382 WORLD WAY 90045

Certificate Information: 382 WORLD WAY 90045

Application / Permit
16014-10000-06005
Plan Check / Job No.
B16LA19913
Group
Building
Type
Bldg-Addition
Sub-Type
Commercial
Primary Use
(3) Airport Building
Work Description
1-STORY WITH BASEMENT BAGGAGE HANDALING STRUCTURE ADDITION TO EXISITING TOM BRADLEY INTERNATIONAL TERMINAL (TBIT) VIA UTILIDOR TUNNEL. SEE COMMENTS.
Permit Issued
Issued on 6/26/2017
Issuing Office
Metro
Current Status
CofO Issued on 9/1/2021
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 12/29/2016 APPLICANT
Disabled Access Plans Picked Up 1/26/2017 APPLICANT
Green Plans Picked Up 1/27/2017 APPLICANT
Assigned to Plan Check Engineer 2/16/2017 SUEN LIEU
Corrections Issued 3/15/2017 SUEN LIEU
Quality Review Completed 3/15/2017 DAVID CHANG
Building Plans Picked Up 3/17/2017 APPLICANT
Applicant returned to address corrections 6/5/2017 SUEN LIEU
Applicant returned to address corrections 6/13/2017 EDUARDO RODRIGUEZ
Applicant returned to address corrections 6/20/2017 EDUARDO RODRIGUEZ
Plan Check Approved 6/22/2017 EDUARDO RODRIGUEZ
Issued 6/26/2017 LADBS
TCO Issued (Expire Date: 08-04-2021) 2/5/2021 JONATHAN ALLEN
CofO in Progress 8/17/2021 JONATHAN ALLEN
Permit Finaled 9/1/2021 HENRY BAGHDASSARIAN
CofO Issued 9/1/2021 HENRY BAGHDASSARIAN
Permit Finaled 9/1/2021 HENRY BAGHDASSARIAN

Permit Application Clearance Information

Low Impact Development Cleared 5/3/2017 AMMAR ELTAWIL
Prkng lot landscape/Water mgmt Cleared 5/18/2017 BRIAN CARR
ZA Case Cleared 5/18/2017 BRIAN CARR
DAS Clearance Cleared 5/23/2017 WAI LAU
Green Code Cleared 5/24/2017 DONALD CRICHLOW
Hydrant and Access approval Cleared 5/24/2017 ROBERT DUFF
City owned building/parcel Cleared 5/25/2017 HAROOT AVANESIAN
Airport buildings Cleared 5/26/2017 ANDREW KO
Eng Process Fee Ord 176,300 Cleared 5/30/2017 OSCAR GUTIERREZ
Miscellaneous Cleared 5/30/2017 OSCAR GUTIERREZ
Roof/Waste drainage to street Cleared 5/30/2017 OSCAR GUTIERREZ
Sewer availability Cleared 6/8/2017 OSCAR GUTIERREZ
Excavation more than 5-ft deep Cleared 6/20/2017 CALOSHA APPROVED
Project Permit Cleared 6/20/2017 VINITA HUANG

Contact Information

Architect Kelley, Brent Allen; Lic. No.: C29540 401 NORTH HOUSTON STREET      DALLAS, TX 75202
Contractor Turner - P C L A Joint Venture; Lic. No.: 996152-B 1900 S STATE COLLEGE BLVD #200      ANAHEIM, CA 92806
Engineer Ball, Steven Craig; Lic. No.: S4626 1420 PEERLESS PLACE APT 108      LOS ANGELES, CA 90035
Engineer Donahue, Matthew Walker; Lic. No.: FP1634 4923 INDIAN WOOD ROAD 480      CULVER CITY, CA 90230
Engineer Zadoorian, Christopher John; Lic. No.: GE2493 2121 S TOWNE CENTRE PLACE SUITE 130      ANAHEIM, CA 92806

Inspector Information

NICK LAROCCA, (213) 473-2153 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Grading 10/12/2017 Conditional Approval ALBERT COMISARI
Deputy Grading 10/13/2017 Conditional Approval ALBERT COMISARI
Deputy Grading 10/16/2017 Conditional Approval ALBERT COMISARI
Deputy Grading 10/17/2017 Conditional Approval ALBERT COMISARI
Deputy Grading 10/18/2017 Conditional Approval ALBERT COMISARI
Deputy Grading 10/19/2017 Conditional Approval ALBERT COMISARI
Deputy Grading 10/20/2017 Conditional Approval TIMOTHY GRIFFITH
Deputy Grading 10/23/2017 Conditional Approval LARRY ARNICK
Excavation/Setback/Form/Re-Bar 10/23/2017 Partial Approval LARRY ARNICK
Footing/Foundation/Slab 10/23/2017 Not Ready for Inspection LARRY ARNICK
METHANE-Barrier 10/23/2017 Not Ready for Inspection LARRY ARNICK
METHANE-Subgrade 10/23/2017 Not Ready for Inspection LARRY ARNICK
Pre-Inspection 10/23/2017 Partial Approval LARRY ARNICK
SWPPP-Const. Storm Water 10/23/2017 Completed LARRY ARNICK
Deputy Grading 10/24/2017 Conditional Approval ALBERT COMISARI
Deputy Grading 10/25/2017 Conditional Approval ALBERT COMISARI
Deputy Grading 10/26/2017 Conditional Approval ALBERT COMISARI
Deputy Grading 10/27/2017 Conditional Approval LARRY ARNICK
Deputy Grading 10/30/2017 Conditional Approval ALBERT COMISARI
Deputy Grading 10/31/2017 Conditional Approval ALBERT COMISARI
Deputy Grading 11/1/2017 Conditional Approval ALBERT COMISARI
Green Building Rough 11/1/2017 Not Ready for Inspection ALBERT COMISARI
METHANE-Rough 11/1/2017 Not Ready for Inspection ALBERT COMISARI
Pre-Inspection 11/1/2017 Not Ready for Inspection ALBERT COMISARI
Reinforced Concrete Frame 11/1/2017 Not Ready for Inspection ALBERT COMISARI
Deputy Grading 11/2/2017 Conditional Approval ALBERT COMISARI
Pre-Inspection 11/2/2017 Not Ready for Inspection ALBERT COMISARI
Deputy Grading 11/3/2017 Conditional Approval TIMOTHY GRIFFITH
Deputy Grading 11/7/2017 Conditional Approval LARRY ARNICK
Green Building Rough 11/8/2017 Conditional Approval LARRY ARNICK
METHANE-Rough 11/8/2017 Approved LARRY ARNICK
Reinforced Concrete Frame 11/8/2017 Partial Approval LARRY ARNICK
Deputy Grading 11/9/2017 Conditional Approval TIMOTHY GRIFFITH
Deputy Grading 11/15/2017 Conditional Approval LARRY ARNICK
Footing/Foundation/Slab 11/16/2017 Not Ready for Inspection LARRY ARNICK
Green Building Rough 11/16/2017 Not Ready for Inspection LARRY ARNICK
METHANE-Barrier 11/16/2017 Not Ready for Inspection LARRY ARNICK
METHANE-Subgrade 11/16/2017 Not Ready for Inspection LARRY ARNICK
Reinforced Concrete Frame 11/16/2017 Not Ready for Inspection LARRY ARNICK
Deputy Grading 11/17/2017 Conditional Approval LARRY ARNICK
Footing/Foundation/Slab 11/17/2017 Partial Approval LARRY ARNICK
Green Building Rough 11/17/2017 Approved LARRY ARNICK
METHANE-Barrier 11/17/2017 Partial Approval LARRY ARNICK
METHANE-Subgrade 11/17/2017 Partial Approval LARRY ARNICK
Structural Steel Frame 11/17/2017 Approved Pending GreenApproval LARRY ARNICK
Wall Anchors 11/17/2017 Partial Approval LARRY ARNICK
Deputy Drilled-In Anchors 11/20/2017 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 11/20/2017 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 11/21/2017 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 11/21/2017 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 11/22/2017 Conditional Approval LARRY ARNICK
Deputy Grading 11/22/2017 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 11/22/2017 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 11/27/2017 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 11/27/2017 Conditional Approval LARRY ARNICK
Footing/Foundation/Slab 11/27/2017 Not Ready for Inspection LARRY ARNICK
METHANE-Barrier 11/27/2017 Not Ready for Inspection LARRY ARNICK
METHANE-Subgrade 11/27/2017 Not Ready for Inspection LARRY ARNICK
Deputy Drilled-In Anchors 11/28/2017 Conditional Approval LARRY ARNICK
Deputy Grading 11/28/2017 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 11/28/2017 Conditional Approval LARRY ARNICK
Reinforced Concrete Frame 11/28/2017 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 11/29/2017 Conditional Approval LARRY ARNICK
Deputy Grading 11/29/2017 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 11/29/2017 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 11/30/2017 Conditional Approval LARRY ARNICK
Deputy Grading 11/30/2017 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 11/30/2017 Conditional Approval LARRY ARNICK
Reinforced Concrete Frame 11/30/2017 Not Ready for Inspection LARRY ARNICK
Deputy Drilled-In Anchors 12/1/2017 Conditional Approval LARRY ARNICK
Deputy Grading 12/1/2017 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 12/1/2017 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 12/4/2017 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 12/4/2017 Conditional Approval LARRY ARNICK
Reinforced Concrete Frame 12/4/2017 Not Ready for Inspection LARRY ARNICK
Deputy Drilled-In Anchors 12/5/2017 Conditional Approval LARRY ARNICK
Deputy Grading 12/5/2017 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 12/5/2017 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 12/6/2017 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 12/6/2017 Conditional Approval LARRY ARNICK
Reinforced Concrete Frame 12/6/2017 Not Ready for Inspection LARRY ARNICK
Deputy Drilled-In Anchors 12/7/2017 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 12/7/2017 Conditional Approval LARRY ARNICK
Footing/Foundation/Slab 12/7/2017 Partial Approval LARRY ARNICK
METHANE-Barrier 12/7/2017 Not Ready for Inspection LARRY ARNICK
METHANE-Subgrade 12/7/2017 Partial Approval LARRY ARNICK
Deputy Drilled-In Anchors 12/8/2017 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 12/8/2017 Conditional Approval LARRY ARNICK
Final 12/8/2017 Not Ready for Inspection LARRY ARNICK
Green Building Final 12/8/2017 Approved LARRY ARNICK
Reinforced Concrete Frame 12/8/2017 Partial Approval LARRY ARNICK
SGSOV-Seismic Gas S/O Valve 12/8/2017 SGSOV Not Ready LARRY ARNICK
Smoke Detectors 12/8/2017 Not Ready for Inspection LARRY ARNICK
Structural Steel Frame 12/8/2017 Partial Approval LARRY ARNICK
Deputy Drilled-In Anchors 12/11/2017 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 12/11/2017 Conditional Approval LARRY ARNICK
Deputy Shotcrete 12/11/2017 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 12/12/2017 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 12/12/2017 Conditional Approval LARRY ARNICK
Deputy Shotcrete 12/12/2017 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 12/13/2017 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 12/13/2017 Conditional Approval LARRY ARNICK
Deputy Shotcrete 12/13/2017 Conditional Approval LARRY ARNICK
Footing/Foundation/Slab 12/13/2017 Not Ready for Inspection LARRY ARNICK
METHANE-Barrier 12/13/2017 Not Ready for Inspection LARRY ARNICK
