420 N BEIRUT AVE 90272

Certificate Information: 420 N BEIRUT AVE 90272

Application / Permit
16014-10000-01304
Plan Check / Job No.
B16LA04134
Group
Building
Type
Bldg-New
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
(N) 30'x49' 2-story single family dwelling with full habitable space basement level and 13'x13' roof deck. NFPA-13D is provided thoughout. See comments.
Permit Issued
Issued on 6/7/2018
Issuing Office
West Los Angeles
Current Status
CofO Issued on 3/19/2020
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 3/24/2016 APPLICANT
Assigned to Plan Check Engineer 4/14/2016 TU HUA
Corrections Issued 4/19/2016 ERIC CABRERA
Quality Review Completed 4/26/2016 HOK CHI CHIU
Building Plans Picked Up 5/3/2016 APPLICANT
Green Plans Picked Up 5/10/2016 APPLICANT
Applicant returned to address corrections 12/13/2017 TU HUA
Applicant returned to address corrections 1/16/2018 TU HUA
Applicant returned to address corrections 3/7/2018 TU HUA
Applicant returned to address corrections 5/23/2018 TU HUA
Plan Check Approved 5/30/2018 TU HUA
Issued 6/7/2018 LADBS
CofO in Progress 3/11/2020 ANDREW NAVE
Permit Finaled 3/19/2020 VINCENT COTTON
CofO Issued 3/19/2020 VINCENT COTTON
Permit Finaled 3/19/2020 VINCENT COTTON

Permit Application Clearance Information

Highway dedication Cleared 2/28/2017 RAVIL MANAPOV
Permit Cleared 2/28/2017 RAVIL MANAPOV
Coastal Zone Cleared 11/21/2017 IVORY CHAMBESHI
Miscellaneous Cleared 11/21/2017 IVORY CHAMBESHI
Hydrant and Access approval Cleared 1/12/2018 JOHN CONNEALLY
Eng Process Fee Ord 176,300 Cleared 3/14/2018 CELINA MORENO
Low Impact Development Cleared 3/14/2018 RYAN HUDSON
Roof/Waste drainage to street Cleared 3/14/2018 CELINA MORENO
Sewer availability Cleared 3/14/2018 CELINA MORENO
Green Code Cleared 3/19/2018 SARAH ABOULHOSN
Excavation more than 5-ft deep Cleared 5/23/2018 CALOSHA APPROVED
GPI Written Notices Cleared 5/23/2018 ERIC CABRERA
Grading Pre-Inspection Cleared 5/23/2018 ERIC CABRERA

Contact Information

Architect Eckelberry, Anthony Evans; Lic. No.: C17278 4535 GAINSBOROUGH AVE.      LOS ANGELES, CA 90027
Contractor Triumph Construction Inc; Lic. No.: 688865-B 1309 PICO BLVD SUITE B      SANTA MONICA, CA 90405
Engineer Babayan, Raffi Samuel; Lic. No.: C72168 1140 N COLUMBUS AVE 112      GLENDALE, CA 91202
Engineer Tuchscher, James Todd; Lic. No.: C77649 5503 E 2ND ST      LONG BEACH, CA 90803

