Deputy Steel/Welding
|
7/2/2018
|
Approved
|
TONY HARTONO
|
|
Pre-Inspection
|
7/2/2018
|
Partial Inspection
|
TONY HARTONO
|
|
Special/Order Compliance
|
7/3/2018
|
Approved
|
JASON BORUTA
|
|
METHANE-Subgrade
|
7/30/2018
|
Not Ready for Inspection
|
JASON BORUTA
|
|
Pre-Inspection
|
7/30/2018
|
Approved
|
JASON BORUTA
|
|
Deputy Shotcrete
|
8/15/2018
|
Approved
|
JASON BORUTA
|
|
Pre-Inspection
|
8/15/2018
|
Approved
|
JASON BORUTA
|
|
METHANE-Barrier
|
8/24/2018
|
Not Ready for Inspection
|
JASON BORUTA
|
|
Footing/Foundation/Slab
|
8/27/2018
|
Partial Approval
|
JASON BORUTA
|
|
METHANE-Subgrade
|
8/27/2018
|
Partial Approval
|
JASON BORUTA
|
|
Deputy Methane Barrier
|
8/28/2018
|
Conditional Approval
|
JASON BORUTA
|
|
Deputy Reinf. Concrete
|
8/28/2018
|
Conditional Approval
|
JASON BORUTA
|
|
Deputy Methane Barrier
|
8/29/2018
|
Conditional Approval
|
TONY HARTONO
|
|
Deputy Methane Barrier
|
8/30/2018
|
Approved
|
JASON BORUTA
|
|
Deputy Methane Barrier
|
8/31/2018
|
Conditional Approval
|
JASON BORUTA
|
|
Deputy Methane Barrier
|
9/4/2018
|
Conditional Approval
|
JASON BORUTA
|
|
Deputy Methane Barrier
|
9/5/2018
|
Conditional Approval
|
JASON BORUTA
|
|
Deputy Methane Barrier
|
9/6/2018
|
Approved
|
JASON BORUTA
|
|
Deputy Steel/Welding
|
9/6/2018
|
Conditional Approval
|
JASON BORUTA
|
|
Deputy Methane Barrier
|
9/7/2018
|
Conditional Approval
|
JASON BORUTA
|
|
METHANE-Barrier
|
9/14/2018
|
Partial Approval
|
JASON BORUTA
|
|
METHANE-Final
|
9/18/2018
|
Approved
|
JASON BORUTA
|
|
Excavation/Setback/Form/Re-Bar
|
9/20/2018
|
Not Ready for Inspection
|
JASON BORUTA
|
|
Pre-Inspection
|
9/20/2018
|
Not Ready for Inspection
|
JASON BORUTA
|
|
Excavation/Setback/Form/Re-Bar
|
9/27/2018
|
Partial Inspection
|
TONY HARTONO
|
|
Footing/Foundation/Slab
|
9/27/2018
|
Partial Inspection
|
TONY HARTONO
|
|
METHANE-Barrier
|
9/27/2018
|
Partial Approval
|
TONY HARTONO
|
|
METHANE-Subgrade
|
9/27/2018
|
Approved
|
TONY HARTONO
|
|
Excavation/Setback/Form/Re-Bar
|
10/11/2018
|
Not Ready for Inspection
|
JASON BORUTA
|
|
Footing/Foundation/Slab
|
10/12/2018
|
Partial Approval
|
JASON BORUTA
|
|
METHANE-Barrier
|
10/12/2018
|
Approved
|
JASON BORUTA
|
|
Deputy Shotcrete
|
10/19/2018
|
Approved
|
TONY HARTONO
|
|
Deputy Shotcrete
|
10/22/2018
|
Approved
|
TONY HARTONO
|
|
Excavation/Setback/Form/Re-Bar
|
10/22/2018
|
Corrections Issued
|
TONY HARTONO
|
|
Green Building Rough
|
10/22/2018
|
Not Ready for Inspection
|
TONY HARTONO
|
|
Reinforced Concrete Frame
|
10/22/2018
|
Partial Inspection
|
TONY HARTONO
|
|
Verify Sprinkler Sign Off
|
10/22/2018
|
Not Ready for Inspection
|
TONY HARTONO
|
|
Deputy Shotcrete
|
10/23/2018
|
Approved
|
DANIEL MC AULIFFE
|
|
Excavation/Setback/Form/Re-Bar
|
10/23/2018
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Deputy Shotcrete
|
10/24/2018
|
Conditional Approval
|
DANIEL MC AULIFFE
|
|
Excavation/Setback/Form/Re-Bar
|
10/24/2018
|
Not Ready for Inspection
|
DANIEL MC AULIFFE
|
|
Deputy Shotcrete
|
10/25/2018
|
Approved
|
TONY HARTONO
|
|
Excavation/Setback/Form/Re-Bar