METHANE-Subgrade 12/13/2017 Not Ready for Inspection LARRY ARNICK
Deputy Drilled-In Anchors 12/14/2017 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 12/14/2017 Conditional Approval LARRY ARNICK
Deputy Shotcrete 12/14/2017 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 12/15/2017 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 12/15/2017 Conditional Approval LARRY ARNICK
Deputy Shotcrete 12/15/2017 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 12/18/2017 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 12/18/2017 Conditional Approval LARRY ARNICK
Deputy Shotcrete 12/18/2017 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 12/19/2017 Conditional Approval LARRY ARNICK
Deputy Grading 12/19/2017 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 12/19/2017 Conditional Approval LARRY ARNICK
Deputy Shotcrete 12/19/2017 Conditional Approval LARRY ARNICK
Pre-Inspection 12/19/2017 Partial Inspection LARRY ARNICK
Reinforced Concrete Frame 12/19/2017 Partial Inspection LARRY ARNICK
Deputy Drilled-In Anchors 12/20/2017 Conditional Approval LARRY ARNICK
Deputy Grading 12/20/2017 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 12/20/2017 Conditional Approval LARRY ARNICK
Deputy Shotcrete 12/20/2017 Conditional Approval LARRY ARNICK
Pre-Inspection 12/20/2017 Partial Approval LARRY ARNICK
Deputy Drilled-In Anchors 12/21/2017 Conditional Approval LARRY ARNICK
Deputy Grading 12/21/2017 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 12/21/2017 Conditional Approval LARRY ARNICK
Deputy Shotcrete 12/21/2017 Conditional Approval LARRY ARNICK
Final 12/21/2017 Not Ready for Inspection LARRY ARNICK
Footing/Foundation/Slab 12/21/2017 Not Ready for Inspection LARRY ARNICK
METHANE-Barrier 12/21/2017 Not Ready for Inspection LARRY ARNICK
METHANE-Subgrade 12/21/2017 Not Ready for Inspection LARRY ARNICK
Reinforced Concrete Frame 12/21/2017 Not Ready for Inspection LARRY ARNICK
SGSOV-Seismic Gas S/O Valve 12/21/2017 SGSOV Not Ready LARRY ARNICK
Smoke Detectors 12/21/2017 Not Ready for Inspection LARRY ARNICK
Structural Steel Frame 12/21/2017 Not Ready for Inspection LARRY ARNICK
Deputy Drilled-In Anchors 12/22/2017 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 12/22/2017 Conditional Approval LARRY ARNICK
Deputy Shotcrete 12/22/2017 Conditional Approval LARRY ARNICK
Pre-Inspection 12/22/2017 Partial Approval LARRY ARNICK
Deputy Drilled-In Anchors 12/26/2017 Conditional Approval LARRY ARNICK
Deputy Grading 12/26/2017 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 12/26/2017 Conditional Approval LARRY ARNICK
Deputy Shotcrete 12/26/2017 Conditional Approval LARRY ARNICK
Pre-Inspection 12/26/2017 Not Ready for Inspection LARRY ARNICK
Deputy Drilled-In Anchors 12/27/2017 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 12/27/2017 Conditional Approval LARRY ARNICK
Deputy Shotcrete 12/27/2017 Conditional Approval LARRY ARNICK
Pre-Inspection 12/27/2017 Not Ready for Inspection LARRY ARNICK
Deputy Drilled-In Anchors 12/28/2017 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 12/28/2017 Conditional Approval LARRY ARNICK
Deputy Shotcrete 12/28/2017 Conditional Approval LARRY ARNICK
Pre-Inspection 12/28/2017 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 12/29/2017 Conditional Approval LARRY ARNICK
Deputy Grading 12/29/2017 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 12/29/2017 Conditional Approval LARRY ARNICK
Deputy Shotcrete 12/29/2017 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 1/2/2018 Conditional Approval LARRY ARNICK
Deputy Shotcrete 1/2/2018 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 1/3/2018 Conditional Approval LARRY ARNICK
Deputy Shotcrete 1/3/2018 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 1/4/2018 Conditional Approval LARRY ARNICK
Deputy Shotcrete 1/4/2018 Conditional Approval LARRY ARNICK
Final 1/4/2018 Not Ready for Inspection LARRY ARNICK
Footing/Foundation/Slab 1/4/2018 Not Ready for Inspection LARRY ARNICK
METHANE-Barrier 1/4/2018 Not Ready for Inspection LARRY ARNICK
METHANE-Subgrade 1/4/2018 Not Ready for Inspection LARRY ARNICK
Reinforced Concrete Frame 1/4/2018 Not Ready for Inspection LARRY ARNICK
SGSOV-Seismic Gas S/O Valve 1/4/2018 SGSOV Not Ready LARRY ARNICK
Smoke Detectors 1/4/2018 Not Ready for Inspection LARRY ARNICK
Structural Steel Frame 1/4/2018 Not Ready for Inspection LARRY ARNICK
Deputy Reinf. Concrete 1/5/2018 Conditional Approval LARRY ARNICK
Deputy Shotcrete 1/5/2018 Conditional Approval LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 1/5/2018 Not Ready for Inspection LARRY ARNICK
Pre-Inspection 1/5/2018 Not Ready for Inspection LARRY ARNICK
Pre-Inspection 1/11/2018 Partial Approval LARRY ARNICK
Pre-Inspection 1/12/2018 Conditional Approval LARRY ARNICK
Reinforced Concrete Frame 1/12/2018 Partial Approval LARRY ARNICK
Final 1/15/2018 Off-Hour Fees Due
Footing/Foundation/Slab 1/15/2018 Off-Hour Fees Due
METHANE-Barrier 1/15/2018 Off-Hour Fees Due
METHANE-Subgrade 1/15/2018 Off-Hour Fees Due
SGSOV-Seismic Gas S/O Valve 1/15/2018 Off-Hour Fees Due
Smoke Detectors 1/15/2018 Off-Hour Fees Due
Structural Steel Frame 1/15/2018 Off-Hour Fees Due
Deputy Reinf. Concrete 1/16/2018 Conditional Approval LARRY ARNICK
Deputy Shotcrete 1/16/2018 Conditional Approval LARRY ARNICK
Pre-Inspection 1/16/2018 Partial Approval LARRY ARNICK
Deputy Reinf. Concrete 1/17/2018 Conditional Approval LARRY ARNICK
Deputy Shotcrete 1/17/2018 Conditional Approval LARRY ARNICK
Final 1/17/2018 Not Ready for Inspection LARRY ARNICK
Footing/Foundation/Slab 1/17/2018 Not Ready for Inspection LARRY ARNICK
METHANE-Barrier 1/17/2018 Not Ready for Inspection LARRY ARNICK
METHANE-Subgrade 1/17/2018 Not Ready for Inspection LARRY ARNICK
SGSOV-Seismic Gas S/O Valve 1/17/2018 SGSOV Not Ready LARRY ARNICK
Smoke Detectors 1/17/2018 Not Ready for Inspection LARRY ARNICK
Structural Steel Frame 1/17/2018 Not Ready for Inspection LARRY ARNICK
Deputy Reinf. Concrete 1/18/2018 Conditional Approval LARRY ARNICK
Deputy Shotcrete 1/18/2018 Conditional Approval LARRY ARNICK
Final 1/18/2018 Not Ready for Inspection LARRY ARNICK
Footing/Foundation/Slab 1/18/2018 Partial Approval LARRY ARNICK
METHANE-Barrier 1/18/2018 Not Ready for Inspection LARRY ARNICK
METHANE-Subgrade 1/18/2018 Not Ready for Inspection LARRY ARNICK
SGSOV-Seismic Gas S/O Valve 1/18/2018 SGSOV Not Ready LARRY ARNICK
Smoke Detectors 1/18/2018 Not Ready for Inspection LARRY ARNICK
Structural Steel Frame 1/18/2018 Not Ready for Inspection LARRY ARNICK
Deputy Reinf. Concrete 1/19/2018 Conditional Approval LARRY ARNICK
Deputy Shotcrete 1/19/2018 Conditional Approval LARRY ARNICK
Pre-Inspection 1/19/2018 Partial Approval LARRY ARNICK
Pre-Inspection 1/22/2018 Partial Approval LARRY ARNICK
Final 1/23/2018 Not Ready for Inspection LARRY ARNICK
Footing/Foundation/Slab 1/23/2018 Not Ready for Inspection LARRY ARNICK
METHANE-Barrier 1/23/2018 Not Ready for Inspection LARRY ARNICK
METHANE-Subgrade 1/23/2018 Not Ready for Inspection LARRY ARNICK
Reinforced Concrete Frame 1/23/2018 Not Ready for Inspection LARRY ARNICK
SGSOV-Seismic Gas S/O Valve 1/23/2018 SGSOV Not Ready LARRY ARNICK
Smoke Detectors 1/23/2018 Not Ready for Inspection LARRY ARNICK
Structural Steel Frame 1/23/2018 Not Ready for Inspection LARRY ARNICK
Deputy Grading 1/24/2018 Conditional Approval LARRY ARNICK
Pre-Inspection 1/25/2018 Not Ready for Inspection LARRY ARNICK
Pre-Inspection 1/26/2018 Partial Approval TIMOTHY GRIFFITH
Footing/Foundation/Slab 1/29/2018 Not Ready for Inspection TIMOTHY GRIFFITH
METHANE-Barrier 1/29/2018 Not Ready for Inspection TIMOTHY GRIFFITH
METHANE-Subgrade 1/29/2018 Not Ready for Inspection TIMOTHY GRIFFITH
Pre-Inspection 1/29/2018 Not Ready for Inspection TIMOTHY GRIFFITH
Pre-Inspection 1/30/2018 Not Ready for Inspection LARRY ARNICK
Pre-Inspection 1/31/2018 Partial Approval LARRY ARNICK
Pre-Inspection 2/1/2018 Partial Approval LARRY ARNICK
Pre-Inspection 2/2/2018 Approved LARRY ARNICK
Deputy Drilled-In Anchors 2/5/2018 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 2/5/2018 Conditional Approval LARRY ARNICK
Deputy Shotcrete 2/5/2018 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 2/6/2018 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 2/6/2018 Conditional Approval LARRY ARNICK
Deputy Shotcrete 2/6/2018 Conditional Approval LARRY ARNICK
Pre-Inspection 2/6/2018 Not Ready for Inspection LARRY ARNICK
Deputy Drilled-In Anchors 2/7/2018 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 2/7/2018 Conditional Approval TIMOTHY GRIFFITH
Deputy Shotcrete 2/7/2018 Conditional Approval TIMOTHY GRIFFITH
Pre-Inspection 2/7/2018 Not Ready for Inspection ALBERT COMISARI
Deputy Drilled-In Anchors 2/8/2018 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 2/8/2018 Conditional Approval LARRY ARNICK
Deputy Shotcrete 2/8/2018 Conditional Approval LARRY ARNICK
Pre-Inspection 2/8/2018 Partial Approval LARRY ARNICK
Deputy Drilled-In Anchors 2/9/2018 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 2/9/2018 Conditional Approval LARRY ARNICK
Deputy Shotcrete 2/9/2018 Conditional Approval LARRY ARNICK
Pre-Inspection 2/9/2018 Not Ready for Inspection LARRY ARNICK
Deputy Drilled-In Anchors 2/12/2018 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 2/12/2018 Conditional Approval LARRY ARNICK
Deputy Shotcrete 2/12/2018 Conditional Approval LARRY ARNICK
Pre-Inspection 2/12/2018 Not Ready for Inspection LARRY ARNICK
Deputy Drilled-In Anchors 2/13/2018 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 2/13/2018 Conditional Approval LARRY ARNICK
