8/18/2021 Partial Approval JAMES POWERS
Deputy Fireproofing 8/19/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/19/2021 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 8/19/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/19/2021 Partial Approval JAMES POWERS
Deputy Fireproofing 8/20/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/20/2021 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 8/20/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/20/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/23/2021 Partial Approval JAMES POWERS
Deputy Fireproofing 8/23/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/23/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/23/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/24/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/24/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/25/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/25/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/26/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/26/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/27/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/27/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/30/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/30/2021 Partial Approval JAMES POWERS
Deputy Shotcrete 8/30/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/31/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/31/2021 Partial Approval JAMES POWERS
Deputy Shotcrete 8/31/2021 Partial Approval JAMES POWERS
Footing/Foundation/Slab 8/31/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/1/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/1/2021 Partial Approval JAMES POWERS
Deputy Shotcrete 9/1/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/2/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/2/2021 Partial Approval JAMES POWERS
Deputy Shotcrete 9/2/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/3/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/3/2021 Partial Approval JAMES POWERS
Deputy Shotcrete 9/3/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/7/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/7/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/8/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/8/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/9/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/9/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 9/9/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/10/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/10/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 9/10/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/13/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/13/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 9/13/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/14/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/14/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 9/14/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/15/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/15/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 9/15/2021 Partial Approval JAMES POWERS
Reinforced Concrete Frame 9/15/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/16/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/16/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/17/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/17/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/20/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/20/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/21/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/21/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 9/21/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/22/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/22/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 9/22/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/23/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/23/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 9/23/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/24/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/24/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 9/24/2021 Partial Approval JAMES POWERS
Reinforced Concrete Frame 9/24/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/27/2021 Partial Approval JAMES POWERS
Deputy Fireproofing 9/27/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/27/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 9/27/2021 Partial Approval JAMES POWERS
Excavation/Setback/Form/Re-Bar 9/27/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/28/2021 Partial Approval JAMES POWERS
Deputy Fireproofing 9/28/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/28/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 9/28/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/29/2021 Partial Approval JAMES POWERS
Deputy Fireproofing 9/29/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/29/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 9/29/2021 Partial Approval JAMES POWERS
Reinforced Concrete Frame 9/29/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 10/1/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Fireproofing 10/1/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 10/1/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 10/1/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 10/4/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/4/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/4/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 10/5/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/5/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/5/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 10/6/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/6/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/6/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 10/7/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/7/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/7/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 10/8/2021 Partial Approval JAMES POWERS
Deputy Fireproofing 10/8/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/8/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/8/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 10/12/2021 Partial Approval JAMES POWERS
Deputy Fireproofing 10/12/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/12/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/12/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 10/13/2021 Partial Approval JAMES POWERS
Deputy Fireproofing 10/13/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/13/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/13/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 10/14/2021 Partial Approval JAMES POWERS
Deputy Fireproofing 10/14/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/14/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/14/2021 Partial Approval JAMES POWERS
Floor/Roof Diaphrgm/Shear Wall 10/14/2021 Partial Approval JAMES POWERS
Footing/Foundation/Slab 10/14/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 10/15/2021 Conditional Approval BRUCE CAMPBELL
Deputy Fireproofing 10/15/2021 Conditional Approval BRUCE CAMPBELL
Deputy Reinf. Concrete 10/15/2021 Conditional Approval BRUCE CAMPBELL
Deputy Steel/Welding 10/15/2021 Conditional Approval BRUCE CAMPBELL
Footing/Foundation/Slab 10/15/2021 Approved BRUCE CAMPBELL
Green Building Rough 10/15/2021 Conditional Approval BRUCE CAMPBELL
Deputy Drilled-In Anchors 10/18/2021 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 10/18/2021 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 10/18/2021 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 10/19/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Fireproofing 10/19/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Reinf. Concrete 10/19/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Steel/Welding 10/19/2021 Conditional Approval RUSSELL BONVOULOIR
Green Building Rough 10/19/2021 Partial Inspection RUSSELL BONVOULOIR
Reinforced Concrete Frame 10/19/2021 Partial Approval RUSSELL BONVOULOIR
Deputy Drilled-In Anchors 10/20/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Fireproofing 10/20/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Reinf. Concrete 10/20/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Steel/Welding 10/20/2021 Conditional Approval RUSSELL BONVOULOIR
Pre-Inspection 10/20/2021 Partial Inspection RUSSELL BONVOULOIR
Deputy Drilled-In Anchors 10/21/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Fireproofing 10/21/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Reinf. Concrete 10/21/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Steel/Welding 10/21/2021 Conditional Approval RUSSELL BONVOULOIR
Pre-Inspection 10/21/2021 Partial Approval RUSSELL BONVOULOIR
Deputy Drilled-In Anchors 10/22/2021 Conditional Approval ERNESTO CORRAL
Deputy Fireproofing 10/22/2021 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 10/22/2021 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 10/22/2021 Conditional Approval ERNESTO CORRAL
Deputy Fireproofing 10/25/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/25/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/25/2021 Partial Approval JAMES POWERS
Reinforced Concrete Frame 10/25/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 10/26/2021 Partial Approval JAMES POWERS
Deputy Fireproofing 10/26/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/26/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/26/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 10/27/2021 Partial Approval JAMES POWERS
Deputy Fireproofing 10/27/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/27/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/27/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 10/28/2021 Partial Approval JAMES POWERS
Deputy Fireproofing 10/28/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/28/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/28/2021 Partial Approval JAMES POWERS
Reinforced Concrete Frame 10/28/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 10/29/2021 Partial Approval JAMES POWERS
Deputy Fireproofing 10/29/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/29/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/29/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 11/1/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Fireproofing 11/1/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Reinf. Concrete 11/1/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Steel/Welding 11/1/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Drilled-In Anchors 11/2/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 11/2/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 11/2/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 11/3/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 11/3/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 11/3/2021 Order to Comply Issued JAMES POWERS
Deputy Drilled-In Anchors 11/4/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 11/4/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 11/4/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 11/5/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 11/5/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 11/5/2021 Partial Approval JAMES POWERS
Reinforced Concrete Frame 11/5/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 11/8/2021 Conditional Approval TED RIES
Deputy Fireproofing 11/8/2021 Conditional Approval TED RIES
Deputy Reinf. Concrete 11/8/2021 Conditional Approval TED RIES
Deputy Steel/Welding 11/8/2021 Conditional Approval TED RIES
Deputy Drilled-In Anchors 11/9/2021 Partial Approval JAMES POWERS
Deputy Fireproofing 11/9/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 11/9/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 11/9/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 11/10/2021 Partial Approval JAMES POWERS
Deputy Fireproofing 11/10/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 11/10/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 11/10/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 11/12/2021 Partial Approval JAMES POWERS
Deputy Fireproofing 11/12/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 11/12/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 11/12/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 11/15/2021 Partial Approval JAMES POWERS
Deputy Fireproofing 11/15/2021 Order to Comply Issued JAMES POWERS
Deputy Reinf. Concrete 11/15/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 11/15/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 11/16/2021 Conditional Approval TED RIES
Deputy Reinf. Concrete 11/16/2021 Conditional Approval TED RIES
Deputy Steel/Welding 11/16/2021 Conditional Approval TED RIES
Deputy Drilled-In Anchors 11/17/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 11/17/2021 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 11/17/2021 Conditional Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 11/18/2021 Conditional Approval TED RIES
Deputy Reinf. Concrete 11/18/2021 Conditional Approval TED RIES
Deputy Steel/Welding 11/18/2021 Conditional Approval TED RIES
Deputy Drilled-In Anchors 11/19/2021 Conditional Approval TED RIES
Deputy Fireproofing 11/19/2021 Conditional Approval TED RIES
Deputy Reinf. Concrete 11/19/2021 Conditional Approval TED RIES
Deputy Steel/Welding 11/19/2021 Conditional Approval TED RIES
Deputy Drilled-In Anchors 11/22/2021 Approved TED RIES
Deputy Fireproofing 11/22/2021 Approved TED RIES
Deputy Reinf. Concrete 11/22/2021 Approved TED RIES
Deputy Steel/Welding 11/22/2021 Approved TED RIES
Deputy Drilled-In Anchors 11/23/2021 Conditional Approval TED RIES
Deputy Fireproofing 11/23/2021 Conditional Approval TED RIES
Deputy Reinf. Concrete 11/23/2021 Conditional Approval TED RIES
Deputy Steel/Welding 11/23/2021 Conditional Approval TED RIES
Deputy Drilled-In Anchors 11/24/2021 Conditional Approval ERNESTO CORRAL
Deputy Fireproofing 11/24/2021 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 11/24/2021 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 11/24/2021 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 11/29/2021 Partial Approval JAMES POWERS
Deputy Fireproofing 11/29/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 11/29/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 11/29/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 11/30/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 11/30/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 12/1/2021 Approved TED RIES
Deputy Reinf. Concrete 12/1/2021 Approved TED RIES
Deputy Drilled-In Anchors 12/2/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/2/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 12/3/2021 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 12/3/2021 Conditional Approval NICK DANERI
Deputy Drilled-In Anchors 12/6/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/6/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/6/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 12/7/2021 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 12/7/2021 Conditional Approval NICK DANERI
Deputy Steel/Welding 12/7/2021 Conditional Approval NICK DANERI
