10950 W BELLAGIO ROAD 90077

Certificate Information: 10950 W BELLAGIO ROAD 90077

Application / Permit
16014-20000-03262
Plan Check / Job No.
B16VN09245
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
28'-8" X 19'-4" TWO STORY AND BASEMENT ADDITION TO (E) TWO STORY SFD W/ ATTACHED GARAGE AND BASEMENT TO ENLARGE GARAGE AND ADD TWO BEDROOMS AND TWO FULL BATHROOMS. FULLY SPRINKLERED IRREG SHAPED BUILDING 42'-0" X 115'-9"
Permit Issued
Issued on 8/21/2017
Issuing Office
West Los Angeles
Current Status
CofO Issued on 1/12/2022
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 7/11/2016 APPLICANT
Assigned to Plan Check Engineer 8/25/2016 JEROME MAGAT PALMA
Corrections Issued 8/30/2016 JEROME MAGAT PALMA
Quality Review Completed 9/1/2016 GUANG MIN TUNG
Building Plans Picked Up 9/2/2016 APPLICANT
Green Plans Picked Up 9/2/2016 APPLICANT
Plan Check Approved 2/1/2017 JEROME MAGAT PALMA
Issued 8/21/2017 LADBS
CofO in Progress 1/12/2022 CHRISTOPHER WILSON
Permit Finaled 1/12/2022 DANIEL ORRANTE
CofO Issued 1/12/2022 DANIEL ORRANTE
Permit Finaled 1/12/2022 DANIEL ORRANTE

Permit Application Clearance Information

BHO/Hillside ordinance Cleared 11/22/2016 IRENE CHIA
BHO/Hillside ordinance Cleared 11/22/2016 IRENE CHIA
BHO/Hillside ordinance Cleared 11/22/2016 IRENE CHIA
BHO/Hillside ordinance Cleared 11/22/2016 IRENE CHIA
Eng Process Fee Ord 176,300 Cleared 11/22/2016 IRENE CHIA
Green Code Cleared 11/22/2016 MICHAEL AYERS
Hydrant and Access approval Cleared 11/22/2016 OSCAR SALGADO JR
Low Impact Development Cleared 11/22/2016 SAM NAVID
Roof/Waste drainage to street Cleared 11/22/2016 IRENE CHIA
Sewer availability Cleared 11/22/2016 IRENE CHIA
ZA Case Cleared 11/22/2016 TOM HENRY
Watercourse Cleared 11/28/2016 HUGO RICO
GPI Written Notices Cleared 12/6/2016 JEROME MAGAT PALMA
Grading Pre-Inspection Cleared 12/6/2016 JEROME MAGAT PALMA

Contact Information

Contractor Owner-Builder       ,
Engineer Motavvef, Nasser; Lic. No.: C40977 15335 MORRISON ST 370      SHERMAN OAKS, CA 91403
Engineer Podegracz, Joseph David; Lic. No.: C78425 PO BOX 1083      FRAZIER PARK, CA 93225
Engineer Walter, Scott John; Lic. No.: GE2476 14428 HAMLIN ST STE 200      VAN NUYS, CA 91401
Geologist Barrett, Mark A; Lic. No.: EG2088 11966 HONEYBROOK CT.      MOORPARK, CA 93021

Inspector Information

RYAN SALAZAR, (310) 914-3862 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