Inspector Information

STEPHANIE SWANSON, (213) 469-1255 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Underground Mechanical 9/21/2018 Partial Approval RICHARD STEINBACH
Footing/Foundation/Slab 10/17/2018 Partial Approval RICHARD STEINBACH
Footing/Foundation/Slab 11/2/2018 Partial Approval RICHARD STEINBACH
Deputy Shotcrete 11/6/2018 Conditional Approval RICHARD STEINBACH
Masonry Wall/Backfill 11/21/2018 Partial Approval RICHARD STEINBACH
Floor/Roof Diaphrgm/Shear Wall 12/20/2018 Partial Approval RICHARD STEINBACH
Floor/Roof Diaphrgm/Shear Wall 1/11/2019 Partial Approval RICHARD STEINBACH
Floor/Roof Diaphrgm/Shear Wall 2/15/2019 Partial Approval RICHARD STEINBACH
Floor/Roof Diaphrgm/Shear Wall 3/27/2019 Corrections Issued RICHARD STEINBACH
Floor/Roof Diaphrgm/Shear Wall 4/10/2019 Partial Approval ANDREW NAVE
Floor/Roof Diaphrgm/Shear Wall 5/2/2019 Approved ANDREW NAVE
Floor/Roof Diaphrgm/Shear Wall 5/3/2019 Approved ANDREW NAVE
HVAC-Rough 6/21/2019 Not Ready for Inspection ANDREW NAVE
PLUMBING-Rough 6/21/2019 Conditional Approval ANDREW NAVE
HVAC-Rough 6/24/2019 Corrections Issued ANDREW NAVE
ELECTRICAL-Rough 6/27/2019 Approved ANDREW NAVE
HVAC-Rough 6/28/2019 Partial Inspection ANDREW NAVE
Wood Frame 6/28/2019 Partial Approval ANDREW NAVE
Insulation 7/30/2019 Approved GERMAN RODRIGUEZ MENDOZA
Interior/Exterior Lathing 7/30/2019 Approved GERMAN RODRIGUEZ MENDOZA
Sewer 7/30/2019 Partial Approval GERMAN RODRIGUEZ MENDOZA
Excavation/Setback/Form/Re-Bar 8/6/2019 Partial Approval ANDREW NAVE
Shower Pan 8/6/2019 Conditional Approval ANDREW NAVE
Drywall Nailing 8/8/2019 Not Ready for Inspection ANDREW NAVE
Green Building Rough 8/8/2019 Approved ANDREW NAVE
Shower Pan 8/8/2019 Corrections Issued ANDREW NAVE
Drywall Nailing 8/14/2019 Approved ANDREW NAVE
Excavation/Setback/Form/Re-Bar 8/14/2019 Partial Approval ANDREW NAVE
Interior/Exterior Lathing 9/3/2019 Approved ANDREW NAVE
Gas Test 10/16/2019 Approved ANDREW NAVE
PLUMBING-Rough 10/16/2019 Approved ANDREW NAVE
SGSOV-Seismic Gas S/O Valve 10/16/2019 SGSOV Not Ready ANDREW NAVE
Sewer 10/16/2019 Approved ANDREW NAVE
HVAC-Final 1/16/2020 Corrections Issued DANNY TOLENTINO
PLUMBING-Final 1/16/2020 Approved DANNY TOLENTINO
ELECTRICAL-Final 1/27/2020 Corrections Issued ANDREW NAVE
Green Building Final 1/27/2020 Approved ANDREW NAVE
HVAC-Final 1/27/2020 Approved ANDREW NAVE
Footing/Foundation/Slab 2/5/2020 Approved ANDREW NAVE
BUILDING-Rough-Frame 2/20/2020 Not Ready for Inspection KENNETH NAGLE
Final 2/20/2020 Corrections Issued KENNETH NAGLE
Reinforced Concrete Frame 2/20/2020 Not Ready for Inspection KENNETH NAGLE
Reinforced Masonry Frame 2/20/2020 Not Ready for Inspection KENNETH NAGLE
SGSOV-Seismic Gas S/O Valve 2/20/2020 SGSOV Not Ready KENNETH NAGLE
Service/Power Release 2/20/2020 Not Ready for Inspection KENNETH NAGLE
Smoke Detectors 2/20/2020 Approved KENNETH NAGLE
Structural Steel Frame 2/20/2020 Not Ready for Inspection KENNETH NAGLE
Verify Sprinkler Sign Off 2/20/2020 Approved KENNETH NAGLE
BUILDING-Rough-Frame 3/3/2020 Approved ANDREW NAVE
ELECTRICAL-Final 3/3/2020 Approved ANDREW NAVE
Final 3/3/2020 Conditional Approval ANDREW NAVE
Reinforced Concrete Frame 3/3/2020 Approved ANDREW NAVE
Reinforced Masonry Frame 3/3/2020 Approved ANDREW NAVE
SGSOV-Seismic Gas S/O Valve 3/3/2020 SGSOV Approved ANDREW NAVE
Service/Power Release 3/3/2020 Approved ANDREW NAVE
Structural Steel Frame 3/3/2020 Approved ANDREW NAVE