|
10/25/2018
|
Partial Approval
|
TONY HARTONO
|
|
Deputy Shotcrete
|
10/26/2018
|
Approved
|
TONY HARTONO
|
|
Deputy Reinf. Concrete
|
10/29/2018
|
Conditional Approval
|
TONY HARTONO
|
|
Deputy Shotcrete
|
10/29/2018
|
Approved
|
TONY HARTONO
|
|
Deputy Reinf. Concrete
|
10/30/2018
|
Conditional Approval
|
TONY HARTONO
|
|
Deputy Reinf. Concrete
|
10/30/2018
|
No Access for Inspection
|
TONY HARTONO
|
|
Deputy Shotcrete
|
10/30/2018
|
No Access for Inspection
|
TONY HARTONO
|
|
Excavation/Setback/Form/Re-Bar
|
10/30/2018
|
Partial Approval
|
TONY HARTONO
|
|
Deputy Reinf. Concrete
|
10/31/2018
|
Approved
|
TONY HARTONO
|
|
Deputy Reinf. Concrete
|
10/31/2018
|
No Access for Inspection
|
TONY HARTONO
|
|
Deputy Shotcrete
|
10/31/2018
|
No Access for Inspection
|
TONY HARTONO
|
|
Deputy Reinf. Concrete
|
11/1/2018
|
Approved
|
TONY HARTONO
|
|
Deputy Reinf. Concrete
|
11/1/2018
|
No Access for Inspection
|
TONY HARTONO
|
|
Deputy Shotcrete
|
11/1/2018
|
Approved
|
TONY HARTONO
|
|
Deputy Shotcrete
|
11/1/2018
|
No Access for Inspection
|
TONY HARTONO
|
|
Deputy Reinf. Concrete
|
11/2/2018
|
Approved
|
TONY HARTONO
|
|
Deputy Shotcrete
|
11/2/2018
|
Approved
|
TONY HARTONO
|
|
Deputy Shotcrete
|
11/2/2018
|
No Access for Inspection
|
TONY HARTONO
|
|
Deputy Reinf. Concrete
|
11/8/2018
|
Approved
|
TONY HARTONO
|
|
Excavation/Setback/Form/Re-Bar
|
11/8/2018
|
Partial Approval
|
TONY HARTONO
|
|
Excavation/Setback/Form/Re-Bar
|
11/9/2018
|
Partial Approval
|
TONY HARTONO
|
|
Deputy Reinf. Concrete
|
11/27/2018
|
Approved
|
TONY HARTONO
|
|
Deputy Reinf. Concrete
|
11/28/2018
|
Approved
|
TONY HARTONO
|
|
Deputy Reinf. Concrete
|
11/30/2018
|
Approved
|
TONY HARTONO
|
|
Excavation/Setback/Form/Re-Bar
|
11/30/2018
|
Partial Inspection
|
TONY HARTONO
|
|
Deputy Reinf. Concrete
|
12/7/2018
|
Approved
|
TONY HARTONO
|
|
Deputy Reinf. Concrete
|
12/10/2018
|
Approved
|
TONY HARTONO
|
|
Excavation/Setback/Form/Re-Bar
|
12/10/2018
|
Partial Approval
|
TONY HARTONO
|
|
Footing/Foundation/Slab
|
12/10/2018
|
Not Ready for Inspection
|
TONY HARTONO
|
|
Deputy Reinf. Concrete
|
12/13/2018
|
Approved
|
TONY HARTONO
|
|
Excavation/Setback/Form/Re-Bar
|
12/13/2018
|
Partial Approval
|
TONY HARTONO
|
|
Deputy Shotcrete
|
12/14/2018
|
Approved
|
TONY HARTONO
|
|
Deputy Reinf. Masonry
|
12/17/2018
|
Conditional Approval
|
JASON BORUTA
|
|
Green Building Rough
|
12/17/2018
|
Approved
|
JASON BORUTA
|
|
Reinforced Masonry Frame
|
12/17/2018
|
Partial Approval
|
JASON BORUTA
|
|
Verify Sprinkler Sign Off
|
12/17/2018
|
Not Ready for Inspection
|
JASON BORUTA
|
|
Deputy Reinf. Concrete
|
12/18/2018
|
Approved
|
TONY HARTONO
|
|
Deputy Shotcrete
|
12/18/2018
|
Approved
|
TONY HARTONO
|
|
Reinforced Masonry Frame
|
12/18/2018
|
Partial Approval
|
TONY HARTONO
|
|
Deputy Reinf. Concrete
|
12/19/2018
|
Approved
|
TONY HARTONO
|
|
Deputy Reinf. Masonry
|
12/19/2018
|
Approved
|
TONY HARTONO
|
|
Deputy Shotcrete
|
12/19/2018
|
Approved
|
TONY HARTONO
|
|
Deputy Reinf. Concrete
|
12/20/2018
|
Approved
|
TONY HARTONO
|
|
