813 S FLOWER ST 90017

Certificate Information: 813 S FLOWER ST 90017

Application / Permit
16016-10000-25000
Plan Check / Job No.
B16LA16191
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
Commercial
Primary Use
(11) Hotel
Work Description
RENOVATION TO (E) 12 STORY HOTEL. RECONFIGURE FLOOR PLAN ON EACH FLOOR. CONVERT BASEMENT INTO BAR/OFFICE AREA AND ROOFTOP INTO ROOF DECK WITH BAR. STRUCTURAL RETROFIT TO COMPLY WITH NON-DUCTILE CONCRETE ORDINANCE 183693 DIVISION 95 FOR MANDATORY RETROFIT
Permit Issued
Issued on 9/8/2017
Issuing Office
Metro
Current Status
CofO Issued on 8/16/2021
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 10/18/2016 APPLICANT
Green Plans Picked Up 11/2/2016 APPLICANT
Assigned to Plan Check Engineer 11/9/2016 RICARDO SUPAN
Corrections Issued 11/29/2016 RICARDO SUPAN
Disabled Access Plans Picked Up 12/1/2016 APPLICANT
Quality Review Completed 12/2/2016 HOK CHI CHIU
Building Plans Picked Up 12/8/2016 APPLICANT
Applicant returned to address corrections 2/8/2017 RICARDO SUPAN
Applicant returned to address corrections 2/21/2017 RICARDO SUPAN
Applicant returned to address corrections 3/8/2017 RICARDO SUPAN
Applicant returned to address corrections 4/12/2017 RICARDO SUPAN
Plan Check Approved 9/6/2017 RICARDO SUPAN
Issued 9/8/2017 LADBS
TCO Issued (Expire Date: 08-03-2020) 2/5/2020 DAVID TSAU
TCO Issued (Expire Date: 04-11-2021) 10/13/2020 ERNESTO CORRAL
TCO Issued (Expire Date: 12-28-2021) 7/1/2021 ERNESTO CORRAL
CofO in Progress 8/10/2021 KATY RAMIREZ
CofO Issued 8/16/2021 ERNESTO CORRAL
Permit Finaled 8/16/2021 ERNESTO CORRAL

Permit Application Clearance Information

Eng Process Fee Ord 176,300 Cleared 2/9/2017 ADRIAN SANCHEZ
Sewer availability Cleared 2/9/2017 ADRIAN SANCHEZ
DAS Clearance Cleared 6/13/2017 WAI LAU
Green Code Cleared 6/13/2017 RICHARD DOCKUS
Low Impact Development Cleared 6/16/2017 AMMAR ELTAWIL
"D" conditions Cleared 7/14/2017 DANALYNN DOMINGUEZ
ZA Case Cleared 7/14/2017 DANALYNN DOMINGUEZ
ZI Cleared 7/25/2017 SANTOS SANCHEZ
Food Service Establishment Cleared 8/15/2017 RAMESHBHAIR PATEL
Metro Rail approval Cleared 8/17/2017 RICARDO SUPAN
Work Adjacent to Public Way Cleared 8/22/2017 HOK CHI CHIU
Demo/Removal of Rental Units Cleared 8/24/2017 MIGUEL BARCENAS
Housing rent stabilization Cleared 8/28/2017 DANIEL WILLIAMS
Residential hotels Cleared 8/29/2017 MARITES CUNANAN
ZA Case Cleared 8/29/2017 BOB DUENAS
Fire Marshall Fire Life Safety Cleared 9/5/2017 MENOA AGHAJANI
Excavation more than 5-ft deep Cleared 9/6/2017 CALOSHA APPROVED
Food establishment approval Cleared 9/6/2017 LACDHS APPROVED

Contact Information

Architect Rockefeller, Darrell S; Lic. No.: C14927 620 24TH PLACE      HERMOSA BEACH, CA 90254
Contractor Shangri - La Construction L P; Lic. No.: 926436-B 550 S HOPE ST STE 700      LOS ANGELES, CA 90071
Engineer Adams, Jelisa Thomas; Lic. No.: GE3092 86 HEDGE BLOOM      IRVINE, CA 92618
Engineer Berliner, Neal David; Lic. No.: GE2576 4913 MONUMENT ST      SIMI VALLEY, CA 93063
Engineer Curtis, David Jesse; Lic. No.: C75791 609 S GRAND AVENUE      LOS ANGELES, CA 90017
Engineer Derkalousdian, Hrair Harry; Lic. No.: C79694 441 PALM DR 3      GLENDALE, CA 91202
Engineer Funk, David Lyle; Lic. No.: S5421 619 BERYL ST      REDONDO BEACH, CA 90277
Engineer Schneider, Mary Katherine; Lic. No.: FP1730 1221 1ST AVE APT 1221      SEATTLE, WA 98101

Inspector Information

JEROME BLACKWOOD, (213) 213-5353 Office Hours: 7:00-8:00 AM MON-FRI
REGINA MENDEZ, (213) 213-5353 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 10/12/2017 Approved JOSE GAXIOLA
