10550 W FONTENELLE WAY 90077

Certificate Information: 10550 W FONTENELLE WAY 90077

Application / Permit
16014-10000-01649
Plan Check / Job No.
B16LA05371
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
ADDITION AND MAJOR REMODEL OF EXISTING SINGLE FAMILY DWELLING.
Permit Issued
Issued on 12/29/2016
Issuing Office
Metro
Current Status
Issued on 12/29/2016
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 4/14/2016 APPLICANT
Green Plans Picked Up 5/11/2016 APPLICANT
Assigned to Plan Check Engineer 5/14/2016 TEODORO DIAZ RODRIGUEZ
Corrections Issued 5/17/2016 TEODORO DIAZ RODRIGUEZ
Quality Review Completed 5/19/2016 KESETE HAREGOT
Plan Check Approved 12/29/2016 TEODORO DIAZ RODRIGUEZ
Issued 12/29/2016 LADBS
Building Plans Picked Up 5/25/2021 APPLICANT

Permit Application Clearance Information

BHO/Hillside ordinance Cleared 7/6/2016 SEVAK ISAKHAYAN
BHO/Hillside ordinance Cleared 7/6/2016 SEVAK ISAKHAYAN
BHO/Hillside ordinance Cleared 7/6/2016 SEVAK ISAKHAYAN
BHO/Hillside ordinance Cleared 7/6/2016 SEVAK ISAKHAYAN
Eng Process Fee Ord 176,300 Cleared 10/28/2016 ROCHELLE DUNGCA
Hydrant and Access approval Cleared 11/22/2016 JOHN CONNEALLY
Sewer availability Cleared 11/22/2016 ALFREDO JARA
Low Impact Development Cleared 12/27/2016 SAM NAVID
Building over 3-story or 36-ft Cleared 12/28/2016 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 12/28/2016 CALOSHA APPROVED
GPI Written Notices Cleared 12/28/2016 TEODORO DIAZ RODRIGUEZ
Grading Pre-Inspection Cleared 12/28/2016 TEODORO DIAZ RODRIGUEZ
Green Code Cleared 12/28/2016 MICKEY YAMASHITA
Roof/Waste drainage to street Cleared 12/28/2016 CELINA MORENO

Contact Information

Contractor Lucy Development Company; Lic. No.: 913288-B 16060 VENTURA BLVD 110      ENCINO, CA 91436
Engineer Faul, James David; Lic. No.: C52258 6473 TREFOIL AVE      OAK PARK, CA 91377
Engineer Liston, Leonard Irvin; Lic. No.: C31902 889 PIERCE CT STE 101      THOUSAND OAKS, CA 91360

Inspector Information

RYAN SALAZAR, (310) 914-3862 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Footing/Foundation/Slab 5/3/2017 Corrections Issued ANTHONY ANDERSON
Deputy Grading 6/12/2017 Conditional Approval ANTHONY ANDERSON
Deputy Grading 6/13/2017 Conditional Approval ANTHONY ANDERSON
Deputy Grading 6/14/2017 Conditional Approval ANTHONY ANDERSON
Deputy Grading 6/15/2017 Conditional Approval ANTHONY ANDERSON
Deputy Grading 6/16/2017 Conditional Approval ANTHONY ANDERSON
Deputy Grading 6/19/2017 Conditional Approval ANTHONY ANDERSON
Deputy Grading 6/20/2017 Conditional Approval ANTHONY ANDERSON
Deputy Grading 6/21/2017 Conditional Approval ANTHONY ANDERSON
Excavation/Setback/Form/Re-Bar 6/26/2017 Partial Approval ANTHONY ANDERSON
Deputy Grading 8/16/2017 Conditional Approval ANTHONY ANDERSON
Deputy Grading 8/17/2017 Conditional Approval ANTHONY ANDERSON
Deputy Grading 8/21/2017 Conditional Approval ANTHONY ANDERSON
Excavation/Setback/Form/Re-Bar 8/21/2017 Partial Inspection ANTHONY ANDERSON
Deputy Grading 10/4/2017 Conditional Approval ANTHONY ANDERSON
Deputy Grading 10/5/2017 Conditional Approval ANTHONY ANDERSON
Deputy Grading 10/6/2017 Conditional Approval ANTHONY ANDERSON