Deputy Reinf. Masonry
|
12/20/2018
|
Approved
|
TONY HARTONO
|
|
Deputy Shotcrete
|
12/20/2018
|
Approved
|
TONY HARTONO
|
|
Deputy Reinf. Concrete
|
12/21/2018
|
Approved
|
TONY HARTONO
|
|
Deputy Reinf. Masonry
|
12/21/2018
|
Approved
|
TONY HARTONO
|
|
Deputy Shotcrete
|
12/21/2018
|
Approved
|
TONY HARTONO
|
|
Excavation/Setback/Form/Re-Bar
|
12/21/2018
|
Partial Approval
|
TONY HARTONO
|
|
Masonry Wall/Backfill
|
12/21/2018
|
Partial Approval
|
TONY HARTONO
|
|
Deputy Reinf. Concrete
|
12/24/2018
|
Approved
|
TONY HARTONO
|
|
Deputy Shotcrete
|
12/24/2018
|
Approved
|
TONY HARTONO
|
|
Deputy Reinf. Concrete
|
12/27/2018
|
Conditional Approval
|
TONY HARTONO
|
|
Deputy Shotcrete
|
12/27/2018
|
Approved
|
TONY HARTONO
|
|
Deputy Reinf. Concrete
|
12/28/2018
|
Conditional Approval
|
TONY HARTONO
|
|
Special/Order Compliance
|
12/31/2018
|
No Access for Inspection
|
TONY HARTONO
|
|
Deputy Reinf. Concrete
|
1/11/2019
|
Approved
|
TONY HARTONO
|
|
Deputy Reinf. Concrete
|
1/14/2019
|
Conditional Approval
|
TONY HARTONO
|
|
Deputy Reinf. Concrete
|
1/15/2019
|
No Access for Inspection
|
TONY HARTONO
|
|
Deputy Reinf. Concrete
|
1/16/2019
|
No Access for Inspection
|
TONY HARTONO
|
|
Deputy Reinf. Concrete
|
1/17/2019
|
Conditional Approval
|
TONY HARTONO
|
|
Deputy Reinf. Concrete
|
1/22/2019
|
Approved
|
TONY HARTONO
|
|
Excavation/Setback/Form/Re-Bar
|
1/22/2019
|
Conditional Approval
|
TONY HARTONO
|
|
Deputy Reinf. Concrete
|
1/23/2019
|
Approved
|
TONY HARTONO
|
|
Pre-Inspection
|
1/24/2019
|
Partial Approval
|
TONY HARTONO
|
|
Excavation/Setback/Form/Re-Bar
|
1/28/2019
|
Partial Approval
|
TONY HARTONO
|
|
Masonry Wall/Backfill
|
1/28/2019
|
Partial Approval
|
TONY HARTONO
|
|
Deputy Reinf. Concrete
|
1/29/2019
|
Approved
|
TONY HARTONO
|
|
Deputy Shotcrete
|
1/29/2019
|
Approved
|
TONY HARTONO
|
|
Excavation/Setback/Form/Re-Bar
|
1/29/2019
|
Partial Approval
|
TONY HARTONO
|
|
Deputy Reinf. Concrete
|
1/30/2019
|
Approved
|
TONY HARTONO
|
|
Deputy Reinf. Masonry
|
1/30/2019
|
Approved
|
TONY HARTONO
|
|
Deputy Shotcrete
|
1/30/2019
|
Approved
|
TONY HARTONO
|
|
Deputy Reinf. Concrete
|
1/31/2019
|
No Access for Inspection
|
TONY HARTONO
|
|
Deputy Reinf. Masonry
|
1/31/2019
|
No Access for Inspection
|
TONY HARTONO
|
|
Deputy Shotcrete
|
1/31/2019
|
No Access for Inspection
|
TONY HARTONO
|
|
Deputy Reinf. Concrete
|
2/1/2019
|
Approved
|
TONY HARTONO
|
|
Deputy Reinf. Masonry
|
2/1/2019
|
Approved
|
TONY HARTONO
|
|
Deputy Shotcrete
|
2/1/2019
|
Approved
|
TONY HARTONO
|
|
Excavation/Setback/Form/Re-Bar
|
2/1/2019
|
Partial Approval
|
TONY HARTONO
|
|
Deputy Shotcrete
|
2/8/2019
|
Approved
|
TONY HARTONO
|
|
Masonry Wall/Backfill
|
2/13/2019
|
Partial Approval
|
TONY HARTONO
|
|
Excavation/Setback/Form/Re-Bar
|
2/19/2019
|
Partial Approval
|
TONY HARTONO
|
|
Deputy Reinf. Concrete
|
2/27/2019
|
Approved
|
DERRICK SPENCER
|
|
Excavation/Setback/Form/Re-Bar
|
2/28/2019
|
Partial Approval
|
DERRICK SPENCER
|
|
Excavation/Setback/Form/Re-Bar
|
3/4/2019
|
Partial Inspection
|
TONY HARTONO
|
|