Deputy Drilled-In Anchors 12/8/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/8/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/8/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 12/9/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/9/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/9/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 12/10/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/10/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/10/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 12/13/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/13/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 12/14/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/14/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/14/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 12/15/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/15/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/15/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 12/16/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/16/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/16/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 12/17/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/17/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/17/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 12/20/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/20/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 12/21/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/21/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 12/22/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/22/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 12/23/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/23/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 12/27/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/27/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 1/6/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/6/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 1/7/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 1/7/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 1/10/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/10/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 1/11/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/11/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/11/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 1/12/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/12/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/12/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 1/13/2022 Conditional Approval RUSSELL BONVOULOIR
Deputy Steel/Welding 1/13/2022 Conditional Approval RUSSELL BONVOULOIR
Deputy Drilled-In Anchors 1/14/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/14/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 1/18/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/18/2022 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 1/18/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/18/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 1/19/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/19/2022 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 1/19/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/19/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 1/20/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/20/2022 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 1/20/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/20/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 1/21/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/21/2022 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 1/21/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/21/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 1/24/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/24/2022 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 1/24/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/24/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 1/25/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/25/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/25/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 1/26/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/26/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/26/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 1/27/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/27/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/27/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 1/28/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/28/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/28/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 1/31/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/31/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/31/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 2/1/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/1/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/1/2022 Partial Approval JAMES POWERS
Reinforced Concrete Frame 2/1/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 2/2/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/2/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/2/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 2/3/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/3/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/3/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 2/4/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/4/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/4/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 2/7/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/7/2022 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 2/7/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/7/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 2/8/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/8/2022 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 2/8/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/8/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 2/9/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/9/2022 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 2/9/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/9/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 2/10/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/10/2022 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 2/10/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/10/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 2/11/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/11/2022 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 2/11/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/11/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 2/14/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/14/2022 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 2/14/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/14/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 2/15/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/15/2022 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 2/15/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/15/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 2/16/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/16/2022 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 2/16/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/16/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 2/17/2022 Conditional Approval RUSSELL BONVOULOIR
Deputy Reinf. Concrete 2/17/2022 Conditional Approval RUSSELL BONVOULOIR
Deputy Reinf. Masonry 2/17/2022 Conditional Approval RUSSELL BONVOULOIR
Deputy Steel/Welding 2/17/2022 Conditional Approval RUSSELL BONVOULOIR
Deputy Drilled-In Anchors 2/18/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/18/2022 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 2/18/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/18/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 2/22/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/22/2022 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 2/22/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/22/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 2/23/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/23/2022 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 2/23/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/23/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 2/24/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/24/2022 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 2/24/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/24/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 2/25/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/25/2022 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 2/25/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/25/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 2/28/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/28/2022 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 2/28/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/28/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 3/1/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/1/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 3/1/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 3/2/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/2/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 3/2/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 3/3/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/3/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 3/3/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 3/4/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/4/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 3/4/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 3/7/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/7/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 3/7/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 3/8/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/8/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 3/8/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 3/9/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/9/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 3/9/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 3/10/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/10/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 3/10/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 3/11/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/11/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 3/11/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 3/14/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/14/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 3/14/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 3/15/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/15/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 3/15/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 3/16/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/16/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 3/16/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 3/17/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/17/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 3/17/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 3/18/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/18/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 3/18/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 3/21/2022 Conditional Approval RUSSELL BONVOULOIR
Deputy Reinf. Concrete 3/21/2022 Conditional Approval RUSSELL BONVOULOIR
Deputy Drilled-In Anchors 3/22/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/22/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 3/22/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 3/23/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/23/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 3/23/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 3/24/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/24/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 3/24/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 3/25/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/25/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 3/25/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 3/29/2022 Conditional Approval RUSSELL BONVOULOIR
Deputy Other (see comments) 3/29/2022 Conditional Approval RUSSELL BONVOULOIR
Deputy Reinf. Concrete 3/29/2022 Conditional Approval RUSSELL BONVOULOIR
Deputy Steel/Welding 3/29/2022 Conditional Approval RUSSELL BONVOULOIR
Deputy Drilled-In Anchors 3/30/2022 Conditional Approval RUSSELL BONVOULOIR
Deputy Other (see comments) 3/30/2022 Conditional Approval RUSSELL BONVOULOIR
Deputy Reinf. Concrete 3/30/2022 Conditional Approval RUSSELL BONVOULOIR
Deputy Steel/Welding 3/30/2022 Conditional Approval RUSSELL BONVOULOIR
Deputy Drilled-In Anchors 3/31/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Other (see comments) 3/31/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 3/31/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 3/31/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 4/1/2022 Conditional Approval RUSSELL BONVOULOIR
Deputy Other (see comments) 4/1/2022 Conditional Approval RUSSELL BONVOULOIR
Deputy Reinf. Concrete 4/1/2022 Conditional Approval RUSSELL BONVOULOIR
Deputy Steel/Welding 4/1/2022 Conditional Approval RUSSELL BONVOULOIR
Deputy Drilled-In Anchors 4/4/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/4/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 4/4/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 4/5/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/5/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 4/5/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 4/6/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/6/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 4/6/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 4/7/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/7/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 4/7/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 4/8/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/8/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 4/8/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 4/11/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/11/2022 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 4/11/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 4/11/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 4/12/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/12/2022 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 4/12/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 4/12/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 4/13/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/13/2022 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 4/13/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 4/13/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 4/14/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/14/2022 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 4/14/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 4/14/2022 Partial Approval JAMES POWERS
Insulation 4/14/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 4/15/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/15/2022 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 4/15/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 4/15/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 4/18/2022 Conditional Approval RUSSELL BONVOULOIR
Deputy Reinf. Concrete 4/18/2022 Conditional Approval RUSSELL BONVOULOIR
Deputy Reinf. Masonry 4/18/2022 Conditional Approval RUSSELL BONVOULOIR
Deputy Steel/Welding 4/18/2022 Conditional Approval RUSSELL BONVOULOIR