Deputy Drilled-In Anchors 10/20/2017 No Access for Inspection KATY RAMIREZ
Deputy Drilled-In Anchors 11/2/2017 Conditional Approval KATY RAMIREZ
Deputy Reinf. Concrete 11/2/2017 Conditional Approval KATY RAMIREZ
Deputy Reinf. Concrete 11/6/2017 Conditional Approval KATY RAMIREZ
Deputy Drilled-In Anchors 11/17/2017 Conditional Approval KATY RAMIREZ
Deputy Drilled-In Anchors 11/22/2017 Conditional Approval KATY RAMIREZ
Deputy Reinf. Concrete 11/22/2017 No Access for Inspection KATY RAMIREZ
Excavation/Setback/Form/Re-Bar 11/22/2017 Partial Approval KATY RAMIREZ
Excavation/Setback/Form/Re-Bar 11/27/2017 Partial Approval KATY RAMIREZ
Deputy Reinf. Concrete 11/30/2017 Conditional Approval KATY RAMIREZ
Excavation/Setback/Form/Re-Bar 12/5/2017 Partial Approval KATY RAMIREZ
Deputy Reinf. Concrete 12/6/2017 Conditional Approval KATY RAMIREZ
Deputy Drilled-In Anchors 12/11/2017 Conditional Approval JOSE GAXIOLA
Excavation/Setback/Form/Re-Bar 12/19/2017 Partial Approval KATY RAMIREZ
Deputy Reinf. Concrete 12/21/2017 Conditional Approval KATY RAMIREZ
Deputy Drilled-In Anchors 12/28/2017 Conditional Approval KATY RAMIREZ
Deputy Drilled-In Anchors 12/29/2017 Conditional Approval KATY RAMIREZ
Deputy Reinf. Concrete 1/18/2018 Conditional Approval KATY RAMIREZ
Deputy Drilled-In Anchors 1/25/2018 Conditional Approval KATY RAMIREZ
Excavation/Setback/Form/Re-Bar 2/5/2018 Partial Approval JOSE GAXIOLA
Deputy Reinf. Concrete 2/6/2018 Conditional Approval KATY RAMIREZ
Deputy Drilled-In Anchors 2/12/2018 Conditional Approval KATY RAMIREZ
Deputy Reinf. Concrete 2/12/2018 No Access for Inspection KATY RAMIREZ
Excavation/Setback/Form/Re-Bar 2/13/2018 Partial Approval KATY RAMIREZ
Footing/Foundation/Slab 2/13/2018 Conditional Approval KATY RAMIREZ
Deputy Reinf. Concrete 2/14/2018 Conditional Approval KATY RAMIREZ
Deputy Drilled-In Anchors 2/27/2018 Conditional Approval KATY RAMIREZ
Deputy Drilled-In Anchors 3/5/2018 Conditional Approval JOSE GAXIOLA
Deputy Drilled-In Anchors 3/9/2018 Conditional Approval JOSE GAXIOLA
Deputy Reinf. Concrete 3/14/2018 Conditional Approval KATY RAMIREZ
Excavation/Setback/Form/Re-Bar 3/14/2018 Partial Approval KATY RAMIREZ
Deputy Reinf. Concrete 3/15/2018 Conditional Approval KATY RAMIREZ
Deputy Reinf. Concrete 3/16/2018 Conditional Approval KATY RAMIREZ
Deputy Drilled-In Anchors 3/28/2018 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 3/29/2018 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 3/30/2018 Partial Approval JOSE GAXIOLA
Deputy Drilled-In Anchors 4/3/2018 Conditional Approval JOSE GAXIOLA
Deputy Reinf. Concrete 4/3/2018 Conditional Approval JOSE GAXIOLA
Deputy Reinf. Concrete 4/4/2018 Conditional Approval KATY RAMIREZ
Deputy Reinf. Concrete 4/5/2018 Conditional Approval KATY RAMIREZ
Deputy Drilled-In Anchors 4/10/2018 Conditional Approval KATY RAMIREZ
Excavation/Setback/Form/Re-Bar 4/10/2018 Partial Inspection KATY RAMIREZ
Deputy Reinf. Concrete 4/12/2018 Conditional Approval KATY RAMIREZ
Deputy Drilled-In Anchors 4/16/2018 Conditional Approval KATY RAMIREZ
Deputy Steel/Welding 4/16/2018 Conditional Approval KATY RAMIREZ
Deputy Reinf. Concrete 4/17/2018 Conditional Approval KATY RAMIREZ
Deputy Steel/Welding 4/18/2018 Conditional Approval KATY RAMIREZ
Deputy Drilled-In Anchors 4/19/2018 Conditional Approval KATY RAMIREZ
Deputy Steel/Welding 4/19/2018 Conditional Approval KATY RAMIREZ
Deputy Reinf. Concrete 4/20/2018 Conditional Approval KATY RAMIREZ
Deputy Drilled-In Anchors 4/24/2018 Conditional Approval KATY RAMIREZ
