5865 S CAMPUS CENTER DR 90094
Certificate Information: 5865 S CAMPUS CENTER DR 90094
- Application / Permit
- 16014-10000-02613
- Plan Check / Job No.
- B16LA08300
- Group
- Building
- Type
- Bldg-Addition
- Sub-Type
- Commercial
- Primary Use
- (13) Office
- Work Description
- CORE AND SHELL ALTERATION, ADDITION, AND CHANGE OF USE FROM AIRPLANE HANGAR TO OFFICE. PROPOSED PARKING LOT RESTRIPE. VOLUNTARY SEISMIC RETROFIT OF EXISTING BOILER ROOM, SEISMICALLY SEPARATED FROM REMAINDER OF STRUCTURE. SEE COMMENTS FOR METHANE CONCERNS. STEEL STAIRS, RAILS (GLASS AND STEEL), FRP AT BOILER ROOM RETROFIT ARE DEFERRED APPROVAL. THE BIKE ENCLOSURE IS ALSO DEFERRED APPROVAL
- Permit Issued
- Issued on 2/9/2017
- Issuing Office
- Metro
- Current Status
- CofO Issued on 1/28/2020
- Certificate of Occupancy
- CofO Issued More Information
Permit Application Status History
Submitted | 6/9/2016 | APPLICANT |
Assigned to Plan Check Engineer | 6/16/2016 | MINYE PAK |
Building Plans Picked Up | 7/18/2016 | APPLICANT |
Disabled Access Plans Picked Up | 7/20/2016 | APPLICANT |
Green Plans Picked Up | 7/20/2016 | APPLICANT |
Corrections Issued | 8/18/2016 | MINYE PAK |
Quality Review Completed | 8/19/2016 | CHARLES CHANG |
Applicant returned to address corrections | 9/1/2016 | JOHN VASQUEZ |
Applicant returned to address corrections | 10/11/2016 | MINYE PAK |
Applicant returned to address corrections | 10/17/2016 | JOHN VASQUEZ |
Applicant returned to address corrections | 10/24/2016 | JOHN VASQUEZ |
Applicant returned to address corrections | 10/28/2016 | MINYE PAK |
Applicant returned to address corrections | 10/31/2016 | JOHN VASQUEZ |
Applicant returned to address corrections | 11/4/2016 | JOHN VASQUEZ |
Plan Check Approved | 11/22/2016 | JOHN VASQUEZ |
Issued | 2/9/2017 | LADBS |
TCO Issued (Expire Date: 12-16-2018) | 6/19/2018 | JONATHAN ALLEN |
TCO Issued (Expire Date: 06-01-2019) | 12/3/2018 | JONATHAN ALLEN |
TCO Issued (Expire Date: 12-09-2019) | 6/12/2019 | JONATHAN ALLEN |
CofO in Progress | 12/5/2019 | ALAN NOVAK |
Permit Finaled | 1/28/2020 | TED RIES |
CofO Issued | 1/28/2020 | TED RIES |
Permit Finaled | 1/28/2020 | TED RIES |
Permit Application Clearance Information
City Hist. Cultural Monument | Cleared | 6/27/2016 | LAMBERT GIESSINGER |
Historic monument | Cleared | 6/27/2016 | LAMBERT GIESSINGER |
Highway dedication | Cleared | 8/15/2016 | PHONG NGUYEN |
Permit | Cleared | 8/15/2016 | PHONG NGUYEN |
Eng Process Fee Ord 176,300 | Cleared | 8/16/2016 | JUSTIN ZHANG |
Hydrant and Access approval | Cleared | 9/1/2016 | ROBERT DUFF |
Specific Plan | Cleared | 9/16/2016 | EDER ROMERO |
Sewer availability | Cleared | 10/11/2016 | ALFREDO JARA |
Low Impact Development | Cleared | 10/13/2016 | AMMAR ELTAWIL |
Stormwater Pollution Mitigatn | Cleared | 10/13/2016 | AMMAR ELTAWIL |
Food Service Establishment | Cleared | 10/14/2016 | PAWAN VERMA |
Roof/Waste drainage to street | Cleared | 10/20/2016 | HUGO RICO |
Miscellaneous | Cleared | 10/24/2016 | SIMON PASTUCHA |
Miscellaneous | Cleared | 10/24/2016 | SIMON PASTUCHA |
Miscellaneous | Cleared | 10/24/2016 | SIMON PASTUCHA |