Deputy Drilled-In Anchors
|
3/6/2019
|
Approved
|
TONY HARTONO
|
|
Deputy Other (see comments)
|
3/6/2019
|
Approved
|
TONY HARTONO
|
|
Deputy Reinf. Concrete
|
3/6/2019
|
Approved
|
TONY HARTONO
|
|
Deputy Shotcrete
|
3/6/2019
|
Approved
|
TONY HARTONO
|
|
Excavation/Setback/Form/Re-Bar
|
3/6/2019
|
Partial Approval
|
TONY HARTONO
|
|
Deputy Drilled-In Anchors
|
3/7/2019
|
Approved
|
TONY HARTONO
|
|
Deputy Other (see comments)
|
3/7/2019
|
Approved
|
TONY HARTONO
|
|
Deputy Reinf. Concrete
|
3/7/2019
|
Approved
|
TONY HARTONO
|
|
Deputy Shotcrete
|
3/7/2019
|
Approved
|
TONY HARTONO
|
|
Deputy Drilled-In Anchors
|
3/8/2019
|
Approved
|
TONY HARTONO
|
|
Deputy Other (see comments)
|
3/8/2019
|
Approved
|
TONY HARTONO
|
|
Deputy Reinf. Concrete
|
3/8/2019
|
Approved
|
TONY HARTONO
|
|
Deputy Shotcrete
|
3/8/2019
|
Approved
|
TONY HARTONO
|
|
Deputy Drilled-In Anchors
|
3/11/2019
|
Conditional Approval
|
JASON BORUTA
|
|
Deputy Other (see comments)
|
3/11/2019
|
Conditional Approval
|
JASON BORUTA
|
|
Deputy Reinf. Concrete
|
3/11/2019
|
Conditional Approval
|
JASON BORUTA
|
|
Deputy Shotcrete
|
3/11/2019
|
Conditional Approval
|
JASON BORUTA
|
|
Deputy Drilled-In Anchors
|
3/12/2019
|
Approved
|
DERRICK SPENCER
|
|
Deputy Other (see comments)
|
3/12/2019
|
Approved
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
3/12/2019
|
Approved
|
DERRICK SPENCER
|
|
Deputy Shotcrete
|
3/12/2019
|
Approved
|
DERRICK SPENCER
|
|
Excavation/Setback/Form/Re-Bar
|
3/12/2019
|
Not Ready for Inspection
|
DERRICK SPENCER
|
|
Reinforced Masonry Frame
|
3/12/2019
|
Partial Approval
|
DERRICK SPENCER
|
|
Verify Sprinkler Sign Off
|
3/12/2019
|
Approved
|
DERRICK SPENCER
|
|
Deputy Reinf. Masonry
|
3/13/2019
|
Approved
|
DERRICK SPENCER
|
|
Deputy Reinf. Masonry
|
3/14/2019
|
Approved
|
DERRICK SPENCER
|
|
Excavation/Setback/Form/Re-Bar
|
3/14/2019
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Reinf. Masonry
|
3/15/2019
|
Approved
|
DERRICK SPENCER
|
|
Excavation/Setback/Form/Re-Bar
|
3/15/2019
|
Not Ready for Inspection
|
DERRICK SPENCER
|
|
Excavation/Setback/Form/Re-Bar
|
3/18/2019
|
Partial Approval
|
DERRICK SPENCER
|
|
Excavation/Setback/Form/Re-Bar
|
4/5/2019
|
Partial Approval
|
TONY HARTONO
|
|
Excavation/Setback/Form/Re-Bar
|
4/10/2019
|
Partial Approval
|
TONY HARTONO
|
|
Deputy Reinf. Concrete
|
4/12/2019
|
Approved
|
TONY HARTONO
|
|
Excavation/Setback/Form/Re-Bar
|
4/15/2019
|
Partial Inspection
|
TONY HARTONO
|
|
Deputy Reinf. Concrete
|
4/23/2019
|
Approved
|
TONY HARTONO
|
|
Deputy Reinf. Concrete
|
4/24/2019
|
Approved
|
TONY HARTONO
|
|
Excavation/Setback/Form/Re-Bar
|
4/24/2019
|
Conditional Approval
|
TONY HARTONO
|
|
Excavation/Setback/Form/Re-Bar
|
4/26/2019
|
Corrections Issued
|
TONY HARTONO
|
|
Pre-Inspection
|
5/8/2019
|
Approved
|
DERRICK SPENCER
|
|
Deputy Wood Construction
|
5/29/2019
|
Approved
|
TONY HARTONO
|
|
Deputy Wood Construction
|
5/30/2019
|
Approved
|
TONY HARTONO
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/30/2019
|
Partial Inspection
|
TONY HARTONO
|
|
Deputy Wood Construction
