321 S OXFORD AVE #1-38 90020

Certificate Information: 321 S OXFORD AVE #1-38 90020

Application / Permit
17010-10000-00358
Plan Check / Job No.
B17LA01425
Group
Building
Type
Bldg-New
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
NEW 6- STORY, 38 UNIT APARTMENT USING TOC TIER III; (5 STORY RESIDENTIAL UNITS OVER GROUND AND BASEMENT PARKING GARAGE)
Permit Issued
Issued on 2/3/2021
Issuing Office
Metro
Current Status
CofO Issued on 7/5/2024
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 1/31/2017 APPLICANT
Assigned to Plan Check Engineer 3/9/2017 SAM CHANG
Corrections Issued 4/5/2017 SAM CHANG
Quality Review Completed 4/7/2017 DAVID CHANG
Building Plans Picked Up 10/4/2017 APPLICANT
Disabled Access Plans Picked Up 10/4/2017 APPLICANT
Green Plans Picked Up 10/4/2017 APPLICANT
Applicant returned to address corrections 9/5/2019 SAM CHANG
Applicant returned to address corrections 11/5/2019 SAM CHANG
Applicant returned to address corrections 11/27/2019 SAM CHANG
Applicant returned to address corrections 7/23/2020 SAM CHANG
Plan Check Approved 1/6/2021 SAM CHANG
Issued 2/3/2021 APPLICANT
CofO in Progress 7/5/2024 DAVID BURKHEAD
CofO in Progress 7/5/2024 ADAM BURGESS
CofO Issued 7/5/2024 ADAM BURGESS
Permit Finaled 7/5/2024 ADAM BURGESS

Permit Application Clearance Information

Address approval Cleared 6/13/2018 ADRIAN SANCHEZ
Eng Process Fee Ord 176,300 Cleared 6/13/2018 ADRIAN SANCHEZ
Permit Cleared 10/1/2019 LINDA MARGARET
Green Code Cleared 10/2/2019 SAM CHANG
Density Bonus 12.22.A.31 Cleared 10/9/2019 JAMES MCCARTHY
Highway dedication Cleared 10/10/2019 LINDA MARGARET
Hydrant and Access approval Cleared 10/10/2019 JOHN CONNEALLY
Project located in CRA area Cleared 10/11/2019 JIM URQUHART
DAS Clearance Cleared 10/17/2019 OLLIE CARTER
Low Impact Development Cleared 10/24/2019 ORVAL HERNANDEZ-MARCI
Building over 3-story or 36-ft Cleared 11/5/2019 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 11/5/2019 CALOSHA APPROVED
Roof/Waste drainage to street Cleared 11/5/2019 CELINA MORENO
Driveway location Cleared 11/6/2019 EDUARDO HERMOSO
Internal circulation Cleared 11/6/2019 EDUARDO HERMOSO
Fire Marshall Fire Life Safety Cleared 11/7/2019 OSCAR SALGADO JR
Frnt yard landscape/Water mgmt Cleared 11/14/2019 NORALI MARTINEZ
Miscellaneous Cleared 11/14/2019 NORALI MARTINEZ
Miscellaneous Cleared 11/14/2019 NORALI MARTINEZ
Opn space landscape/Water mgmt Cleared 11/14/2019 NORALI MARTINEZ
Work Adjacent to Public Way Cleared 4/29/2020 CHIU TAM
Hold Cleared 5/11/2020 SAM CHANG
Sewer availability Cleared 10/7/2020 CELINA MORENO

Contact Information

Architect Kim,, Sunghoon; Lic. No.: C30089 3183 WILSHIRE BLVD. #196B9      LOS ANGELES, CA 90010
Contractor New Creation Engineering & Development Inc; Lic. No.: 939139-B 17811 CLARK AVENUE      BELLFLOWER, CA 90706
Engineer Hwang, Junho; Lic. No.: S5592 815 FAIRVIEW AVE #205      SOUTH PASADENA, CA 91030
Engineer Kim, Paul Sungkyo; Lic. No.: GE2066 21266 E SUNDANCE ST      WALNUT, CA 91789
Engineer Pukkanasut, Jirayus; Lic. No.: C73728 1000 S COAST DRIVE #A204      COSTA MESA, CA 92626