Deputy Reinf. Concrete 4/24/2018 Conditional Approval KATY RAMIREZ
Deputy Steel/Welding 4/25/2018 Conditional Approval KATY RAMIREZ
Deputy Steel/Welding 4/26/2018 Conditional Approval KATY RAMIREZ
Deputy Steel/Welding 4/30/2018 Conditional Approval KATY RAMIREZ
Deputy Drilled-In Anchors 5/1/2018 Conditional Approval KATY RAMIREZ
Deputy Steel/Welding 5/1/2018 Conditional Approval KATY RAMIREZ
Excavation/Setback/Form/Re-Bar 5/1/2018 Partial Inspection KATY RAMIREZ
Deputy Reinf. Concrete 5/2/2018 Conditional Approval KATY RAMIREZ
Excavation/Setback/Form/Re-Bar 5/2/2018 Not Ready for Inspection KATY RAMIREZ
Pre-Inspection 5/2/2018 Partial Approval JAMES POWERS
Footing/Foundation/Slab 5/3/2018 Partial Approval KATY RAMIREZ
Deputy Reinf. Concrete 5/4/2018 Conditional Approval KATY RAMIREZ
Deputy Shotcrete 5/4/2018 Conditional Approval KATY RAMIREZ
Deputy Steel/Welding 5/4/2018 Conditional Approval KATY RAMIREZ
Deputy Shotcrete 5/7/2018 Conditional Approval KATY RAMIREZ
Deputy Drilled-In Anchors 5/10/2018 Conditional Approval KATY RAMIREZ
Light Gage Steel Frame 5/10/2018 Partial Inspection KATY RAMIREZ
Deputy Drilled-In Anchors 5/16/2018 Conditional Approval KATY RAMIREZ
Deputy Reinf. Concrete 5/16/2018 Conditional Approval KATY RAMIREZ
Deputy Drilled-In Anchors 5/17/2018 Conditional Approval KATY RAMIREZ
Excavation/Setback/Form/Re-Bar 5/17/2018 Partial Approval KATY RAMIREZ
Deputy Shotcrete 5/18/2018 Conditional Approval KATY RAMIREZ
Deputy Steel/Welding 5/18/2018 Conditional Approval KATY RAMIREZ
Deputy Shotcrete 5/21/2018 Conditional Approval KATY RAMIREZ
Deputy Drilled-In Anchors 5/24/2018 Conditional Approval KATY RAMIREZ
Deputy Reinf. Concrete 5/24/2018 Conditional Approval KATY RAMIREZ
Deputy Steel/Welding 5/24/2018 Conditional Approval KATY RAMIREZ
Footing/Foundation/Slab 5/24/2018 Partial Inspection KATY RAMIREZ
Deputy Drilled-In Anchors 5/29/2018 Conditional Approval KATY RAMIREZ
Deputy Steel/Welding 5/29/2018 Conditional Approval KATY RAMIREZ
Deputy Drilled-In Anchors 5/30/2018 Conditional Approval KATY RAMIREZ
Deputy Steel/Welding 5/30/2018 Conditional Approval KATY RAMIREZ
Deputy Drilled-In Anchors 5/31/2018 Conditional Approval KATY RAMIREZ
Deputy Steel/Welding 5/31/2018 Conditional Approval KATY RAMIREZ
Deputy Drilled-In Anchors 6/1/2018 Conditional Approval JOSE GAXIOLA
Deputy Drilled-In Anchors 6/8/2018 Conditional Approval KATY RAMIREZ
Deputy Steel/Welding 6/8/2018 Conditional Approval KATY RAMIREZ
Deputy Drilled-In Anchors 6/11/2018 Conditional Approval KATY RAMIREZ
Deputy Steel/Welding 6/11/2018 Conditional Approval KATY RAMIREZ
Deputy Drilled-In Anchors 6/13/2018 Conditional Approval KATY RAMIREZ
Deputy Drilled-In Anchors 6/15/2018 Conditional Approval KATY RAMIREZ
Deputy Reinf. Concrete 6/15/2018 Conditional Approval KATY RAMIREZ
Deputy Drilled-In Anchors 6/19/2018 Conditional Approval KATY RAMIREZ
Deputy Steel/Welding 6/19/2018 Conditional Approval KATY RAMIREZ
Deputy Drilled-In Anchors 6/20/2018 Conditional Approval KATY RAMIREZ
Deputy Steel/Welding 6/20/2018 Conditional Approval KATY RAMIREZ
Deputy Drilled-In Anchors 6/21/2018 Conditional Approval KATY RAMIREZ
Deputy Steel/Welding 6/21/2018 Conditional Approval KATY RAMIREZ
Special/Order Compliance 6/27/2018 Corrections Issued KATY RAMIREZ
Deputy Shotcrete 6/28/2018 Conditional Approval NICK DANERI
Floor/Roof Diaphrgm/Shear Wall 6/28/2018 Partial Approval NICK DANERI
Deputy Drilled-In Anchors 6/29/2018 Conditional Approval KATY RAMIREZ
Deputy Shotcrete 6/29/2018 Conditional Approval KATY RAMIREZ