|
5/31/2019
|
Approved
|
TONY HARTONO
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/31/2019
|
Partial Approval
|
TONY HARTONO
|
|
Drywall Nailing
|
6/4/2019
|
Partial Approval
|
TONY HARTONO
|
|
Excavation/Setback/Form/Re-Bar
|
6/11/2019
|
Partial Approval
|
TONY HARTONO
|
|
Masonry Wall/Backfill
|
6/11/2019
|
Partial Approval
|
TONY HARTONO
|
|
Masonry Wall/Backfill
|
6/14/2019
|
Partial Approval
|
DERRICK SPENCER
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/20/2019
|
Partial Approval
|
TONY HARTONO
|
|
Drywall Nailing
|
6/24/2019
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Wood Construction
|
7/9/2019
|
Approved
|
TONY HARTONO
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/9/2019
|
Partial Approval
|
TONY HARTONO
|
|
Drywall Nailing
|
7/12/2019
|
Partial Approval
|
NICK LAROCCA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/19/2019
|
Partial Approval
|
TONY HARTONO
|
|
Insulation
|
7/19/2019
|
Partial Inspection
|
TONY HARTONO
|
|
Pre-Inspection
|
7/19/2019
|
Partial Inspection
|
TONY HARTONO
|
|
Insulation
|
7/22/2019
|
Partial Approval
|
TONY HARTONO
|
|
Drywall Nailing
|
7/24/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/29/2019
|
Partial Approval
|
TONY HARTONO
|
|
Deputy Wood Construction
|
7/31/2019
|
Approved
|
TONY HARTONO
|
|
Floor/Roof Diaphrgm/Shear Wall
|
8/1/2019
|
Partial Inspection
|
TONY HARTONO
|
|
Drywall Nailing
|
8/2/2019
|
Partial Inspection
|
TONY HARTONO
|
|
Deputy Wood Construction
|
8/6/2019
|
Approved
|
TONY HARTONO
|
|
Deputy Wood Construction
|
8/7/2019
|
Approved
|
TONY HARTONO
|
|
Deputy Wood Construction
|
8/8/2019
|
Approved
|
DERRICK SPENCER
|
|
Floor/Roof Diaphrgm/Shear Wall
|
8/8/2019
|
Partial Approval
|
DERRICK SPENCER
|
|
Special/Order Compliance
|
8/13/2019
|
Corrections Issued
|
TONY HARTONO
|
|
Drywall Nailing
|
8/16/2019
|
Partial Approval
|
TONY HARTONO
|
|
Drywall Nailing
|
8/19/2019
|
Partial Approval
|
DERRICK SPENCER
|
|
Wood Frame
|
9/16/2019
|
Partial Inspection
|
TONY HARTONO
|
|
Insulation
|
9/18/2019
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Wood Construction
|
9/19/2019
|
Conditional Approval
|
TONY HARTONO
|
|
Insulation
|
9/20/2019
|
Partial Approval
|
TONY HARTONO
|
|
Insulation
|
10/2/2019
|
Partial Approval
|
TONY HARTONO
|
|
Insulation
|
10/4/2019
|
Partial Approval
|
TONY HARTONO
|
|
Light Gage Steel Frame
|
10/8/2019
|
Partial Approval
|
TONY HARTONO
|
|
Interior/Exterior Lathing
|
10/11/2019
|
Partial Approval
|
TONY HARTONO
|
|
Light Gage Steel Frame
|
10/24/2019
|
Partial Approval
|
DERRICK SPENCER
|
|
Interior/Exterior Lathing
|
10/28/2019
|
Partial Approval
|
DERRICK SPENCER
|
|
Light Gage Steel Frame
|
10/29/2019
|
Partial Approval
|
DERRICK SPENCER
|
|
Interior/Exterior Lathing
|
11/6/2019
|
Partial Approval
|
DERRICK SPENCER
|
|
Light Gage Steel Frame
|
11/8/2019
|
Partial Approval
|
TED RIES
|
|
Interior/Exterior Lathing
|
11/22/2019
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Light Gage Steel Frame
|
11/22/2019
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Light Gage Steel Frame