ZA Case | Cleared | 10/24/2016 | SIMON PASTUCHA |
Fire Marshall Fire Life Safety | Cleared | 10/28/2016 | ANDREW KO |
Green Code | Cleared | 10/31/2016 | ALDO UBAU |
DAS Clearance | Cleared | 11/2/2016 | MINYE PAK |
Miscellaneous | Cleared | 11/21/2016 | DAVID TEHRANI |
Miscellaneous | Cleared | 11/21/2016 | DAVID TEHRANI |
Prkng lot landscape/Water mgmt | Cleared | 11/21/2016 | DAVID TEHRANI |
Site Plan review | Cleared | 11/21/2016 | DAVID TEHRANI |
Specific Plan | Cleared | 11/21/2016 | DAVID TEHRANI |
Specific Plan | Cleared | 11/21/2016 | DAVID TEHRANI |
Building over 3-story or 36-ft | Cleared | 2/8/2017 | CALOSHA APPROVED |
Contact Information
Architect | Hyman, Ted Alan; Lic. No.: C14702 | 515 S FLOWER STREET SUITE 3700 LOS ANGELES, CA 90071 |
Contractor | Matt Construction Corporation; Lic. No.: 631020-B | 9814 NORWALK BLVD #100 SANTA FE SPRINGS, CA 90670 |
Engineer | Rees, Simon; Lic. No.: S4897 | 1246 11TH ST MANHATTAN BEACH, CA 90266 |
Inspector Information
VASIL MIHALEV, (310) 914-3920 | Office Hours: 7:00-8:00 AM MON-FRI |
Pending Inspections
No Data Available. |
Inspection Request History
Deputy Steel/Welding | 2/23/2017 | Partial Approval | ALAN NOVAK |
Green Building Rough | 4/14/2017 | Not Ready for Inspection | DAVID MATSON |
METHANE-Rough | 4/14/2017 | Not Ready for Inspection | JONATHAN ALLEN |
Wood Frame | 4/14/2017 | Partial Inspection | JONATHAN ALLEN |
Deputy Wood Construction | 4/17/2017 | Partial Approval | ALAN NOVAK |
Deputy Wood Construction | 4/18/2017 | Partial Approval | ALAN NOVAK |
Deputy Wood Construction | 4/19/2017 | Partial Approval | ALAN NOVAK |
Deputy Wood Construction | 4/20/2017 | Partial Approval | ALAN NOVAK |
Deputy Wood Construction | 4/21/2017 | Partial Approval | ALAN NOVAK |
Deputy Wood Construction | 4/21/2017 | Partial Approval | JOHN DODGE |
METHANE-Rough | 4/24/2017 | Not Ready for Inspection | JONATHAN ALLEN |
Wood Frame | 4/24/2017 | Partial Inspection | JONATHAN ALLEN |
Deputy Wood Construction | 4/25/2017 | Partial Approval | ALAN NOVAK |
Deputy Wood Construction | 4/26/2017 | Partial Approval | ALAN NOVAK |
Deputy Wood Construction | 4/27/2017 | Partial Approval | ALAN NOVAK |
Deputy Wood Construction | 4/28/2017 | Partial Approval | ALAN NOVAK |
METHANE-Rough | 4/28/2017 | Not Ready for Inspection | JONATHAN ALLEN |
Wood Frame | 4/28/2017 | Partial Approval | JONATHAN ALLEN |
Deputy Wood Construction | 5/1/2017 | Approved | JONATHAN ALLEN |
Deputy Wood Construction | 5/2/2017 | Approved | JONATHAN ALLEN |
Deputy Wood Construction | 5/3/2017 | Approved | JONATHAN ALLEN |
Deputy Wood Construction | 5/4/2017 | Approved | JONATHAN ALLEN |
Deputy Wood Construction | 5/5/2017 | Approved | JONATHAN ALLEN |
Deputy Wood Construction | 5/8/2017 | Approved | JONATHAN ALLEN |
Green Building Rough | 5/8/2017 | Not Ready for Inspection | JOHN KLARIN |
METHANE-Rough | 5/8/2017 | Not Ready for Inspection | JONATHAN ALLEN |
Wood Frame | 5/8/2017 | Partial Approval | JONATHAN ALLEN |
Deputy Wood Construction | 5/9/2017 | Approved | JONATHAN ALLEN |
Deputy Wood Construction | 5/10/2017 | Approved | JONATHAN ALLEN |