FLOOD-Elevation Certificate 5/29/2018 Not Ready for Inspection MATT KELLERMAN
Footing/Foundation/Slab 5/29/2018 Not Ready for Inspection MATT KELLERMAN
Excavation/Setback/Form/Re-Bar 5/30/2018 Partial Approval MATT KELLERMAN
Masonry Wall/Backfill 6/7/2018 Partial Inspection JONATHAN HOM
FLOOD-Elevation Certificate 6/11/2018 Not Ready for Inspection RYAN MCGILL
Footing/Foundation/Slab 6/11/2018 Partial Approval THOMAS FINNILA
Reinforced Concrete Frame 7/5/2018 Partial Approval THOMAS FINNILA
Reinforced Concrete Frame 7/26/2018 Partial Approval MATT KELLERMAN
FLOOD-Elevation Certificate 9/6/2018 Approved CHRISTOPHER WILSON
Footing/Foundation/Slab 9/6/2018 Partial Approval CHRISTOPHER WILSON
Footing/Foundation/Slab 10/15/2018 Partial Approval CHRISTOPHER WILSON
Floor/Roof Diaphrgm/Shear Wall 1/8/2019 Corrections Issued CHRISTOPHER WILSON
Footing/Foundation/Slab 1/8/2019 Partial Approval CHRISTOPHER WILSON
Floor/Roof Diaphrgm/Shear Wall 2/21/2019 Partial Approval CARLOS MATAMOROS
PLUMBING-Rough 2/21/2019 Not Ready for Inspection CARLOS MATAMOROS
PLUMBING-Rough 4/25/2019 Approved CHRISTOPHER WILSON
Floor/Roof Diaphrgm/Shear Wall 5/1/2019 Partial Approval ANTHONY MCDOWALL
ELECTRICAL-Rough 5/9/2019 Partial Inspection CHRISTOPHER WILSON
HVAC-Rough 5/9/2019 Approved CHRISTOPHER WILSON
ELECTRICAL-Rough 5/16/2019 Approved CHRISTOPHER WILSON
Footing/Foundation/Slab 5/16/2019 Partial Inspection CHRISTOPHER WILSON
HVAC-Rough 5/16/2019 Approved CHRISTOPHER WILSON
Interior/Exterior Lathing 5/16/2019 Corrections Issued CHRISTOPHER WILSON
Interior/Exterior Lathing 5/20/2019 Partial Approval CHRISTOPHER WILSON
BUILDING-Rough-Frame 6/6/2019 Corrections Issued CHRISTOPHER WILSON
FLOOD-Proofing Certificate 6/6/2019 Approved CHRISTOPHER WILSON
Green Building Rough 6/6/2019 Partial Inspection CHRISTOPHER WILSON
Verify Sprinkler Sign Off 6/6/2019 Approved CHRISTOPHER WILSON
Shower Pan 6/12/2019 Approved ANTHONY MCDOWALL
BUILDING-Rough-Frame 6/17/2019 Approved ANTHONY MCDOWALL
Green Building Rough 6/17/2019 Approved ANTHONY MCDOWALL
Insulation 6/24/2019 Approved ANTHONY MCDOWALL
Interior/Exterior Lathing 6/24/2019 Partial Approval ANTHONY MCDOWALL
Drywall Nailing 7/15/2019 Approved ANTHONY MCDOWALL
Final 11/16/2020 Corrections Issued CHRISTOPHER WILSON
Footing/Foundation/Slab 11/16/2020 Approved CHRISTOPHER WILSON
Green Building Final 11/16/2020 Not Ready for Inspection CHRISTOPHER WILSON
Reinforced Masonry Frame 11/16/2020 Approved CHRISTOPHER WILSON
SGSOV-Seismic Gas S/O Valve 11/16/2020 SGSOV Not Ready CHRISTOPHER WILSON
Smoke Detectors 11/16/2020 Not Ready for Inspection CHRISTOPHER WILSON
SGSOV-Seismic Gas S/O Valve 10/8/2021 SGSOV Not Ready CHRISTOPHER WILSON
Pre-Inspection 10/12/2021 Partial Approval CHRISTOPHER WILSON
SGSOV-Seismic Gas S/O Valve 10/12/2021 SGSOV Approved CHRISTOPHER WILSON
Final 11/8/2021 Not Ready for Inspection CHRISTOPHER WILSON
Green Building Final 11/8/2021 Not Ready for Inspection CHRISTOPHER WILSON
Smoke Detectors 11/8/2021 Not Ready for Inspection CHRISTOPHER WILSON
Final 11/23/2021 Corrections Issued CHRISTOPHER WILSON
Green Building Final 11/23/2021 Approved CHRISTOPHER WILSON
Smoke Detectors 11/23/2021 Approved CHRISTOPHER WILSON
Final 1/7/2022 Conditional Approval CHRISTOPHER WILSON