Excavation/Setback/Form/Re-Bar
|
3/27/2019
|
Partial Inspection
|
NICK DANERI
|
|
Reinforced Concrete Frame
|
3/27/2019
|
Partial Approval
|
KATY RAMIREZ
|
|
Deputy Drilled-In Anchors
|
4/18/2019
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Drilled-In Anchors
|
4/23/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
4/26/2019
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Drilled-In Anchors
|
5/14/2019
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Reinf. Concrete
|
5/16/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Footing/Foundation/Slab
|
5/16/2019
|
Partial Approval
|
KATY RAMIREZ
|
|
METHANE-Barrier
|
5/16/2019
|
Partial Inspection
|
KATY RAMIREZ
|
|
METHANE-Subgrade
|
5/16/2019
|
Partial Inspection
|
KATY RAMIREZ
|
|
Deputy Reinf. Concrete
|
5/17/2019
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Drilled-In Anchors
|
5/22/2019
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Drilled-In Anchors
|
5/29/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Reinf. Concrete
|
5/29/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
5/31/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Footing/Foundation/Slab
|
5/31/2019
|
Partial Approval
|
DANIEL COLLINS
|
|
METHANE-Barrier
|
5/31/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
METHANE-Subgrade
|
5/31/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Reinforced Concrete Frame
|
6/12/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
6/18/2019
|
Conditional Approval
|
HAMID PISHEHVAR
|
|
Deputy Reinf. Concrete
|
6/20/2019
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Reinf. Concrete
|
6/25/2019
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Reinf. Concrete
|
6/26/2019
|
Conditional Approval
|
KATY RAMIREZ
|
|
Footing/Foundation/Slab
|
6/26/2019
|
Partial Approval
|
JAMES POWERS
|
|
METHANE-Barrier
|
6/26/2019
|
Not Ready for Inspection
|
KATY RAMIREZ
|
|
METHANE-Subgrade
|
6/26/2019
|
Not Ready for Inspection
|
KATY RAMIREZ
|
|
Deputy Reinf. Concrete
|
6/27/2019
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Reinf. Concrete
|
6/28/2019
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Reinf. Concrete
|
7/1/2019
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Reinf. Concrete
|
7/22/2019
|
Partial Approval
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
7/22/2019
|
Partial Approval
|
JAMES POWERS
|
|
METHANE-Barrier
|
7/22/2019
|
Not Ready for Inspection
|
JAMES POWERS
|
|
METHANE-Subgrade
|
7/22/2019
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
7/23/2019
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
7/29/2019
|
Partial Approval
|
HAMID PISHEHVAR
|
|
Deputy Reinf. Concrete
|
8/1/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Shotcrete
|
8/1/2019
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
8/1/2019
|
Partial Approval
|
HAMID PISHEHVAR
|
|
Deputy Reinf. Concrete
|
8/2/2019
|
Conditional Approval
|
DAVID TSAU
|
|
Reinforced Concrete Frame
|
8/2/2019
|
Partial Approval
|
HAMID PISHEHVAR
|
|
Deputy Shotcrete
|
8/27/2019
|
Approved
|
JOEY BUCHANAN
|
|
Reinforced Concrete Frame
|
8/27/2019
|
Not Ready for Inspection