Deputy Wood Construction | 5/11/2017 | Approved | JONATHAN ALLEN |
Deputy Wood Construction | 5/12/2017 | Approved | JONATHAN ALLEN |
METHANE-Rough | 5/15/2017 | Not Ready for Inspection | JONATHAN ALLEN |
Wood Frame | 5/15/2017 | Partial Approval | JONATHAN ALLEN |
Deputy Wood Construction | 5/16/2017 | Partial Approval | ALAN NOVAK |
Deputy Wood Construction | 5/17/2017 | Approved | JONATHAN ALLEN |
Deputy Wood Construction | 5/18/2017 | Approved | JONATHAN ALLEN |
Deputy Wood Construction | 5/19/2017 | Approved | JONATHAN ALLEN |
Green Building Rough | 5/19/2017 | Not Ready for Inspection | BRYAN MEYER |
METHANE-Rough | 5/19/2017 | Not Ready for Inspection | JONATHAN ALLEN |
Wood Frame | 5/19/2017 | Partial Approval | JONATHAN ALLEN |
Deputy Wood Construction | 5/25/2017 | Approved | JONATHAN ALLEN |
Deputy Wood Construction | 5/26/2017 | Approved | JONATHAN ALLEN |
Deputy Wood Construction | 5/30/2017 | Approved | JONATHAN ALLEN |
Deputy Wood Construction | 5/31/2017 | Approved | JONATHAN ALLEN |
Deputy Wood Construction | 6/1/2017 | Approved | JONATHAN ALLEN |
Deputy Wood Construction | 6/5/2017 | Approved | JONATHAN ALLEN |
Deputy Wood Construction | 6/6/2017 | Approved | JONATHAN ALLEN |
Deputy Wood Construction | 6/7/2017 | Approved | JONATHAN ALLEN |
Deputy Wood Construction | 6/8/2017 | Conditional Approval | JONATHAN ALLEN |
Deputy Wood Construction | 6/9/2017 | Approved | JONATHAN ALLEN |
METHANE-Rough | 6/9/2017 | Not Ready for Inspection | JONATHAN ALLEN |
Wood Frame | 6/9/2017 | Partial Approval | JONATHAN ALLEN |
Deputy Wood Construction | 6/12/2017 | Approved | JONATHAN ALLEN |
Deputy Wood Construction | 6/13/2017 | Approved | JONATHAN ALLEN |
Deputy Wood Construction | 6/14/2017 | Approved | JONATHAN ALLEN |
Deputy Wood Construction | 6/15/2017 | Approved | JONATHAN ALLEN |
Deputy Wood Construction | 6/16/2017 | Approved | JONATHAN ALLEN |
Deputy Wood Construction | 6/19/2017 | Approved | JONATHAN ALLEN |
Deputy Wood Construction | 6/20/2017 | Approved | JONATHAN ALLEN |
Deputy Wood Construction | 6/21/2017 | Approved | JONATHAN ALLEN |
Deputy Wood Construction | 6/22/2017 | Approved | JONATHAN ALLEN |
Deputy Wood Construction | 6/23/2017 | Approved | JONATHAN ALLEN |
Green Building Rough | 6/23/2017 | Partial Inspection | BRYAN MEYER |
METHANE-Rough | 6/23/2017 | Approved | JONATHAN ALLEN |
Wood Frame | 6/23/2017 | Partial Approval | JONATHAN ALLEN |
Deputy Wood Construction | 6/26/2017 | Approved | JONATHAN ALLEN |
Deputy Wood Construction | 6/27/2017 | Conditional Approval | JONATHAN ALLEN |
Deputy Wood Construction | 6/28/2017 | Approved | JONATHAN ALLEN |
Deputy Wood Construction | 6/29/2017 | Conditional Approval | JONATHAN ALLEN |
Deputy Wood Construction | 6/30/2017 | Approved | JONATHAN ALLEN |
Deputy Wood Construction | 7/17/2017 | Approved | JONATHAN ALLEN |
Deputy Wood Construction | 7/18/2017 | Approved | JONATHAN ALLEN |
Deputy Wood Construction | 7/19/2017 | Approved | JONATHAN ALLEN |
Deputy Wood Construction | 7/20/2017 | Approved | JONATHAN ALLEN |
Deputy Wood Construction | 7/21/2017 | Approved | DERRICK SPENCER |
Deputy Wood Construction | 7/24/2017 | Partial Approval | JOHN DODGE |
