1911 N REDCLIFF ST 90039

Certificate Information: 1911 N REDCLIFF ST 90039

Application / Permit
16014-10000-04911
Plan Check / Job No.
B16LA16027
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
Addition of Rec Room, Storage, Patio, Bedroom and Basement Garage to (E) 2 Story SFD. NFPA13D SPRINKLERS
Permit Issued
Issued on 12/27/2017
Issuing Office
Valley
Current Status
CofO Issued on 2/3/2021
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 10/14/2016 APPLICANT
Assigned to Plan Check Engineer 11/3/2016 HERNAN ARREOLA
Corrections Issued 11/14/2016 HERNAN ARREOLA
Quality Review Completed 11/14/2016 CHAD DOI
Building Plans Picked Up 11/18/2016 APPLICANT
Green Plans Picked Up 11/18/2016 APPLICANT
Plan Check Approved 11/17/2017 HERNAN ARREOLA
Issued 12/27/2017 LADBS
CofO in Progress 2/2/2021 RUBEN SALAS
Permit Finaled 2/3/2021 DEROLD HAUFF
CofO Issued 2/3/2021 DEROLD HAUFF
Permit Finaled 2/3/2021 DEROLD HAUFF

Permit Application Clearance Information

BHO/Hillside ordinance Cleared 12/15/2016 SEVAK ISAKHAYAN
BHO/Hillside ordinance Cleared 12/15/2016 SEVAK ISAKHAYAN
BHO/Hillside ordinance Cleared 12/15/2016 SEVAK ISAKHAYAN
Distance to fire station Cleared 12/15/2016 JOHN CONNEALLY
Eng Process Fee Ord 176,300 Cleared 12/15/2016 SEVAK ISAKHAYAN
Hydrant and Access approval Cleared 12/15/2016 JOHN CONNEALLY
Permit Cleared 12/15/2016 SEVAK ISAKHAYAN
Sewer availability Cleared 12/15/2016 SEVAK ISAKHAYAN
Disturb/Remove Protected Trees Cleared 3/28/2017 ADRIAN SANCHEZ
Low Impact Development Cleared 7/24/2017 MITESH PATEL
GPI Written Notices Cleared 7/25/2017 HERNAN ARREOLA
Grading Pre-Inspection Cleared 7/25/2017 HERNAN ARREOLA
Roof/Waste drainage to street Cleared 7/25/2017 MARYAM AZARBAYJANI
Excavation more than 5-ft deep Cleared 12/21/2017 CALOSHA APPROVED

Contact Information

Architect Unruh, Antony M; Lic. No.: C26012 2311 HYPERION AVENUE      LOS ANGELES, CA 90027
Contractor Construction Group Inc A; Lic. No.: 811094-B 6012 ROD AVENUE      WOODLAND HILLS, CA 91367
Engineer Mccullum, Eric William; Lic. No.: C68850 880 MANHATTAN BEACH BLVD 202      MANHATTAN BEACH, CA 90266

