7846 W GRANITO DR 90046

Certificate Information: 7846 W GRANITO DR 90046

Application / Permit
16014-20000-05495
Plan Check / Job No.
B16VN16033
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
9'-3" x 59'-2" FIRST FLOOR, DECK, AND STAIRS ADDITION, 5'-3" X 59'-2" SECOND FLOOR BALCONY ADDITION, REMOVE AND REPLACE BALCONIES AT THIRD FLOOR, AND REMODEL TO (E) THREE SFD W/ ATTACHED GARAGE. IRREG SHAPED BUILDING 74'-3" X 59'-2"
Permit Issued
Issued on 2/24/2017
Issuing Office
West Los Angeles
Current Status
CofO Issued on 11/12/2022
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 11/17/2016 APPLICANT
Assigned to Plan Check Engineer 12/8/2016 JEROME MAGAT PALMA
Green Plans Picked Up 12/8/2016 APPLICANT
Corrections Issued 12/12/2016 JEROME MAGAT PALMA
Quality Review Completed 12/15/2016 MOURAD AZIZ
Building Plans Picked Up 12/15/2016 APPLICANT
Plan Check Approved 2/22/2017 JEROME MAGAT PALMA
Issued 2/24/2017 LADBS
CofO in Progress 11/1/2022 RAUL BARAJAS
Permit Finaled 11/12/2022 DEROLD HAUFF
CofO Issued 11/12/2022 DEROLD HAUFF
Permit Finaled 11/12/2022 DEROLD HAUFF

Permit Application Clearance Information

Eng Process Fee Ord 176,300 Cleared 12/16/2016 SEVAK ISAKHAYAN
Low Impact Development Cleared 1/6/2017 SAM NAVID
Green Code Cleared 1/12/2017 RICHARD DOCKUS
Miscellaneous Cleared 1/12/2017 YESENIA DIAZ
Roof/Waste drainage to street Cleared 1/12/2017 YESENIA DIAZ
Sewer availability Cleared 1/12/2017 YESENIA DIAZ
Grading Pre-Inspection Cleared 1/27/2017 JEROME MAGAT PALMA

Contact Information

Contractor Owner-Builder       ,
Engineer Cai, Luo B; Lic. No.: C80352 5244 HUCKLEBERRY OAK STREET      SIMI VALLEY, CA 93063
Engineer Lau, David Harkwong; Lic. No.: C34961 12467 W WASHINGTON BLVD      LOS ANGELES, CA 90066
Geologist Schick, John Wayne; Lic. No.: EG1300 7650 HASKELL AVENUE STE D      VAN NUYS, CA 91406

Inspector Information

No Data Available.

Pending Inspections

No Data Available.

Inspection Request History

Deputy Drilled-In Anchors 10/16/2017 Conditional Approval CRAIG VAUGHAN
Excavation/Setback/Form/Re-Bar 10/18/2017 Partial Approval RAUL BARAJAS
Floor/Roof Diaphrgm/Shear Wall 10/18/2017 Not Ready for Inspection RAUL BARAJAS
Wood Frame 10/18/2017 Not Ready for Inspection RAUL BARAJAS
Deputy Drilled-In Anchors 11/14/2017 Approved RAUL BARAJAS
PLUMBING-Rough 12/28/2017 Partial Approval RAUL BARAJAS
Sewer 12/28/2017 Partial Approval RAUL BARAJAS
Pre-Inspection 7/20/2018 Partial Inspection RAUL BARAJAS
Pre-Inspection 7/24/2018 Partial Inspection RAUL BARAJAS
Final 9/20/2018 Not Ready for Inspection RAUL BARAJAS
BUILDING-Rough-Frame 10/5/2018 Partial Inspection RAUL BARAJAS
ELECTRICAL-Rough 10/5/2018 Partial Inspection RAUL BARAJAS
Green Building Rough 10/5/2018 Not Ready for Inspection RAUL BARAJAS
HVAC-Rough 10/5/2018 Partial Inspection RAUL BARAJAS
PLUMBING-Rough 10/5/2018 Partial Inspection RAUL BARAJAS
BUILDING-Rough-Frame 10/10/2018 Corrections Issued RAUL BARAJAS
Green Building Rough 10/10/2018 Not Ready for Inspection RAUL BARAJAS
BUILDING-Rough-Frame 10/15/2018 Conditional Approval RAUL BARAJAS
Green Building Rough 10/15/2018 Approved RAUL BARAJAS
Insulation 10/26/2018 Approved RAUL BARAJAS
Shower Pan 10/26/2018 Approved RAUL BARAJAS
Drywall Nailing 11/2/2018 Approved RAUL BARAJAS
Interior/Exterior Lathing 11/2/2018 Approved RAUL BARAJAS
Structural Steel Frame 3/12/2019 Corrections Issued RAUL BARAJAS
Structural Steel Frame 3/20/2019 Approved RAUL BARAJAS
ELECTRICAL-Rough 8/12/2019 Partial Inspection RAUL BARAJAS
HVAC-Rough 8/12/2019 Partial Inspection RAUL BARAJAS
PLUMBING-Rough 8/12/2019 Partial Inspection RAUL BARAJAS
BUILDING-Rough-Frame 12/9/2020 Approved RAUL BARAJAS
ELECTRICAL-Final 12/9/2020 No Access for Inspection RAUL BARAJAS
Final 12/9/2020 No Access for Inspection RAUL BARAJAS
Footing/Foundation/Slab 12/9/2020 Approved RAUL BARAJAS
Green Building Final 12/9/2020 No Access for Inspection RAUL BARAJAS
HVAC-Final 12/9/2020 No Access for Inspection RAUL BARAJAS
PLUMBING-Final 12/9/2020 No Access for Inspection RAUL BARAJAS
SGSOV-Seismic Gas S/O Valve 12/9/2020 SGSOV Not Ready RAUL BARAJAS
Smoke Detectors 12/9/2020 No Access for Inspection RAUL BARAJAS
Final 1/4/2021 Corrections Issued RAUL BARAJAS
Green Building Final 1/4/2021 Not Ready for Inspection RAUL BARAJAS
SGSOV-Seismic Gas S/O Valve 1/4/2021 SGSOV Not Ready RAUL BARAJAS
Smoke Detectors 1/4/2021 Not Ready for Inspection RAUL BARAJAS
Final 2/14/2022 Corrections Issued RAUL BARAJAS
Green Building Final 2/14/2022 Not Ready for Inspection RAUL BARAJAS
SGSOV-Seismic Gas S/O Valve 2/14/2022 SGSOV Not Ready RAUL BARAJAS
Smoke Detectors 2/14/2022 Not Ready for Inspection RAUL BARAJAS
Final 4/18/2022 Corrections Issued RAUL BARAJAS
Green Building Final 4/18/2022 Approved RAUL BARAJAS
SGSOV-Seismic Gas S/O Valve 4/18/2022 SGSOV Approved RAUL BARAJAS
Smoke Detectors 4/18/2022 Approved RAUL BARAJAS
Final 5/19/2022 No Access for Inspection JOAQUIN GREENOUGH
Final 5/24/2022 Partial Approval RYAN SALAZAR
Final 11/1/2022 OK to Issue CofO RAUL BARAJAS