Deputy Wood Construction | 7/25/2017 | Approved | JONATHAN ALLEN |
Deputy Wood Construction | 7/26/2017 | Approved | JONATHAN ALLEN |
Deputy Wood Construction | 7/27/2017 | Approved | JONATHAN ALLEN |
Deputy Wood Construction | 7/28/2017 | Approved | JONATHAN ALLEN |
Green Building Rough | 7/28/2017 | Partial Inspection | BRYAN MEYER |
Wood Frame | 7/28/2017 | Partial Approval | JONATHAN ALLEN |
Deputy Wood Construction | 8/1/2017 | Approved | JONATHAN ALLEN |
Deputy Wood Construction | 8/2/2017 | Approved | JONATHAN ALLEN |
Green Building Rough | 8/2/2017 | Not Ready for Inspection | BRYAN MEYER |
Wood Frame | 8/2/2017 | Partial Approval | JONATHAN ALLEN |
Deputy Wood Construction | 8/3/2017 | Conditional Approval | JONATHAN ALLEN |
Deputy Wood Construction | 8/4/2017 | Conditional Approval | JONATHAN ALLEN |
Deputy Wood Construction | 8/7/2017 | Approved | JONATHAN ALLEN |
Deputy Wood Construction | 8/8/2017 | Approved | JONATHAN ALLEN |
Deputy Wood Construction | 8/9/2017 | Conditional Approval | JONATHAN ALLEN |
Deputy Wood Construction | 8/10/2017 | Approved | JONATHAN ALLEN |
Deputy Wood Construction | 8/11/2017 | Approved | JONATHAN ALLEN |
Deputy Wood Construction | 8/14/2017 | Approved | JONATHAN ALLEN |
Deputy Wood Construction | 8/15/2017 | Approved | JONATHAN ALLEN |
Deputy Wood Construction | 8/16/2017 | Approved | JONATHAN ALLEN |
Deputy Wood Construction | 8/17/2017 | Conditional Approval | JONATHAN ALLEN |
Deputy Wood Construction | 8/18/2017 | Approved | JONATHAN ALLEN |
Wood Frame | 8/18/2017 | Partial Approval | JONATHAN ALLEN |
Deputy Wood Construction | 8/22/2017 | Conditional Approval | DANIEL MC AULIFFE |
Deputy Wood Construction | 8/23/2017 | Conditional Approval | DANIEL MC AULIFFE |
Deputy Wood Construction | 8/24/2017 | Approved | DERRICK SPENCER |
Deputy Wood Construction | 8/25/2017 | Approved | DERRICK SPENCER |
Deputy Wood Construction | 8/28/2017 | Approved | JONATHAN ALLEN |
Deputy Wood Construction | 8/29/2017 | Approved | JONATHAN ALLEN |
Deputy Wood Construction | 8/30/2017 | Approved | JONATHAN ALLEN |
Deputy Wood Construction | 8/31/2017 | Approved | JONATHAN ALLEN |
Deputy Wood Construction | 9/1/2017 | Approved | JONATHAN ALLEN |
Deputy Wood Construction | 9/5/2017 | Approved | JONATHAN ALLEN |
Deputy Wood Construction | 9/6/2017 | Approved | JONATHAN ALLEN |
Deputy Wood Construction | 9/7/2017 | Conditional Approval | JONATHAN ALLEN |
Deputy Wood Construction | 9/8/2017 | Conditional Approval | JONATHAN ALLEN |
Deputy Wood Construction | 9/11/2017 | Approved | JONATHAN ALLEN |
Wood Frame | 9/11/2017 | Partial Approval | JONATHAN ALLEN |
Deputy Wood Construction | 9/12/2017 | Approved | JONATHAN ALLEN |
Deputy Wood Construction | 9/13/2017 | Approved | JONATHAN ALLEN |
Deputy Wood Construction | 9/14/2017 | Approved | JONATHAN ALLEN |
Deputy Wood Construction | 9/15/2017 | Approved | JONATHAN ALLEN |
Deputy Wood Construction | 9/18/2017 | Approved | DERRICK SPENCER |
Deputy Wood Construction | 9/19/2017 | Approved | DERRICK SPENCER |
Deputy Wood Construction | 9/20/2017 | Approved | JONATHAN ALLEN |
