2020-2022 N CYPREAN DR 90046

Certificate Information: 2020-2022 N CYPREAN DR 90046

Application / Permit
16014-20000-04697
Plan Check / Job No.
B16VN13675
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
MAJOR REMODEL TO (E) DWELLING. CONSTRUCT 100'6" x 120'6" (IRR. SHAPE) 2-STORY DWELLING WITH GARAGE BASEMENT. ATTACH WITH 10' SOLID ROOF 23'6" x 35'8" FIRST FLOOR ACCESSORY DWELLING UNIT PER AB 2299 AND SB 1069; AND 2ND FLOOR RECREATION ROOM (EXTERIOR ACCESS ONLY). ENTIRE BUILDING SHALL BE FULLY SPRINKLERED. ALL WORK PER ENGINEERING. SEE COMMENTS.
Permit Issued
Issued on 6/1/2017
Issuing Office
West Los Angeles
Current Status
Issued on 6/1/2017
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 9/30/2016 APPLICANT
Assigned to Plan Check Engineer 10/26/2016 JEFFREY TANGONAN
Green Plans Picked Up 10/28/2016 APPLICANT
Corrections Issued 11/2/2016 JEFFREY TANGONAN
Quality Review Completed 11/3/2016 MOURAD AZIZ
Building Plans Picked Up 11/3/2016 APPLICANT
Plan Check Approved 5/22/2017 JEFFREY TANGONAN
Issued 6/1/2017 LADBS

Permit Application Clearance Information

Low Impact Development Cleared 3/17/2017 MARTIN FRAGOSO
Roof/Waste drainage to street Cleared 3/17/2017 ALFREDO JARA
BHO/Hillside ordinance Cleared 4/11/2017 LEE GUILBEAUX
BHO/Hillside ordinance Cleared 4/11/2017 LEE GUILBEAUX
Eng Process Fee Ord 176,300 Cleared 4/11/2017 LEE GUILBEAUX
Permit Cleared 4/11/2017 LEE GUILBEAUX
Sewer availability Cleared 4/11/2017 LEE GUILBEAUX
GPI Written Notices Cleared 4/13/2017 JEFFREY TANGONAN
Grading Pre-Inspection Cleared 4/13/2017 JEFFREY TANGONAN
Hydrant and Access approval Cleared 4/17/2017 ROBERT DUFF
BHO/Hillside ordinance Cleared 5/9/2017 HOWARD COOPER
Green Code Cleared 5/19/2017 MICHAEL AYERS

Contact Information

Contractor Greenbuild Construction Services Inc; Lic. No.: 937041-B 8200 WILSHIRE BLVD STE 200      BEVERLY HILLS, CA 90211
Engineer Podegracz, Joseph David; Lic. No.: C78425 PO BOX 1083      FRAZIER PARK, CA 93225
Engineer Tsai, Steve Shi-Shen; Lic. No.: GE2268 1545 VICTORY BLVD      GLENDALE, CA 91201
Geologist Gladson, Richard; Lic. No.: EG1758 1545 VICTORY BL      GLENDALE, CA 91201

Inspector Information

No Data Available.

Pending Inspections

No Data Available.