Deputy Shotcrete 2/13/2018 Conditional Approval LARRY ARNICK
Pre-Inspection 2/13/2018 Partial Approval LARRY ARNICK
Deputy Drilled-In Anchors 2/14/2018 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 2/14/2018 Conditional Approval LARRY ARNICK
Deputy Shotcrete 2/14/2018 Conditional Approval LARRY ARNICK
Pre-Inspection 2/14/2018 Partial Approval LARRY ARNICK
Deputy Drilled-In Anchors 2/15/2018 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 2/15/2018 Conditional Approval LARRY ARNICK
Deputy Shotcrete 2/15/2018 Conditional Approval LARRY ARNICK
Pre-Inspection 2/15/2018 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 2/16/2018 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 2/16/2018 Conditional Approval LARRY ARNICK
Deputy Shotcrete 2/16/2018 Conditional Approval LARRY ARNICK
Pre-Inspection 2/16/2018 Not Ready for Inspection LARRY ARNICK
Final 2/17/2018 Not Ready for Inspection LARRY ARNICK
Footing/Foundation/Slab 2/17/2018 Not Ready for Inspection LARRY ARNICK
METHANE-Barrier 2/17/2018 Not Ready for Inspection LARRY ARNICK
METHANE-Subgrade 2/17/2018 Not Ready for Inspection LARRY ARNICK
Reinforced Concrete Frame 2/17/2018 Partial Approval LARRY ARNICK
SGSOV-Seismic Gas S/O Valve 2/17/2018 SGSOV Not Ready LARRY ARNICK
Smoke Detectors 2/17/2018 Not Ready for Inspection LARRY ARNICK
Structural Steel Frame 2/17/2018 Not Ready for Inspection LARRY ARNICK
Deputy Drilled-In Anchors 2/20/2018 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 2/20/2018 Conditional Approval LARRY ARNICK
Pre-Inspection 2/20/2018 Partial Approval LARRY ARNICK
Deputy Drilled-In Anchors 2/21/2018 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 2/21/2018 Conditional Approval LARRY ARNICK
Final 2/21/2018 Off-Hour Fees Due
Footing/Foundation/Slab 2/21/2018 Off-Hour Fees Due
METHANE-Barrier 2/21/2018 Off-Hour Fees Due
METHANE-Subgrade 2/21/2018 Off-Hour Fees Due
Pre-Inspection 2/21/2018 Not Ready for Inspection LARRY ARNICK
Reinforced Concrete Frame 2/21/2018 Off-Hour Fees Due
SGSOV-Seismic Gas S/O Valve 2/21/2018 Off-Hour Fees Due
Smoke Detectors 2/21/2018 Off-Hour Fees Due
Structural Steel Frame 2/21/2018 Off-Hour Fees Due
Deputy Drilled-In Anchors 2/22/2018 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 2/22/2018 Approved LARRY ARNICK
Pre-Inspection 2/22/2018 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 2/23/2018 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 2/23/2018 Conditional Approval LARRY ARNICK
Pre-Inspection 2/23/2018 Partial Approval LARRY ARNICK
Pre-Inspection 2/26/2018 Not Ready for Inspection LARRY ARNICK
Pre-Inspection 2/27/2018 Partial Approval LARRY ARNICK
Deputy Drilled-In Anchors 2/28/2018 Conditional Approval LARRY ARNICK
Deputy Grading 2/28/2018 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 2/28/2018 Conditional Approval LARRY ARNICK
Deputy Shotcrete 2/28/2018 Conditional Approval LARRY ARNICK
Pre-Inspection 2/28/2018 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 3/1/2018 Partial Approval LARRY ARNICK
Deputy Reinf. Concrete 3/1/2018 Conditional Approval LARRY ARNICK
Deputy Shotcrete 3/1/2018 Conditional Approval LARRY ARNICK
Pre-Inspection 3/1/2018 Partial Approval LARRY ARNICK
Reinforced Masonry Frame 3/1/2018 Partial Approval JONATHAN ALLEN
Deputy Drilled-In Anchors 3/2/2018 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 3/2/2018 Conditional Approval LARRY ARNICK
Deputy Shotcrete 3/2/2018 Conditional Approval LARRY ARNICK
Pre-Inspection 3/2/2018 Not Ready for Inspection LARRY ARNICK
Deputy Drilled-In Anchors 3/5/2018 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 3/5/2018 Conditional Approval LARRY ARNICK
Deputy Shotcrete 3/5/2018 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 3/6/2018 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 3/6/2018 Conditional Approval LARRY ARNICK
Deputy Shotcrete 3/6/2018 Conditional Approval LARRY ARNICK
Pre-Inspection 3/6/2018 Partial Approval LARRY ARNICK
Deputy Drilled-In Anchors 3/7/2018 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 3/7/2018 No Access for Inspection LARRY ARNICK
Deputy Reinf. Concrete 3/7/2018 Conditional Approval LARRY ARNICK
Deputy Shotcrete 3/7/2018 Conditional Approval LARRY ARNICK
Pre-Inspection 3/7/2018 Not Ready for Inspection LARRY ARNICK
Deputy Drilled-In Anchors 3/8/2018 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 3/8/2018 Conditional Approval LARRY ARNICK
Deputy Shotcrete 3/8/2018 Conditional Approval LARRY ARNICK
Pre-Inspection 3/8/2018 Partial Approval LARRY ARNICK
Deputy Drilled-In Anchors 3/9/2018 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 3/9/2018 Conditional Approval LARRY ARNICK
Deputy Shotcrete 3/9/2018 Conditional Approval LARRY ARNICK
Pre-Inspection 3/9/2018 Partial Approval LARRY ARNICK
Deputy Drilled-In Anchors 3/12/2018 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 3/12/2018 Conditional Approval LARRY ARNICK
Deputy Shotcrete 3/12/2018 Conditional Approval LARRY ARNICK
Pre-Inspection 3/12/2018 Not Ready for Inspection LARRY ARNICK
Deputy Drilled-In Anchors 3/13/2018 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 3/13/2018 Conditional Approval LARRY ARNICK
Deputy Shotcrete 3/13/2018 Conditional Approval LARRY ARNICK
Pre-Inspection 3/13/2018 Partial Approval LARRY ARNICK
Deputy Drilled-In Anchors 3/14/2018 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 3/14/2018 Conditional Approval LARRY ARNICK
Deputy Shotcrete 3/14/2018 Conditional Approval LARRY ARNICK
Pre-Inspection 3/14/2018 Not Ready for Inspection LARRY ARNICK
Deputy Drilled-In Anchors 3/15/2018 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 3/15/2018 Conditional Approval LARRY ARNICK
Deputy Shotcrete 3/15/2018 Conditional Approval LARRY ARNICK
Pre-Inspection 3/15/2018 Partial Approval LARRY ARNICK
Deputy Drilled-In Anchors 3/16/2018 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 3/16/2018 Conditional Approval LARRY ARNICK
Deputy Shotcrete 3/16/2018 Conditional Approval LARRY ARNICK
Pre-Inspection 3/16/2018 Not Ready for Inspection LARRY ARNICK
Deputy Drilled-In Anchors 3/19/2018 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 3/19/2018 Conditional Approval LARRY ARNICK
Deputy Shotcrete 3/19/2018 Conditional Approval LARRY ARNICK
Pre-Inspection 3/19/2018 Approved LARRY ARNICK
Deputy Drilled-In Anchors 3/20/2018 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 3/20/2018 Conditional Approval LARRY ARNICK
Deputy Shotcrete 3/20/2018 Conditional Approval LARRY ARNICK
Pre-Inspection 3/20/2018 Partial Approval LARRY ARNICK
Deputy Drilled-In Anchors 3/21/2018 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 3/21/2018 Conditional Approval LARRY ARNICK
Deputy Shotcrete 3/21/2018 Conditional Approval LARRY ARNICK
Pre-Inspection 3/21/2018 Not Ready for Inspection LARRY ARNICK
Deputy Drilled-In Anchors 3/22/2018 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 3/22/2018 Conditional Approval LARRY ARNICK
Deputy Shotcrete 3/22/2018 Conditional Approval LARRY ARNICK
Pre-Inspection 3/22/2018 Not Ready for Inspection LARRY ARNICK
Deputy Drilled-In Anchors 3/23/2018 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 3/23/2018 Conditional Approval LARRY ARNICK
Deputy Shotcrete 3/23/2018 Conditional Approval LARRY ARNICK
Pre-Inspection 3/23/2018 Not Ready for Inspection LARRY ARNICK
Deputy Drilled-In Anchors 3/27/2018 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 3/27/2018 Conditional Approval LARRY ARNICK
Deputy Shotcrete 3/27/2018 Conditional Approval LARRY ARNICK
Pre-Inspection 3/27/2018 Partial Approval LARRY ARNICK
Deputy Drilled-In Anchors 3/28/2018 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 3/28/2018 Conditional Approval LARRY ARNICK
Deputy Reinf. Masonry 3/28/2018 Conditional Approval LARRY ARNICK
Deputy Shotcrete 3/28/2018 Conditional Approval LARRY ARNICK
Pre-Inspection 3/28/2018 Not Ready for Inspection LARRY ARNICK
Deputy Drilled-In Anchors 3/29/2018 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 3/29/2018 Conditional Approval LARRY ARNICK
Deputy Reinf. Masonry 3/29/2018 Conditional Approval LARRY ARNICK
Deputy Shotcrete 3/29/2018 Conditional Approval LARRY ARNICK
Pre-Inspection 3/29/2018 Not Ready for Inspection LARRY ARNICK
Deputy Drilled-In Anchors 3/30/2018 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 3/30/2018 Conditional Approval LARRY ARNICK
Deputy Reinf. Masonry 3/30/2018 Conditional Approval LARRY ARNICK
Deputy Shotcrete 3/30/2018 Conditional Approval LARRY ARNICK
Pre-Inspection 3/30/2018 Not Ready for Inspection LARRY ARNICK
Pre-Inspection 3/31/2018 Approved LARRY ARNICK
Deputy Drilled-In Anchors 4/2/2018 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 4/2/2018 Conditional Approval LARRY ARNICK
Deputy Reinf. Masonry 4/2/2018 Conditional Approval LARRY ARNICK
Deputy Shotcrete 4/2/2018 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 4/3/2018 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 4/3/2018 Conditional Approval LARRY ARNICK
Deputy Reinf. Masonry 4/3/2018 Conditional Approval LARRY ARNICK
Deputy Shotcrete 4/3/2018 Conditional Approval LARRY ARNICK
Pre-Inspection 4/3/2018 Off-Hour Fees Due
Deputy Drilled-In Anchors 4/4/2018 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 4/4/2018 Conditional Approval LARRY ARNICK
Deputy Reinf. Masonry 4/4/2018 Conditional Approval LARRY ARNICK
Deputy Shotcrete 4/4/2018 Conditional Approval LARRY ARNICK
Pre-Inspection 4/4/2018 Not Ready for Inspection LARRY ARNICK
Reinforced Concrete Frame 4/4/2018 Partial Approval LARRY ARNICK