Deputy Drilled-In Anchors 4/19/2022 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 4/19/2022 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Masonry 4/19/2022 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 4/19/2022 Conditional Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 4/20/2022 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 4/20/2022 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Masonry 4/20/2022 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 4/20/2022 Conditional Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 4/21/2022 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 4/21/2022 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Masonry 4/21/2022 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 4/21/2022 Conditional Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 4/22/2022 Conditional Approval RUSSELL BONVOULOIR
Deputy Reinf. Concrete 4/22/2022 Conditional Approval RUSSELL BONVOULOIR
Deputy Reinf. Masonry 4/22/2022 Conditional Approval RUSSELL BONVOULOIR
Deputy Steel/Welding 4/22/2022 Conditional Approval RUSSELL BONVOULOIR
Deputy Drilled-In Anchors 4/25/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/25/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 4/26/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/26/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 4/27/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/27/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 4/28/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/28/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 4/29/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/29/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 5/2/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/2/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/2/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 5/3/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/3/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/3/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 5/4/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/4/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/4/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 5/5/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/5/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/5/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 5/6/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/6/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/6/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 5/9/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/9/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/9/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 5/10/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/10/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/10/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 5/11/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/11/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/11/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 5/12/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/12/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/12/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 5/13/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/13/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/13/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 5/16/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/16/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 5/17/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/17/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/17/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 5/18/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/18/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/18/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 5/19/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/19/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/19/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 5/20/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 5/20/2022 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 5/20/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 5/23/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/23/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/23/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 5/24/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 5/24/2022 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 5/24/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 5/25/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/25/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/25/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 5/26/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 5/26/2022 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 5/26/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 5/27/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 5/27/2022 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 5/27/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 5/31/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 5/31/2022 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 5/31/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 6/1/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/1/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 6/1/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 6/2/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 6/2/2022 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 6/2/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 6/3/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 6/3/2022 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 6/3/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 6/6/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/6/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 6/6/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 6/7/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 6/7/2022 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 6/7/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 6/8/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 6/8/2022 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 6/8/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 6/9/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 6/9/2022 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 6/9/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 6/10/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/10/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 6/10/2022 Partial Approval JAMES POWERS
T-Bar Ceiling 6/10/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 6/13/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 6/13/2022 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 6/13/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 6/14/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 6/14/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 6/14/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 6/15/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 6/15/2022 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 6/15/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 6/16/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 6/16/2022 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 6/16/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 6/17/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/17/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 6/17/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 6/21/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/21/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 6/21/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 6/22/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/22/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 6/22/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 6/23/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 6/23/2022 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 6/23/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 6/24/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 6/24/2022 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 6/24/2022 Conditional Approval ERNESTO CORRAL
Excavation/Setback/Form/Re-Bar 6/24/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 6/27/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 6/27/2022 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 6/27/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 6/28/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 6/28/2022 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 6/28/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 6/29/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/29/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 6/29/2022 Partial Approval JAMES POWERS
Green Building Rough 6/29/2022 Approved JAMES POWERS
Reinforced Concrete Frame 6/29/2022 Partial Approval JAMES POWERS
Verify Sprinkler Sign Off 6/29/2022 Not Ready for Inspection JAMES POWERS
Deputy Drilled-In Anchors 6/30/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 6/30/2022 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 6/30/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 7/1/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 7/1/2022 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 7/1/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 7/5/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 7/5/2022 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 7/5/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/6/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/6/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/6/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/7/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 7/7/2022 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 7/7/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 7/8/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 7/8/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 7/11/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 7/11/2022 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 7/11/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 7/12/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 7/12/2022 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 7/12/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 7/13/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/13/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/13/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/14/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 7/14/2022 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 7/14/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 7/15/2022 Conditional Approval TED RIES
Deputy Reinf. Concrete 7/15/2022 Conditional Approval TED RIES
Deputy Steel/Welding 7/15/2022 Conditional Approval TED RIES
Deputy Drilled-In Anchors 7/18/2022 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 7/18/2022 Conditional Approval WINSTON DUNNING
Deputy Shotcrete 7/18/2022 Conditional Approval WINSTON DUNNING
Deputy Steel/Welding 7/18/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/19/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/19/2022 Partial Approval JAMES POWERS
Deputy Shotcrete 7/19/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/19/2022 Partial Approval JAMES POWERS
Reinforced Concrete Frame 7/19/2022 Partial Approval JAMES POWERS
Verify Sprinkler Sign Off 7/19/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/20/2022 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 7/20/2022 Conditional Approval WINSTON DUNNING
Deputy Shotcrete 7/20/2022 Conditional Approval WINSTON DUNNING
Deputy Steel/Welding 7/20/2022 Conditional Approval WINSTON DUNNING
Deputy Drilled-In Anchors 7/21/2022 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 7/21/2022 Conditional Approval WINSTON DUNNING
Deputy Shotcrete 7/21/2022 Conditional Approval WINSTON DUNNING
Deputy Steel/Welding 7/21/2022 Conditional Approval WINSTON DUNNING
Deputy Drilled-In Anchors 7/22/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/22/2022 Partial Approval JAMES POWERS
Deputy Shotcrete 7/22/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/22/2022 Partial Approval JAMES POWERS
Special/Order Compliance 7/22/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/25/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/25/2022 Partial Approval JAMES POWERS
Deputy Shotcrete 7/25/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/25/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/26/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 7/26/2022 Conditional Approval ERNESTO CORRAL
Deputy Shotcrete 7/26/2022 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 7/26/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 7/27/2022 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 7/27/2022 Conditional Approval WINSTON DUNNING
Deputy Shotcrete 7/27/2022 Conditional Approval WINSTON DUNNING
Deputy Steel/Welding 7/27/2022 Conditional Approval WINSTON DUNNING
Deputy Drilled-In Anchors 7/29/2022 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 7/29/2022 Conditional Approval WINSTON DUNNING
Deputy Shotcrete 7/29/2022 Conditional Approval WINSTON DUNNING
Deputy Steel/Welding 7/29/2022 Conditional Approval WINSTON DUNNING
Deputy Drilled-In Anchors 8/2/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/2/2022 Partial Approval JAMES POWERS
Deputy Shotcrete 8/2/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/2/2022 Partial Approval JAMES POWERS
Reinforced Concrete Frame 8/2/2022 Partial Approval JAMES POWERS
Verify Sprinkler Sign Off 8/2/2022 Not Ready for Inspection JAMES POWERS
Deputy Drilled-In Anchors 8/3/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 8/3/2022 Conditional Approval ERNESTO CORRAL
Deputy Shotcrete 8/3/2022 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 8/3/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 8/4/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 8/4/2022 Conditional Approval ERNESTO CORRAL
Deputy Shotcrete 8/4/2022 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 8/4/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 8/5/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 8/5/2022 Conditional Approval ERNESTO CORRAL
Deputy Shotcrete 8/5/2022 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 8/5/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 8/8/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/8/2022 Partial Approval JAMES POWERS
Deputy Shotcrete 8/8/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/8/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/9/2022 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 8/9/2022 Conditional Approval WINSTON DUNNING
Deputy Shotcrete 8/9/2022 Conditional Approval WINSTON DUNNING
Deputy Steel/Welding 8/9/2022 Conditional Approval WINSTON DUNNING
Deputy Drilled-In Anchors 8/10/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/10/2022 Partial Approval JAMES POWERS
Deputy Shotcrete 8/10/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/10/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/11/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/11/2022 Partial Approval JAMES POWERS
Deputy Shotcrete 8/11/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/11/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/12/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/12/2022 Partial Approval JAMES POWERS