Deputy Wood Construction | 9/21/2017 | Approved | JONATHAN ALLEN |
Deputy Wood Construction | 9/22/2017 | Approved | JONATHAN ALLEN |
Deputy Wood Construction | 9/25/2017 | Approved | JONATHAN ALLEN |
Wood Frame | 9/25/2017 | Partial Approval | JONATHAN ALLEN |
Deputy Wood Construction | 9/26/2017 | Approved | JONATHAN ALLEN |
Deputy Wood Construction | 9/27/2017 | Approved | JONATHAN ALLEN |
Deputy Wood Construction | 9/28/2017 | Approved | JONATHAN ALLEN |
Deputy Wood Construction | 9/29/2017 | Approved | JONATHAN ALLEN |
Deputy Wood Construction | 10/2/2017 | Conditional Approval | JONATHAN ALLEN |
Deputy Wood Construction | 10/3/2017 | Conditional Approval | JONATHAN ALLEN |
Deputy Wood Construction | 10/4/2017 | Approved | JONATHAN ALLEN |
Deputy Wood Construction | 10/5/2017 | Approved | JONATHAN ALLEN |
Deputy Wood Construction | 10/6/2017 | Approved | JONATHAN ALLEN |
Green Building Rough | 10/6/2017 | Not Ready for Inspection | JOHN KLARIN |
Wood Frame | 10/6/2017 | Partial Approval | JONATHAN ALLEN |
Deputy Wood Construction | 10/10/2017 | Approved | JONATHAN ALLEN |
Deputy Wood Construction | 10/11/2017 | Approved | JONATHAN ALLEN |
Deputy Wood Construction | 10/12/2017 | Approved | JONATHAN ALLEN |
Deputy Wood Construction | 10/13/2017 | Approved | JONATHAN ALLEN |
Grading Pre-Inspection | 10/13/2017 | Not Ready for Inspection | JONATHAN ALLEN |
Deputy Wood Construction | 10/16/2017 | Conditional Approval | DANIEL MC AULIFFE |
Deputy Wood Construction | 10/17/2017 | Conditional Approval | DANIEL MC AULIFFE |
Deputy Wood Construction | 10/18/2017 | Approved | JONATHAN ALLEN |
Deputy Wood Construction | 10/19/2017 | Approved | JONATHAN ALLEN |
Deputy Wood Construction | 10/20/2017 | Approved | JONATHAN ALLEN |
Deputy Wood Construction | 10/23/2017 | Conditional Approval | JONATHAN ALLEN |
Deputy Wood Construction | 10/24/2017 | Conditional Approval | JONATHAN ALLEN |
Deputy Wood Construction | 10/25/2017 | Approved | JONATHAN ALLEN |
Drywall Nailing | 10/25/2017 | Partial Approval | JONATHAN ALLEN |
Green Building Rough | 10/25/2017 | Not Ready for Inspection | BRYAN MEYER |
Insulation | 10/25/2017 | Partial Approval | JONATHAN ALLEN |
Light Gage Steel Frame | 10/25/2017 | Partial Approval | JONATHAN ALLEN |
Deputy Wood Construction | 10/26/2017 | Approved | JONATHAN ALLEN |
Deputy Wood Construction | 10/27/2017 | Conditional Approval | JONATHAN ALLEN |
Deputy Wood Construction | 10/30/2017 | Approved | JONATHAN ALLEN |
Drywall Nailing | 10/30/2017 | Partial Approval | JONATHAN ALLEN |
Green Building Rough | 10/30/2017 | Not Ready for Inspection | BRYAN MEYER |
Insulation | 10/30/2017 | Partial Approval | JONATHAN ALLEN |
Light Gage Steel Frame | 10/30/2017 | Partial Approval | JONATHAN ALLEN |
Deputy Wood Construction | 10/31/2017 | Conditional Approval | JONATHAN ALLEN |
Deputy Wood Construction | 11/1/2017 | Approved | JONATHAN ALLEN |
Deputy Wood Construction | 11/2/2017 | Approved | JONATHAN ALLEN |
Deputy Wood Construction | 11/3/2017 | Approved | JONATHAN ALLEN |
Deputy Wood Construction | 11/6/2017 | Conditional Approval | JONATHAN ALLEN |