Inspector Information

DAVID BURKHEAD, (213) 482-7294 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 4/19/2021 Partial Inspection DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 5/4/2021 Partial Approval DANIEL MC AULIFFE
Piling/Pier/Caisson 5/5/2021 Partial Approval DANIEL MC AULIFFE
Deputy Grading 5/6/2021 Approved DANIEL MC AULIFFE
Footing/Foundation/Slab 5/6/2021 Partial Inspection DANIEL MC AULIFFE
Deputy Grading 5/7/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Grading 5/10/2021 Approved DANIEL MC AULIFFE
Special/Order Compliance 5/10/2021 Partial Approval DANIEL MC AULIFFE
Deputy Grading 5/11/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Grading 5/12/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Grading 5/13/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Grading 5/14/2021 Approved DANIEL MC AULIFFE
Deputy Grading 5/17/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Grading 5/18/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Grading 5/19/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Grading 5/20/2021 Conditional Approval DANIEL MC AULIFFE
Piling/Pier/Caisson 5/20/2021 Partial Approval DANIEL MC AULIFFE
Deputy Shotcrete 5/25/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Shotcrete 5/26/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Shotcrete 5/27/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 5/27/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Shotcrete 5/28/2021 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 5/28/2021 Approved DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 5/28/2021 Partial Approval DANIEL MC AULIFFE
Deputy Grading 6/2/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Grading 6/3/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Grading 6/4/2021 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 6/4/2021 Partial Approval NICK DANERI
Deputy Grading 6/7/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Grading 6/8/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Grading 6/9/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Grading 6/10/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Grading 6/11/2021 Approved DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 6/11/2021 Partial Inspection DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 6/18/2021 Partial Inspection RAFAEL ESPINOZA
Excavation/Setback/Form/Re-Bar 6/25/2021 Partial Inspection EDWIN GREGORYONA
Deputy Drilled-In Anchors 6/28/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 6/28/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 6/29/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 6/30/2021 Approved DANIEL MC AULIFFE
Footing/Foundation/Slab 6/30/2021 Partial Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 7/2/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 7/2/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 7/9/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 7/12/2021 Conditional Approval DANIEL MC AULIFFE
Green Building Rough 7/12/2021 Approved DANIEL MC AULIFFE
Reinforced Concrete Frame 7/12/2021 Partial Approval DANIEL MC AULIFFE
Verify Sprinkler Sign Off 7/12/2021 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 7/13/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 7/14/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 7/19/2021 Conditional Approval DANIEL MC AULIFFE
Footing/Foundation/Slab 7/20/2021 Partial Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 7/22/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Shotcrete 7/22/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 7/23/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Shotcrete 7/23/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 8/9/2021 Conditional Approval DANIEL MC AULIFFE
Footing/Foundation/Slab 8/10/2021 Partial Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 8/12/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 9/2/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 9/3/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 9/9/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 9/10/2021 Conditional Approval DANIEL MC AULIFFE
Reinforced Concrete Frame 9/13/2021 Partial Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 9/15/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 9/22/2021 Approved DANIEL MC AULIFFE