Deputy Shotcrete 8/12/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/12/2022 Partial Approval JAMES POWERS
T-Bar Ceiling 8/12/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/15/2022 Conditional Approval ERNESTO CORRAL
Deputy Fireproofing 8/15/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 8/15/2022 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 8/15/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/16/2022 Conditional Approval ERNESTO CORRAL
Deputy Fireproofing 8/16/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 8/16/2022 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 8/16/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 8/17/2022 Partial Approval JAMES POWERS
Deputy Fireproofing 8/17/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/17/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/17/2022 Partial Approval JAMES POWERS
Reinforced Concrete Frame 8/17/2022 Partial Approval JAMES POWERS
Verify Sprinkler Sign Off 8/17/2022 Not Ready for Inspection JAMES POWERS
Deputy Drilled-In Anchors 8/18/2022 Conditional Approval ERNESTO CORRAL
Deputy Fireproofing 8/18/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 8/18/2022 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 8/18/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 8/19/2022 Conditional Approval ERNESTO CORRAL
Deputy Fireproofing 8/19/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 8/19/2022 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 8/19/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 8/22/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/22/2022 Partial Approval JAMES POWERS
Deputy Shotcrete 8/22/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/22/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/23/2022 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 8/23/2022 Conditional Approval WINSTON DUNNING
Deputy Shotcrete 8/23/2022 Conditional Approval WINSTON DUNNING
Deputy Steel/Welding 8/23/2022 Conditional Approval WINSTON DUNNING
Deputy Drilled-In Anchors 8/24/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/24/2022 Partial Approval JAMES POWERS
Deputy Shotcrete 8/24/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/24/2022 Partial Approval JAMES POWERS
Reinforced Concrete Frame 8/24/2022 Not Ready for Inspection JAMES POWERS
Verify Sprinkler Sign Off 8/24/2022 Not Ready for Inspection JAMES POWERS
Deputy Drilled-In Anchors 8/25/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/25/2022 Partial Approval JAMES POWERS
Deputy Shotcrete 8/25/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/25/2022 Partial Approval JAMES POWERS
Pre-Inspection 8/25/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/26/2022 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 8/26/2022 Conditional Approval WINSTON DUNNING
Deputy Shotcrete 8/26/2022 Conditional Approval WINSTON DUNNING
Deputy Steel/Welding 8/26/2022 Conditional Approval WINSTON DUNNING
Deputy Drilled-In Anchors 8/29/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/29/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/29/2022 Partial Approval JAMES POWERS
Reinforced Masonry Frame 8/29/2022 Not Ready for Inspection JAMES POWERS
Verify Sprinkler Sign Off 8/29/2022 Not Ready for Inspection JAMES POWERS
Deputy Drilled-In Anchors 8/30/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/30/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/30/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/31/2022 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 8/31/2022 Conditional Approval WINSTON DUNNING
Deputy Steel/Welding 8/31/2022 Conditional Approval WINSTON DUNNING
Deputy Drilled-In Anchors 9/1/2022 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 9/1/2022 Conditional Approval WINSTON DUNNING
Deputy Steel/Welding 9/1/2022 Conditional Approval WINSTON DUNNING
Deputy Drilled-In Anchors 9/2/2022 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 9/2/2022 Conditional Approval WINSTON DUNNING
Deputy Steel/Welding 9/2/2022 Conditional Approval WINSTON DUNNING
Deputy Drilled-In Anchors 9/7/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/7/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 9/7/2022 Partial Approval JAMES POWERS
Drywall Nailing 9/7/2022 Not Ready for Inspection JAMES POWERS
Final 9/7/2022 Not Ready for Inspection JAMES POWERS
Green Building Final 9/7/2022 Not Ready for Inspection JAMES POWERS
Reinforced Concrete Frame 9/7/2022 Partial Approval JAMES POWERS
Reinforced Masonry Frame 9/7/2022 Not Ready for Inspection JAMES POWERS
SGSOV-Seismic Gas S/O Valve 9/7/2022 SGSOV Not Ready JAMES POWERS
Smoke Detectors 9/7/2022 Not Ready for Inspection JAMES POWERS
Structural Steel Frame 9/7/2022 Not Ready for Inspection JAMES POWERS
Verify Sprinkler Sign Off 9/7/2022 Not Ready for Inspection JAMES POWERS
Deputy Drilled-In Anchors 9/9/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/9/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 9/9/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/12/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/12/2022 Partial Approval JAMES POWERS
Deputy Shotcrete 9/12/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 9/12/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/13/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/13/2022 Partial Approval JAMES POWERS
Deputy Shotcrete 9/13/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 9/13/2022 Partial Approval JAMES POWERS
Reinforced Concrete Frame 9/13/2022 Partial Approval JAMES POWERS
Verify Sprinkler Sign Off 9/13/2022 Not Ready for Inspection JAMES POWERS
Deputy Drilled-In Anchors 9/14/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/14/2022 Partial Approval JAMES POWERS
Deputy Shotcrete 9/14/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 9/14/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/15/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 9/15/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 9/15/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 9/15/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 9/16/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/16/2022 Partial Approval JAMES POWERS
Deputy Shotcrete 9/16/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 9/16/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/19/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 9/19/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 9/21/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 9/21/2022 Partial Approval JAMES POWERS
Pre-Inspection 9/21/2022 Not Ready for Inspection JAMES POWERS
Reinforced Concrete Frame 9/21/2022 Not Ready for Inspection JAMES POWERS
Verify Sprinkler Sign Off 9/21/2022 Not Ready for Inspection JAMES POWERS
Deputy Reinf. Concrete 9/22/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 9/22/2022 Partial Approval JAMES POWERS
Footing/Foundation/Slab 9/22/2022 Partial Approval JAMES POWERS
Reinforced Concrete Frame 9/29/2022 Partial Approval DAVID BURKHEAD
Verify Sprinkler Sign Off 9/29/2022 Not Ready for Inspection DAVID BURKHEAD
Deputy Reinf. Concrete 10/3/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 10/3/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 10/5/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/5/2022 Partial Approval JAMES POWERS
Reinforced Concrete Frame 10/5/2022 Partial Approval JAMES POWERS
Verify Sprinkler Sign Off 10/5/2022 Not Ready for Inspection JAMES POWERS
Deputy Reinf. Concrete 10/11/2022 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 10/11/2022 Conditional Approval GREGORY POMISH
Footing/Foundation/Slab 10/11/2022 Partial Approval GREGORY POMISH
Deputy Reinf. Concrete 10/13/2022 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 10/13/2022 Conditional Approval GREGORY POMISH
Reinforced Concrete Frame 10/13/2022 Partial Approval GREGORY POMISH
Verify Sprinkler Sign Off 10/13/2022 Not Ready for Inspection GREGORY POMISH
Deputy Reinf. Concrete 10/14/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 10/14/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 10/17/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/17/2022 Partial Approval JAMES POWERS
Masonry Wall/Backfill 10/17/2022 Partial Approval JAMES POWERS
Reinforced Concrete Frame 10/19/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/25/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/25/2022 Partial Approval JAMES POWERS
Insulation 10/28/2022 Not Ready for Inspection JAMES POWERS
Footing/Foundation/Slab 10/31/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 11/2/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 11/2/2022 Conditional Approval MICHAEL ROSENBERG
Reinforced Concrete Frame 11/2/2022 Not Ready for Inspection GREGORY POMISH
Verify Sprinkler Sign Off 11/2/2022 Not Ready for Inspection GREGORY POMISH
Deputy Reinf. Concrete 11/3/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 11/3/2022 Conditional Approval MICHAEL ROSENBERG
T-Bar Ceiling 11/3/2022 Not Ready for Inspection GREGORY POMISH
Deputy Steel/Welding 11/4/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 11/7/2022 Conditional Approval MICHAEL ROSENBERG
Reinforced Concrete Frame 11/7/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 11/9/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 11/9/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 11/10/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 11/10/2022 Conditional Approval MICHAEL ROSENBERG
Special/Order Compliance 11/10/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 11/14/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 11/14/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 11/15/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 11/15/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 11/16/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 11/16/2022 Partial Approval JAMES POWERS
Pre-Inspection 11/16/2022 Partial Approval JAMES POWERS
Reinforced Concrete Frame 11/16/2022 Partial Approval JAMES POWERS
Verify Sprinkler Sign Off 11/16/2022 Not Ready for Inspection JAMES POWERS
Deputy Reinf. Concrete 11/17/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 11/17/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 11/18/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 11/18/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 11/21/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 11/21/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 11/22/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 11/22/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 11/28/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 11/28/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 11/30/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 11/30/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 12/1/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 12/2/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 12/6/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 12/7/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 12/8/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 12/9/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 12/12/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 12/12/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 12/13/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 12/13/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 12/14/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/14/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/15/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 12/15/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 12/16/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 12/16/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 12/19/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 12/19/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 12/20/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/20/2022 Partial Approval JAMES POWERS
T-Bar Ceiling 12/20/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/21/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 12/21/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 12/22/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/22/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/23/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 12/23/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 12/27/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 12/28/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 12/29/2022 Partial Approval VAHE KELEDJIAN
Deputy Steel/Welding 12/30/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/3/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 1/3/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 1/4/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 1/4/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 1/5/2023 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/5/2023 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/6/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 1/6/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 1/9/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 1/9/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 1/9/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 1/10/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 1/10/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 1/10/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 1/11/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 1/11/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 1/11/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 1/12/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 1/12/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 1/12/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 1/13/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 1/13/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 1/13/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 1/17/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 1/17/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 1/17/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 1/18/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 1/18/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 1/18/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 1/19/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 1/19/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 1/19/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 1/20/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 1/20/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 1/20/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 1/23/2023 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/23/2023 Partial Approval JAMES POWERS
Deputy Shotcrete 1/23/2023 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/23/2023 Partial Approval JAMES POWERS
Deputy Shotcrete 1/24/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 1/24/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 1/25/2023 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/25/2023 Partial Approval JAMES POWERS
Reinforced Concrete Frame 1/25/2023 Partial Approval JAMES POWERS
Verify Sprinkler Sign Off 1/25/2023 Not Ready for Inspection JAMES POWERS
Deputy Shotcrete 1/26/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 1/26/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 1/27/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 1/27/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 1/30/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 1/30/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 1/30/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 1/31/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 1/31/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 1/31/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 2/1/2023 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/1/2023 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/1/2023 Partial Approval JAMES POWERS