Deputy Grading 1/4/2018 Conditional Approval JOEL LAUNCHBAUGH
Deputy Grading 1/5/2018 Conditional Approval JOEL LAUNCHBAUGH
Deputy Grading 1/8/2018 Conditional Approval ANTHONY ANDERSON
Deputy Grading 1/9/2018 Conditional Approval ANTHONY ANDERSON
Deputy Grading 1/10/2018 Conditional Approval ANTHONY ANDERSON
Deputy Grading 1/11/2018 Conditional Approval ANTHONY ANDERSON
Deputy Grading 1/12/2018 Conditional Approval MATT KELLERMAN
Deputy Grading 1/16/2018 Conditional Approval MATT KELLERMAN
Deputy Grading 1/17/2018 Conditional Approval JOEL LAUNCHBAUGH
Deputy Grading 1/18/2018 Conditional Approval ANTHONY ANDERSON
Deputy Grading 1/19/2018 Partial Approval MATT KELLERMAN
Deputy Grading 1/22/2018 Conditional Approval ANTHONY ANDERSON
Deputy Grading 1/23/2018 Conditional Approval ANTHONY ANDERSON
Deputy Grading 1/24/2018 Approved JOEL LAUNCHBAUGH
Deputy Grading 1/25/2018 Conditional Approval ANTHONY ANDERSON
Deputy Grading 1/26/2018 Conditional Approval ANTHONY ANDERSON
Deputy Grading 1/29/2018 Conditional Approval ANTHONY ANDERSON
Deputy Grading 1/30/2018 Conditional Approval ANTHONY ANDERSON
Deputy Grading 1/31/2018 Partial Approval MATT KELLERMAN
Deputy Grading 2/1/2018 Partial Approval MATT KELLERMAN
Deputy Grading 2/2/2018 Partial Approval MATT KELLERMAN
Deputy Grading 2/5/2018 Conditional Approval ANTHONY ANDERSON
Deputy Grading 2/6/2018 Partial Approval MATT KELLERMAN
Deputy Grading 2/7/2018 Partial Approval MATT KELLERMAN
Deputy Grading 2/8/2018 Conditional Approval ANTHONY ANDERSON
Deputy Grading 2/9/2018 Partial Approval MATT KELLERMAN
Deputy Grading 2/12/2018 Conditional Approval ANTHONY ANDERSON
Deputy Grading 2/13/2018 Conditional Approval HAMIK HARTOUNIAN
Deputy Grading 2/14/2018 Approved ANTHONY ANDERSON
Deputy Grading 2/15/2018 Partial Approval MATT KELLERMAN
Deputy Grading 2/16/2018 Conditional Approval HAMIK HARTOUNIAN
Deputy Grading 2/20/2018 Conditional Approval ANTHONY ANDERSON
Deputy Grading 2/21/2018 Approved MATT KELLERMAN
Deputy Grading 2/22/2018 Conditional Approval JOEL LAUNCHBAUGH
Deputy Grading 2/23/2018 Conditional Approval ANTHONY ANDERSON
Deputy Grading 2/26/2018 Conditional Approval ANTHONY ANDERSON
Deputy Grading 2/27/2018 Conditional Approval ANTHONY ANDERSON
Deputy Grading 2/28/2018 Conditional Approval ANTHONY ANDERSON
Deputy Grading 3/1/2018 Conditional Approval ANTHONY ANDERSON
Deputy Grading 3/2/2018 Conditional Approval ANTHONY ANDERSON
Piling/Pier/Caisson 3/28/2018 Partial Approval ANTHONY ANDERSON
Piling/Pier/Caisson 4/23/2018 Partial Approval ANTHONY ANDERSON
Deputy Grading 6/8/2018 Partial Approval MATT KELLERMAN
Deputy Grading 6/11/2018 Conditional Approval MATT KELLERMAN
Deputy Grading 6/12/2018 Conditional Approval JOEL LAUNCHBAUGH
Final 6/12/2018 Partial Inspection JOEL LAUNCHBAUGH
Footing/Foundation/Slab 6/12/2018 Partial Approval JOEL LAUNCHBAUGH
Deputy Grading 6/13/2018 Conditional Approval MATT KELLERMAN
Deputy Grading 6/14/2018 Conditional Approval RYAN MCGILL
Deputy Grading 6/15/2018 Conditional Approval JONATHAN HOM
Pre-Inspection 6/25/2018 Partial Inspection JOEL LAUNCHBAUGH
Reinforced Concrete Frame 6/25/2018 Partial Approval JOEL LAUNCHBAUGH