Reinforced Concrete Frame 9/22/2021 Partial Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 9/23/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 9/24/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 9/27/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 9/30/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 10/1/2021 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 10/4/2021 Conditional Approval DANIEL MC AULIFFE
Reinforced Concrete Frame 10/6/2021 Partial Inspection DANIEL MC AULIFFE
Deputy Reinf. Concrete 10/12/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 10/12/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 10/13/2021 Conditional Approval ERNESTO CORRAL
Deputy Shotcrete 10/13/2021 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 11/1/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 11/2/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 11/3/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 11/12/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 11/15/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 11/16/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 11/17/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 11/19/2021 Conditional Approval DANIEL MC AULIFFE
Reinforced Concrete Frame 11/19/2021 Partial Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 11/22/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 11/24/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 11/29/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Masonry 12/3/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Masonry 12/6/2021 Conditional Approval DANIEL MC AULIFFE
Light Gage Steel Frame 12/7/2021 Partial Approval DANIEL MC AULIFFE
Masonry Wall/Backfill 12/7/2021 Partial Approval DANIEL MC AULIFFE
Deputy Reinf. Masonry 12/8/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 12/9/2021 Conditional Approval DANIEL MC AULIFFE
Light Gage Steel Frame 12/10/2021 Partial Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 12/13/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 12/17/2021 Conditional Approval DANIEL MC AULIFFE
Wood Frame 1/7/2022 Partial Approval DAVID BURKHEAD
Deputy Steel/Welding 1/12/2022 Partial Approval DANIEL MC AULIFFE
Light Gage Steel Frame 1/12/2022 Partial Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 1/26/2022 Conditional Approval DANIEL MC AULIFFE
Wood Frame 1/31/2022 Partial Approval DANIEL MC AULIFFE
Light Gage Steel Frame 2/4/2022 Partial Approval DANIEL MC AULIFFE
Wood Frame 2/18/2022 Partial Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 2/23/2022 Conditional Approval DANIEL MC AULIFFE
Light Gage Steel Frame 2/23/2022 Partial Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 2/24/2022 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 2/25/2022 Approved DANIEL MC AULIFFE
Reinforced Concrete Frame 2/25/2022 Partial Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 2/28/2022 Approved DANIEL MC AULIFFE
Deputy Reinf. Masonry 3/1/2022 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Masonry 3/2/2022 Approved DANIEL MC AULIFFE
Footing/Foundation/Slab 3/2/2022 Partial Approval DANIEL MC AULIFFE
Deputy Reinf. Masonry 3/3/2022 Approved DANIEL MC AULIFFE
Reinforced Masonry Frame 3/3/2022 Partial Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 3/7/2022 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 3/8/2022 Approved DANIEL MC AULIFFE
Footing/Foundation/Slab 3/9/2022 Partial Approval DANIEL MC AULIFFE
Masonry Wall/Backfill 3/9/2022 Partial Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 3/10/2022 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Masonry 3/11/2022 Conditional Approval DANIEL MC AULIFFE
Wood Frame 3/11/2022 Partial Approval DANIEL MC AULIFFE
Deputy Reinf. Masonry 3/14/2022 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Masonry 3/15/2022 Conditional Approval DANIEL MC AULIFFE
Reinforced Concrete Frame 3/15/2022 Partial Approval DANIEL MC AULIFFE
Reinforced Masonry Frame 3/15/2022 Not Ready for Inspection DANIEL MC AULIFFE
Deputy Reinf. Masonry 3/16/2022 Approved DANIEL MC AULIFFE
Reinforced Masonry Frame 3/16/2022 Partial Approval DANIEL MC AULIFFE
Deputy Reinf. Masonry 3/17/2022 Conditional Approval DAVID BURKHEAD