Deputy Drilled-In Anchors 7/5/2018 Conditional Approval KATY RAMIREZ
Deputy Steel/Welding 7/5/2018 Conditional Approval KATY RAMIREZ
Deputy Drilled-In Anchors 7/9/2018 Conditional Approval KATY RAMIREZ
Deputy Steel/Welding 7/9/2018 Conditional Approval KATY RAMIREZ
Deputy Drilled-In Anchors 7/11/2018 Conditional Approval KATY RAMIREZ
Deputy Reinf. Concrete 7/11/2018 Conditional Approval KATY RAMIREZ
Light Gage Steel Frame 7/11/2018 Partial Inspection KATY RAMIREZ
Deputy Steel/Welding 7/12/2018 Conditional Approval KATY RAMIREZ
Deputy Drilled-In Anchors 7/13/2018 Conditional Approval KATY RAMIREZ
Deputy Reinf. Concrete 7/13/2018 Conditional Approval KATY RAMIREZ
Deputy Shotcrete 7/13/2018 No Access for Inspection KATY RAMIREZ
Deputy Steel/Welding 7/13/2018 Conditional Approval KATY RAMIREZ
Excavation/Setback/Form/Re-Bar 7/13/2018 Partial Inspection KATY RAMIREZ
Deputy Steel/Welding 7/16/2018 Conditional Approval KATY RAMIREZ
Deputy Steel/Welding 7/17/2018 Conditional Approval KATY RAMIREZ
Light Gage Steel Frame 7/26/2018 Partial Approval NICK DANERI
Deputy Drilled-In Anchors 7/30/2018 Conditional Approval JOSE GAXIOLA
Deputy Shotcrete 7/30/2018 Conditional Approval JOSE GAXIOLA
Deputy Drilled-In Anchors 8/1/2018 Conditional Approval JOSE GAXIOLA
Deputy Reinf. Concrete 8/1/2018 Conditional Approval JOSE GAXIOLA
Deputy Steel/Welding 8/1/2018 Conditional Approval JOSE GAXIOLA
Footing/Foundation/Slab 8/2/2018 Partial Approval NICK DANERI
Footing/Foundation/Slab 8/4/2018 Off-Hour Fees Due
Deputy Drilled-In Anchors 8/8/2018 Conditional Approval JOSE GAXIOLA
Deputy Reinf. Concrete 8/8/2018 Conditional Approval JOSE GAXIOLA
Deputy Reinf. Concrete 8/8/2018 Conditional Approval NICK DANERI
Footing/Foundation/Slab 8/8/2018 Partial Approval NICK DANERI
Deputy Drilled-In Anchors 8/10/2018 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 8/10/2018 Conditional Approval NICK DANERI
Footing/Foundation/Slab 8/10/2018 Partial Approval NICK DANERI
Footing/Foundation/Slab 8/11/2018 Partial Approval NICK DANERI
Deputy Reinf. Concrete 8/13/2018 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 8/15/2018 Corrections Issued NICK DANERI
Deputy Shotcrete 8/15/2018 Conditional Approval NICK DANERI
Deputy Shotcrete 8/17/2018 Conditional Approval JONATHAN QUACH
Light Gage Steel Frame 8/20/2018 Partial Inspection KATY RAMIREZ
Deputy Drilled-In Anchors 8/22/2018 Conditional Approval KATY RAMIREZ
Deputy Reinf. Concrete 8/23/2018 No Access for Inspection KATY RAMIREZ
Excavation/Setback/Form/Re-Bar 8/23/2018 Partial Inspection KATY RAMIREZ
Light Gage Steel Frame 8/27/2018 Partial Inspection KATY RAMIREZ
Deputy Drilled-In Anchors 8/29/2018 Conditional Approval KATY RAMIREZ
Deputy Shotcrete 8/29/2018 Conditional Approval KATY RAMIREZ
Deputy Steel/Welding 8/29/2018 Conditional Approval KATY RAMIREZ
Deputy Drilled-In Anchors 8/30/2018 Conditional Approval KATY RAMIREZ
Deputy Shotcrete 8/30/2018 Conditional Approval KATY RAMIREZ
Drywall Nailing 8/30/2018 Not Ready for Inspection KATY RAMIREZ
Green Building Rough 8/30/2018 Partial Inspection KATY RAMIREZ
Light Gage Steel Frame 8/30/2018 Corrections Issued KATY RAMIREZ
Reinforced Concrete Frame 8/30/2018 Partial Inspection KATY RAMIREZ
Reinforced Masonry Frame 8/30/2018 Partial Inspection KATY RAMIREZ
Deputy Drilled-In Anchors 8/31/2018 Conditional Approval KATY RAMIREZ
Deputy Steel/Welding 8/31/2018 Conditional Approval KATY RAMIREZ
Deputy Drilled-In Anchors 9/5/2018 Conditional Approval KATY RAMIREZ
Light Gage Steel Frame 9/6/2018 Partial Approval KATY RAMIREZ