Piling/Pier/Caisson 6/28/2018 Partial Approval JOEL LAUNCHBAUGH
Footing/Foundation/Slab 8/30/2018 Corrections Issued CHRISTOPHER WILSON
Piling/Pier/Caisson 8/31/2018 Partial Inspection CHRISTOPHER WILSON
Deputy Grading 9/14/2018 Partial Approval MATT KELLERMAN
Footing/Foundation/Slab 9/19/2018 Partial Approval CHRISTOPHER WILSON
Piling/Pier/Caisson 11/20/2018 Approved CARLOS MATAMOROS
Piling/Pier/Caisson 11/30/2018 Approved CARLOS MATAMOROS
Excavation/Setback/Form/Re-Bar 2/7/2019 Corrections Issued CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 3/8/2019 Partial Inspection CHRISTOPHER WILSON
Piling/Pier/Caisson 3/8/2019 Partial Inspection CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 3/12/2019 Partial Approval CHRISTOPHER WILSON
Piling/Pier/Caisson 3/12/2019 Partial Approval CHRISTOPHER WILSON
Footing/Foundation/Slab 4/2/2019 Partial Inspection CHRISTOPHER WILSON
Footing/Foundation/Slab 4/3/2019 Corrections Issued CHRISTOPHER WILSON
Underground Mechanical 4/4/2019 Partial Inspection CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 4/5/2019 Partial Approval CHRISTOPHER WILSON
Underground Mechanical 4/29/2019 Partial Approval CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 5/13/2019 Partial Approval CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 5/28/2019 Corrections Issued CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 5/31/2019 Partial Approval CHRISTOPHER WILSON
Deputy Steel/Welding 6/6/2019 Conditional Approval CHRISTOPHER WILSON
Sewer 6/7/2019 Partial Approval CHRISTOPHER WILSON
Underground Mechanical 6/13/2019 Partial Approval CHRISTOPHER WILSON
Underground Mechanical 6/19/2019 Partial Approval CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 7/3/2019 Partial Approval CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 7/11/2019 Partial Approval CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 7/16/2019 Partial Approval CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 7/31/2019 Partial Approval CARLOS MATAMOROS
Footing/Foundation/Slab 7/31/2019 Partial Approval CARLOS MATAMOROS
Footing/Foundation/Slab 8/9/2019 Partial Approval DANNY TOLENTINO
Excavation/Setback/Form/Re-Bar 8/20/2019 Partial Approval CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 8/28/2019 Partial Inspection CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 8/29/2019 Partial Approval DAVID FEILER
Excavation/Setback/Form/Re-Bar 9/16/2019 Partial Approval CHRISTOPHER WILSON
Deputy Steel/Welding 9/18/2019 Conditional Approval CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 9/20/2019 Partial Approval CHRISTOPHER WILSON
Piling/Pier/Caisson 9/26/2019 Partial Approval CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 10/2/2019 Partial Approval MATT KELLERMAN
Excavation/Setback/Form/Re-Bar 10/9/2019 Partial Approval MATT KELLERMAN
Underground Mechanical 10/9/2019 Partial Approval MATT KELLERMAN
Underground Mechanical 10/24/2019 Partial Approval MATT KELLERMAN
Footing/Foundation/Slab 10/30/2019 Not Ready for Inspection MATT KELLERMAN
Footing/Foundation/Slab 10/31/2019 Conditional Approval MATT KELLERMAN