Masonry Wall/Backfill 3/17/2022 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 3/18/2022 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 3/21/2022 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Masonry 3/22/2022 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Masonry 3/23/2022 Approved DANIEL MC AULIFFE
Footing/Foundation/Slab 3/23/2022 Not Ready for Inspection DANIEL MC AULIFFE
Deputy Reinf. Masonry 3/24/2022 Approved DANIEL MC AULIFFE
Reinforced Masonry Frame 3/24/2022 Partial Approval DANIEL MC AULIFFE
Deputy Reinf. Masonry 3/29/2022 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Masonry 3/30/2022 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Masonry 4/4/2022 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Masonry 4/5/2022 Approved DANIEL MC AULIFFE
Masonry Wall/Backfill 4/5/2022 Partial Approval DANIEL MC AULIFFE
Deputy Reinf. Masonry 4/6/2022 Approved DANIEL MC AULIFFE
Light Gage Steel Frame 4/7/2022 Partial Approval DANIEL MC AULIFFE
Special/Order Compliance 4/12/2022 Partial Inspection DANIEL MC AULIFFE
Deputy Steel/Welding 4/15/2022 Conditional Approval DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 5/2/2022 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 5/10/2022 Partial Approval EDWIN GREGORYONA
Wood Frame 5/10/2022 Partial Approval EDWIN GREGORYONA
Wood Frame 5/11/2022 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 5/13/2022 Conditional Approval TED RIES
Deputy Wood Construction 5/16/2022 Conditional Approval TED RIES
Drywall Nailing 5/16/2022 Partial Approval TED RIES
Wood Frame 5/19/2022 Partial Approval TED RIES
Insulation 5/23/2022 Not Ready for Inspection TED RIES
Wood Frame 5/23/2022 Partial Approval TED RIES
Insulation 5/24/2022 Partial Approval TED RIES
Wood Frame 5/26/2022 Partial Inspection TED RIES
Deputy Wood Construction 5/27/2022 Conditional Approval ERNESTO CORRAL
Insulation 5/31/2022 Partial Approval TED RIES
Wood Frame 5/31/2022 Partial Approval TED RIES
Wood Frame 6/1/2022 Partial Approval TED RIES
Wood Frame 6/6/2022 Partial Approval TED RIES
Deputy Wood Construction 6/7/2022 Conditional Approval ERNESTO CORRAL
Wood Frame 6/9/2022 Partial Approval NICK DANERI
Wood Frame 6/16/2022 Partial Approval TED RIES
Deputy Wood Construction 6/17/2022 Conditional Approval WINSTON DUNNING
Wood Frame 6/21/2022 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 6/22/2022 Conditional Approval ERNESTO CORRAL
Wood Frame 6/28/2022 Partial Approval DAVID BURKHEAD
Wood Frame 7/6/2022 Not Ready for Inspection DAVID BURKHEAD
Drywall Nailing 7/8/2022 Partial Approval DAVID BURKHEAD
Wood Frame 7/11/2022 Partial Approval DAVID BURKHEAD
Wood Frame 7/13/2022 Partial Approval TED RIES
Drywall Nailing 7/20/2022 Partial Approval TED RIES
Wood Frame 8/10/2022 Partial Approval GREGORY POMISH
Deputy Wood Construction 8/11/2022 Conditional Approval TED RIES
Wood Frame 8/11/2022 Conditional Approval TED RIES
Light Gage Steel Frame 8/15/2022 Partial Approval TED RIES
Light Gage Steel Frame 8/16/2022 Partial Approval TED RIES
Interior/Exterior Lathing 8/19/2022 Partial Approval TED RIES
Drywall Nailing 9/9/2022 Partial Approval GREGORY POMISH
Drywall Nailing 9/19/2022 Partial Approval TED RIES
Drywall Nailing 10/18/2022 Partial Approval TED RIES
Interior/Exterior Lathing 10/18/2022 Partial Approval TED RIES
Interior/Exterior Lathing 10/19/2022 Not Ready for Inspection TED RIES
Pre-Inspection 11/2/2022 Approved EDWIN GREGORYONA
Drywall Nailing 4/20/2023 Partial Approval TED RIES
Pre-Inspection 6/26/2023 Not Ready for Inspection DAVID BURKHEAD
Pre-Inspection 7/24/2023 Approved TED RIES
Final 11/20/2023 Not Ready for Inspection DAVID BURKHEAD
SGSOV-Seismic Gas S/O Valve 11/20/2023 SGSOV Not Ready DAVID BURKHEAD
Special/Order Compliance 11/27/2023 Corrections Issued DAVID BURKHEAD
Special/Order Compliance 2/23/2024 Partial Approval DAVID BURKHEAD
Final 3/5/2024 Partial Inspection DAVID BURKHEAD
Footing/Foundation/Slab 3/5/2024 Approved DAVID BURKHEAD
Green Building Final 3/5/2024 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 3/5/2024 Approved DAVID BURKHEAD
Reinforced Masonry Frame 3/5/2024 Approved DAVID BURKHEAD
SGSOV-Seismic Gas S/O Valve 3/5/2024 SGSOV Approved DAVID BURKHEAD
Smoke Detectors 3/5/2024 Approved DAVID BURKHEAD
Final 3/22/2024 Partial Inspection DAVID BURKHEAD
Green Building Final 3/22/2024 Not Ready for Inspection DAVID BURKHEAD
Special/Order Compliance 3/28/2024 Approved DAVID BURKHEAD
Green Building Final 4/5/2024 Approved DAVID BURKHEAD
Final 7/5/2024 OK to Issue CofO DAVID BURKHEAD