Deputy Steel/Welding 9/7/2018 Conditional Approval KATY RAMIREZ
Green Building Rough 9/10/2018 Partial Inspection KATY RAMIREZ
Light Gage Steel Frame 9/10/2018 Partial Approval KATY RAMIREZ
Reinforced Concrete Frame 9/10/2018 Partial Approval KATY RAMIREZ
Deputy Drilled-In Anchors 9/11/2018 Conditional Approval KATY RAMIREZ
Deputy Shotcrete 9/11/2018 Conditional Approval KATY RAMIREZ
Deputy Steel/Welding 9/11/2018 Conditional Approval KATY RAMIREZ
Deputy Steel/Welding 9/12/2018 Conditional Approval KATY RAMIREZ
Footing/Foundation/Slab 9/13/2018 Partial Inspection KATY RAMIREZ
Deputy Drilled-In Anchors 9/14/2018 Conditional Approval KATY RAMIREZ
Deputy Reinf. Concrete 9/14/2018 Conditional Approval KATY RAMIREZ
Deputy Drilled-In Anchors 9/17/2018 Conditional Approval KATY RAMIREZ
Deputy Shotcrete 9/17/2018 Conditional Approval KATY RAMIREZ
Green Building Rough 9/17/2018 Partial Inspection KATY RAMIREZ
Reinforced Concrete Frame 9/17/2018 Partial Inspection KATY RAMIREZ
Deputy Drilled-In Anchors 9/18/2018 Conditional Approval KATY RAMIREZ
Deputy Shotcrete 9/18/2018 Conditional Approval KATY RAMIREZ
Deputy Steel/Welding 9/18/2018 Conditional Approval KATY RAMIREZ
Deputy Drilled-In Anchors 9/20/2018 Conditional Approval KATY RAMIREZ
Deputy Reinf. Concrete 9/20/2018 Conditional Approval KATY RAMIREZ
Deputy Steel/Welding 9/21/2018 Conditional Approval KATY RAMIREZ
Green Building Rough 9/21/2018 Partial Inspection KATY RAMIREZ
Reinforced Concrete Frame 9/21/2018 Partial Inspection KATY RAMIREZ
Excavation/Setback/Form/Re-Bar 9/24/2018 Partial Approval NICK DANERI
Special/Order Compliance 9/24/2018 Partial Approval JOSE GAXIOLA
Deputy Drilled-In Anchors 9/26/2018 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 9/26/2018 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 9/26/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 9/26/2018 Conditional Approval NICK DANERI
Special/Order Compliance 9/26/2018 Partial Inspection JOSE GAXIOLA
Green Building Rough 9/27/2018 Not Ready for Inspection JOSE GAXIOLA
Reinforced Concrete Frame 9/27/2018 Partial Inspection JOSE GAXIOLA
Deputy Drilled-In Anchors 9/28/2018 Conditional Approval JOSE GAXIOLA
Deputy Reinf. Concrete 9/28/2018 Conditional Approval JOSE GAXIOLA
Deputy Steel/Welding 9/28/2018 Conditional Approval NICK DANERI
Light Gage Steel Frame 9/28/2018 Partial Approval NICK DANERI
Deputy Reinf. Concrete 10/1/2018 Conditional Approval NICK DANERI
Deputy Steel/Welding 10/2/2018 Conditional Approval KATY RAMIREZ
Light Gage Steel Frame 10/2/2018 Partial Inspection KATY RAMIREZ
Deputy Steel/Welding 10/5/2018 Conditional Approval KATY RAMIREZ
Deputy Steel/Welding 10/10/2018 Conditional Approval KATY RAMIREZ
Deputy Steel/Welding 10/11/2018 Conditional Approval KATY RAMIREZ
Green Building Rough 10/11/2018 Partial Inspection KATY RAMIREZ
Reinforced Concrete Frame 10/11/2018 Partial Approval KATY RAMIREZ
Light Gage Steel Frame 10/12/2018 Not Ready for Inspection KATY RAMIREZ
Structural Steel Frame 10/12/2018 Partial Inspection KATY RAMIREZ
Deputy Steel/Welding 10/16/2018 Conditional Approval KATY RAMIREZ
Drywall Nailing 10/16/2018 Not Ready for Inspection KATY RAMIREZ
Footing/Foundation/Slab 10/16/2018 Partial Approval KATY RAMIREZ
Green Building Rough 10/16/2018 Partial Approval KATY RAMIREZ
Deputy Drilled-In Anchors 10/17/2018 Conditional Approval KATY RAMIREZ
Deputy Reinf. Concrete 10/17/2018 Conditional Approval KATY RAMIREZ
Deputy Steel/Welding 10/17/2018 Conditional Approval KATY RAMIREZ
Deputy Steel/Welding 10/18/2018 Conditional Approval KATY RAMIREZ