Excavation/Setback/Form/Re-Bar 11/25/2019 Partial Approval CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 12/11/2019 Partial Approval CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 2/27/2020 Corrections Issued CHRISTOPHER WILSON
Footing/Foundation/Slab 2/27/2020 Partial Inspection CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 2/28/2020 Partial Approval CHRISTOPHER WILSON
Pre-Inspection 3/4/2020 Partial Approval MATT KELLERMAN
Underground Mechanical 3/31/2020 Partial Approval CHRISTOPHER WILSON
Floor/Roof Diaphrgm/Shear Wall 4/14/2020 Corrections Issued CHRISTOPHER WILSON
Green Building Rough 4/14/2020 Partial Inspection CHRISTOPHER WILSON
Verify Sprinkler Sign Off 4/14/2020 Partial Inspection CHRISTOPHER WILSON
Floor/Roof Diaphrgm/Shear Wall 4/16/2020 Partial Approval CHRISTOPHER WILSON
BUILDING-Rough-Frame 4/24/2020 Partial Approval MATT KELLERMAN
Green Building Rough 4/24/2020 Partial Approval MATT KELLERMAN
Verify Sprinkler Sign Off 4/24/2020 Not Ready for Inspection MATT KELLERMAN
BUILDING-Rough-Frame 4/29/2020 Partial Approval MATT KELLERMAN
Green Building Rough 4/29/2020 Not Ready for Inspection MATT KELLERMAN
Underground Mechanical 4/29/2020 Partial Approval MATT KELLERMAN
Verify Sprinkler Sign Off 4/29/2020 Not Ready for Inspection MATT KELLERMAN
Excavation/Setback/Form/Re-Bar 5/15/2020 Partial Approval MATT KELLERMAN
Footing/Foundation/Slab 5/15/2020 Partial Approval MATT KELLERMAN
Excavation/Setback/Form/Re-Bar 5/22/2020 Not Ready for Inspection MATT KELLERMAN
Deputy Reinf. Concrete 5/26/2020 Conditional Approval CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 5/26/2020 Partial Inspection CHRISTOPHER WILSON
Footing/Foundation/Slab 5/26/2020 Partial Inspection CHRISTOPHER WILSON
Deputy Reinf. Concrete 5/27/2020 Partial Approval MATT KELLERMAN
Excavation/Setback/Form/Re-Bar 5/27/2020 Partial Approval CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 6/25/2020 Corrections Issued CHRISTOPHER WILSON
Deputy Reinf. Concrete 6/26/2020 Conditional Approval CHRISTOPHER WILSON
Structural Steel Frame 6/26/2020 Partial Approval CHRISTOPHER WILSON
Structural Steel Frame 6/29/2020 Partial Approval CHRISTOPHER WILSON
Floor/Roof Diaphrgm/Shear Wall 7/1/2020 Partial Approval CHRISTOPHER WILSON
Structural Steel Frame 7/1/2020 Partial Approval CHRISTOPHER WILSON
Deputy Steel/Welding 7/2/2020 Conditional Approval CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 7/2/2020 Off-Hour Fees Due
Excavation/Setback/Form/Re-Bar 7/2/2020 Partial Approval CHRISTOPHER WILSON
Footing/Foundation/Slab 7/13/2020 Partial Approval MATT KELLERMAN
Excavation/Setback/Form/Re-Bar 7/24/2020 Partial Approval CHRISTOPHER WILSON
Sewer 8/5/2020 Corrections Issued CHRISTOPHER WILSON
Underground Mechanical 8/5/2020 Partial Approval CHRISTOPHER WILSON
PLUMBING-Rough 8/6/2020 Partial Approval CHRISTOPHER WILSON
Floor/Roof Diaphrgm/Shear Wall 8/10/2020 Corrections Issued CHRISTOPHER WILSON
Underground Mechanical 8/10/2020 Partial Approval CHRISTOPHER WILSON
Sewer 8/12/2020 Partial Approval CHRISTOPHER WILSON
Underground Mechanical 8/12/2020 Partial Approval CHRISTOPHER WILSON
Sewer 8/17/2020 Conditional Approval MATT KELLERMAN