Footing/Foundation/Slab 2/1/2023 Not Ready for Inspection JAMES POWERS
Deputy Drilled-In Anchors 2/2/2023 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 2/2/2023 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 2/2/2023 Conditional Approval DAVID BURKHEAD
Reinforced Concrete Frame 2/2/2023 Partial Approval DAVID BURKHEAD
Verify Sprinkler Sign Off 2/2/2023 Partial Inspection TIMOTHY POWELL
Deputy Drilled-In Anchors 2/6/2023 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/6/2023 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/6/2023 Partial Approval JAMES POWERS
Reinforced Concrete Frame 2/6/2023 Partial Approval JAMES POWERS
Verify Sprinkler Sign Off 2/6/2023 Not Ready for Inspection JAMES POWERS
Deputy Drilled-In Anchors 2/7/2023 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/7/2023 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/7/2023 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 2/8/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 2/8/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 2/8/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 2/9/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 2/9/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 2/9/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 2/10/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 2/10/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 2/10/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 2/13/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 2/13/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 2/13/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 2/14/2023 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/14/2023 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/14/2023 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 2/15/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 2/15/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 2/15/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 2/17/2023 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/17/2023 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/17/2023 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 2/21/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 2/21/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 2/22/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 2/22/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 2/23/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 2/23/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 2/24/2023 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/24/2023 Conditional Approval MARTIN TAVITIAN
Deputy Drilled-In Anchors 2/27/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 2/27/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 2/28/2023 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/28/2023 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 3/2/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 3/2/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 3/3/2023 Partial Approval JAMES POWERS
Deputy Steel/Welding 3/3/2023 Conditional Approval KATY RAMIREZ
Deputy Steel/Welding 3/6/2023 Approved MARTIN TAVITIAN
Deputy Drilled-In Anchors 3/7/2023 Conditional Approval KATY RAMIREZ
Deputy Steel/Welding 3/7/2023 Conditional Approval KATY RAMIREZ
Deputy Drilled-In Anchors 3/8/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 3/8/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 3/9/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 3/9/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 3/10/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 3/13/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 3/13/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 3/14/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 3/14/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 3/15/2023 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 3/15/2023 Conditional Approval GREGORY POMISH
Footing/Foundation/Slab 3/15/2023 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 3/16/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 3/16/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 3/17/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 3/17/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 3/20/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 3/20/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 3/20/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 3/21/2023 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/21/2023 Partial Approval JAMES POWERS
Deputy Steel/Welding 3/21/2023 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 3/22/2023 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/22/2023 Partial Approval JAMES POWERS
Deputy Steel/Welding 3/22/2023 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 3/23/2023 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/23/2023 Partial Approval JAMES POWERS
Deputy Steel/Welding 3/23/2023 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 3/24/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 3/24/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 3/24/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 3/29/2023 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/29/2023 Partial Approval JAMES POWERS
Deputy Steel/Welding 3/29/2023 Partial Approval JAMES POWERS
Footing/Foundation/Slab 3/29/2023 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 4/4/2023 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/4/2023 Partial Approval JAMES POWERS
Deputy Steel/Welding 4/4/2023 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 4/5/2023 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/5/2023 Partial Approval JAMES POWERS
Deputy Steel/Welding 4/5/2023 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 4/10/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 4/10/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 4/10/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 4/11/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 4/11/2023 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/11/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 4/11/2023 Partial Approval JAMES POWERS
Deputy Steel/Welding 4/11/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 4/11/2023 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 4/14/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 4/14/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 4/14/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 4/21/2023 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 4/21/2023 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 4/21/2023 Conditional Approval LARRY ARNICK
Pre-Inspection 4/21/2023 Partial Approval LARRY ARNICK
Reinforced Concrete Frame 4/21/2023 Partial Approval LARRY ARNICK
Verify Sprinkler Sign Off 4/21/2023 Not Ready for Inspection LARRY ARNICK
Deputy Drilled-In Anchors 4/26/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 4/26/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 4/26/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 4/27/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 4/27/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 4/27/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 4/28/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 4/28/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 4/28/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 5/1/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 5/1/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 5/1/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 5/2/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 5/2/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 5/2/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 5/3/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 5/3/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 5/3/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 5/4/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 5/4/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 5/4/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 5/5/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 5/5/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 5/5/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 5/8/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 5/8/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 5/8/2023 Conditional Approval MICHAEL ROSENBERG
Reinforced Concrete Frame 5/8/2023 Partial Approval RAFAEL ESPINOZA
Verify Sprinkler Sign Off 5/8/2023 Partial Inspection RAFAEL ESPINOZA
Deputy Drilled-In Anchors 5/9/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 5/9/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 5/9/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 5/10/2023 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/10/2023 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/10/2023 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 5/11/2023 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 5/11/2023 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 5/11/2023 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 5/12/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 5/12/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 5/12/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 5/15/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 5/16/2023 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/17/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 5/18/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 5/19/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 5/22/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 5/23/2023 Partial Approval JAMES POWERS
T-Bar Ceiling 5/23/2023 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/25/2023 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/26/2023 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/30/2023 Conditional Approval TED RIES
T-Bar Ceiling 5/30/2023 Partial Approval TED RIES
Deputy Steel/Welding 5/31/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 6/1/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 6/2/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 6/5/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 6/6/2023 Partial Approval JAMES POWERS
Deputy Steel/Welding 6/6/2023 Partial Approval JAMES POWERS
Deputy Steel/Welding 6/7/2023 Partial Approval JAMES POWERS
Deputy Steel/Welding 6/8/2023 Partial Approval JAMES POWERS
Deputy Steel/Welding 6/9/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 6/12/2023 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/12/2023 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 6/13/2023 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 6/13/2023 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 6/13/2023 Conditional Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 6/13/2023 Partial Approval RAFAEL ESPINOZA
Deputy Steel/Welding 6/21/2023 Partial Approval JAMES POWERS
Deputy Steel/Welding 6/26/2023 Partial Approval JAMES POWERS
Deputy Steel/Welding 6/27/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 6/28/2023 Conditional Approval ALAN MORELOS
Excavation/Setback/Form/Re-Bar 6/28/2023 Partial Approval ALAN MORELOS
Deputy Steel/Welding 6/30/2023 Conditional Approval LARRY ARNICK
T-Bar Ceiling 6/30/2023 Not Ready for Inspection LARRY ARNICK
Deputy Steel/Welding 7/3/2023 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/5/2023 Partial Approval JAMES POWERS
T-Bar Ceiling 7/5/2023 Partial Approval JAMES POWERS
T-Bar Ceiling 7/11/2023 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/13/2023 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/17/2023 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/17/2023 Partial Approval JAMES POWERS
Reinforced Concrete Frame 7/17/2023 Partial Approval JAMES POWERS
Verify Sprinkler Sign Off 7/17/2023 Not Ready for Inspection JAMES POWERS
Deputy Steel/Welding 7/18/2023 Partial Approval JAMES POWERS
Footing/Foundation/Slab 7/18/2023 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/27/2023 Conditional Approval ALAN MORELOS
T-Bar Ceiling 7/31/2023 Not Ready for Inspection JAMES POWERS
Deputy Steel/Welding 8/3/2023 Conditional Approval ALAN MORELOS
Deputy Steel/Welding 8/4/2023 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/10/2023 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/11/2023 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/14/2023 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/15/2023 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/16/2023 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/17/2023 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/18/2023 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/21/2023 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/22/2023 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/23/2023 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/24/2023 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/24/2023 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/25/2023 Conditional Approval ALAN MORELOS
Footing/Foundation/Slab 8/25/2023 Partial Approval ALAN MORELOS
Special/Order Compliance 8/25/2023 Approved ALAN MORELOS
Deputy Steel/Welding 8/28/2023 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/29/2023 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/30/2023 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/31/2023 Partial Approval JAMES POWERS
Deputy Steel/Welding 9/1/2023 Partial Approval JAMES POWERS
Deputy Steel/Welding 9/5/2023 Partial Approval JAMES POWERS
Deputy Steel/Welding 9/6/2023 Partial Approval JAMES POWERS
Deputy Steel/Welding 9/7/2023 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 9/8/2023 Partial Approval JAMES POWERS
Deputy Steel/Welding 9/11/2023 Partial Approval JAMES POWERS
Deputy Steel/Welding 9/12/2023 Partial Approval JAMES POWERS
Deputy Steel/Welding 9/13/2023 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 9/14/2023 Partial Approval JAMES POWERS
Deputy Steel/Welding 9/22/2023 Partial Approval JAMES POWERS
Reinforced Concrete Frame 9/22/2023 Partial Approval JAMES POWERS
Verify Sprinkler Sign Off 9/22/2023 Not Ready for Inspection JAMES POWERS
Deputy Steel/Welding 9/25/2023 Partial Approval JAMES POWERS
Deputy Steel/Welding 9/26/2023 Partial Approval JAMES POWERS
Deputy Steel/Welding 9/27/2023 Partial Approval JAMES POWERS
Deputy Steel/Welding 9/28/2023 Partial Approval JAMES POWERS
Footing/Foundation/Slab 9/28/2023 Partial Approval JAMES POWERS
Deputy Steel/Welding 9/29/2023 Partial Approval JAMES POWERS
Pre-Inspection 9/29/2023 Not Ready for Inspection JAMES POWERS
Deputy Steel/Welding 10/2/2023 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/3/2023 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/4/2023 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/5/2023 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/6/2023 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/6/2023 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/10/2023 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/11/2023 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/12/2023 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/13/2023 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/13/2023 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/16/2023 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 10/17/2023 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/17/2023 Partial Approval JAMES POWERS