Excavation/Setback/Form/Re-Bar 10/18/2018 Partial Inspection KATY RAMIREZ
Deputy Shotcrete 10/19/2018 Conditional Approval KATY RAMIREZ
Deputy Reinf. Concrete 10/23/2018 Conditional Approval KATY RAMIREZ
Deputy Steel/Welding 10/23/2018 Conditional Approval KATY RAMIREZ
Deputy Drilled-In Anchors 10/26/2018 Conditional Approval KATY RAMIREZ
Deputy Reinf. Concrete 10/26/2018 Conditional Approval KATY RAMIREZ
Green Building Rough 10/26/2018 Approved KATY RAMIREZ
Light Gage Steel Frame 10/26/2018 Corrections Issued KATY RAMIREZ
Reinforced Concrete Frame 10/26/2018 Not Ready for Inspection KATY RAMIREZ
Footing/Foundation/Slab 10/29/2018 Partial Approval KATY RAMIREZ
Deputy Reinf. Concrete 10/30/2018 Conditional Approval KATY RAMIREZ
Deputy Reinf. Concrete 10/31/2018 Conditional Approval KATY RAMIREZ
Deputy Shotcrete 10/31/2018 Conditional Approval KATY RAMIREZ
Light Gage Steel Frame 10/31/2018 Partial Inspection KATY RAMIREZ
Deputy Steel/Welding 11/2/2018 Conditional Approval KATY RAMIREZ
Insulation 11/2/2018 Partial Inspection KATY RAMIREZ
Reinforced Concrete Frame 11/2/2018 Partial Approval KATY RAMIREZ
Deputy Drilled-In Anchors 11/8/2018 Conditional Approval KATY RAMIREZ
Deputy Reinf. Concrete 11/8/2018 Conditional Approval KATY RAMIREZ
Light Gage Steel Frame 11/8/2018 No Access for Inspection KATY RAMIREZ
Reinforced Concrete Frame 11/8/2018 Partial Approval KATY RAMIREZ
Deputy Reinf. Concrete 11/9/2018 Conditional Approval KATY RAMIREZ
Deputy Shotcrete 11/9/2018 Conditional Approval KATY RAMIREZ
Deputy Reinf. Concrete 11/15/2018 Conditional Approval KATY RAMIREZ
Reinforced Concrete Frame 11/16/2018 Corrections Issued KATY RAMIREZ
Drywall Nailing 11/17/2018 Partial Approval KATY RAMIREZ
Deputy Reinf. Concrete 11/19/2018 Conditional Approval KATY RAMIREZ
Footing/Foundation/Slab 11/20/2018 Partial Approval KATY RAMIREZ
Insulation 11/20/2018 Partial Inspection KATY RAMIREZ
Light Gage Steel Frame 11/20/2018 Partial Approval KATY RAMIREZ
Deputy Reinf. Concrete 11/26/2018 Conditional Approval JEFFREY FULTON
Footing/Foundation/Slab 11/26/2018 Partial Inspection JEFFREY FULTON
Deputy Reinf. Concrete 11/27/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/28/2018 Conditional Approval NICK DANERI
Deputy Shotcrete 11/28/2018 Conditional Approval NICK DANERI
Deputy Drilled-In Anchors 11/30/2018 Conditional Approval KATY RAMIREZ
Deputy Reinf. Concrete 11/30/2018 Conditional Approval KATY RAMIREZ
Reinforced Concrete Frame 11/30/2018 Partial Approval KATY RAMIREZ
Structural Steel Frame 12/4/2018 Partial Approval KATY RAMIREZ
Deputy Reinf. Concrete 12/5/2018 Conditional Approval KATY RAMIREZ
Floor/Roof Diaphrgm/Shear Wall 12/5/2018 Partial Approval KATY RAMIREZ
Reinforced Concrete Frame 12/7/2018 Partial Approval KATY RAMIREZ
Light Gage Steel Frame 12/12/2018 Partial Approval KATY RAMIREZ
Reinforced Concrete Frame 12/12/2018 Partial Approval KATY RAMIREZ
Deputy Reinf. Concrete 12/14/2018 Conditional Approval KATY RAMIREZ
Deputy Shotcrete 12/14/2018 Conditional Approval KATY RAMIREZ
Light Gage Steel Frame 12/14/2018 Partial Approval KATY RAMIREZ
Deputy Shotcrete 12/17/2018 Conditional Approval KATY RAMIREZ
Reinforced Concrete Frame 12/17/2018 Partial Approval KATY RAMIREZ
Deputy Shotcrete 12/19/2018 Conditional Approval KATY RAMIREZ
Light Gage Steel Frame 12/21/2018 No Access for Inspection KATY RAMIREZ
Reinforced Concrete Frame 12/21/2018 Partial Approval KATY RAMIREZ
Light Gage Steel Frame 12/27/2018 No Access for Inspection KATY RAMIREZ
Reinforced Concrete Frame 12/27/2018 Partial Approval KATY RAMIREZ