Underground Mechanical 8/17/2020 Conditional Approval MATT KELLERMAN
PLUMBING-Rough 8/19/2020 Partial Approval CHRISTOPHER WILSON
Underground Mechanical 8/19/2020 Partial Approval CHRISTOPHER WILSON
Sewer 8/24/2020 Partial Approval CHRISTOPHER WILSON
Underground Mechanical 8/24/2020 Partial Approval CHRISTOPHER WILSON
PLUMBING-Rough 8/26/2020 Partial Approval CHRISTOPHER WILSON
Underground Mechanical 8/26/2020 Partial Approval CHRISTOPHER WILSON
PLUMBING-Rough 8/27/2020 Off-Hour Fees Due
PLUMBING-Rough 8/27/2020 Partial Approval CHRISTOPHER WILSON
Underground Mechanical 8/27/2020 Off-Hour Fees Due
Underground Mechanical 8/27/2020 Partial Approval CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 9/29/2020 Corrections Issued CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 10/2/2020 Partial Approval CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 11/12/2020 Partial Approval CHRISTOPHER WILSON
Interior/Exterior Lathing 11/25/2020 Partial Approval CHRISTOPHER WILSON
Interior/Exterior Lathing 12/2/2020 Partial Approval CHRISTOPHER WILSON
Floor/Roof Diaphrgm/Shear Wall 12/8/2020 Partial Approval CHRISTOPHER WILSON
Floor/Roof Diaphrgm/Shear Wall 12/17/2020 Partial Approval MATT KELLERMAN
Wood Frame 12/17/2020 Partial Approval MATT KELLERMAN
Deputy Steel/Welding 12/23/2020 Partial Approval MATT KELLERMAN
Floor/Roof Diaphrgm/Shear Wall 12/24/2020 Partial Approval MATT KELLERMAN
Piling/Pier/Caisson 12/24/2020 Partial Approval MATT KELLERMAN
Deputy Steel/Welding 12/28/2020 Partial Approval MATT KELLERMAN
Excavation/Setback/Form/Re-Bar 12/30/2020 Partial Approval MATT KELLERMAN
Piling/Pier/Caisson 12/30/2020 Partial Approval MATT KELLERMAN
Excavation/Setback/Form/Re-Bar 1/11/2021 Partial Approval CHRISTOPHER WILSON
Floor/Roof Diaphrgm/Shear Wall 1/11/2021 Partial Approval CHRISTOPHER WILSON
Deputy Reinf. Concrete 1/13/2021 Conditional Approval CHRISTOPHER WILSON
Floor/Roof Diaphrgm/Shear Wall 1/13/2021 Partial Approval CHRISTOPHER WILSON
PLUMBING-Rough 1/19/2021 Partial Approval CHRISTOPHER WILSON
Green Building Rough 2/17/2021 Not Ready for Inspection CHRISTOPHER WILSON
Pre-Inspection 2/17/2021 Partial Approval CHRISTOPHER WILSON
Verify Sprinkler Sign Off 2/17/2021 Not Ready for Inspection CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 3/9/2021 Partial Approval MATT KELLERMAN
Footing/Foundation/Slab 3/9/2021 Partial Approval MATT KELLERMAN
Piling/Pier/Caisson 3/9/2021 Partial Approval MATT KELLERMAN
Interior/Exterior Lathing 3/17/2021 Partial Approval CHRISTOPHER WILSON
Floor/Roof Diaphrgm/Shear Wall 4/15/2021 Partial Approval CHRISTOPHER WILSON
Green Building Rough 4/15/2021 Not Ready for Inspection CHRISTOPHER WILSON
Verify Sprinkler Sign Off 4/15/2021 Not Ready for Inspection CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 4/19/2021 Not Ready for Inspection CHRISTOPHER WILSON
Underground Mechanical 4/19/2021 Partial Approval CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 4/22/2021 Corrections Issued CHRISTOPHER WILSON
Underground Mechanical 4/22/2021 Partial Approval CHRISTOPHER WILSON
Footing/Foundation/Slab 4/23/2021 Partial Approval CHRISTOPHER WILSON