Inspection Request History

Piling/Pier/Caisson 11/3/2017 Partial Inspection DANIEL GONZALEZ
Excavation/Setback/Form/Re-Bar 11/7/2017 Partial Approval JOEL WILLIAMS
Footing/Foundation/Slab 1/24/2018 Partial Approval DANIEL GONZALEZ
Excavation/Setback/Form/Re-Bar 1/30/2018 Corrections Issued ROBERT MINASSIANS
Footing/Foundation/Slab 1/30/2018 Partial Inspection DANIEL GONZALEZ
Deputy Reinf. Concrete 1/31/2018 Partial Approval DANIEL GONZALEZ
Excavation/Setback/Form/Re-Bar 1/31/2018 Partial Approval DANIEL GONZALEZ
Footing/Foundation/Slab 1/31/2018 Partial Approval DANIEL GONZALEZ
Deputy Reinf. Concrete 2/5/2018 Partial Approval DANIEL GONZALEZ
Piling/Pier/Caisson 2/7/2018 Partial Approval DANIEL GONZALEZ
Excavation/Setback/Form/Re-Bar 12/11/2018 Partial Approval JOSEPH MCGARRY
Footing/Foundation/Slab 12/11/2018 Partial Approval JOSEPH MCGARRY
Deputy Reinf. Concrete 12/13/2018 No Access for Inspection ROBERT MINASSIANS
Footing/Foundation/Slab 12/28/2018 Partial Approval RAUL BARAJAS
Masonry Wall/Backfill 1/10/2019 Partial Approval HAMIK HARTOUNIAN
ELECTRICAL-Rough 1/23/2019 Partial Approval RAUL BARAJAS
PLUMBING-Rough 1/23/2019 Partial Approval RAUL BARAJAS
Wood Frame 1/28/2019 Partial Approval RAUL BARAJAS
Footing/Foundation/Slab 2/28/2019 Corrections Issued DANNY TOLENTINO
Excavation/Setback/Form/Re-Bar 3/1/2019 Partial Approval DANNY TOLENTINO
BUILDING-Rough-Frame 3/6/2019 Not Ready for Inspection DANNY TOLENTINO
Floor/Roof Diaphrgm/Shear Wall 3/6/2019 Partial Inspection DANNY TOLENTINO
Green Building Rough 3/6/2019 Not Ready for Inspection DANNY TOLENTINO
Verify Sprinkler Sign Off 3/6/2019 Not Ready for Inspection DANNY TOLENTINO
Reinforced Concrete Frame 3/13/2019 Partial Approval DANNY TOLENTINO
Reinforced Concrete Frame 3/21/2019 Partial Approval RAUL BARAJAS
Masonry Wall/Backfill 5/30/2019 Partial Approval DANNY TOLENTINO
Footing/Foundation/Slab 6/6/2019 Partial Approval DANNY TOLENTINO
ELECTRICAL-Rough 6/26/2019 Partial Approval RAUL BARAJAS
Floor/Roof Diaphrgm/Shear Wall 6/26/2019 Partial Approval RAUL BARAJAS
PLUMBING-Rough 6/26/2019 Partial Approval RAUL BARAJAS
Deputy Steel/Welding 7/16/2019 Approved RAUL BARAJAS
Floor/Roof Diaphrgm/Shear Wall 7/16/2019 Partial Approval RAUL BARAJAS
Green Building Rough 7/16/2019 Not Ready for Inspection RAUL BARAJAS
Verify Sprinkler Sign Off 7/16/2019 Not Ready for Inspection RAUL BARAJAS
Wood Frame 7/16/2019 Not Ready for Inspection RAUL BARAJAS
Deputy Steel/Welding 8/9/2019 Conditional Approval RAUL BARAJAS
Deputy Steel/Welding 9/3/2019 Approved RAUL BARAJAS
Floor/Roof Diaphrgm/Shear Wall 9/10/2019 Not Ready for Inspection RAUL BARAJAS
Floor/Roof Diaphrgm/Shear Wall 9/20/2019 Conditional Approval RAUL BARAJAS
Deputy Wood Construction 12/2/2019 Conditional Approval RAUL BARAJAS
Floor/Roof Diaphrgm/Shear Wall 2/6/2020 No Access for Inspection RAUL BARAJAS
Wood Frame 2/6/2020 Not Ready for Inspection RAUL BARAJAS
Floor/Roof Diaphrgm/Shear Wall 4/3/2020 Conditional Approval RAUL BARAJAS
Deputy Steel/Welding 5/14/2020 Conditional Approval RAUL BARAJAS
Floor/Roof Diaphrgm/Shear Wall 1/13/2021 Corrections Issued RAUL BARAJAS