Deputy Drilled-In Anchors 4/5/2018 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 4/5/2018 Conditional Approval LARRY ARNICK
Deputy Reinf. Masonry 4/5/2018 Conditional Approval LARRY ARNICK
Deputy Shotcrete 4/5/2018 Conditional Approval LARRY ARNICK
Pre-Inspection 4/5/2018 Partial Approval LARRY ARNICK
Deputy Drilled-In Anchors 4/6/2018 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 4/6/2018 Conditional Approval LARRY ARNICK
Deputy Reinf. Masonry 4/6/2018 Conditional Approval LARRY ARNICK
Deputy Shotcrete 4/6/2018 Conditional Approval LARRY ARNICK
Pre-Inspection 4/6/2018 Not Ready for Inspection LARRY ARNICK
Deputy Drilled-In Anchors 4/9/2018 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 4/9/2018 Conditional Approval LARRY ARNICK
Deputy Reinf. Masonry 4/9/2018 Conditional Approval LARRY ARNICK
Deputy Shotcrete 4/9/2018 Conditional Approval LARRY ARNICK
Excavation/Setback/Form/Re-Bar 4/9/2018 Partial Approval LARRY ARNICK
Final 4/9/2018 Not Ready for Inspection LARRY ARNICK
Pre-Inspection 4/9/2018 Partial Approval LARRY ARNICK
Reinforced Concrete Frame 4/9/2018 Not Ready for Inspection LARRY ARNICK
Structural Steel Frame 4/9/2018 Not Ready for Inspection LARRY ARNICK
Deputy Drilled-In Anchors 4/10/2018 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 4/10/2018 Conditional Approval LARRY ARNICK
Deputy Shotcrete 4/10/2018 Conditional Approval LARRY ARNICK
Pre-Inspection 4/10/2018 Partial Inspection LARRY ARNICK
Deputy Drilled-In Anchors 4/11/2018 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 4/11/2018 Conditional Approval TIMOTHY GRIFFITH
Deputy Shotcrete 4/11/2018 Conditional Approval TIMOTHY GRIFFITH
Pre-Inspection 4/11/2018 Not Ready for Inspection TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 4/12/2018 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 4/12/2018 Conditional Approval LARRY ARNICK
Deputy Shotcrete 4/12/2018 Conditional Approval LARRY ARNICK
Pre-Inspection 4/12/2018 Not Ready for Inspection LARRY ARNICK
Deputy Drilled-In Anchors 4/13/2018 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 4/13/2018 Conditional Approval LARRY ARNICK
Deputy Shotcrete 4/13/2018 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 4/16/2018 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 4/16/2018 Conditional Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 4/17/2018 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 4/17/2018 Conditional Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 4/18/2018 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 4/18/2018 Conditional Approval LARRY ARNICK
Pre-Inspection 4/18/2018 Not Ready for Inspection LARRY ARNICK
Deputy Drilled-In Anchors 4/19/2018 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 4/19/2018 Conditional Approval LARRY ARNICK
Pre-Inspection 4/19/2018 Partial Approval LARRY ARNICK
Deputy Drilled-In Anchors 4/20/2018 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 4/20/2018 Conditional Approval LARRY ARNICK
Pre-Inspection 4/20/2018 Partial Approval LARRY ARNICK
Deputy Drilled-In Anchors 4/23/2018 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 4/23/2018 Conditional Approval LARRY ARNICK
Excavation/Setback/Form/Re-Bar 4/23/2018 Not Ready for Inspection LARRY ARNICK
Deputy Drilled-In Anchors 4/24/2018 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 4/24/2018 Conditional Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 4/25/2018 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 4/25/2018 Conditional Approval LARRY ARNICK
Pre-Inspection 4/25/2018 Partial Approval LARRY ARNICK
Deputy Drilled-In Anchors 4/26/2018 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 4/26/2018 Conditional Approval LARRY ARNICK
Pre-Inspection 4/26/2018 Not Ready for Inspection LARRY ARNICK
Deputy Drilled-In Anchors 4/27/2018 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 4/27/2018 Conditional Approval LARRY ARNICK
Pre-Inspection 4/27/2018 Not Ready for Inspection LARRY ARNICK
Deputy Drilled-In Anchors 4/30/2018 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 4/30/2018 Conditional Approval LARRY ARNICK
Pre-Inspection 4/30/2018 Not Ready for Inspection LARRY ARNICK
Deputy Drilled-In Anchors 5/1/2018 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 5/1/2018 Order to Comply Issued LARRY ARNICK
Deputy Reinf. Concrete 5/1/2018 Conditional Approval LARRY ARNICK
Pre-Inspection 5/1/2018 Not Ready for Inspection LARRY ARNICK
Deputy Drilled-In Anchors 5/2/2018 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 5/2/2018 Conditional Approval LARRY ARNICK
Footing/Foundation/Slab 5/2/2018 Not Ready for Inspection LARRY ARNICK
METHANE-Barrier 5/2/2018 Not Ready for Inspection LARRY ARNICK
METHANE-Subgrade 5/2/2018 Not Ready for Inspection LARRY ARNICK
Deputy Drilled-In Anchors 5/3/2018 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 5/3/2018 Conditional Approval LARRY ARNICK
Pre-Inspection 5/3/2018 Not Ready for Inspection LARRY ARNICK
Deputy Drilled-In Anchors 5/4/2018 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 5/4/2018 Conditional Approval LARRY ARNICK
Pre-Inspection 5/4/2018 Partial Inspection LARRY ARNICK
Deputy Reinf. Concrete 5/7/2018 Conditional Approval LARRY ARNICK
Final 5/7/2018 Not Ready for Inspection LARRY ARNICK
Footing/Foundation/Slab 5/7/2018 Partial Approval LARRY ARNICK
METHANE-Barrier 5/7/2018 Not Ready for Inspection LARRY ARNICK
METHANE-Subgrade 5/7/2018 Not Ready for Inspection LARRY ARNICK
Pre-Inspection 5/7/2018 Partial Approval LARRY ARNICK
SGSOV-Seismic Gas S/O Valve 5/7/2018 SGSOV Not Ready LARRY ARNICK
Smoke Detectors 5/7/2018 Not Ready for Inspection LARRY ARNICK
Structural Steel Frame 5/7/2018 Partial Approval LARRY ARNICK
Deputy Reinf. Concrete 5/8/2018 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 5/9/2018 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 5/10/2018 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 5/11/2018 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 5/14/2018 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 5/14/2018 Conditional Approval LARRY ARNICK
Pre-Inspection 5/14/2018 Partial Approval LARRY ARNICK
Deputy Drilled-In Anchors 5/15/2018 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 5/15/2018 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 5/16/2018 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 5/16/2018 Conditional Approval LARRY ARNICK
Pre-Inspection 5/16/2018 Not Ready for Inspection LARRY ARNICK
Deputy Drilled-In Anchors 5/17/2018 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 5/17/2018 Conditional Approval LARRY ARNICK
Pre-Inspection 5/17/2018 Not Ready for Inspection LARRY ARNICK
Deputy Drilled-In Anchors 5/18/2018 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 5/18/2018 Conditional Approval LARRY ARNICK
Pre-Inspection 5/18/2018 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 5/21/2018 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 5/21/2018 Conditional Approval TIMOTHY GRIFFITH
Pre-Inspection 5/21/2018 Partial Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 5/22/2018 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 5/22/2018 Conditional Approval TIMOTHY GRIFFITH
Pre-Inspection 5/22/2018 Not Ready for Inspection TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 5/23/2018 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 5/23/2018 Conditional Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 5/24/2018 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 5/24/2018 Conditional Approval TIMOTHY GRIFFITH
Pre-Inspection 5/24/2018 Not Ready for Inspection TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 5/25/2018 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 5/25/2018 Conditional Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 5/29/2018 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 5/29/2018 Conditional Approval TIMOTHY GRIFFITH
Pre-Inspection 5/29/2018 Partial Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 5/30/2018 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 5/30/2018 Conditional Approval TIMOTHY GRIFFITH
Pre-Inspection 5/30/2018 Not Ready for Inspection TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 5/31/2018 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 5/31/2018 Conditional Approval TIMOTHY GRIFFITH
Pre-Inspection 5/31/2018 Not Ready for Inspection TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 6/1/2018 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 6/1/2018 Conditional Approval TIMOTHY GRIFFITH
Pre-Inspection 6/1/2018 Partial Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 6/4/2018 Conditional Approval TIMOTHY GRIFFITH
Pre-Inspection 6/4/2018 Partial Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 6/5/2018 Conditional Approval TIMOTHY GRIFFITH
Pre-Inspection 6/5/2018 Partial Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 6/6/2018 Conditional Approval TIMOTHY GRIFFITH
Pre-Inspection 6/6/2018 Partial Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 6/7/2018 Conditional Approval TIMOTHY GRIFFITH
Pre-Inspection 6/7/2018 Partial Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 6/8/2018 Conditional Approval TIMOTHY GRIFFITH
Pre-Inspection 6/8/2018 Not Ready for Inspection TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 6/11/2018 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 6/11/2018 Conditional Approval TIMOTHY GRIFFITH