PLUMBING-Rough 4/23/2021 Partial Approval CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 4/28/2021 Partial Approval CHRISTOPHER WILSON
Underground Mechanical 4/28/2021 Partial Approval CHRISTOPHER WILSON
Footing/Foundation/Slab 4/29/2021 Partial Approval CHRISTOPHER WILSON
Underground Mechanical 4/29/2021 Partial Approval CHRISTOPHER WILSON
Deputy Reinf. Concrete 5/3/2021 Conditional Approval CHRISTOPHER WILSON
BUILDING-Rough-Frame 5/12/2021 Partial Approval CHRISTOPHER WILSON
Green Building Rough 5/12/2021 Not Ready for Inspection CHRISTOPHER WILSON
Interior/Exterior Lathing 5/12/2021 Partial Approval CHRISTOPHER WILSON
Verify Sprinkler Sign Off 5/12/2021 Not Ready for Inspection CHRISTOPHER WILSON
Footing/Foundation/Slab 5/19/2021 Conditional Approval MATT KELLERMAN
Footing/Foundation/Slab 5/19/2021 Off-Hour Fees Due
Excavation/Setback/Form/Re-Bar 6/1/2021 Partial Approval JUAN VALENZUELA
Excavation/Setback/Form/Re-Bar 6/3/2021 Partial Approval MATT KELLERMAN
Excavation/Setback/Form/Re-Bar 7/8/2021 Corrections Issued CHRISTOPHER WILSON
Footing/Foundation/Slab 7/16/2021 Partial Approval CHRISTOPHER WILSON
Interior/Exterior Lathing 7/16/2021 Not Ready for Inspection CHRISTOPHER WILSON
Interior/Exterior Lathing 7/20/2021 Partial Approval MATT KELLERMAN
Interior/Exterior Lathing 7/27/2021 Partial Approval CHRISTOPHER WILSON
Footing/Foundation/Slab 7/28/2021 Not Ready for Inspection CHRISTOPHER WILSON
Masonry Wall/Backfill 7/28/2021 Not Ready for Inspection CHRISTOPHER WILSON
Interior/Exterior Lathing 8/5/2021 Partial Approval CHRISTOPHER WILSON
Sewer 8/5/2021 Partial Approval CHRISTOPHER WILSON
Interior/Exterior Lathing 8/10/2021 Partial Approval CHRISTOPHER WILSON
Interior/Exterior Lathing 8/12/2021 Partial Approval CHRISTOPHER WILSON
Footing/Foundation/Slab 8/16/2021 Not Ready for Inspection CHRISTOPHER WILSON
Interior/Exterior Lathing 8/16/2021 Partial Approval CHRISTOPHER WILSON
PLUMBING-Rough 8/20/2021 Corrections Issued CHRISTOPHER WILSON
Sewer 8/20/2021 Not Ready for Inspection CHRISTOPHER WILSON
Pre-Inspection 8/25/2021 Corrections Issued MATT KELLERMAN
ELECTRICAL-Rough 8/26/2021 Corrections Issued CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 8/27/2021 Partial Approval CHRISTOPHER WILSON
PLUMBING-Rough 9/2/2021 Corrections Issued CHRISTOPHER WILSON
Sewer 9/2/2021 Not Ready for Inspection CHRISTOPHER WILSON
PLUMBING-Rough 9/3/2021 Partial Approval CHRISTOPHER WILSON
Sewer 9/3/2021 Not Ready for Inspection CHRISTOPHER WILSON
ELECTRICAL-Rough 9/15/2021 Partial Approval CHRISTOPHER WILSON
HVAC-Rough 9/24/2021 Corrections Issued CHRISTOPHER WILSON
ELECTRICAL-Rough 9/29/2021 Corrections Issued CHRISTOPHER WILSON
ELECTRICAL-Rough 9/30/2021 Partial Approval CHRISTOPHER WILSON
Underground Mechanical 9/30/2021 Partial Approval CHRISTOPHER WILSON
PLUMBING-Rough 10/1/2021 Corrections Issued CHRISTOPHER WILSON
Interior/Exterior Lathing 10/4/2021 Partial Approval CHRISTOPHER WILSON
PLUMBING-Rough 10/4/2021 Partial Approval CHRISTOPHER WILSON
BUILDING-Rough-Frame 10/5/2021 Corrections Issued CHRISTOPHER WILSON
Floor/Roof Diaphrgm/Shear Wall 10/13/2021 Partial Approval CHRISTOPHER WILSON