Deputy Fireproofing 10/18/2023 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/18/2023 Partial Approval JAMES POWERS
Deputy Fireproofing 10/19/2023 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/19/2023 Partial Approval JAMES POWERS
Deputy Fireproofing 10/20/2023 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/20/2023 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/23/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 10/24/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 10/25/2023 Conditional Approval LARRY ARNICK
Deputy Reinf. Masonry 10/26/2023 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 10/26/2023 Conditional Approval MICHAEL ROSENBERG
Light Gage Steel Frame 10/26/2023 Partial Approval LARRY ARNICK
Deputy Reinf. Masonry 10/30/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 10/30/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 10/31/2023 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/31/2023 Partial Approval JAMES POWERS
Deputy Steel/Welding 11/1/2023 Partial Approval JAMES POWERS
Deputy Steel/Welding 11/2/2023 Partial Approval JAMES POWERS
Deputy Steel/Welding 11/3/2023 Partial Approval JAMES POWERS
Deputy Steel/Welding 11/6/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 11/7/2023 Partial Approval JAMES POWERS
Deputy Steel/Welding 11/8/2023 Partial Approval JAMES POWERS
Deputy Steel/Welding 11/9/2023 Partial Approval JAMES POWERS
Deputy Steel/Welding 11/13/2023 Partial Approval JAMES POWERS
Deputy Steel/Welding 11/14/2023 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 11/15/2023 Partial Approval JAMES POWERS
Deputy Steel/Welding 11/16/2023 Partial Approval JAMES POWERS
Deputy Steel/Welding 11/17/2023 Partial Approval JAMES POWERS
Deputy Steel/Welding 11/20/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 11/21/2023 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 11/27/2023 Approved DARRYL ARNOLD
Deputy Steel/Welding 11/28/2023 Partial Approval JAMES POWERS
Deputy Steel/Welding 11/29/2023 Partial Approval JAMES POWERS
Deputy Steel/Welding 11/30/2023 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/1/2023 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/4/2023 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/5/2023 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/6/2023 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/7/2023 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/8/2023 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/11/2023 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/12/2023 Partial Approval JAMES POWERS
Excavation/Setback/Form/Re-Bar 12/12/2023 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/13/2023 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/14/2023 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/15/2023 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/18/2023 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/19/2023 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/20/2023 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/21/2023 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/22/2023 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/26/2023 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/27/2023 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/28/2023 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/29/2023 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/2/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/3/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/4/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/5/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/8/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/9/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/10/2024 Partial Approval JAMES POWERS
T-Bar Ceiling 1/10/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/11/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/12/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/16/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/17/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/18/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/19/2024 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/23/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/23/2024 Partial Approval JAMES POWERS
Light Gage Steel Frame 1/23/2024 Partial Approval JAMES POWERS
T-Bar Ceiling 1/23/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/24/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/25/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/26/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/29/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/30/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/31/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/2/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/6/2024 Partial Approval JAMES POWERS
Light Gage Steel Frame 2/6/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/7/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/8/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/9/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/12/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/13/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/14/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/15/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/16/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/20/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/21/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/22/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/23/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/26/2024 Partial Approval JAMES POWERS
T-Bar Ceiling 2/26/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/27/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/28/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/29/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 3/1/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 3/5/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 3/6/2024 Partial Approval JAMES POWERS
Drywall Nailing 3/7/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 3/8/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 3/11/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 3/12/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 3/13/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 3/14/2024 Partial Approval JAMES POWERS
Insulation 3/14/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 3/15/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 3/18/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 3/19/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 3/20/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 3/21/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 3/22/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 3/26/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 3/27/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 3/28/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 3/29/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 4/2/2024 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/3/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 4/3/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 4/17/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 4/18/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 4/19/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 4/23/2024 Partial Approval JAMES POWERS
Light Gage Steel Frame 4/23/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 4/24/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 4/25/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 4/26/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 4/30/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/1/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/2/2024 Conditional Approval NICK DANERI
Deputy Steel/Welding 5/3/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/6/2024 Partial Approval JAMES POWERS
Light Gage Steel Frame 5/6/2024 Partial Approval JAMES POWERS
T-Bar Ceiling 5/6/2024 Not Ready for Inspection JAMES POWERS
Deputy Steel/Welding 5/7/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/8/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/9/2024 Partial Approval JAMES POWERS
Pre-Inspection 5/9/2024 Not Ready for Inspection JAMES POWERS
Deputy Steel/Welding 5/10/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/13/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/14/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/15/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/16/2024 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/28/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/28/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/29/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/30/2024 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 6/3/2024 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/3/2024 Partial Approval JAMES POWERS
Deputy Shotcrete 6/3/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 6/3/2024 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 6/4/2024 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/4/2024 Partial Approval JAMES POWERS
Deputy Shotcrete 6/4/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 6/4/2024 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 6/5/2024 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/5/2024 Partial Approval JAMES POWERS
Deputy Shotcrete 6/5/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 6/5/2024 Partial Approval JAMES POWERS
Light Gage Steel Frame 6/5/2024 Partial Approval JAMES POWERS
Structural Steel Frame 6/5/2024 Not Ready for Inspection JAMES POWERS
Verify Sprinkler Sign Off 6/5/2024 Not Ready for Inspection JAMES POWERS
Deputy Drilled-In Anchors 6/6/2024 Partial Approval JEROME BLACKWOOD
Deputy Reinf. Concrete 6/6/2024 Partial Approval JEROME BLACKWOOD
Deputy Shotcrete 6/6/2024 Approved JEROME BLACKWOOD
Deputy Steel/Welding 6/6/2024 Partial Approval JEROME BLACKWOOD
Deputy Drilled-In Anchors 6/7/2024 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/7/2024 Partial Approval JAMES POWERS
Deputy Shotcrete 6/7/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 6/7/2024 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 6/10/2024 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/10/2024 Partial Approval JAMES POWERS
Deputy Shotcrete 6/10/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 6/10/2024 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 6/11/2024 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/11/2024 Partial Approval JAMES POWERS
Deputy Shotcrete 6/11/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 6/11/2024 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 6/12/2024 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/12/2024 Partial Approval JAMES POWERS
Deputy Shotcrete 6/12/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 6/12/2024 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 6/13/2024 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/13/2024 Partial Approval JAMES POWERS
Deputy Shotcrete 6/13/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 6/13/2024 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 6/17/2024 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/17/2024 Partial Approval JAMES POWERS
Deputy Shotcrete 6/17/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 6/17/2024 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 6/18/2024 Partial Approval JAMES POWERS
Deputy Shotcrete 6/18/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 6/18/2024 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 6/20/2024 Partial Approval JAMES POWERS
Deputy Shotcrete 6/20/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 6/20/2024 Partial Approval JAMES POWERS
Drywall Nailing 6/20/2024 Partial Approval JAMES POWERS
Light Gage Steel Frame 6/20/2024 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 6/21/2024 Partial Approval JAMES POWERS
Deputy Shotcrete 6/21/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 6/21/2024 Partial Approval JAMES POWERS
Insulation 6/21/2024 Not Ready for Inspection JAMES POWERS
Deputy Drilled-In Anchors 6/24/2024 Partial Approval JAMES POWERS
Deputy Shotcrete 6/24/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 6/24/2024 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 6/25/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 6/25/2024 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 6/26/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 6/26/2024 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 6/27/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 6/27/2024 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 6/28/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 6/28/2024 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/1/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/1/2024 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/2/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/2/2024 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/3/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/3/2024 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/5/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/5/2024 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/9/2024 Partial Approval JAMES POWERS
Deputy Fireproofing 7/9/2024 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/9/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/9/2024 Partial Approval JAMES POWERS
Drywall Nailing 7/9/2024 Partial Approval JAMES POWERS
Light Gage Steel Frame 7/9/2024 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/10/2024 Partial Approval JAMES POWERS
Deputy Fireproofing 7/10/2024 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/10/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/10/2024 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/11/2024 Partial Approval JAMES POWERS
Deputy Fireproofing 7/11/2024 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/11/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/11/2024 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/12/2024 Partial Approval JAMES POWERS
Deputy Fireproofing 7/12/2024 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/12/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/12/2024 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/15/2024 Partial Approval JAMES POWERS
Deputy Shotcrete 7/15/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/15/2024 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/16/2024 Partial Approval JAMES POWERS
Deputy Shotcrete 7/16/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/16/2024 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/17/2024 Partial Approval JAMES POWERS
Deputy Shotcrete 7/17/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/17/2024 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/18/2024 Partial Approval JAMES POWERS
Deputy Shotcrete 7/18/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/18/2024 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/19/2024 Partial Approval JAMES POWERS