|
JOEY BUCHANAN
|
|
Deputy Shotcrete
|
8/28/2019
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
8/28/2019
|
Off-Hour Fees Due
|
|
|
Reinforced Concrete Frame
|
8/28/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
8/29/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Shotcrete
|
8/29/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Shotcrete
|
8/30/2019
|
Conditional Approval
|
DANIEL MC AULIFFE
|
|
Reinforced Concrete Frame
|
8/30/2019
|
Not Ready for Inspection
|
DANIEL MC AULIFFE
|
|
Deputy Shotcrete
|
9/3/2019
|
Conditional Approval
|
KATY RAMIREZ
|
|
Reinforced Concrete Frame
|
9/3/2019
|
Partial Approval
|
KATY RAMIREZ
|
|
Deputy Reinf. Concrete
|
9/4/2019
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Reinf. Concrete
|
9/20/2019
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Steel/Welding
|
9/20/2019
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Reinf. Concrete
|
9/23/2019
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Steel/Welding
|
9/23/2019
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Reinf. Concrete
|
9/24/2019
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Steel/Welding
|
9/24/2019
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Reinf. Concrete
|
9/25/2019
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Steel/Welding
|
9/25/2019
|
Conditional Approval
|
KATY RAMIREZ
|
|
Floor/Roof Diaphrgm/Shear Wall
|
9/25/2019
|
Partial Approval
|
KATY RAMIREZ
|
|
Footing/Foundation/Slab
|
9/25/2019
|
Partial Approval
|
KATY RAMIREZ
|
|
METHANE-Barrier
|
9/25/2019
|
Not Ready for Inspection
|
KATY RAMIREZ
|
|
METHANE-Subgrade
|
9/25/2019
|
Partial Inspection
|
KATY RAMIREZ
|
|
Deputy Reinf. Concrete
|
9/26/2019
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Steel/Welding
|
9/26/2019
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Shotcrete
|
9/27/2019
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Reinf. Concrete
|
9/30/2019
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Shotcrete
|
9/30/2019
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Steel/Welding
|
9/30/2019
|
Conditional Approval
|
KATY RAMIREZ
|
|
Footing/Foundation/Slab
|
10/3/2019
|
Not Ready for Inspection
|
KATY RAMIREZ
|
|
METHANE-Barrier
|
10/3/2019
|
Not Ready for Inspection
|
KATY RAMIREZ
|
|
METHANE-Subgrade
|
10/3/2019
|
Not Ready for Inspection
|
KATY RAMIREZ
|
|
Deputy Reinf. Concrete
|
10/4/2019
|
No Access for Inspection
|
KATY RAMIREZ
|
|
Deputy Steel/Welding
|
10/7/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Footing/Foundation/Slab
|
10/9/2019
|
Partial Approval
|
JAMES POWERS
|
|
METHANE-Barrier
|
10/9/2019
|
Partial Approval
|
JONATHAN QUACH
|
|
METHANE-Subgrade
|
10/9/2019
|
Partial Approval
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
10/11/2019
|
Partial Approval
|
JAMES POWERS
|
|
METHANE-Subgrade
|
10/11/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
10/16/2019
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Shotcrete
|
10/18/2019
|
No Access for Inspection
|
KATY RAMIREZ
|
|
Deputy Steel/Welding
|
10/18/2019
|
Conditional Approval
|
KATY RAMIREZ
|
|