Pre-Inspection 6/11/2018 Not Ready for Inspection TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 6/12/2018 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 6/12/2018 Conditional Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 6/13/2018 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 6/13/2018 Conditional Approval TIMOTHY GRIFFITH
Pre-Inspection 6/13/2018 Not Ready for Inspection TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 6/14/2018 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 6/14/2018 Conditional Approval TIMOTHY GRIFFITH
Pre-Inspection 6/14/2018 Not Ready for Inspection TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 6/15/2018 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 6/15/2018 Conditional Approval TIMOTHY GRIFFITH
Pre-Inspection 6/15/2018 Partial Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 6/18/2018 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 6/19/2018 Conditional Approval TIMOTHY GRIFFITH
Pre-Inspection 6/19/2018 Not Ready for Inspection TIMOTHY GRIFFITH
Deputy Reinf. Concrete 6/20/2018 Conditional Approval TIMOTHY GRIFFITH
Pre-Inspection 6/20/2018 Partial Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 6/21/2018 Conditional Approval TIMOTHY GRIFFITH
Pre-Inspection 6/21/2018 Partial Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 6/22/2018 Conditional Approval TIMOTHY GRIFFITH
Pre-Inspection 6/22/2018 Not Ready for Inspection TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 6/25/2018 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 6/25/2018 Conditional Approval TIMOTHY GRIFFITH
Pre-Inspection 6/25/2018 Not Ready for Inspection TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 6/26/2018 Conditional Approval ALBERT COMISARI
Deputy Reinf. Concrete 6/26/2018 Conditional Approval ALBERT COMISARI
Pre-Inspection 6/26/2018 Not Ready for Inspection ALBERT COMISARI
Deputy Drilled-In Anchors 6/27/2018 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 6/27/2018 Conditional Approval TIMOTHY GRIFFITH
Pre-Inspection 6/27/2018 Not Ready for Inspection TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 6/28/2018 Conditional Approval ALBERT COMISARI
Deputy Reinf. Concrete 6/28/2018 Conditional Approval ALBERT COMISARI
Pre-Inspection 6/28/2018 Not Ready for Inspection ALBERT COMISARI
Deputy Drilled-In Anchors 6/29/2018 Conditional Approval ALBERT COMISARI
Deputy Reinf. Concrete 6/29/2018 Conditional Approval ALBERT COMISARI
Pre-Inspection 6/29/2018 Not Ready for Inspection ALBERT COMISARI
Deputy Reinf. Concrete 7/2/2018 Conditional Approval ALBERT COMISARI
Footing/Foundation/Slab 7/2/2018 Partial Approval ALBERT COMISARI
METHANE-Barrier 7/2/2018 Conditional Approval ALBERT COMISARI
METHANE-Subgrade 7/2/2018 Conditional Approval ALBERT COMISARI
Deputy Reinf. Concrete 7/3/2018 Conditional Approval ALBERT COMISARI
Pre-Inspection 7/3/2018 Not Ready for Inspection ALBERT COMISARI
Deputy Reinf. Concrete 7/5/2018 Conditional Approval ALBERT COMISARI
Pre-Inspection 7/5/2018 Not Ready for Inspection ALBERT COMISARI
Deputy Reinf. Concrete 7/6/2018 Conditional Approval ALBERT COMISARI
Pre-Inspection 7/6/2018 Conditional Approval ALBERT COMISARI
Deputy Reinf. Concrete 7/9/2018 Conditional Approval ALBERT COMISARI
Pre-Inspection 7/9/2018 Not Ready for Inspection TIMOTHY GRIFFITH
Deputy Reinf. Concrete 7/10/2018 Conditional Approval TIMOTHY GRIFFITH
Pre-Inspection 7/10/2018 Not Ready for Inspection TIMOTHY GRIFFITH
Deputy Reinf. Concrete 7/11/2018 Conditional Approval TIMOTHY GRIFFITH
Pre-Inspection 7/11/2018 Not Ready for Inspection TIMOTHY GRIFFITH
Deputy Reinf. Concrete 7/12/2018 Conditional Approval TIMOTHY GRIFFITH
Pre-Inspection 7/12/2018 Not Ready for Inspection ALBERT COMISARI
Deputy Reinf. Concrete 7/13/2018 Conditional Approval TIMOTHY GRIFFITH
Pre-Inspection 7/13/2018 Partial Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 7/16/2018 Conditional Approval ALBERT COMISARI
Deputy Reinf. Concrete 7/16/2018 Conditional Approval ALBERT COMISARI
Pre-Inspection 7/16/2018 Not Ready for Inspection ALBERT COMISARI
Deputy Drilled-In Anchors 7/17/2018 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 7/17/2018 Conditional Approval TIMOTHY GRIFFITH
Pre-Inspection 7/17/2018 Not Ready for Inspection TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 7/18/2018 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 7/18/2018 Conditional Approval TIMOTHY GRIFFITH
Pre-Inspection 7/18/2018 Not Ready for Inspection TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 7/19/2018 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 7/19/2018 Conditional Approval TIMOTHY GRIFFITH
Pre-Inspection 7/19/2018 Not Ready for Inspection ALBERT COMISARI
Deputy Drilled-In Anchors 7/20/2018 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 7/20/2018 Conditional Approval TIMOTHY GRIFFITH
Pre-Inspection 7/20/2018 Not Ready for Inspection TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 7/23/2018 Conditional Approval ALBERT COMISARI
Deputy Reinf. Concrete 7/23/2018 Conditional Approval ALBERT COMISARI
Pre-Inspection 7/23/2018 Partial Inspection TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 7/24/2018 Conditional Approval ALBERT COMISARI
Deputy Reinf. Concrete 7/24/2018 Conditional Approval ALBERT COMISARI
Pre-Inspection 7/24/2018 Partial Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 7/25/2018 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 7/25/2018 Conditional Approval TIMOTHY GRIFFITH
Pre-Inspection 7/25/2018 Not Ready for Inspection TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 7/26/2018 Conditional Approval ALBERT COMISARI
Deputy Reinf. Concrete 7/26/2018 Conditional Approval ALBERT COMISARI
Pre-Inspection 7/26/2018 Conditional Approval ALBERT COMISARI
Deputy Drilled-In Anchors 7/27/2018 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 7/27/2018 Conditional Approval TIMOTHY GRIFFITH
Pre-Inspection 7/27/2018 Partial Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 7/30/2018 Conditional Approval ALBERT COMISARI
Deputy Reinf. Concrete 7/30/2018 Conditional Approval ALBERT COMISARI
Pre-Inspection 7/30/2018 Partial Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 7/31/2018 Conditional Approval ALBERT COMISARI
Deputy Reinf. Concrete 7/31/2018 Conditional Approval ALBERT COMISARI
Pre-Inspection 7/31/2018 Not Ready for Inspection ALBERT COMISARI
Deputy Drilled-In Anchors 8/1/2018 Conditional Approval ALBERT COMISARI
Deputy Reinf. Concrete 8/1/2018 Conditional Approval ALBERT COMISARI
Deputy Drilled-In Anchors 8/2/2018 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 8/2/2018 Conditional Approval TIMOTHY GRIFFITH
Pre-Inspection 8/2/2018 Approved TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 8/3/2018 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 8/3/2018 Conditional Approval TIMOTHY GRIFFITH
Pre-Inspection 8/3/2018 Not Ready for Inspection TIMOTHY GRIFFITH
Pre-Inspection 8/4/2018 Partial Approval JONATHAN ALLEN
Deputy Reinf. Concrete 8/6/2018 Conditional Approval ALBERT COMISARI
Pre-Inspection 8/6/2018 Not Ready for Inspection ALBERT COMISARI
Deputy Reinf. Concrete 8/7/2018 Conditional Approval ALBERT COMISARI
Reinforced Masonry Frame 8/7/2018 Partial Approval ALBERT COMISARI
Deputy Reinf. Concrete 8/8/2018 Conditional Approval ALBERT COMISARI
Masonry Wall/Backfill 8/8/2018 Conditional Approval ALBERT COMISARI
Pre-Inspection 8/8/2018 Not Ready for Inspection ALBERT COMISARI
Deputy Reinf. Concrete 8/9/2018 Conditional Approval TIMOTHY GRIFFITH
Pre-Inspection 8/9/2018 Not Ready for Inspection TIMOTHY GRIFFITH
Deputy Reinf. Concrete 8/10/2018 Conditional Approval TIMOTHY GRIFFITH
Pre-Inspection 8/10/2018 Not Ready for Inspection TIMOTHY GRIFFITH
Deputy Reinf. Concrete 8/13/2018 Conditional Approval TIMOTHY GRIFFITH
Floor/Roof Diaphrgm/Shear Wall 8/13/2018 Approved TIMOTHY GRIFFITH
Deputy Reinf. Concrete 8/14/2018 Conditional Approval TIMOTHY GRIFFITH
Pre-Inspection 8/14/2018 Not Ready for Inspection TIMOTHY GRIFFITH
Deputy Reinf. Concrete 8/15/2018 Conditional Approval TIMOTHY GRIFFITH
Pre-Inspection 8/15/2018 Partial Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 8/16/2018 Conditional Approval TIMOTHY GRIFFITH
Pre-Inspection 8/16/2018 Not Ready for Inspection TIMOTHY GRIFFITH
Deputy Reinf. Concrete 8/17/2018 Conditional Approval TIMOTHY GRIFFITH
Pre-Inspection 8/17/2018 Not Ready for Inspection TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 8/20/2018 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 8/20/2018 Conditional Approval TIMOTHY GRIFFITH
Pre-Inspection 8/20/2018 Not Ready for Inspection TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 8/21/2018 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 8/21/2018 Conditional Approval TIMOTHY GRIFFITH
Pre-Inspection 8/21/2018 Partial Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 8/22/2018 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 8/22/2018 Conditional Approval TIMOTHY GRIFFITH
Masonry Wall/Backfill 8/22/2018 Not Ready for Inspection ALBERT COMISARI
Pre-Inspection 8/22/2018 Not Ready for Inspection ALBERT COMISARI
Deputy Drilled-In Anchors 8/23/2018 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 8/23/2018 Conditional Approval TIMOTHY GRIFFITH
Masonry Wall/Backfill 8/23/2018 Partial Approval TIMOTHY GRIFFITH
Pre-Inspection 8/23/2018 Partial Approval TIMOTHY GRIFFITH
Final 8/24/2018 Not Ready for Inspection ALBERT COMISARI
Pre-Inspection 8/24/2018 Not Ready for Inspection ALBERT COMISARI
SGSOV-Seismic Gas S/O Valve 8/24/2018 SGSOV Approved ALBERT COMISARI
Smoke Detectors 8/24/2018 Approved ALBERT COMISARI
Structural Steel Frame 8/24/2018 Partial Approval ALBERT COMISARI
