- REVISIONS TO THE CORE AND SHELL PERMIT. REVISING FOUNDATION PILE CAPS, REVISE THE BIKE COUNT (USING THE ACTUAL ADDED FLOOR AREA ONLY). CIVIL CHANGES, SOME ARCHITECTURAL REVISIONS, EDGE OF SLAB CHANGES. OMIT PREVIOUSLY APPROVED (DEFERRED) BIKE STORAGE ROOM. REVISE PLUMBING FIXTURE COUNT, NO CHANGE TO THE SKYLIGHTS. ORIG WORK DESC ON THE CORE AND SHELL PERMI:CORE AND SHELL ALTERATION, ADDITION, AND CHANGE OF USE FROM AIRPLANE HANGAR TO OFFICE. PROPOSED PARKING LOT RESTRIPE. VOLUNTARY SEISMIC RETROFIT OF EXISTING BOILER ROOM, SEISMICALLY SEPARATED FROM REMAINDER OF STRUCTURE. SEE COMMENTS FOR METHANE CONCERNS. STEEL STAIRS, RAILS (GLASS AND STEEL), FRP AT BOILER ROOM RETROFIT ARE DEFERRED APPROVAL. THE BIKE ENCLOSURE IS ALSO DEFERRED APPROVAL. GLULAM ARCH REPAIR IS DEFERRED.
- Permit Issued
- Issued on 3/14/2017
- Issuing Office
- Metro
- Current Status
- Permit Finaled on 5/24/2018
- Certificate of Occupancy
- CofO Issued More Information
Permit Application Status History
Submitted | 12/13/2016 | APPLICANT |
Assigned to Plan Check Engineer | 12/29/2016 | JOHN VASQUEZ |
Corrections Issued | 1/18/2017 | MINYE PAK |
Quality Review Completed | 1/19/2017 | CHARLES CHANG |
Building Plans Picked Up | 1/23/2017 | APPLICANT |
Green Plans Picked Up | 1/23/2017 | APPLICANT |
Disabled Access Plans Picked Up | 2/2/2017 | APPLICANT |
Plan Check Approved | 3/14/2017 | JOHN VASQUEZ |
Issued | 3/14/2017 | LADBS |
Permit Finaled | 5/23/2018 | JONATHAN ALLEN |
Permit Application Clearance Information
Building over 3-story or 36-ft | Cleared | 1/11/2017 | CALOSHA APPROVED |
City Hist. Cultural Monument | Cleared | 1/31/2017 | LAMBERT GIESSINGER |
Historic monument | Cleared | 1/31/2017 | LAMBERT GIESSINGER |
Low Impact Development | Cleared | 2/1/2017 | AMMAR ELTAWIL |
Stormwater Pollution Mitigatn | Cleared | 2/1/2017 | AMMAR ELTAWIL |
Eng Process Fee Ord 176,300 | Cleared | 2/21/2017 | MARYAM AZARBAYJANI |
Roof/Waste drainage to street | Cleared | 2/23/2017 | PHONG NGUYEN |
Miscellaneous | Cleared | 2/27/2017 | SIMON PASTUCHA |
Prkng lot landscape/Water mgmt | Cleared | 2/27/2017 | SIMON PASTUCHA |
Specific Plan | Cleared | 2/27/2017 | SIMON PASTUCHA |
ZA Case | Cleared | 2/27/2017 | SIMON PASTUCHA |
DAS Clearance | Cleared | 3/7/2017 | EDDIE GARIN |
Fire Marshall Fire Life Safety | Cleared | 3/8/2017 | DAVE MYERS |
Green Code | Cleared | 3/9/2017 | SEAN DANG |
Contact Information
Architect | Hyman, Ted Alan; Lic. No.: C14702 | 515 S FLOWER STREET SUITE 3700 LOS ANGELES, CA 90071 |
Contractor | Matt Construction Corporation; Lic. No.: 631020-B | 9814 NORWALK BLVD #100 SANTA FE SPRINGS, CA 90670 |
Engineer | Bueno, Jaime Luis; Lic. No.: C65389 | 230 COMMERCE STE 200 IRVINE, CA 92602 |
Engineer | Rees, Simon; Lic. No.: S4897 | 1246 11TH ST MANHATTAN BEACH, CA 90266 |
Inspector Information
No Data Available. |
Pending Inspections
No Data Available. |
Inspection Request History
Drywall Nailing | 5/23/2018 | Approved | JONATHAN ALLEN |
Final | 5/23/2018 | Permit Finaled | JONATHAN ALLEN |
Green Building Final | 5/23/2018 | Approved | JONATHAN ALLEN |
Green Building Rough | 5/23/2018 | Approved | JONATHAN ALLEN |
METHANE-Final | 5/23/2018 | Approved | JONATHAN ALLEN |
METHANE-Rough | 5/23/2018 | Approved | JONATHAN ALLEN |
Reinforced Concrete Frame | 5/23/2018 | Approved | JONATHAN ALLEN |
Smoke Detectors | 5/23/2018 | Approved | JONATHAN ALLEN |
Structural Steel Frame | 5/23/2018 | Approved | JONATHAN ALLEN |
Wood Frame | 5/23/2018 | Approved | JONATHAN ALLEN |