Reinforced Concrete Frame
|
10/18/2019
|
Partial Inspection
|
KATY RAMIREZ
|
|
Deputy Shotcrete
|
10/22/2019
|
No Access for Inspection
|
KATY RAMIREZ
|
|
Deputy Steel/Welding
|
10/22/2019
|
Conditional Approval
|
KATY RAMIREZ
|
|
Reinforced Concrete Frame
|
10/22/2019
|
Not Ready for Inspection
|
KATY RAMIREZ
|
|
Structural Steel Frame
|
10/22/2019
|
Partial Approval
|
KATY RAMIREZ
|
|
Deputy Reinf. Concrete
|
10/23/2019
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Shotcrete
|
10/23/2019
|
Conditional Approval
|
KATY RAMIREZ
|
|
Floor/Roof Diaphrgm/Shear Wall
|
10/24/2019
|
Partial Approval
|
KATY RAMIREZ
|
|
Deputy Reinf. Concrete
|
10/30/2019
|
Conditional Approval
|
KATY RAMIREZ
|
|
Floor/Roof Diaphrgm/Shear Wall
|
10/30/2019
|
Partial Inspection
|
KATY RAMIREZ
|
|
Structural Steel Frame
|
10/30/2019
|
Partial Approval
|
KATY RAMIREZ
|
|
Deputy Reinf. Concrete
|
10/31/2019
|
Conditional Approval
|
KATY RAMIREZ
|
|
Excavation/Setback/Form/Re-Bar
|
11/7/2019
|
Partial Approval
|
KATY RAMIREZ
|
|
Reinforced Concrete Frame
|
11/7/2019
|
Partial Inspection
|
KATY RAMIREZ
|
|
Excavation/Setback/Form/Re-Bar
|
11/8/2019
|
Partial Approval
|
KATY RAMIREZ
|
|
Reinforced Concrete Frame
|
11/8/2019
|
Partial Inspection
|
KATY RAMIREZ
|
|
Deputy Reinf. Concrete
|
11/13/2019
|
Conditional Approval
|
KATY RAMIREZ
|
|
Excavation/Setback/Form/Re-Bar
|
11/13/2019
|
Not Ready for Inspection
|
KATY RAMIREZ
|
|
Footing/Foundation/Slab
|
11/15/2019
|
Partial Approval
|
KATY RAMIREZ
|
|
METHANE-Barrier
|
11/15/2019
|
Not Ready for Inspection
|
KATY RAMIREZ
|
|
METHANE-Subgrade
|
11/15/2019
|
Not Ready for Inspection
|
KATY RAMIREZ
|
|
Deputy Reinf. Concrete
|
11/19/2019
|
Conditional Approval
|
RONALD PACHECO
|
|
Deputy Shotcrete
|
11/19/2019
|
Conditional Approval
|
RONALD PACHECO
|
|
Deputy Steel/Welding
|
11/19/2019
|
Conditional Approval
|
RONALD PACHECO
|
|
Reinforced Concrete Frame
|
11/19/2019
|
Partial Approval
|
RONALD PACHECO
|
|
Reinforced Concrete Frame
|
11/21/2019
|
Not Ready for Inspection
|
KATY RAMIREZ
|
|
Structural Steel Frame
|
11/21/2019
|
Not Ready for Inspection
|
KATY RAMIREZ
|
|
Deputy Reinf. Concrete
|
11/22/2019
|
Conditional Approval
|
KATY RAMIREZ
|
|
Reinforced Concrete Frame
|
11/22/2019
|
Partial Inspection
|
KATY RAMIREZ
|
|
Deputy Reinf. Concrete
|
11/26/2019
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Reinf. Masonry
|
11/26/2019
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Shotcrete
|
11/26/2019
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Steel/Welding
|
11/26/2019
|
Conditional Approval
|
KATY RAMIREZ
|
|
Masonry Wall/Backfill
|
11/26/2019
|
Partial Approval
|
KATY RAMIREZ
|
|
Reinforced Concrete Frame
|
11/26/2019
|
Partial Approval
|
KATY RAMIREZ
|
|
Deputy Reinf. Concrete
|
11/27/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Reinf. Concrete
|
11/27/2019
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Reinf. Masonry
|
11/27/2019
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Shotcrete
|
11/27/2019
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Steel/Welding
|
11/27/2019