Deputy Reinf. Concrete 8/27/2018 Conditional Approval TIMOTHY GRIFFITH
Pre-Inspection 8/27/2018 Partial Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 8/28/2018 Conditional Approval TIMOTHY GRIFFITH
Footing/Foundation/Slab 8/28/2018 Not Ready for Inspection TIMOTHY GRIFFITH
METHANE-Barrier 8/28/2018 Not Ready for Inspection TIMOTHY GRIFFITH
METHANE-Subgrade 8/28/2018 Not Ready for Inspection TIMOTHY GRIFFITH
Pre-Inspection 8/28/2018 Not Ready for Inspection TIMOTHY GRIFFITH
Deputy Reinf. Concrete 8/29/2018 Conditional Approval TIMOTHY GRIFFITH
Pre-Inspection 8/29/2018 Partial Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 8/30/2018 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 8/31/2018 Conditional Approval TIMOTHY GRIFFITH
Masonry Wall/Backfill 8/31/2018 Partial Approval TIMOTHY GRIFFITH
Pre-Inspection 8/31/2018 Partial Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 9/4/2018 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 9/4/2018 Conditional Approval TIMOTHY GRIFFITH
Pre-Inspection 9/4/2018 Not Ready for Inspection TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 9/5/2018 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 9/5/2018 Conditional Approval TIMOTHY GRIFFITH
Masonry Wall/Backfill 9/5/2018 Partial Approval TIMOTHY GRIFFITH
Pre-Inspection 9/5/2018 Partial Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 9/6/2018 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 9/6/2018 Conditional Approval TIMOTHY GRIFFITH
Drywall Nailing 9/6/2018 Partial Approval TIMOTHY GRIFFITH
Masonry Wall/Backfill 9/6/2018 Not Ready for Inspection TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 9/7/2018 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 9/7/2018 Conditional Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 9/10/2018 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 9/10/2018 Conditional Approval TIMOTHY GRIFFITH
Final 9/10/2018 Not Ready for Inspection TIMOTHY GRIFFITH
Footing/Foundation/Slab 9/10/2018 Partial Approval TIMOTHY GRIFFITH
METHANE-Barrier 9/10/2018 Not Ready for Inspection TIMOTHY GRIFFITH
METHANE-Subgrade 9/10/2018 Not Ready for Inspection TIMOTHY GRIFFITH
Masonry Wall/Backfill 9/10/2018 Partial Approval TIMOTHY GRIFFITH
Structural Steel Frame 9/10/2018 Partial Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 9/11/2018 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 9/11/2018 Conditional Approval TIMOTHY GRIFFITH
Final 9/11/2018 Off-Hour Fees Due
Footing/Foundation/Slab 9/11/2018 Off-Hour Fees Due
METHANE-Barrier 9/11/2018 Off-Hour Fees Due
METHANE-Subgrade 9/11/2018 Off-Hour Fees Due
Pre-Inspection 9/11/2018 Not Ready for Inspection TIMOTHY GRIFFITH
Pre-Inspection 9/11/2018 Partial Approval TIMOTHY GRIFFITH
Structural Steel Frame 9/11/2018 Off-Hour Fees Due
Deputy Drilled-In Anchors 9/12/2018 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 9/12/2018 Conditional Approval TIMOTHY GRIFFITH
Masonry Wall/Backfill 9/12/2018 Partial Approval TIMOTHY GRIFFITH
Pre-Inspection 9/12/2018 Not Ready for Inspection TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 9/13/2018 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 9/13/2018 Conditional Approval TIMOTHY GRIFFITH
Pre-Inspection 9/13/2018 Not Ready for Inspection TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 9/14/2018 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 9/14/2018 Conditional Approval TIMOTHY GRIFFITH
Masonry Wall/Backfill 9/17/2018 Partial Approval TIMOTHY GRIFFITH
Pre-Inspection 9/18/2018 Not Ready for Inspection TIMOTHY GRIFFITH
Pre-Inspection 9/19/2018 Not Ready for Inspection TIMOTHY GRIFFITH
Pre-Inspection 9/20/2018 Not Ready for Inspection TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 9/24/2018 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 9/24/2018 Conditional Approval TIMOTHY GRIFFITH
Pre-Inspection 9/24/2018 Not Ready for Inspection TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 9/25/2018 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 9/25/2018 Conditional Approval TIMOTHY GRIFFITH
Masonry Wall/Backfill 9/25/2018 Partial Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 9/26/2018 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 9/26/2018 Conditional Approval TIMOTHY GRIFFITH
Pre-Inspection 9/26/2018 Partial Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 9/27/2018 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 9/27/2018 Conditional Approval TIMOTHY GRIFFITH
Pre-Inspection 9/27/2018 Not Ready for Inspection TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 9/28/2018 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 9/28/2018 Conditional Approval TIMOTHY GRIFFITH
Pre-Inspection 9/28/2018 Not Ready for Inspection TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 10/1/2018 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 10/1/2018 Conditional Approval TIMOTHY GRIFFITH
Masonry Wall/Backfill 10/1/2018 Partial Approval TIMOTHY GRIFFITH
Pre-Inspection 10/1/2018 Partial Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 10/2/2018 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 10/2/2018 Conditional Approval TIMOTHY GRIFFITH
Pre-Inspection 10/2/2018 Partial Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 10/3/2018 Conditional Approval ALBERT COMISARI
Deputy Reinf. Concrete 10/3/2018 Conditional Approval ALBERT COMISARI
Pre-Inspection 10/3/2018 Partial Approval ALBERT COMISARI
Deputy Drilled-In Anchors 10/4/2018 Conditional Approval ALBERT COMISARI
Deputy Reinf. Concrete 10/4/2018 Conditional Approval ALBERT COMISARI
Pre-Inspection 10/4/2018 Partial Approval ALBERT COMISARI
Deputy Drilled-In Anchors 10/5/2018 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 10/5/2018 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 10/9/2018 Conditional Approval TIMOTHY GRIFFITH
Masonry Wall/Backfill 10/9/2018 Partial Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 10/10/2018 Conditional Approval TIMOTHY GRIFFITH
Pre-Inspection 10/10/2018 Not Ready for Inspection TIMOTHY GRIFFITH
Deputy Reinf. Concrete 10/11/2018 Conditional Approval TIMOTHY GRIFFITH
Pre-Inspection 10/11/2018 Not Ready for Inspection TIMOTHY GRIFFITH
Deputy Reinf. Concrete 10/12/2018 Conditional Approval ALBERT COMISARI
Pre-Inspection 10/12/2018 Not Ready for Inspection ALBERT COMISARI
Pre-Inspection 10/15/2018 Partial Approval TIMOTHY GRIFFITH
Reinforced Masonry Frame 10/15/2018 Partial Approval TIMOTHY GRIFFITH
Pre-Inspection 10/16/2018 Not Ready for Inspection TIMOTHY GRIFFITH
Pre-Inspection 10/17/2018 Partial Approval TIMOTHY GRIFFITH
Pre-Inspection 10/18/2018 Partial Approval TIMOTHY GRIFFITH
Pre-Inspection 10/19/2018 Partial Approval TIMOTHY GRIFFITH
Reinforced Masonry Frame 10/19/2018 Partial Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 10/22/2018 Conditional Approval ALBERT COMISARI
Deputy Reinf. Concrete 10/22/2018 Conditional Approval ALBERT COMISARI
Deputy Drilled-In Anchors 10/23/2018 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 10/23/2018 Conditional Approval TIMOTHY GRIFFITH
Pre-Inspection 10/23/2018 Not Ready for Inspection TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 10/24/2018 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 10/24/2018 Conditional Approval TIMOTHY GRIFFITH
Masonry Wall/Backfill 10/24/2018 Partial Approval TIMOTHY GRIFFITH
Pre-Inspection 10/24/2018 Not Ready for Inspection TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 10/25/2018 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 10/25/2018 Conditional Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 10/26/2018 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 10/26/2018 Conditional Approval TIMOTHY GRIFFITH
Pre-Inspection 10/26/2018 Not Ready for Inspection TIMOTHY GRIFFITH
Deputy Reinf. Concrete 10/29/2018 Conditional Approval TIMOTHY GRIFFITH
Pre-Inspection 10/29/2018 Not Ready for Inspection TIMOTHY GRIFFITH
Deputy Reinf. Concrete 10/30/2018 Conditional Approval TIMOTHY GRIFFITH
Pre-Inspection 10/30/2018 Not Ready for Inspection TIMOTHY GRIFFITH
Deputy Reinf. Concrete 10/31/2018 Conditional Approval TIMOTHY GRIFFITH
Pre-Inspection 10/31/2018 Not Ready for Inspection TIMOTHY GRIFFITH
Deputy Reinf. Concrete 11/2/2018 Conditional Approval TIMOTHY GRIFFITH
Pre-Inspection 11/2/2018 Not Ready for Inspection TIMOTHY GRIFFITH
Deputy Reinf. Concrete 11/5/2018 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 11/6/2018 Conditional Approval TIMOTHY GRIFFITH
Masonry Wall/Backfill 11/6/2018 Not Ready for Inspection TIMOTHY GRIFFITH
Pre-Inspection 11/6/2018 Not Ready for Inspection TIMOTHY GRIFFITH
Deputy Reinf. Concrete 11/7/2018 Conditional Approval TIMOTHY GRIFFITH
Masonry Wall/Backfill 11/7/2018 Not Ready for Inspection TIMOTHY GRIFFITH
Pre-Inspection 11/7/2018 Not Ready for Inspection TIMOTHY GRIFFITH
Deputy Reinf. Concrete 11/8/2018 Conditional Approval TIMOTHY GRIFFITH
Masonry Wall/Backfill 11/8/2018 Partial Approval TIMOTHY GRIFFITH
Pre-Inspection 11/8/2018 Not Ready for Inspection TIMOTHY GRIFFITH
Deputy Reinf. Concrete 11/9/2018 Conditional Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 11/13/2018 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 11/13/2018 Conditional Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 11/14/2018 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 11/14/2018 Conditional Approval TIMOTHY GRIFFITH