Light Gage Steel Frame 1/2/2019 Partial Inspection KATY RAMIREZ
Deputy Reinf. Masonry 1/4/2019 Conditional Approval DANIEL COLLINS
Light Gage Steel Frame 1/4/2019 Not Ready for Inspection KATY RAMIREZ
Deputy Reinf. Concrete 1/7/2019 Conditional Approval KATY RAMIREZ
Deputy Shotcrete 1/7/2019 Conditional Approval KATY RAMIREZ
Light Gage Steel Frame 1/7/2019 Partial Approval KATY RAMIREZ
Reinforced Masonry Frame 1/7/2019 Partial Approval KATY RAMIREZ
Deputy Reinf. Concrete 1/8/2019 Conditional Approval DANIEL COLLINS
Deputy Reinf. Masonry 1/8/2019 Conditional Approval DANIEL COLLINS
Reinforced Concrete Frame 1/8/2019 Partial Approval KATY RAMIREZ
Deputy Reinf. Masonry 1/9/2019 Conditional Approval DANIEL COLLINS
Deputy Reinf. Masonry 1/10/2019 Conditional Approval KATY RAMIREZ
Floor/Roof Diaphrgm/Shear Wall 1/10/2019 Partial Approval KATY RAMIREZ
Deputy Reinf. Masonry 1/11/2019 Conditional Approval KATY RAMIREZ
Deputy Reinf. Concrete 1/15/2019 Conditional Approval DANIEL COLLINS
Reinforced Concrete Frame 1/15/2019 Partial Approval KATY RAMIREZ
Insulation 1/18/2019 Partial Approval KATY RAMIREZ
Light Gage Steel Frame 1/18/2019 Partial Approval KATY RAMIREZ
Deputy Drilled-In Anchors 1/22/2019 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 1/22/2019 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 1/22/2019 Conditional Approval DANIEL COLLINS
Reinforced Concrete Frame 1/22/2019 Conditional Approval KATY RAMIREZ
Deputy Steel/Welding 1/23/2019 Conditional Approval KATY RAMIREZ
Light Gage Steel Frame 1/24/2019 Partial Approval KATY RAMIREZ
Insulation 1/28/2019 Partial Inspection KATY RAMIREZ
Reinforced Concrete Frame 1/28/2019 Partial Approval KATY RAMIREZ
Deputy Reinf. Concrete 1/29/2019 Conditional Approval DANIEL COLLINS
Deputy Shotcrete 1/29/2019 Conditional Approval DANIEL COLLINS
Excavation/Setback/Form/Re-Bar 1/29/2019 Partial Approval KATY RAMIREZ
Light Gage Steel Frame 1/29/2019 Partial Approval KATY RAMIREZ
Deputy Reinf. Concrete 1/30/2019 Conditional Approval KATY RAMIREZ
Reinforced Concrete Frame 2/4/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/5/2019 Conditional Approval DANIEL COLLINS
Deputy Shotcrete 2/5/2019 Conditional Approval DANIEL COLLINS
Light Gage Steel Frame 2/6/2019 Partial Inspection KATY RAMIREZ
Reinforced Concrete Frame 2/6/2019 Partial Approval KATY RAMIREZ
Light Gage Steel Frame 2/11/2019 Not Ready for Inspection JAMES POWERS
Reinforced Concrete Frame 2/11/2019 Partial Approval JAMES POWERS
Light Gage Steel Frame 2/12/2019 Corrections Issued KATY RAMIREZ
Light Gage Steel Frame 2/14/2019 Corrections Issued KATY RAMIREZ
Deputy Drilled-In Anchors 2/15/2019 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 2/15/2019 Conditional Approval DANIEL COLLINS
Reinforced Concrete Frame 2/20/2019 Partial Approval KATY RAMIREZ
Deputy Reinf. Concrete 2/22/2019 Conditional Approval KATY RAMIREZ
Light Gage Steel Frame 2/22/2019 Partial Approval KATY RAMIREZ
Deputy Reinf. Concrete 2/25/2019 Conditional Approval DANIEL COLLINS
Drywall Nailing 3/1/2019 Partial Approval KATY RAMIREZ
Light Gage Steel Frame 3/1/2019 Partial Approval KATY RAMIREZ
Light Gage Steel Frame 3/7/2019 Partial Approval KATY RAMIREZ
Reinforced Concrete Frame 3/7/2019 Partial Approval KATY RAMIREZ
Deputy Reinf. Concrete 3/8/2019 Conditional Approval DANIEL COLLINS
Deputy Shotcrete 3/8/2019 Conditional Approval DANIEL COLLINS
Light Gage Steel Frame 3/18/2019 Partial Approval DANIEL COLLINS
Light Gage Steel Frame 3/19/2019 Corrections Issued KATY RAMIREZ