|
11/26/2019
|
Partial Approval
|
TED RIES
|
|
Deputy Steel/Welding
|
1/27/2020
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Steel/Welding
|
1/28/2020
|
Approved
|
JEFF BYTHEWAY
|
|
Special/Order Compliance
|
2/13/2020
|
Corrections Issued
|
JEFF BYTHEWAY
|
|
Excavation/Setback/Form/Re-Bar
|
2/18/2020
|
Approved
|
JEFF BYTHEWAY
|
|
Masonry Wall/Backfill
|
2/18/2020
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Steel/Welding
|
2/26/2020
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Masonry
|
3/18/2020
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Masonry
|
3/19/2020
|
Approved
|
JEFF BYTHEWAY
|
|
Masonry Wall/Backfill
|
3/19/2020
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Masonry
|
3/20/2020
|
Approved
|
JEFF BYTHEWAY
|
|
Reinforced Masonry Frame
|
3/20/2020
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Excavation/Setback/Form/Re-Bar
|
3/27/2020
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
3/31/2020
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Wood Frame
|
3/31/2020
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/8/2020
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Excavation/Setback/Form/Re-Bar
|
4/10/2020
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Interior/Exterior Lathing
|
4/21/2020
|
Corrections Issued
|
DERRICK SPENCER
|
|
Light Gage Steel Frame
|
4/21/2020
|
Partial Approval
|
DERRICK SPENCER
|
|
Drywall Nailing
|
4/27/2020
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Interior/Exterior Lathing
|
4/27/2020
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Drywall Nailing
|
4/28/2020
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Special/Order Compliance
|
5/28/2020
|
Partial Inspection
|
JEFF BYTHEWAY
|
|
Light Gage Steel Frame
|
6/9/2020
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Special/Order Compliance
|
6/9/2020
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Final
|
6/10/2020
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Footing/Foundation/Slab
|
6/10/2020
|
Approved
|
JEFF BYTHEWAY
|
|
Green Building Final
|
6/10/2020
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
6/10/2020
|
Approved
|
JEFF BYTHEWAY
|
|
Reinforced Masonry Frame
|
6/10/2020
|
Approved
|
JEFF BYTHEWAY
|
|
SGSOV-Seismic Gas S/O Valve
|
6/10/2020
|
SGSOV Approved
|
JEFF BYTHEWAY
|
|
Smoke Detectors
|
6/10/2020
|
Approved
|
JEFF BYTHEWAY
|
|
Special/Order Compliance
|
6/10/2020
|
Approved
|
JEFF BYTHEWAY
|
|
Green Building Final
|
6/12/2020
|
Approved
|
JEFF BYTHEWAY
|
|
Final
|
6/30/2020
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Final
|
7/7/2020
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Final
|
7/15/2020
|
Partial Inspection
|
JEFF BYTHEWAY
|
|
Final
|
7/17/2020
|
Conditional Approval
|
JEFF BYTHEWAY
|
|
Pre-Inspection
|
7/29/2020
|
Partial Inspection
|
JEFF BYTHEWAY
|
|
Final
|
8/5/2020
|
OK for TCO
|
JEFF BYTHEWAY
|
|
Final
|
11/4/2020
|
OK to Issue CofO
|
JEFF BYTHEWAY
|
|
Special/Order Compliance
|
5/19/2021
|
Approved
|
NICK LAROCCA
|