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Reinf. Concrete
|
12/4/2019
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Shotcrete
|
12/4/2019
|
No Access for Inspection
|
KATY RAMIREZ
|
|
Reinforced Concrete Frame
|
12/5/2019
|
Partial Approval
|
KATY RAMIREZ
|
|
Deputy Reinf. Concrete
|
12/6/2019
|
Conditional Approval
|
KATY RAMIREZ
|
|
Reinforced Concrete Frame
|
12/9/2019
|
Partial Approval
|
KATY RAMIREZ
|
|
Deputy Reinf. Concrete
|
12/12/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Masonry Wall/Backfill
|
12/12/2019
|
Partial Approval
|
KATY RAMIREZ
|
|
Reinforced Concrete Frame
|
12/12/2019
|
Partial Approval
|
KATY RAMIREZ
|
|
Masonry Wall/Backfill
|
12/16/2019
|
Partial Approval
|
RONALD PACHECO
|
|
Deputy Shotcrete
|
12/20/2019
|
Conditional Approval
|
KATY RAMIREZ
|
|
Reinforced Concrete Frame
|
12/20/2019
|
Partial Approval
|
KATY RAMIREZ
|
|
Footing/Foundation/Slab
|
1/7/2020
|
Partial Approval
|
KATY RAMIREZ
|
|
METHANE-Barrier
|
1/7/2020
|
Not Ready for Inspection
|
KATY RAMIREZ
|
|
METHANE-Subgrade
|
1/7/2020
|
Partial Inspection
|
KATY RAMIREZ
|
|
Reinforced Concrete Frame
|
1/15/2020
|
Partial Approval
|
DANIEL VARNUM
|
|
Deputy Reinf. Concrete
|
1/16/2020
|
Conditional Approval
|
KATY RAMIREZ
|
|
Light Gage Steel Frame
|
1/22/2020
|
Partial Approval
|
KATY RAMIREZ
|
|
Reinforced Concrete Frame
|
1/22/2020
|
Not Ready for Inspection
|
KATY RAMIREZ
|
|
Light Gage Steel Frame
|
1/29/2020
|
Partial Inspection
|
KATY RAMIREZ
|
|
Light Gage Steel Frame
|
2/5/2020
|
Partial Inspection
|
KATY RAMIREZ
|
|
Reinforced Concrete Frame
|
2/5/2020
|
Partial Approval
|
KATY RAMIREZ
|
|
Light Gage Steel Frame
|
2/12/2020
|
Partial Inspection
|
KATY RAMIREZ
|
|
Light Gage Steel Frame
|
2/20/2020
|
Not Ready for Inspection
|
KATY RAMIREZ
|
|
Reinforced Concrete Frame
|
2/20/2020
|
Partial Inspection
|
KATY RAMIREZ
|
|
Deputy Drilled-In Anchors
|
2/21/2020
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Reinf. Concrete
|
2/21/2020
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Steel/Welding
|
2/21/2020
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Drilled-In Anchors
|
2/24/2020
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Reinf. Concrete
|
2/24/2020
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Steel/Welding
|
2/24/2020
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Drilled-In Anchors
|
2/25/2020
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Reinf. Concrete
|
2/25/2020
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Steel/Welding
|
2/25/2020
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Drilled-In Anchors
|
2/26/2020
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Reinf. Concrete
|
2/26/2020
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Steel/Welding
|
2/26/2020
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Drilled-In Anchors
|
2/27/2020
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Reinf. Concrete
|
2/27/2020
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Steel/Welding
|
2/27/2020
|
Conditional Approval
|
KATY RAMIREZ
|
|
Footing/Foundation/Slab
|
2/27/2020
|
Corrections Issued
|
KATY RAMIREZ
|