Deputy Shotcrete 7/19/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/19/2024 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/22/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/22/2024 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/23/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/23/2024 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/24/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/24/2024 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/25/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/25/2024 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/26/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/26/2024 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/30/2024 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/30/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/30/2024 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/31/2024 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/31/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/31/2024 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/1/2024 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/1/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/1/2024 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/2/2024 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/2/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/2/2024 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/5/2024 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/5/2024 Partial Approval JAMES POWERS
Deputy Shotcrete 8/5/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/5/2024 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/6/2024 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/6/2024 Partial Approval JAMES POWERS
Deputy Shotcrete 8/6/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/6/2024 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/7/2024 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/7/2024 Partial Approval JAMES POWERS
Deputy Shotcrete 8/7/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/7/2024 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/8/2024 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/8/2024 Partial Approval JAMES POWERS
Deputy Shotcrete 8/8/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/8/2024 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/9/2024 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/9/2024 Partial Approval JAMES POWERS
Deputy Shotcrete 8/9/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/9/2024 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/12/2024 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/12/2024 Partial Approval JAMES POWERS
Deputy Shotcrete 8/12/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/12/2024 Partial Approval JAMES POWERS
Drywall Nailing 8/12/2024 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/13/2024 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/13/2024 Partial Approval JAMES POWERS
Deputy Shotcrete 8/13/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/13/2024 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/14/2024 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/14/2024 Partial Approval JAMES POWERS
Deputy Shotcrete 8/14/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/14/2024 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/15/2024 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/15/2024 Partial Approval JAMES POWERS
Deputy Shotcrete 8/15/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/15/2024 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/16/2024 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/16/2024 Partial Approval JAMES POWERS
Deputy Shotcrete 8/16/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/16/2024 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/19/2024 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/19/2024 Partial Approval JAMES POWERS
Deputy Shotcrete 8/19/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/19/2024 Partial Approval JAMES POWERS
Footing/Foundation/Slab 8/19/2024 Not Ready for Inspection JAMES POWERS
Deputy Drilled-In Anchors 8/20/2024 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/20/2024 Partial Approval JAMES POWERS
Deputy Shotcrete 8/20/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/20/2024 Partial Approval JAMES POWERS
Footing/Foundation/Slab 8/20/2024 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/21/2024 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/21/2024 Partial Approval JAMES POWERS
Deputy Shotcrete 8/21/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/21/2024 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/22/2024 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/22/2024 Partial Approval JAMES POWERS
Deputy Shotcrete 8/22/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/22/2024 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/23/2024 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/23/2024 Partial Approval JAMES POWERS
Deputy Shotcrete 8/23/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/23/2024 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/26/2024 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/26/2024 Partial Approval JAMES POWERS
Deputy Shotcrete 8/26/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/26/2024 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/27/2024 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/27/2024 Partial Approval JAMES POWERS
Deputy Shotcrete 8/27/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/27/2024 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/28/2024 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/28/2024 Partial Approval JAMES POWERS
Deputy Shotcrete 8/28/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/28/2024 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/29/2024 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/29/2024 Partial Approval JAMES POWERS
Deputy Shotcrete 8/29/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/29/2024 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/30/2024 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/30/2024 Partial Approval JAMES POWERS
Deputy Shotcrete 8/30/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/30/2024 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/6/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 9/6/2024 Partial Approval JAMES POWERS
Special/Order Compliance 9/6/2024 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/9/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 9/9/2024 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/10/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 9/10/2024 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/11/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 9/11/2024 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/12/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 9/12/2024 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/13/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 9/13/2024 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/16/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 9/16/2024 Partial Approval JAMES POWERS
Pre-Inspection 10/16/2024 Partial Approval JAMES POWERS
Deputy Grading 10/18/2024 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/22/2024 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/23/2024 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/24/2024 Partial Approval JAMES POWERS
Footing/Foundation/Slab 10/24/2024 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/25/2024 Partial Approval JAMES POWERS
Insulation 10/25/2024 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 10/28/2024 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/28/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/28/2024 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 10/29/2024 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/29/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/29/2024 Partial Approval JAMES POWERS
Footing/Foundation/Slab 10/29/2024 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 10/30/2024 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/30/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/30/2024 Partial Approval JAMES POWERS
Light Gage Steel Frame 10/30/2024 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 10/31/2024 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/31/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/31/2024 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 11/1/2024 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 11/1/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 11/1/2024 Partial Approval JAMES POWERS
Drywall Nailing 11/1/2024 Partial Approval JAMES POWERS
Light Gage Steel Frame 11/1/2024 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 11/4/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 11/4/2024 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 11/5/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 11/5/2024 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 11/6/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 11/6/2024 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 11/7/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 11/7/2024 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 11/8/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 11/8/2024 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 11/19/2024 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 11/19/2024 Partial Approval JAMES POWERS
Deputy Shotcrete 11/19/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 11/19/2024 Partial Approval JAMES POWERS
Pre-Inspection 11/19/2024 Partial Approval JAMES POWERS
Reinforced Concrete Frame 11/19/2024 Partial Approval JAMES POWERS
Verify Sprinkler Sign Off 11/19/2024 Not Ready for Inspection JAMES POWERS
Deputy Drilled-In Anchors 11/20/2024 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 11/20/2024 Partial Approval JAMES POWERS
Deputy Shotcrete 11/20/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 11/20/2024 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 11/21/2024 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 11/21/2024 Partial Approval JAMES POWERS
Deputy Shotcrete 11/21/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 11/21/2024 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 11/26/2024 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 11/26/2024 Partial Approval JAMES POWERS
Deputy Shotcrete 11/26/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 11/26/2024 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 11/27/2024 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 11/27/2024 Partial Approval JAMES POWERS
Deputy Shotcrete 11/27/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 11/27/2024 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 12/2/2024 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/2/2024 Partial Approval JAMES POWERS
Deputy Shotcrete 12/2/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/2/2024 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 12/3/2024 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/3/2024 Partial Approval JAMES POWERS
Deputy Shotcrete 12/3/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/3/2024 Partial Approval JAMES POWERS
Reinforced Concrete Frame 12/3/2024 Partial Approval JAMES POWERS
Verify Sprinkler Sign Off 12/3/2024 Not Ready for Inspection JAMES POWERS
Deputy Drilled-In Anchors 12/10/2024 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/10/2024 Partial Approval JAMES POWERS
Deputy Shotcrete 12/10/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/10/2024 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 12/11/2024 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/11/2024 Partial Approval JAMES POWERS
Deputy Shotcrete 12/11/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/11/2024 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 12/12/2024 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/12/2024 Partial Approval JAMES POWERS
Deputy Shotcrete 12/12/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/12/2024 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 12/13/2024 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/13/2024 Partial Approval JAMES POWERS
Deputy Shotcrete 12/13/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/13/2024 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 12/17/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/17/2024 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 12/18/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/18/2024 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 12/19/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/19/2024 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 12/20/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/20/2024 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 12/24/2024 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/24/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/24/2024 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 12/26/2024 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/26/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/26/2024 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 12/27/2024 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/27/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/27/2024 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 12/30/2024 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/30/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/30/2024 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 12/31/2024 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/31/2024 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/31/2024 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 1/2/2025 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/2/2025 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/2/2025 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 1/3/2025 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/3/2025 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/3/2025 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 1/6/2025 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/6/2025 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/6/2025 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 1/8/2025 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/8/2025 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/8/2025 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/9/2025 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/9/2025 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 1/10/2025 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/10/2025 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/10/2025 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 1/13/2025 Partial Approval JACOB MYERS
Deputy Drilled-In Anchors 1/13/2025 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/13/2025 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/13/2025 Partial Approval JAMES POWERS