Deputy Wood Construction | 11/7/2017 | Conditional Approval | DANIEL MC AULIFFE |
Deputy Wood Construction | 11/8/2017 | Approved | JONATHAN ALLEN |
Deputy Wood Construction | 11/9/2017 | Approved | JONATHAN ALLEN |
Deputy Wood Construction | 11/13/2017 | Approved | JONATHAN ALLEN |
Deputy Wood Construction | 11/14/2017 | Approved | JONATHAN ALLEN |
Deputy Wood Construction | 11/15/2017 | Approved | JONATHAN ALLEN |
Deputy Wood Construction | 11/16/2017 | Approved | DERRICK SPENCER |
Deputy Wood Construction | 11/17/2017 | Conditional Approval | DANIEL MC AULIFFE |
Deputy Wood Construction | 11/20/2017 | Conditional Approval | JONATHAN ALLEN |
Deputy Wood Construction | 11/28/2017 | Approved | JONATHAN ALLEN |
Deputy Wood Construction | 11/29/2017 | Conditional Approval | JONATHAN ALLEN |
Deputy Wood Construction | 11/30/2017 | Conditional Approval | JONATHAN ALLEN |
Deputy Wood Construction | 12/1/2017 | Approved | JONATHAN ALLEN |
Deputy Wood Construction | 12/4/2017 | Approved | JONATHAN ALLEN |
Green Building Rough | 12/4/2017 | Partial Approval | JONATHAN ALLEN |
Wood Frame | 12/4/2017 | Partial Approval | JONATHAN ALLEN |
Deputy Wood Construction | 12/5/2017 | Conditional Approval | JONATHAN ALLEN |
Deputy Wood Construction | 12/6/2017 | Conditional Approval | JONATHAN ALLEN |
Deputy Wood Construction | 12/7/2017 | Approved | JONATHAN ALLEN |
Drywall Nailing | 12/7/2017 | Partial Approval | JONATHAN ALLEN |
Green Building Rough | 12/7/2017 | Partial Approval | JONATHAN ALLEN |
Insulation | 12/7/2017 | Partial Approval | JONATHAN ALLEN |
Light Gage Steel Frame | 12/7/2017 | Partial Approval | JONATHAN ALLEN |
T-Bar Ceiling | 12/7/2017 | Not Ready for Inspection | JONATHAN ALLEN |
Deputy Wood Construction | 12/8/2017 | Conditional Approval | JONATHAN ALLEN |
Deputy Wood Construction | 12/11/2017 | Conditional Approval | JONATHAN ALLEN |
Excavation/Setback/Form/Re-Bar | 12/11/2017 | Partial Approval | JONATHAN ALLEN |
Deputy Wood Construction | 12/12/2017 | Conditional Approval | JONATHAN ALLEN |
Deputy Wood Construction | 12/13/2017 | Conditional Approval | JONATHAN ALLEN |
Deputy Wood Construction | 12/14/2017 | Approved | JONATHAN ALLEN |
Drywall Nailing | 12/14/2017 | Partial Approval | JONATHAN ALLEN |
Green Building Rough | 12/14/2017 | Partial Approval | JONATHAN ALLEN |
Insulation | 12/14/2017 | Partial Approval | JONATHAN ALLEN |
Light Gage Steel Frame | 12/14/2017 | Partial Approval | JONATHAN ALLEN |
T-Bar Ceiling | 12/14/2017 | Partial Approval | JONATHAN ALLEN |
Deputy Wood Construction | 12/15/2017 | Conditional Approval | JONATHAN ALLEN |
Deputy Wood Construction | 12/18/2017 | Conditional Approval | JONATHAN ALLEN |
Deputy Wood Construction | 12/19/2017 | Approved | JOHN DODGE |
Green Building Rough | 12/19/2017 | Not Ready for Inspection | JOHN DODGE |
Light Gage Steel Frame | 12/19/2017 | Not Ready for Inspection | JOHN DODGE |
Drywall Nailing | 1/2/2018 | Partial Approval | JONATHAN ALLEN |
Green Building Rough | 1/2/2018 | Partial Approval | JONATHAN ALLEN |
Insulation | 1/2/2018 | Partial Approval | JONATHAN ALLEN |
Light Gage Steel Frame | 1/2/2018 | Partial Approval | JONATHAN ALLEN |