|
Light Gage Steel Frame
|
2/27/2020
|
Not Ready for Inspection
|
KATY RAMIREZ
|
|
Deputy Methane Barrier
|
2/28/2020
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Other (see comments)
|
2/28/2020
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Methane Barrier
|
3/2/2020
|
Conditional Approval
|
JONATHAN QUACH
|
|
Deputy Other (see comments)
|
3/2/2020
|
Conditional Approval
|
JONATHAN QUACH
|
|
Deputy Methane Barrier
|
3/3/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Methane Barrier
|
3/4/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Drywall Nailing
|
3/4/2020
|
Partial Approval
|
DANIEL COLLINS
|
|
Light Gage Steel Frame
|
3/4/2020
|
Partial Approval
|
DANIEL COLLINS
|
|
Deputy Methane Barrier
|
3/5/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Methane Barrier
|
3/6/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Footing/Foundation/Slab
|
3/6/2020
|
Partial Approval
|
DANIEL COLLINS
|
|
METHANE-Barrier
|
3/6/2020
|
Approved
|
DANIEL COLLINS
|
|
METHANE-Subgrade
|
3/6/2020
|
Approved
|
DANIEL COLLINS
|
|
Light Gage Steel Frame
|
3/16/2020
|
Partial Approval
|
KATY RAMIREZ
|
|
Interior/Exterior Lathing
|
3/31/2020
|
Partial Approval
|
DANIEL COLLINS
|
|
Light Gage Steel Frame
|
3/31/2020
|
Partial Approval
|
DANIEL COLLINS
|
|
Light Gage Steel Frame
|
4/16/2020
|
Partial Approval
|
KATY RAMIREZ
|
|
Deputy Reinf. Concrete
|
4/20/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Footing/Foundation/Slab
|
4/20/2020
|
Not Ready for Inspection
|
KATY RAMIREZ
|
|
Special/Order Compliance
|
4/20/2020
|
Partial Approval
|
KATY RAMIREZ
|
|
Deputy Reinf. Concrete
|
4/23/2020
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Steel/Welding
|
4/23/2020
|
Conditional Approval
|
KATY RAMIREZ
|
|
Drywall Nailing
|
4/23/2020
|
Partial Approval
|
KATY RAMIREZ
|
|
Insulation
|
4/23/2020
|
Partial Approval
|
KATY RAMIREZ
|
|
Drywall Nailing
|
4/28/2020
|
Partial Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
5/6/2020
|
Conditional Approval
|
JONATHAN QUACH
|
|
Deputy Steel/Welding
|
5/7/2020
|
Conditional Approval
|
JONATHAN QUACH
|
|
Drywall Nailing
|
5/7/2020
|
Partial Approval
|
JONATHAN QUACH
|
|
Light Gage Steel Frame
|
5/7/2020
|
Partial Approval
|
JONATHAN QUACH
|
|
Light Gage Steel Frame
|
5/14/2020
|
Partial Approval
|
KATY RAMIREZ
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/22/2020
|
Not Ready for Inspection
|
KATY RAMIREZ
|
|
Light Gage Steel Frame
|
5/22/2020
|
Partial Inspection
|
KATY RAMIREZ
|
|
Light Gage Steel Frame
|
6/4/2020
|
Partial Approval
|
DANIEL COLLINS
|
|
Light Gage Steel Frame
|
6/11/2020
|
Partial Approval
|
KATY RAMIREZ
|
|
Light Gage Steel Frame
|
6/17/2020
|
Partial Approval
|
KATY RAMIREZ
|
|
Special/Order Compliance
|
7/21/2020
|
Approved
|
KATY RAMIREZ
|
|
Final
|
8/5/2020
|
Partial Inspection
|
KATY RAMIREZ
|
|
Footing/Foundation/Slab
|
8/5/2020
|
Not Ready for Inspection
|
KATY RAMIREZ
|
|
Green Building Final
|
8/5/2020
|
Not Ready for Inspection
|
KATY RAMIREZ
|
|
Green Building Rough
|
8/5/2020
|
Approved
|
KATY RAMIREZ
|
|
METHANE-Final
|
8/5/2020
|
Not Ready for Inspection
|
KATY RAMIREZ
|