Pre-Inspection 1/13/2025 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 1/14/2025 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/14/2025 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/14/2025 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 1/15/2025 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/15/2025 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/15/2025 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 1/16/2025 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/16/2025 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/16/2025 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 1/17/2025 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/17/2025 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/17/2025 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 1/21/2025 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/21/2025 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/21/2025 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 1/22/2025 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/22/2025 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 1/23/2025 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/23/2025 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 1/24/2025 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/24/2025 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 1/29/2025 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/29/2025 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/29/2025 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 1/30/2025 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/30/2025 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/30/2025 Partial Approval JAMES POWERS
Light Gage Steel Frame 1/30/2025 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 1/31/2025 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/31/2025 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/31/2025 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 2/3/2025 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 2/3/2025 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 2/3/2025 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 2/6/2025 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/6/2025 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/6/2025 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 2/7/2025 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/7/2025 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/7/2025 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 2/10/2025 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/10/2025 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/10/2025 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 2/11/2025 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/11/2025 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/11/2025 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 2/12/2025 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/12/2025 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/12/2025 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 2/13/2025 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/13/2025 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/13/2025 Partial Approval JAMES POWERS
Drywall Nailing 2/13/2025 Partial Approval JAMES POWERS
Light Gage Steel Frame 2/13/2025 Partial Approval JAMES POWERS
Structural Steel Frame 2/13/2025 Not Ready for Inspection JAMES POWERS
Verify Sprinkler Sign Off 2/13/2025 Not Ready for Inspection JAMES POWERS
Deputy Drilled-In Anchors 2/14/2025 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/14/2025 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/14/2025 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 2/18/2025 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/18/2025 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/18/2025 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 2/19/2025 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/19/2025 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/19/2025 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 2/24/2025 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/24/2025 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/24/2025 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 2/25/2025 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/25/2025 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/25/2025 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 3/4/2025 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/4/2025 Partial Approval JAMES POWERS
Deputy Steel/Welding 3/4/2025 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 3/5/2025 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/5/2025 Partial Approval JAMES POWERS
Deputy Steel/Welding 3/5/2025 Partial Approval JAMES POWERS
Drywall Nailing 3/5/2025 Not Ready for Inspection JAMES POWERS
Final 3/5/2025 Partial Inspection JAMES POWERS
Footing/Foundation/Slab 3/5/2025 Not Ready for Inspection JAMES POWERS
Green Building Final 3/5/2025 Not Ready for Inspection JAMES POWERS
Reinforced Concrete Frame 3/5/2025 Not Ready for Inspection JAMES POWERS
Reinforced Masonry Frame 3/5/2025 Not Ready for Inspection JAMES POWERS
SGSOV-Seismic Gas S/O Valve 3/5/2025 SGSOV Not Ready JAMES POWERS
Smoke Detectors 3/5/2025 Not Ready for Inspection JAMES POWERS
Structural Steel Frame 3/5/2025 Not Ready for Inspection JAMES POWERS
Verify Sprinkler Sign Off 3/5/2025 Not Ready for Inspection JAMES POWERS
Deputy Drilled-In Anchors 3/6/2025 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/6/2025 Partial Approval JAMES POWERS
Deputy Steel/Welding 3/6/2025 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 3/7/2025 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/7/2025 Partial Approval JAMES POWERS
Deputy Steel/Welding 3/7/2025 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 3/17/2025 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/17/2025 Partial Approval JAMES POWERS
Deputy Steel/Welding 3/17/2025 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 3/18/2025 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/18/2025 Partial Approval JAMES POWERS
Deputy Steel/Welding 3/18/2025 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 3/19/2025 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/19/2025 Partial Approval JAMES POWERS
Deputy Steel/Welding 3/19/2025 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 3/20/2025 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/20/2025 Partial Approval JAMES POWERS
Deputy Steel/Welding 3/20/2025 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 3/21/2025 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/21/2025 Partial Approval JAMES POWERS
Deputy Steel/Welding 3/21/2025 Partial Approval JAMES POWERS
Drywall Nailing 3/26/2025 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 4/1/2025 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/1/2025 Partial Approval JAMES POWERS
Deputy Steel/Welding 4/1/2025 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 4/2/2025 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/2/2025 Partial Approval JAMES POWERS
Deputy Steel/Welding 4/2/2025 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 4/3/2025 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/3/2025 Partial Approval JAMES POWERS
Deputy Steel/Welding 4/3/2025 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 4/4/2025 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/4/2025 Partial Approval JAMES POWERS
Deputy Steel/Welding 4/4/2025 Partial Approval JAMES POWERS
Special/Order Compliance 4/4/2025 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 4/7/2025 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/7/2025 Partial Approval JAMES POWERS
Deputy Steel/Welding 4/7/2025 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 4/8/2025 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/8/2025 Partial Approval JAMES POWERS
Deputy Steel/Welding 4/8/2025 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 4/9/2025 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/9/2025 Partial Approval JAMES POWERS
Deputy Steel/Welding 4/9/2025 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 4/10/2025 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/10/2025 Partial Approval JAMES POWERS
Deputy Steel/Welding 4/10/2025 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 4/11/2025 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/11/2025 Partial Approval JAMES POWERS
Deputy Steel/Welding 4/11/2025 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 4/14/2025 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/14/2025 Partial Approval JAMES POWERS
Deputy Steel/Welding 4/14/2025 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 4/15/2025 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/15/2025 Partial Approval JAMES POWERS
Deputy Steel/Welding 4/15/2025 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 4/16/2025 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/16/2025 Partial Approval JAMES POWERS
Deputy Steel/Welding 4/16/2025 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 4/17/2025 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/17/2025 Partial Approval JAMES POWERS
Deputy Steel/Welding 4/17/2025 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 4/18/2025 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/18/2025 Partial Approval JAMES POWERS
Deputy Steel/Welding 4/18/2025 Partial Approval JAMES POWERS
Drywall Nailing 4/22/2025 Partial Approval LARRY ARNICK
Deputy Grading 5/5/2025 Partial Approval JAMES POWERS
Drywall Nailing 5/5/2025 Partial Approval JAMES POWERS
Deputy Grading 5/6/2025 Partial Approval JAMES POWERS
Deputy Grading 5/7/2025 Partial Approval JAMES POWERS
Deputy Grading 5/8/2025 Partial Approval JAMES POWERS
Interior/Exterior Lathing 5/20/2025 Partial Approval JAMES POWERS
Drywall Nailing 5/22/2025 Approved JAMES POWERS
Final 5/22/2025 Not Ready for Inspection JAMES POWERS
Footing/Foundation/Slab 5/22/2025 Not Ready for Inspection JAMES POWERS
Green Building Final 5/22/2025 Not Ready for Inspection JAMES POWERS
Reinforced Concrete Frame 5/22/2025 Not Ready for Inspection JAMES POWERS
Reinforced Masonry Frame 5/22/2025 Partial Approval JAMES POWERS
SGSOV-Seismic Gas S/O Valve 5/22/2025 SGSOV Not Ready JAMES POWERS
Smoke Detectors 5/22/2025 Not Ready for Inspection JAMES POWERS
Structural Steel Frame 5/22/2025 Partial Approval JAMES POWERS
Verify Sprinkler Sign Off 5/22/2025 Not Ready for Inspection JAMES POWERS
Final 6/12/2025 Not Ready for Inspection JAMES POWERS
Footing/Foundation/Slab 6/12/2025 Approved JAMES POWERS
Green Building Final 6/12/2025 Approved JAMES POWERS
Reinforced Concrete Frame 6/12/2025 Partial Approval JAMES POWERS
Reinforced Masonry Frame 6/12/2025 Partial Approval JAMES POWERS
SGSOV-Seismic Gas S/O Valve 6/12/2025 SGSOV Not Ready JAMES POWERS
Smoke Detectors 6/12/2025 Approved JAMES POWERS
Structural Steel Frame 6/12/2025 Not Ready for Inspection JAMES POWERS
Verify Sprinkler Sign Off 6/12/2025 Not Ready for Inspection JAMES POWERS
Deputy Grading 6/16/2025 Partial Approval JAMES POWERS
Light Gage Steel Frame 7/7/2025 Partial Approval JAMES POWERS
Light Gage Steel Frame 7/15/2025 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/16/2025 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/16/2025 Partial Approval JAMES POWERS
Deputy Grading 7/25/2025 Partial Approval JAMES POWERS
Light Gage Steel Frame 7/25/2025 Not Ready for Inspection JAMES POWERS
Deputy Grading 7/28/2025 Partial Approval JAMES POWERS
Pre-Inspection 7/28/2025 Partial Approval JAMES POWERS
Deputy Grading 7/30/2025 Partial Approval JAMES POWERS
Deputy Grading 7/31/2025 Partial Approval JAMES POWERS
Drywall Nailing 8/5/2025 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/6/2025 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/6/2025 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/6/2025 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/7/2025 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/7/2025 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/7/2025 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/8/2025 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/8/2025 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/8/2025 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/11/2025 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/11/2025 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/11/2025 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/12/2025 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/12/2025 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/12/2025 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/19/2025 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/19/2025 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/20/2025 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/20/2025 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/21/2025 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/21/2025 Partial Approval JAMES POWERS
Light Gage Steel Frame 8/21/2025 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/22/2025 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/22/2025 Partial Approval JAMES POWERS
Drywall Nailing 9/16/2025 Partial Approval JAMES POWERS
Interior/Exterior Lathing 9/16/2025 Partial Approval JAMES POWERS
Drywall Nailing 10/1/2025 Partial Approval LARRY ARNICK
Light Gage Steel Frame 10/1/2025 Partial Approval LARRY ARNICK
Deputy Reinf. Concrete 10/3/2025 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/3/2025 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/6/2025 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/6/2025 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/7/2025 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/7/2025 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/8/2025 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/8/2025 Partial Approval JAMES POWERS
Light Gage Steel Frame 10/14/2025 Partial Approval JAMES POWERS
Deputy Grading 10/15/2025 Partial Approval JAMES POWERS
Drywall Nailing 10/21/2025 Partial Approval JOEY BUCHANAN
Light Gage Steel Frame 10/21/2025 Partial Approval JOEY BUCHANAN
Deputy Grading 10/27/2025 Partial Approval JAMES POWERS
Drywall Nailing 10/27/2025 Partial Approval JAMES POWERS
Light Gage Steel Frame 10/27/2025 Partial Approval JAMES POWERS
Drywall Nailing 10/31/2025 Approved JAMES POWERS
Final 10/31/2025 Not Ready for Inspection JAMES POWERS
Reinforced Concrete Frame 10/31/2025 Approved JAMES POWERS
Reinforced Masonry Frame 10/31/2025 Approved JAMES POWERS
SGSOV-Seismic Gas S/O Valve 10/31/2025 SGSOV Approved JAMES POWERS
Structural Steel Frame 10/31/2025 Approved JAMES POWERS
Verify Sprinkler Sign Off 10/31/2025 Approved JAMES POWERS
Deputy Grading 11/5/2025 Partial Approval JAMES POWERS
Light Gage Steel Frame 11/6/2025 Partial Approval JAMES POWERS
Special/Order Compliance 11/6/2025 Partial Approval SCOTT SOBEL
Final 11/21/2025 Not Ready for Inspection JAMES POWERS
Deputy Reinf. Concrete 12/8/2025 Partial Approval JAMES POWERS
Insulation 12/26/2025 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/29/2025 Partial Approval JAMES POWERS
T-Bar Ceiling 1/21/2026 Partial Approval JAMES POWERS
Pre-Inspection 1/26/2026 Not Ready for Inspection JAMES POWERS
Special/Order Compliance 1/26/2026 Approved ALFREDO LOPEZ
Pre-Inspection 1/27/2026 Not Ready for Inspection JAMES POWERS
Pre-Inspection 1/28/2026 Partial Approval JAMES POWERS
Pre-Inspection 3/17/2026 Partial Approval JAMES POWERS
Pre-Inspection 3/18/2026 Not Ready for Inspection JAMES POWERS
Deputy Other (see comments) 3/24/2026 Partial Approval JAMES POWERS
Final 3/24/2026 Not Ready for Inspection JAMES POWERS
Deputy Reinf. Concrete 3/26/2026 Partial Approval JAMES POWERS
Special/Order Compliance 3/26/2026 Not Ready for Inspection JAMES POWERS
Special/Order Compliance 4/6/2026 Not Ready for Inspection JAMES POWERS
Final 4/27/2026 Not Ready for Inspection JAMES POWERS
Special/Order Compliance 4/27/2026 Not Ready for Inspection JAMES POWERS
Insulation 4/28/2026 Partial Approval JAMES POWERS
Special/Order Compliance 4/29/2026 Partial Approval JAMES POWERS
Light Gage Steel Frame 5/1/2026 Not Ready for Inspection JAMES POWERS
Final 5/4/2026 Not Ready for Inspection JAMES POWERS
Special/Order Compliance 5/6/2026 Partial Approval JAMES POWERS
Final 5/7/2026 Not Ready for Inspection JAMES POWERS
Final 5/26/2026 OK to Issue CofO JAMES POWERS