Green Building Rough 10/13/2021 Not Ready for Inspection CHRISTOPHER WILSON
Verify Sprinkler Sign Off 10/13/2021 Not Ready for Inspection CHRISTOPHER WILSON
Floor/Roof Diaphrgm/Shear Wall 10/14/2021 Partial Approval CHRISTOPHER WILSON
Sewer 10/20/2021 Partial Approval CHRISTOPHER WILSON
Underground Mechanical 10/20/2021 Partial Approval CHRISTOPHER WILSON
Interior/Exterior Lathing 10/21/2021 Partial Approval CHRISTOPHER WILSON
BUILDING-Rough-Frame 10/22/2021 Partial Approval CHRISTOPHER WILSON
Green Building Rough 10/22/2021 Partial Approval CHRISTOPHER WILSON
HVAC-Rough 10/22/2021 Partial Approval CHRISTOPHER WILSON
Interior/Exterior Lathing 10/22/2021 Partial Approval CHRISTOPHER WILSON
Underground Mechanical 10/22/2021 Partial Approval CHRISTOPHER WILSON
Verify Sprinkler Sign Off 10/22/2021 Partial Approval CHRISTOPHER WILSON
BUILDING-Rough-Frame 11/1/2021 Corrections Issued CHRISTOPHER WILSON
HVAC-Rough 11/1/2021 Corrections Issued CHRISTOPHER WILSON
BUILDING-Rough-Frame 11/3/2021 Partial Approval CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 11/3/2021 Partial Approval CHRISTOPHER WILSON
Green Building Rough 11/3/2021 Partial Approval CHRISTOPHER WILSON
HVAC-Rough 11/3/2021 Partial Approval CHRISTOPHER WILSON
Underground Mechanical 11/9/2021 Partial Approval CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 11/17/2021 Partial Approval CHRISTOPHER WILSON
Footing/Foundation/Slab 11/17/2021 Partial Approval CHRISTOPHER WILSON
Insulation 11/22/2021 Partial Approval BRENDAN LOONEY
Insulation 11/24/2021 Partial Approval CHRISTOPHER WILSON
Wood Frame 12/7/2021 Corrections Issued CHRISTOPHER WILSON
Floor/Roof Diaphrgm/Shear Wall 12/20/2021 Partial Approval CHRISTOPHER WILSON
Special/Order Compliance 12/20/2021 Partial Inspection CLAYTON GRAHAM
Drywall Nailing 12/27/2021 Partial Approval CHRISTOPHER WILSON
Drywall Nailing 1/10/2022 Partial Approval CHRISTOPHER WILSON
PLUMBING-Rough 1/18/2022 Corrections Issued CHRISTOPHER WILSON
HVAC-Rough 1/20/2022 Partial Approval CHRISTOPHER WILSON
PLUMBING-Rough 1/20/2022 Partial Approval CHRISTOPHER WILSON
PLUMBING-Rough 1/28/2022 Corrections Issued CHRISTOPHER WILSON
Underground Mechanical 1/28/2022 Partial Approval CHRISTOPHER WILSON
PLUMBING-Rough 2/14/2022 No Access for Inspection JOHN KIDWELL
Underground Mechanical 2/14/2022 No Access for Inspection JOHN KIDWELL
PLUMBING-Rough 2/16/2022 Partial Approval CHRISTOPHER WILSON
Underground Mechanical 2/16/2022 Partial Approval CHRISTOPHER WILSON
HVAC-Rough 2/25/2022 Partial Approval CHRISTOPHER WILSON
BUILDING-Rough-Frame 3/3/2022 Partial Approval CHRISTOPHER WILSON
HVAC-Rough 3/9/2022 Corrections Issued BRENDAN LOONEY
Wood Frame 3/16/2022 Corrections Issued CHRISTOPHER WILSON
Underground Mechanical 3/17/2022 Not Ready for Inspection GERMAN RODRIGUEZ MENDOZA
BUILDING-Rough-Frame 3/24/2022 Partial Approval CHRISTOPHER WILSON
Underground Mechanical 3/24/2022 Not Ready for Inspection CHRISTOPHER WILSON
BUILDING-Rough-Frame 3/25/2022 Not Ready for Inspection CHRISTOPHER WILSON
Insulation 3/25/2022 Partial Approval CHRISTOPHER WILSON
BUILDING-Rough-Frame 4/1/2022 Partial Approval STEPHANIE SWANSON