Drywall Nailing | 1/9/2018 | Partial Approval | JONATHAN ALLEN |
Green Building Rough | 1/9/2018 | Approved | JONATHAN ALLEN |
Insulation | 1/9/2018 | Partial Approval | JONATHAN ALLEN |
Light Gage Steel Frame | 1/9/2018 | Partial Approval | JONATHAN ALLEN |
T-Bar Ceiling | 1/9/2018 | Partial Approval | JONATHAN ALLEN |
Deputy Wood Construction | 1/11/2018 | Approved | JONATHAN ALLEN |
Deputy Wood Construction | 1/12/2018 | Conditional Approval | DANIEL MC AULIFFE |
Deputy Reinf. Masonry | 1/16/2018 | Approved | JONATHAN ALLEN |
Deputy Wood Construction | 1/16/2018 | Approved | JONATHAN ALLEN |
Special/Order Compliance | 1/16/2018 | Approved | JONATHAN ALLEN |
Deputy Reinf. Masonry | 1/17/2018 | Conditional Approval | JONATHAN ALLEN |
Deputy Wood Construction | 1/17/2018 | Conditional Approval | JONATHAN ALLEN |
Deputy Reinf. Masonry | 1/18/2018 | Conditional Approval | DANIEL MC AULIFFE |
Deputy Wood Construction | 1/18/2018 | Conditional Approval | DANIEL MC AULIFFE |
Deputy Reinf. Masonry | 1/19/2018 | Approved | JOHN DODGE |
Deputy Wood Construction | 1/19/2018 | Approved | JOHN DODGE |
Deputy Reinf. Masonry | 1/22/2018 | Approved | JONATHAN ALLEN |
Deputy Wood Construction | 1/22/2018 | Approved | JONATHAN ALLEN |
Deputy Reinf. Masonry | 1/23/2018 | Approved | JONATHAN ALLEN |
Deputy Wood Construction | 1/23/2018 | Approved | JONATHAN ALLEN |
Drywall Nailing | 1/23/2018 | Partial Approval | JONATHAN ALLEN |
Insulation | 1/23/2018 | Partial Approval | JONATHAN ALLEN |
Light Gage Steel Frame | 1/23/2018 | Partial Approval | JONATHAN ALLEN |
T-Bar Ceiling | 1/23/2018 | Partial Approval | JONATHAN ALLEN |
Deputy Reinf. Concrete | 1/24/2018 | Approved | JONATHAN ALLEN |
Deputy Reinf. Masonry | 1/24/2018 | Approved | JONATHAN ALLEN |
Deputy Wood Construction | 1/24/2018 | Approved | JONATHAN ALLEN |
Deputy Reinf. Concrete | 1/25/2018 | Approved | JONATHAN ALLEN |
Deputy Reinf. Masonry | 1/25/2018 | Approved | JONATHAN ALLEN |
Deputy Wood Construction | 1/25/2018 | Approved | JONATHAN ALLEN |
Piling/Pier/Caisson | 1/25/2018 | Partial Approval | JONATHAN ALLEN |
Deputy Reinf. Concrete | 1/26/2018 | Approved | JONATHAN ALLEN |
Deputy Reinf. Masonry | 1/26/2018 | Approved | JONATHAN ALLEN |
Deputy Wood Construction | 1/26/2018 | Approved | JONATHAN ALLEN |
Deputy Reinf. Concrete | 1/29/2018 | Approved | JONATHAN ALLEN |
Deputy Reinf. Concrete | 1/30/2018 | Conditional Approval | JONATHAN ALLEN |
Deputy Reinf. Concrete | 1/31/2018 | Conditional Approval | JONATHAN ALLEN |
Deputy Reinf. Concrete | 2/1/2018 | Approved | JONATHAN ALLEN |
T-Bar Ceiling | 2/1/2018 | Partial Approval | JONATHAN ALLEN |
Deputy Reinf. Concrete | 2/2/2018 | Approved | JONATHAN ALLEN |
Drywall Nailing | 2/13/2018 | Partial Inspection | ALAN NOVAK |
Footing/Foundation/Slab | 2/13/2018 | Partial Inspection | ALAN NOVAK |
Insulation | 2/13/2018 | Partial Inspection | ALAN NOVAK |
Light Gage Steel Frame | 2/13/2018 | Partial Inspection | ALAN NOVAK |
METHANE-Barrier | 2/13/2018 | Partial Inspection | ALAN NOVAK |
METHANE-Subgrade | 2/13/2018 | Partial Inspection | ALAN NOVAK |