Pre-Inspection 11/14/2018 Not Ready for Inspection TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 11/15/2018 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 11/15/2018 Conditional Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 11/16/2018 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 11/16/2018 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 11/19/2018 Conditional Approval ALBERT COMISARI
Deputy Reinf. Concrete 11/20/2018 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 11/21/2018 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 11/26/2018 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 11/27/2018 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 11/28/2018 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 11/29/2018 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 12/3/2018 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 12/4/2018 Conditional Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 12/5/2018 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 12/5/2018 Conditional Approval TIMOTHY GRIFFITH
Masonry Wall/Backfill 12/5/2018 Approved TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 12/6/2018 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 12/6/2018 Conditional Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 12/7/2018 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 12/7/2018 Conditional Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 12/10/2018 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 12/10/2018 Conditional Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 12/11/2018 Conditional Approval ALBERT COMISARI
Deputy Reinf. Concrete 12/11/2018 Conditional Approval ALBERT COMISARI
Deputy Drilled-In Anchors 12/12/2018 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 12/12/2018 Conditional Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 12/13/2018 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 12/13/2018 Conditional Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 12/14/2018 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 12/14/2018 Conditional Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 12/17/2018 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 12/17/2018 Conditional Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 12/18/2018 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 12/18/2018 Conditional Approval TIMOTHY GRIFFITH
Pre-Inspection 12/18/2018 Not Ready for Inspection TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 12/19/2018 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 12/19/2018 Conditional Approval TIMOTHY GRIFFITH
Pre-Inspection 12/19/2018 Not Ready for Inspection TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 12/20/2018 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 12/20/2018 Conditional Approval TIMOTHY GRIFFITH
Pre-Inspection 12/20/2018 Not Ready for Inspection TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 12/21/2018 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 12/21/2018 Conditional Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 12/24/2018 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 12/24/2018 Conditional Approval TIMOTHY GRIFFITH
Pre-Inspection 12/24/2018 Not Ready for Inspection TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 12/26/2018 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 12/26/2018 Conditional Approval TIMOTHY GRIFFITH
Pre-Inspection 12/26/2018 Not Ready for Inspection TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 12/27/2018 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 12/27/2018 Conditional Approval TIMOTHY GRIFFITH
Pre-Inspection 12/27/2018 Approved TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 12/28/2018 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 12/28/2018 Conditional Approval TIMOTHY GRIFFITH
Pre-Inspection 12/28/2018 Not Ready for Inspection TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 12/31/2018 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 12/31/2018 Conditional Approval TIMOTHY GRIFFITH
Pre-Inspection 12/31/2018 Not Ready for Inspection TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 1/2/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 1/2/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 1/3/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 1/3/2019 Conditional Approval TIMOTHY GRIFFITH
Pre-Inspection 1/3/2019 Not Ready for Inspection TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 1/4/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 1/4/2019 Conditional Approval TIMOTHY GRIFFITH
Pre-Inspection 1/4/2019 Not Ready for Inspection TIMOTHY GRIFFITH
Pre-Inspection 1/7/2019 Not Ready for Inspection ALBERT COMISARI
Deputy Drilled-In Anchors 1/8/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 1/8/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 1/9/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 1/9/2019 Conditional Approval TIMOTHY GRIFFITH
Pre-Inspection 1/9/2019 Not Ready for Inspection TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 1/10/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 1/10/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 1/11/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 1/11/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 1/14/2019 Conditional Approval ALBERT COMISARI
Deputy Reinf. Concrete 1/15/2019 Conditional Approval ALBERT COMISARI
Deputy Reinf. Concrete 1/16/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 1/17/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 1/18/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 1/22/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 1/23/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 1/24/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 1/25/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 1/28/2019 Conditional Approval ALBERT COMISARI
Deputy Reinf. Concrete 1/28/2019 Conditional Approval ALBERT COMISARI
Deputy Drilled-In Anchors 1/29/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 1/29/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 1/30/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 1/30/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 1/31/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 1/31/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 2/1/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 2/1/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 2/4/2019 Conditional Approval ALBERT COMISARI
Deputy Reinf. Concrete 2/4/2019 Conditional Approval ALBERT COMISARI
Deputy Drilled-In Anchors 2/5/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 2/5/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 2/6/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 2/6/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 2/7/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 2/7/2019 Conditional Approval TIMOTHY GRIFFITH
Pre-Inspection 2/7/2019 Not Ready for Inspection TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 2/8/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 2/8/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 2/12/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 2/13/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 2/14/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 2/15/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 2/19/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 2/20/2019 Conditional Approval ALBERT COMISARI
Deputy Drilled-In Anchors 2/21/2019 Conditional Approval ALBERT COMISARI
Deputy Drilled-In Anchors 2/22/2019 Conditional Approval ALBERT COMISARI
Deputy Drilled-In Anchors 2/25/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 2/26/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 2/28/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 3/1/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 3/4/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 3/5/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 3/6/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 3/7/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 3/13/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 3/14/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 3/15/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 3/18/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 3/19/2019 Conditional Approval TIMOTHY GRIFFITH
Pre-Inspection 3/21/2019 Partial Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 3/22/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 3/26/2019 Conditional Approval ALBERT COMISARI
Deputy Drilled-In Anchors 3/27/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 3/28/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 3/29/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 4/1/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 4/2/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 4/3/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 4/4/2019 Conditional Approval TIMOTHY GRIFFITH
SWPPP-Const. Storm Water 4/4/2019 Violation Observed TIMOTHY GRIFFITH
Structural Steel Frame 4/4/2019 Not Ready for Inspection TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 4/5/2019 Conditional Approval TIMOTHY GRIFFITH
Pre-Inspection 4/10/2019 Partial Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 4/12/2019 Conditional Approval TIMOTHY GRIFFITH
Pre-Inspection 4/26/2019 Approved TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 4/29/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 4/30/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 5/1/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 5/3/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 5/14/2019 Conditional Approval TIMOTHY GRIFFITH