|
METHANE-Rough
|
8/5/2020
|
Approved
|
KATY RAMIREZ
|
|
Reinforced Masonry Frame
|
8/5/2020
|
Not Ready for Inspection
|
KATY RAMIREZ
|
|
SGSOV-Seismic Gas S/O Valve
|
8/5/2020
|
SGSOV Not Ready
|
KATY RAMIREZ
|
|
Smoke Detectors
|
8/5/2020
|
Not Ready for Inspection
|
KATY RAMIREZ
|
|
Final
|
8/21/2020
|
Not Ready for Inspection
|
KATY RAMIREZ
|
|
Footing/Foundation/Slab
|
8/21/2020
|
Not Ready for Inspection
|
KATY RAMIREZ
|
|
Green Building Final
|
8/21/2020
|
Not Ready for Inspection
|
KATY RAMIREZ
|
|
METHANE-Final
|
8/21/2020
|
Not Ready for Inspection
|
KATY RAMIREZ
|
|
METHANE-Rough
|
8/21/2020
|
Approved
|
KATY RAMIREZ
|
|
Reinforced Masonry Frame
|
8/21/2020
|
Not Ready for Inspection
|
KATY RAMIREZ
|
|
SGSOV-Seismic Gas S/O Valve
|
8/21/2020
|
SGSOV Not Ready
|
KATY RAMIREZ
|
|
Smoke Detectors
|
8/21/2020
|
Not Ready for Inspection
|
KATY RAMIREZ
|
|
Pre-Inspection
|
9/21/2020
|
Not Ready for Inspection
|
KATY RAMIREZ
|
|
Pre-Inspection
|
9/22/2020
|
No Access for Inspection
|
KATY RAMIREZ
|
|
Pre-Inspection
|
9/23/2020
|
Not Ready for Inspection
|
KATY RAMIREZ
|
|
Final
|
9/25/2020
|
Not Ready for Inspection
|
KATY RAMIREZ
|
|
Footing/Foundation/Slab
|
9/25/2020
|
Not Ready for Inspection
|
KATY RAMIREZ
|
|
Green Building Final
|
9/25/2020
|
Not Ready for Inspection
|
KATY RAMIREZ
|
|
METHANE-Final
|
9/25/2020
|
Approved
|
KATY RAMIREZ
|
|
METHANE-Rough
|
9/25/2020
|
Approved
|
KATY RAMIREZ
|
|
Pre-Inspection
|
9/25/2020
|
Approved
|
KATY RAMIREZ
|
|
Reinforced Masonry Frame
|
9/25/2020
|
Not Ready for Inspection
|
KATY RAMIREZ
|
|
SGSOV-Seismic Gas S/O Valve
|
9/25/2020
|
SGSOV Not Ready
|
KATY RAMIREZ
|
|
Smoke Detectors
|
9/25/2020
|
Not Ready for Inspection
|
KATY RAMIREZ
|
|
Pre-Inspection
|
9/28/2020
|
Partial Inspection
|
KATY RAMIREZ
|
|
Pre-Inspection
|
9/29/2020
|
Approved
|
KATY RAMIREZ
|
|
Pre-Inspection
|
10/1/2020
|
Partial Inspection
|
KATY RAMIREZ
|
|
Special/Order Compliance
|
11/16/2020
|
Approved
|
KATY RAMIREZ
|
|
SGSOV-Seismic Gas S/O Valve
|
11/20/2020
|
SGSOV Not Ready
|
RONALD PACHECO
|
|
Final
|
11/24/2020
|
OK for TCO
|
DANIEL COLLINS
|
|
Footing/Foundation/Slab
|
11/24/2020
|
Approved
|
DANIEL COLLINS
|
|
Green Building Final
|
11/24/2020
|
Approved
|
DANIEL COLLINS
|
|
Reinforced Masonry Frame
|
11/24/2020
|
Approved
|
DANIEL COLLINS
|
|
SGSOV-Seismic Gas S/O Valve
|
11/24/2020
|
SGSOV Approved
|
DANIEL COLLINS
|
|
Smoke Detectors
|
11/24/2020
|
Approved
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
12/11/2020
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Reinf. Concrete
|
12/23/2020
|
Conditional Approval
|
KATY RAMIREZ
|
|
Special/Order Compliance
|
4/28/2021
|
Partial Inspection
|
KATY RAMIREZ
|
|
Deputy Steel/Welding
|
5/10/2021
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Methane Barrier
|
7/9/2021
|
Conditional Approval
|
DANIEL COLLINS
|
|
Final
|
9/8/2021
|
Not Ready for Inspection
|
KATY RAMIREZ
|
|
Special/Order Compliance
|
10/20/2021
|
Partial Inspection
|
KATY RAMIREZ
|
|
Final
|
10/28/2021
|
Not Ready for Inspection
|
KATY RAMIREZ
|
|
Final
|
11/3/2021
|
Not Ready for Inspection
|
KATY RAMIREZ
|