T-Bar Ceiling | 2/13/2018 | Partial Inspection | ALAN NOVAK |
Insulation | 2/15/2018 | Partial Approval | JONATHAN ALLEN |
Light Gage Steel Frame | 2/15/2018 | Partial Approval | JONATHAN ALLEN |
T-Bar Ceiling | 2/15/2018 | Partial Approval | JONATHAN ALLEN |
T-Bar Ceiling | 2/20/2018 | Partial Approval | JONATHAN ALLEN |
Insulation | 2/21/2018 | Partial Approval | JONATHAN ALLEN |
Light Gage Steel Frame | 2/21/2018 | Partial Approval | JONATHAN ALLEN |
Drywall Nailing | 2/23/2018 | Partial Approval | JONATHAN ALLEN |
Footing/Foundation/Slab | 2/23/2018 | Partial Approval | JONATHAN ALLEN |
Insulation | 2/23/2018 | Partial Approval | JONATHAN ALLEN |
Light Gage Steel Frame | 2/23/2018 | Partial Approval | JONATHAN ALLEN |
METHANE-Barrier | 2/23/2018 | Approved | JONATHAN ALLEN |
METHANE-Subgrade | 2/23/2018 | Approved | JONATHAN ALLEN |
T-Bar Ceiling | 2/23/2018 | Partial Approval | JONATHAN ALLEN |
Insulation | 2/26/2018 | Partial Approval | JONATHAN ALLEN |
Piling/Pier/Caisson | 2/26/2018 | Partial Approval | JONATHAN ALLEN |
Special/Order Compliance | 2/26/2018 | Approved | JONATHAN ALLEN |
T-Bar Ceiling | 2/26/2018 | Partial Approval | JONATHAN ALLEN |
Light Gage Steel Frame | 3/1/2018 | Partial Approval | JONATHAN ALLEN |
Drywall Nailing | 3/5/2018 | Partial Approval | JONATHAN ALLEN |
Footing/Foundation/Slab | 3/5/2018 | Partial Approval | JONATHAN ALLEN |
Insulation | 3/5/2018 | Partial Approval | JONATHAN ALLEN |
Light Gage Steel Frame | 3/5/2018 | Partial Approval | JONATHAN ALLEN |
T-Bar Ceiling | 3/5/2018 | Partial Approval | JONATHAN ALLEN |
Insulation | 3/9/2018 | Partial Approval | JONATHAN ALLEN |
Light Gage Steel Frame | 3/9/2018 | Partial Approval | JONATHAN ALLEN |
T-Bar Ceiling | 3/9/2018 | Partial Approval | JONATHAN ALLEN |
Light Gage Steel Frame | 3/14/2018 | Partial Approval | JONATHAN ALLEN |
Drywall Nailing | 3/15/2018 | Partial Approval | JONATHAN ALLEN |
Insulation | 3/15/2018 | Partial Approval | JONATHAN ALLEN |
Light Gage Steel Frame | 3/15/2018 | Partial Approval | JONATHAN ALLEN |
T-Bar Ceiling | 3/15/2018 | Partial Approval | JONATHAN ALLEN |
Light Gage Steel Frame | 4/3/2018 | Partial Approval | JONATHAN ALLEN |
Deputy Reinf. Concrete | 4/9/2018 | Approved | JONATHAN ALLEN |
Light Gage Steel Frame | 5/7/2018 | Partial Approval | JONATHAN ALLEN |
Light Gage Steel Frame | 6/5/2018 | Partial Approval | JONATHAN ALLEN |
Special/Order Compliance | 11/19/2018 | Approved | JONATHAN ALLEN |
Special/Order Compliance | 5/6/2019 | Partial Approval | JONATHAN ALLEN |
Special/Order Compliance | 11/15/2019 | Approved | ALAN NOVAK |
Drywall Nailing | 12/4/2019 | Approved | ALAN NOVAK |
Final | 12/4/2019 | OK to Issue CofO | ALAN NOVAK |
Footing/Foundation/Slab | 12/4/2019 | Approved | ALAN NOVAK |
Green Building Final | 12/4/2019 | Approved | ALAN NOVAK |
Reinforced Concrete Frame | 12/4/2019 | Approved | ALAN NOVAK |
SGSOV-Seismic Gas S/O Valve | 12/4/2019 | SGSOV Approved | ALAN NOVAK |
Smoke Detectors | 12/4/2019 | Approved | ALAN NOVAK |
Structural Steel Frame | 12/4/2019 | Approved | ALAN NOVAK |
Wood Frame | 12/4/2019 | Approved | ALAN NOVAK |