Drywall Nailing 3/21/2019 Partial Inspection KATY RAMIREZ
Interior/Exterior Lathing 3/27/2019 Approved KATY RAMIREZ
Light Gage Steel Frame 4/4/2019 Partial Inspection KATY RAMIREZ
Light Gage Steel Frame 4/10/2019 Partial Approval KATY RAMIREZ
Light Gage Steel Frame 4/15/2019 Partial Approval KATY RAMIREZ
Light Gage Steel Frame 4/19/2019 Corrections Issued KATY RAMIREZ
Light Gage Steel Frame 4/23/2019 Partial Approval KATY RAMIREZ
Light Gage Steel Frame 4/26/2019 Corrections Issued KATY RAMIREZ
Light Gage Steel Frame 5/6/2019 Partial Approval KATY RAMIREZ
Light Gage Steel Frame 5/14/2019 Partial Approval TED RIES
Light Gage Steel Frame 5/17/2019 Partial Inspection KATY RAMIREZ
Light Gage Steel Frame 5/22/2019 Partial Approval KATY RAMIREZ
Light Gage Steel Frame 6/4/2019 Conditional Approval DANIEL COLLINS
Masonry Wall/Backfill 6/4/2019 Partial Approval DANIEL COLLINS
Light Gage Steel Frame 6/6/2019 Partial Approval DANIEL COLLINS
Light Gage Steel Frame 6/11/2019 Conditional Approval DANIEL COLLINS
Drywall Nailing 6/28/2019 Partial Approval KATY RAMIREZ
Light Gage Steel Frame 6/28/2019 Partial Approval KATY RAMIREZ
Interior/Exterior Lathing 7/15/2019 Partial Approval KATY RAMIREZ
T-Bar Ceiling 7/15/2019 Not Ready for Inspection KATY RAMIREZ
Light Gage Steel Frame 7/17/2019 Partial Inspection KATY RAMIREZ
Light Gage Steel Frame 7/23/2019 Conditional Approval DANIEL COLLINS
T-Bar Ceiling 7/30/2019 Conditional Approval DANIEL COLLINS
T-Bar Ceiling 8/30/2019 Partial Approval DANIEL COLLINS
Special/Order Compliance 9/17/2019 Not Ready for Inspection KATY RAMIREZ
Special/Order Compliance 9/30/2019 Partial Inspection KATY RAMIREZ
Special/Order Compliance 10/21/2019 Not Ready for Inspection KATY RAMIREZ
Insulation 10/22/2019 Partial Approval KATY RAMIREZ
Drywall Nailing 12/4/2019 Not Ready for Inspection KATY RAMIREZ
Final 12/4/2019 Not Ready for Inspection KATY RAMIREZ
Green Building Final 12/4/2019 Not Ready for Inspection KATY RAMIREZ
Reinforced Concrete Frame 12/4/2019 Not Ready for Inspection KATY RAMIREZ
SGSOV-Seismic Gas S/O Valve 12/4/2019 SGSOV Not Ready KATY RAMIREZ
Smoke Detectors 12/4/2019 Not Ready for Inspection KATY RAMIREZ
Final 12/5/2019 Corrections Issued KATY RAMIREZ
Special/Order Compliance 12/6/2019 Partial Inspection KATY RAMIREZ
Special/Order Compliance 12/11/2019 Not Ready for Inspection KATY RAMIREZ
Special/Order Compliance 1/15/2020 Partial Inspection KATY RAMIREZ
Special/Order Compliance 1/23/2020 Partial Inspection KATY RAMIREZ
Special/Order Compliance 2/3/2020 Partial Inspection KATY RAMIREZ
Special/Order Compliance 7/14/2020 Not Ready for Inspection KATY RAMIREZ
Pre-Inspection 8/26/2020 Approved KATY RAMIREZ
Special/Order Compliance 10/27/2020 Partial Approval KATY RAMIREZ
Special/Order Compliance 3/17/2021 Conditional Approval NICK DANERI
Drywall Nailing 4/19/2021 Approved KATY RAMIREZ
Final 4/19/2021 Not Ready for Inspection KATY RAMIREZ
Green Building Final 4/19/2021 Approved KATY RAMIREZ
Reinforced Concrete Frame 4/19/2021 Not Ready for Inspection KATY RAMIREZ
SGSOV-Seismic Gas S/O Valve 4/19/2021 SGSOV Not Ready KATY RAMIREZ
Smoke Detectors 4/19/2021 Not Ready for Inspection KATY RAMIREZ
Special/Order Compliance 6/11/2021 Not Ready for Inspection KATY RAMIREZ
Special/Order Compliance 7/29/2021 Not Ready for Inspection KATY RAMIREZ
Final 8/10/2021 OK to Issue CofO KATY RAMIREZ
Reinforced Concrete Frame 8/10/2021 Approved KATY RAMIREZ
SGSOV-Seismic Gas S/O Valve 8/10/2021 SGSOV Approved KATY RAMIREZ
Smoke Detectors 8/10/2021 Approved KATY RAMIREZ