Inspector Information

HAMIK HARTOUNIAN, (213) 202-3275 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Excavation/Setback/Form/Re-Bar 6/4/2018 Partial Approval DAVID CHAN
Excavation/Setback/Form/Re-Bar 7/25/2018 Conditional Approval DAVID CHAN
Excavation/Setback/Form/Re-Bar 10/12/2018 Approved DAVID CHAN
Footing/Foundation/Slab 10/12/2018 Partial Approval DAVID CHAN
Deputy Steel/Welding 1/22/2019 No Access for Inspection DAVID CHAN
Reinforced Concrete Frame 1/28/2019 Corrections Issued DAVID CHAN
Reinforced Concrete Frame 2/8/2019 Partial Approval DAVID CHAN
Deputy Drilled-In Anchors 2/28/2019 Conditional Approval CHARLES BOGHOSKHAN
Reinforced Concrete Frame 3/1/2019 Conditional Approval DAVID CHAN
Wood Frame 3/19/2019 Partial Approval DAVID CHAN
Floor/Roof Diaphrgm/Shear Wall 3/28/2019 Partial Approval DAVID CHAN
PLUMBING-Rough 3/28/2019 Partial Approval DAVID CHAN
Deputy Steel/Welding 5/9/2019 Conditional Approval DAVID CHAN
Floor/Roof Diaphrgm/Shear Wall 6/3/2019 Partial Approval DAVID CHAN
PLUMBING-Rough 6/3/2019 Conditional Approval DAVID CHAN
PLUMBING-Rough 6/12/2019 Partial Approval DAVID CHAN
Deputy Drilled-In Anchors 6/21/2019 Conditional Approval DAVID CHAN
Footing/Foundation/Slab 6/24/2019 No Access for Inspection DAVID CHAN
Excavation/Setback/Form/Re-Bar 6/26/2019 Partial Approval DAVID CHAN
Deputy Wood Construction 7/12/2019 Conditional Approval RICHARD STEINBACH
Wood Frame 7/16/2019 Partial Approval DAVID CHAN
BUILDING-Rough-Frame 8/7/2019 Not Ready for Inspection ROBERT VORHIS
ELECTRICAL-Rough 8/7/2019 Not Ready for Inspection ROBERT VORHIS
Green Building Rough 8/7/2019 Not Ready for Inspection ROBERT VORHIS
HVAC-Rough 8/7/2019 Partial Inspection ROBERT VORHIS
PLUMBING-Rough 8/7/2019 Approved ROBERT VORHIS
Verify Sprinkler Sign Off 8/7/2019 Not Ready for Inspection ROBERT VORHIS
BUILDING-Rough-Frame 8/20/2019 Approved DAVID CHAN
ELECTRICAL-Rough 8/20/2019 Approved DAVID CHAN
Green Building Rough 8/20/2019 Approved DAVID CHAN
HVAC-Rough 8/20/2019 Approved DAVID CHAN
Verify Sprinkler Sign Off 8/20/2019 Approved DAVID CHAN
Drywall Nailing 9/6/2019 Approved DAVID CHAN
Insulation 9/6/2019 Approved DAVID CHAN
Shower Pan 9/6/2019 Approved DAVID CHAN
Interior/Exterior Lathing 9/16/2019 Approved DAVID CHAN
Footing/Foundation/Slab 11/6/2019 Not Ready for Inspection DAVID CHAN
Footing/Foundation/Slab 11/12/2019 Partial Approval AJA COLLAY
Reinforced Concrete Frame 11/12/2019 Partial Approval AJA COLLAY
Footing/Foundation/Slab 12/16/2019 Not Ready for Inspection COREY HUPP
Footing/Foundation/Slab 12/20/2019 Partial Approval AJA COLLAY
Footing/Foundation/Slab 1/17/2020 Partial Approval ROBERT VORHIS
ELECTRICAL-Final 1/28/2020 Not Ready for Inspection MICHAEL FAUNCE
Gas Test 1/28/2020 Conditional Approval MICHAEL FAUNCE
Deputy Drilled-In Anchors 3/17/2020 Conditional Approval MICHAEL FAUNCE
Footing/Foundation/Slab 3/19/2020 Corrections Issued RUBEN SALAS
Footing/Foundation/Slab 4/17/2020 Partial Approval KATHRYN BUTTERWORTH
ELECTRICAL-Final 4/22/2020 Approved STUART CHAPMAN
Floor/Roof Diaphrgm/Shear Wall 4/22/2020 Approved STUART CHAPMAN
Gas Test 4/22/2020 Not Ready for Inspection STUART CHAPMAN
Service/Power Release 4/22/2020 Approved STUART CHAPMAN
Wood Frame 4/22/2020 Approved STUART CHAPMAN
Gas Test 4/27/2020 Corrections Issued HAMIK HARTOUNIAN
Gas Test 5/5/2020 Not Ready for Inspection CHRISTOPHER DELLEFIELD
Interior/Exterior Lathing 5/5/2020 Approved CHRISTOPHER DELLEFIELD
Gas Test 5/19/2020 Approved THOMAS LOGRASSO
Final 11/10/2020 Conditional Approval STUART CHAPMAN
Footing/Foundation/Slab 11/10/2020 Approved STUART CHAPMAN
Green Building Final 11/10/2020 Approved STUART CHAPMAN
SGSOV-Seismic Gas S/O Valve 11/10/2020 SGSOV Approved STUART CHAPMAN
Smoke Detectors 11/10/2020 Approved STUART CHAPMAN