Insulation 4/1/2022 Partial Approval STEPHANIE SWANSON
Wood Frame 4/5/2022 Partial Approval CHRISTOPHER WILSON
Drywall Nailing 4/6/2022 Not Ready for Inspection CHRISTOPHER WILSON
Insulation 4/6/2022 Partial Approval CHRISTOPHER WILSON
Drywall Nailing 4/13/2022 Partial Approval CHRISTOPHER WILSON
Insulation 4/13/2022 Partial Approval CHRISTOPHER WILSON
Drywall Nailing 4/22/2022 Corrections Issued CHRISTOPHER WILSON
Drywall Nailing 4/28/2022 Partial Approval CHRISTOPHER WILSON
ELECTRICAL-Rough 5/2/2022 Corrections Issued CHRISTOPHER WILSON
ELECTRICAL-Rough 5/3/2022 Partial Approval CHRISTOPHER WILSON
HVAC-Rough 5/5/2022 Partial Approval CHRISTOPHER WILSON
PLUMBING-Rough 5/5/2022 Partial Approval CHRISTOPHER WILSON
BUILDING-Rough-Frame 5/10/2022 Partial Approval CHRISTOPHER WILSON
Insulation 5/13/2022 Partial Approval CHRISTOPHER WILSON
HVAC-Rough 5/17/2022 Corrections Issued CHRISTOPHER WILSON
BUILDING-Rough-Frame 5/19/2022 Corrections Issued CHRISTOPHER WILSON
HVAC-Rough 5/19/2022 Not Ready for Inspection CHRISTOPHER WILSON
BUILDING-Rough-Frame 5/20/2022 Partial Approval CHRISTOPHER WILSON
Drywall Nailing 5/20/2022 Partial Approval CHRISTOPHER WILSON
Wood Frame 5/23/2022 Not Ready for Inspection CHRISTOPHER WILSON
BUILDING-Rough-Frame 5/26/2022 Approved CHRISTOPHER WILSON
Green Building Rough 5/26/2022 Approved CHRISTOPHER WILSON
Insulation 5/26/2022 Approved CHRISTOPHER WILSON
Verify Sprinkler Sign Off 5/26/2022 Approved CHRISTOPHER WILSON
Drywall Nailing 6/3/2022 Partial Approval CHRISTOPHER WILSON
Drywall Nailing 6/22/2022 Approved CHRISTOPHER WILSON
Rough-Elec/Plmb/HVAC 6/22/2022 Approved CHRISTOPHER WILSON
Sewer 7/20/2022 Partial Approval CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 9/28/2022 Not Ready for Inspection CHRISTOPHER WILSON
Special/Order Compliance 9/28/2022 Partial Inspection MICHAEL PELHAM
Excavation/Setback/Form/Re-Bar 9/30/2022 Corrections Issued CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 10/5/2022 Corrections Issued CHRISTOPHER WILSON
Pre-Inspection 12/1/2022 Partial Approval CHRISTOPHER WILSON
Special/Order Compliance 12/1/2022 Partial Inspection MICHAEL PELHAM
Excavation/Setback/Form/Re-Bar 1/23/2023 Partial Approval CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 2/3/2023 Partial Approval CHRISTOPHER WILSON
Footing/Foundation/Slab 4/17/2023 Corrections Issued CHRISTOPHER WILSON
Special/Order Compliance 8/17/2023 Partial Inspection CHRISTOPHER WILSON
Special/Order Compliance 8/17/2023 Partial Inspection MICHAEL PELHAM
Footing/Foundation/Slab 11/25/2024 Partial Approval CHRISTOPHER WILSON
Gas Test 2/4/2025 Corrections Issued CHRISTOPHER WILSON
PLUMBING-Rough 2/4/2025 Corrections Issued CHRISTOPHER WILSON
PLUMBING-Rough 2/12/2025 Not Ready for Inspection BOBBY KEY
Pre-Inspection 2/24/2025 Not Ready for Inspection CHRISTOPHER WILSON
PLUMBING-Rough 2/25/2025 Partial Approval CHRISTOPHER WILSON
Gas Test 3/4/2025 Partial Approval CHRISTOPHER WILSON
Footing/Foundation/Slab 3/20/2026 Partial Approval CHRISTOPHER WILSON
Pre-Inspection 3/20/2026 Partial Inspection CHRISTOPHER WILSON
Special/Order Compliance 3/20/2026 Partial Inspection ANDREW NAVE