Pre-Inspection 5/23/2019 Approved TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 6/4/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 6/4/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 6/5/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 6/5/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 6/6/2019 Conditional Approval JONATHAN ALLEN
Deputy Reinf. Concrete 6/6/2019 Conditional Approval JONATHAN ALLEN
Deputy Drilled-In Anchors 6/7/2019 Conditional Approval JONATHAN ALLEN
Deputy Reinf. Concrete 6/7/2019 Conditional Approval JONATHAN ALLEN
Deputy Drilled-In Anchors 6/10/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Reinf. Concrete 6/10/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 6/11/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 6/12/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 6/13/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 6/14/2019 Conditional Approval TIMOTHY GRIFFITH
Deputy Drilled-In Anchors 6/17/2019 Conditional Approval JONATHAN ALLEN
Deputy Drilled-In Anchors 6/19/2019 Conditional Approval JONATHAN ALLEN
Deputy Reinf. Concrete 6/19/2019 Conditional Approval JONATHAN ALLEN
Deputy Drilled-In Anchors 6/20/2019 Approved JONATHAN ALLEN
Deputy Reinf. Concrete 6/20/2019 Approved JONATHAN ALLEN
Deputy Drilled-In Anchors 6/21/2019 Approved JONATHAN ALLEN
Deputy Reinf. Concrete 6/21/2019 Approved JONATHAN ALLEN
Deputy Drilled-In Anchors 6/24/2019 Approved JONATHAN ALLEN
Deputy Reinf. Concrete 6/24/2019 Approved JONATHAN ALLEN
Deputy Drilled-In Anchors 6/25/2019 Approved JONATHAN ALLEN
Deputy Reinf. Concrete 6/25/2019 Approved JONATHAN ALLEN
Deputy Drilled-In Anchors 6/26/2019 Approved JONATHAN ALLEN
Deputy Drilled-In Anchors 6/27/2019 Conditional Approval JONATHAN ALLEN
Deputy Drilled-In Anchors 6/28/2019 Approved JONATHAN ALLEN
Deputy Drilled-In Anchors 7/1/2019 Approved JONATHAN ALLEN
Deputy Drilled-In Anchors 7/9/2019 Conditional Approval ALBERT COMISARI
Deputy Drilled-In Anchors 7/10/2019 Approved JONATHAN ALLEN
Deputy Drilled-In Anchors 7/11/2019 Conditional Approval JONATHAN ALLEN
Deputy Drilled-In Anchors 7/12/2019 Approved JONATHAN ALLEN
Deputy Drilled-In Anchors 7/15/2019 Conditional Approval JONATHAN ALLEN
Deputy Drilled-In Anchors 7/16/2019 Approved JONATHAN ALLEN
Deputy Drilled-In Anchors 7/17/2019 Conditional Approval JONATHAN ALLEN
Deputy Drilled-In Anchors 7/18/2019 Approved JONATHAN ALLEN
Wall Anchors 7/19/2019 Partial Approval ALBERT COMISARI
Deputy Drilled-In Anchors 7/22/2019 Conditional Approval JONATHAN ALLEN
Deputy Drilled-In Anchors 7/23/2019 Approved JONATHAN ALLEN
Deputy Drilled-In Anchors 7/25/2019 Conditional Approval JONATHAN ALLEN
Deputy Drilled-In Anchors 7/26/2019 Conditional Approval JONATHAN ALLEN
Deputy Drilled-In Anchors 7/29/2019 Conditional Approval JONATHAN ALLEN
Deputy Drilled-In Anchors 7/30/2019 Conditional Approval JONATHAN ALLEN
Deputy Drilled-In Anchors 7/31/2019 Conditional Approval JONATHAN ALLEN
Deputy Drilled-In Anchors 8/1/2019 Conditional Approval JONATHAN ALLEN
Deputy Drilled-In Anchors 8/2/2019 Conditional Approval JONATHAN ALLEN
Deputy Drilled-In Anchors 8/5/2019 Approved JONATHAN ALLEN
Deputy Drilled-In Anchors 8/6/2019 Conditional Approval JONATHAN ALLEN
Light Gage Steel Frame 8/6/2019 Conditional Approval ALBERT COMISARI
Deputy Drilled-In Anchors 8/7/2019 Conditional Approval JONATHAN ALLEN
Deputy Other (see comments) 8/8/2019 Approved JONATHAN ALLEN
Deputy Reinf. Concrete 8/8/2019 Approved JONATHAN ALLEN
Deputy Other (see comments) 8/9/2019 Conditional Approval JONATHAN ALLEN
Deputy Reinf. Concrete 8/9/2019 Conditional Approval JONATHAN ALLEN
Deputy Other (see comments) 8/12/2019 Conditional Approval JONATHAN ALLEN
Deputy Reinf. Concrete 8/12/2019 Conditional Approval JONATHAN ALLEN
Deputy Other (see comments) 8/13/2019 Approved JONATHAN ALLEN
Deputy Reinf. Concrete 8/13/2019 Approved JONATHAN ALLEN
Deputy Drilled-In Anchors 8/21/2019 Conditional Approval ALBERT COMISARI
Deputy Drilled-In Anchors 8/22/2019 Conditional Approval ALBERT COMISARI
Deputy Drilled-In Anchors 8/23/2019 Conditional Approval ALBERT COMISARI
Deputy Drilled-In Anchors 8/26/2019 Approved JONATHAN ALLEN
Deputy Drilled-In Anchors 8/27/2019 Conditional Approval JONATHAN ALLEN
Deputy Drilled-In Anchors 9/6/2019 Conditional Approval JONATHAN ALLEN
Deputy Reinf. Concrete 9/6/2019 Conditional Approval JONATHAN ALLEN
Deputy Drilled-In Anchors 9/9/2019 Conditional Approval ALBERT COMISARI
Deputy Reinf. Concrete 9/9/2019 Conditional Approval ALBERT COMISARI
Deputy Drilled-In Anchors 9/10/2019 Conditional Approval ALBERT COMISARI
Deputy Reinf. Concrete 9/10/2019 Conditional Approval ALBERT COMISARI
Deputy Drilled-In Anchors 9/11/2019 Conditional Approval JONATHAN ALLEN
Deputy Reinf. Concrete 9/11/2019 Conditional Approval JONATHAN ALLEN
Deputy Drilled-In Anchors 9/12/2019 Conditional Approval JONATHAN ALLEN
Deputy Reinf. Concrete 9/12/2019 Conditional Approval JONATHAN ALLEN
Deputy Drilled-In Anchors 9/13/2019 Approved JONATHAN ALLEN
Deputy Reinf. Concrete 9/13/2019 Approved JONATHAN ALLEN
Deputy Drilled-In Anchors 9/16/2019 Approved JONATHAN ALLEN
Deputy Drilled-In Anchors 9/23/2019 Approved JONATHAN ALLEN
Deputy Drilled-In Anchors 9/24/2019 Approved JONATHAN ALLEN
Deputy Drilled-In Anchors 9/25/2019 Approved JONATHAN ALLEN
Deputy Drilled-In Anchors 9/26/2019 Conditional Approval JONATHAN ALLEN
Deputy Drilled-In Anchors 9/27/2019 Approved JONATHAN ALLEN
Deputy Drilled-In Anchors 9/30/2019 Approved JONATHAN ALLEN
Deputy Drilled-In Anchors 10/1/2019 Approved JONATHAN ALLEN
Deputy Drilled-In Anchors 10/2/2019 Conditional Approval JONATHAN ALLEN
Deputy Drilled-In Anchors 10/3/2019 Conditional Approval JONATHAN ALLEN
Deputy Drilled-In Anchors 10/4/2019 Approved JONATHAN ALLEN
Deputy Drilled-In Anchors 10/7/2019 Conditional Approval JONATHAN ALLEN
Deputy Drilled-In Anchors 10/8/2019 Conditional Approval JONATHAN ALLEN
Deputy Drilled-In Anchors 10/9/2019 Conditional Approval JONATHAN ALLEN
Deputy Drilled-In Anchors 10/10/2019 Approved JONATHAN ALLEN
Deputy Drilled-In Anchors 10/11/2019 Approved JONATHAN ALLEN
Deputy Drilled-In Anchors 10/15/2019 Approved JONATHAN ALLEN
Deputy Drilled-In Anchors 10/16/2019 Approved JONATHAN ALLEN
Deputy Drilled-In Anchors 10/17/2019 Approved JONATHAN ALLEN
Deputy Drilled-In Anchors 10/18/2019 Conditional Approval JONATHAN ALLEN
Pre-Inspection 10/22/2019 Conditional Approval ALBERT COMISARI
Deputy Drilled-In Anchors 10/25/2019 Approved JONATHAN ALLEN
Deputy Drilled-In Anchors 11/1/2019 Approved JONATHAN ALLEN
Deputy Drilled-In Anchors 11/4/2019 Approved JONATHAN ALLEN
Deputy Drilled-In Anchors 11/5/2019 Approved JONATHAN ALLEN
Deputy Drilled-In Anchors 11/6/2019 Conditional Approval JONATHAN ALLEN
Deputy Drilled-In Anchors 11/7/2019 Approved JONATHAN ALLEN
Deputy Drilled-In Anchors 11/19/2019 Approved JONATHAN ALLEN
Deputy Drilled-In Anchors 11/20/2019 Approved JONATHAN ALLEN
Deputy Drilled-In Anchors 11/21/2019 Approved JONATHAN ALLEN
Deputy Drilled-In Anchors 11/22/2019 Approved JONATHAN ALLEN
Deputy Drilled-In Anchors 11/25/2019 Approved JONATHAN ALLEN
Special/Order Compliance 11/27/2019 Approved JONATHAN ALLEN
Deputy Drilled-In Anchors 12/10/2019 Approved JONATHAN ALLEN
Deputy Drilled-In Anchors 12/11/2019 Approved JONATHAN ALLEN
Deputy Drilled-In Anchors 12/12/2019 Conditional Approval ALBERT COMISARI
Deputy Drilled-In Anchors 12/13/2019 Approved JONATHAN ALLEN
Deputy Drilled-In Anchors 3/3/2020 Approved JONATHAN ALLEN
Deputy Reinf. Concrete 3/3/2020 Approved JONATHAN ALLEN
Deputy Drilled-In Anchors 3/4/2020 Approved JONATHAN ALLEN
Deputy Reinf. Concrete 3/4/2020 Approved JONATHAN ALLEN
Deputy Drilled-In Anchors 3/5/2020 Conditional Approval JONATHAN ALLEN
Deputy Reinf. Concrete 3/5/2020 Conditional Approval JONATHAN ALLEN
Deputy Drilled-In Anchors 3/6/2020 Conditional Approval ALBERT COMISARI
Deputy Reinf. Concrete 3/6/2020 Conditional Approval ALBERT COMISARI
Deputy Drilled-In Anchors 3/9/2020 Approved JONATHAN ALLEN
Deputy Reinf. Concrete 3/9/2020 Conditional Approval JONATHAN ALLEN
Deputy Drilled-In Anchors 3/13/2020 Approved JONATHAN ALLEN
Deputy Reinf. Concrete 3/13/2020 Approved JONATHAN ALLEN
Deputy Drilled-In Anchors 3/16/2020 Approved JONATHAN ALLEN
Deputy Reinf. Concrete 3/16/2020 Approved JONATHAN ALLEN
Deputy Drilled-In Anchors 3/17/2020 Approved JONATHAN ALLEN
Deputy Reinf. Concrete 3/17/2020 Approved JONATHAN ALLEN
Deputy Drilled-In Anchors 3/18/2020 Approved JONATHAN ALLEN
Deputy Reinf. Concrete 3/18/2020 Approved JONATHAN ALLEN
Deputy Drilled-In Anchors 3/19/2020 Approved JONATHAN ALLEN
Deputy Reinf. Concrete 3/19/2020 Approved JONATHAN ALLEN
Final 11/20/2020 Conditional Approval JONATHAN ALLEN
Floor/Roof Diaphrgm/Shear Wall 11/20/2020 Approved JONATHAN ALLEN
Footing/Foundation/Slab 11/20/2020 Approved JONATHAN ALLEN
METHANE-Barrier 11/20/2020 Approved JONATHAN ALLEN
METHANE-Subgrade 11/20/2020 Approved JONATHAN ALLEN
Reinforced Concrete Frame 11/20/2020 Approved JONATHAN ALLEN
SWPPP-Const. Storm Water 11/20/2020 Completed JONATHAN ALLEN
Structural Steel Frame 11/20/2020 Approved JONATHAN ALLEN
Final 12/7/2020 Not Ready for Inspection JONATHAN ALLEN
Floor/Roof Diaphrgm/Shear Wall 12/7/2020 Approved JONATHAN ALLEN
Insulation 12/7/2020 Approved JONATHAN ALLEN
Special/Order Compliance 12/31/2020 Not Ready for Inspection ALBERT COMISARI
Special/Order Compliance 7/7/2021 Approved JONATHAN ALLEN