Interior/Exterior Lathing 1/13/2021 Partial Approval RAUL BARAJAS
Special/Order Compliance 3/3/2021 Partial Approval RAUL BARAJAS
Special/Order Compliance 4/16/2021 Partial Inspection RAUL BARAJAS
Deputy Steel/Welding 4/29/2021 Conditional Approval RAUL BARAJAS
Deputy Steel/Welding 4/30/2021 Conditional Approval RAUL BARAJAS
ELECTRICAL-Rough 8/13/2021 Not Ready for Inspection RAUL BARAJAS
HVAC-Rough 8/13/2021 Not Ready for Inspection RAUL BARAJAS
PLUMBING-Rough 8/13/2021 Not Ready for Inspection RAUL BARAJAS
BUILDING-Rough-Frame 8/16/2021 Corrections Issued RAUL BARAJAS
Rough-Elec/Plmb/HVAC 8/16/2021 Corrections Issued RAUL BARAJAS
Special/Order Compliance 11/5/2021 Corrections Issued RAUL BARAJAS
Interior/Exterior Lathing 12/13/2021 Approved RAUL BARAJAS
Shower Pan 12/13/2021 Approved RAUL BARAJAS
Pre-Gunite 2/2/2023 Approved STUART CHAPMAN
Deputy Reinf. Concrete 4/12/2023 Conditional Approval STUART CHAPMAN
Excavation/Setback/Form/Re-Bar 4/12/2023 Partial Approval STUART CHAPMAN
Deputy Reinf. Concrete 4/14/2023 Approved STUART CHAPMAN
Underground Mechanical 4/25/2024 Approved RAUL BARAJAS
Underground Mechanical 5/1/2024 Approved RAUL BARAJAS
Underground Mechanical 5/7/2024 Partial Approval RAUL BARAJAS
Underground Mechanical 5/20/2024 Partial Approval BRENDAN MORELLI
PLUMBING-Final 8/14/2024 Corrections Issued BRENDAN MORELLI
Final 8/29/2024 Corrections Issued RAUL BARAJAS
Service/Power Release 8/29/2024 Corrections Issued RAUL BARAJAS
ELECTRICAL-Final 9/4/2024 Approved RAUL BARAJAS
HVAC-Final 9/4/2024 Approved RAUL BARAJAS
PLUMBING-Final 9/4/2024 Approved RAUL BARAJAS
Service/Power Release 9/4/2024 Approved RAUL BARAJAS
BUILDING-Rough-Frame 1/23/2025 Approved RAUL BARAJAS
Drywall Nailing 1/23/2025 Approved RAUL BARAJAS
Final 1/23/2025 Corrections Issued RAUL BARAJAS
Footing/Foundation/Slab 1/23/2025 Approved RAUL BARAJAS
Green Building Final 1/23/2025 Not Ready for Inspection RAUL BARAJAS
Green Building Rough 1/23/2025 Approved RAUL BARAJAS
SGSOV-Seismic Gas S/O Valve 1/23/2025 SGSOV Not Ready RAUL BARAJAS
Smoke Detectors 1/23/2025 Approved RAUL BARAJAS
Verify Sprinkler Sign Off 1/23/2025 Approved RAUL BARAJAS
Gas Test 9/18/2025 Not Ready for Inspection ROY SPAULDING
Gas Test 9/19/2025 Not Ready for Inspection ROY SPAULDING
PLUMBING-Final 9/19/2025 Approved ROY SPAULDING
Gas Test 9/25/2025 Approved ROY SPAULDING
PLUMBING-Final 9/25/2025 Approved ROY SPAULDING
Final 11/25/2025 Corrections Issued ROY SPAULDING
Green Building Final 11/25/2025 Not Ready for Inspection ROY SPAULDING
SGSOV-Seismic Gas S/O Valve 11/25/2025 SGSOV Not Ready ROY SPAULDING
SGSOV-Seismic Gas S/O Valve 3/20/2026 SGSOV Not Ready ROY SPAULDING
Final 7/13/2026 Not Ready for Inspection ROY SPAULDING
Green Building Final 7/13/2026 Not Ready for Inspection ROY SPAULDING
SGSOV-Seismic Gas S/O Valve 7/13/2026 SGSOV Not Ready ROY SPAULDING
Final 7/21/2026 Corrections Issued ROY SPAULDING
Green Building Final 7/21/2026 Approved ROY SPAULDING
SGSOV-Seismic Gas S/O Valve 7/21/2026 SGSOV Approved ROY SPAULDING
Final 7/24/2026 Conditional Approval BRENDAN MORELLI