Pre-Inspection
|
11/20/2018
|
Approved
|
CARLOS MATAMOROS
|
|
Pre-Inspection
|
5/1/2019
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Special/Order Compliance
|
8/28/2019
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
Special/Order Compliance
|
8/31/2019
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
Footing/Foundation/Slab
|
9/24/2019
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Footing/Foundation/Slab
|
10/3/2019
|
Corrections Issued
|
MATT KELLERMAN
|
|
Footing/Foundation/Slab
|
10/10/2019
|
Corrections Issued
|
CARLOS MATAMOROS
|
|
Excavation/Setback/Form/Re-Bar
|
10/15/2019
|
Not Ready for Inspection
|
CARLOS MATAMOROS
|
|
Pre-Inspection
|
10/15/2019
|
Not Ready for Inspection
|
MATT KELLERMAN
|
|
Footing/Foundation/Slab
|
10/22/2019
|
Partial Approval
|
ROBERT SHELLY
|
|
Footing/Foundation/Slab
|
10/29/2019
|
Partial Inspection
|
ANTHONY MCDOWALL
|
|
Deputy Grading
|
11/15/2019
|
Approved
|
MATT KELLERMAN
|
|
Deputy Grading
|
11/18/2019
|
Conditional Approval
|
MATT KELLERMAN
|
|
Excavation/Setback/Form/Re-Bar
|
11/19/2019
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Footing/Foundation/Slab
|
11/20/2019
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Excavation/Setback/Form/Re-Bar
|
11/25/2019
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Deputy Grading
|
1/6/2020
|
Partial Approval
|
MATT KELLERMAN
|
|
Deputy Reinf. Concrete
|
1/6/2020
|
Partial Approval
|
MATT KELLERMAN
|
|
Footing/Foundation/Slab
|
1/28/2020
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Footing/Foundation/Slab
|
2/3/2020
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Footing/Foundation/Slab
|
2/7/2020
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Deputy Reinf. Concrete
|
2/21/2020
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Masonry Wall/Backfill
|
2/21/2020
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Deputy Reinf. Concrete
|
2/24/2020
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Deputy Shotcrete
|
2/25/2020
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Deputy Grading
|
3/4/2020
|
Conditional Approval
|
GERMAN RODRIGUEZ MENDOZA
|
|
Deputy Grading
|
3/5/2020
|
Conditional Approval
|
GERMAN RODRIGUEZ MENDOZA
|
|
Deputy Grading
|
3/6/2020
|
Partial Approval
|
MATT KELLERMAN
|
|
Excavation/Setback/Form/Re-Bar
|
3/31/2020
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Excavation/Setback/Form/Re-Bar
|
4/2/2020
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Footing/Foundation/Slab
|
4/23/2020
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
Footing/Foundation/Slab
|
5/4/2020
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Excavation/Setback/Form/Re-Bar
|
5/6/2020
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Deputy Reinf. Concrete
|
5/21/2020
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Footing/Foundation/Slab
|
5/21/2020
|
Corrections Issued
|
CARLOS MATAMOROS
|
|
Excavation/Setback/Form/Re-Bar
|
5/22/2020
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Excavation/Setback/Form/Re-Bar
|
5/26/2020
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Deputy Reinf. Concrete
|
5/28/2020
|
Partial Approval
|
MATT KELLERMAN
|
|
Excavation/Setback/Form/Re-Bar
|
5/29/2020
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Footing/Foundation/Slab
|
6/2/2020
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Deputy Reinf. Concrete
|
6/9/2020
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Excavation/Setback/Form/Re-Bar
|
6/10/2020
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Footing/Foundation/Slab
|
6/10/2020
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Deputy Shotcrete
|
6/11/2020
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Excavation/Setback/Form/Re-Bar
|
6/16/2020
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Footing/Foundation/Slab
|
6/19/2020
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Excavation/Setback/Form/Re-Bar
|
6/29/2020
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Footing/Foundation/Slab
|
6/29/2020
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Deputy Shotcrete
|
6/30/2020
|
Partial Approval
|
MATT KELLERMAN
|
|
Excavation/Setback/Form/Re-Bar
|
7/6/2020
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Excavation/Setback/Form/Re-Bar
|
7/8/2020
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Footing/Foundation/Slab
|
7/9/2020
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Deputy Steel/Welding
|
2/3/2021
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Excavation/Setback/Form/Re-Bar
|
3/5/2021
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Excavation/Setback/Form/Re-Bar
|
3/9/2021
|
Partial Approval
|
GERMAN RODRIGUEZ MENDOZA
|
|
Excavation/Setback/Form/Re-Bar
|
5/24/2021
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
PLUMBING-Rough
|
5/24/2021
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Excavation/Setback/Form/Re-Bar
|
6/8/2021
|
Corrections Issued
|
MATT KELLERMAN
|
|
Footing/Foundation/Slab
|
6/8/2021
|
Not Ready for Inspection
|
MATT KELLERMAN
|
|
Excavation/Setback/Form/Re-Bar
|
6/15/2021
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Deputy Reinf. Concrete
|
6/18/2021
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Footing/Foundation/Slab
|
8/11/2021
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Excavation/Setback/Form/Re-Bar
|
8/13/2021
|
Conditional Approval
|
GERMAN RODRIGUEZ MENDOZA
|
|
Deputy Reinf. Concrete
|
8/23/2021
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Pre-Inspection
|
10/8/2021
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Structural Steel Frame
|
10/8/2021
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Verify Sprinkler Sign Off
|
10/8/2021
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Deputy Wood Construction
|
10/20/2021
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Deputy Wood Construction
|
10/21/2021
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
10/22/2021
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
10/27/2021
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Deputy Wood Construction
|
1/5/2022
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
1/25/2022
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
1/25/2022
|
Partial Inspection
|
MICHAEL PELHAM
|
|
Pre-Inspection
|
1/25/2022
|
Approved
|
BRENDAN LOONEY
|
|
Pre-Inspection
|
1/25/2022
|
Approved
|
CARLOS MATAMOROS
|
|
Pre-Inspection
|
1/25/2022
|
Approved
|
GERMAN RODRIGUEZ MENDOZA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
1/27/2022
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Wood Frame
|
2/7/2022
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
Deputy Wood Construction
|
3/3/2022
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/7/2022
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/10/2022
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/14/2022
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/29/2022
|
Partial Approval
|
CARLOS MATAMOROS
|
|
Gas Test
|
4/8/2022
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Wood Frame
|
8/15/2022
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Insulation
|
8/22/2022
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
BUILDING-Rough-Frame
|
8/25/2022
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Drywall Nailing
|
8/31/2022
|
Partial Approval
|
CLAYTON GRAHAM
|
|
Wood Frame
|
9/20/2022
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Rough-Elec/Plmb/HVAC
|
12/1/2022
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Shower Pan
|
12/7/2022
|
Corrections Issued
|
STEPHANIE SWANSON
|
|
Pre-Inspection
|
12/12/2022
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Pre-Inspection
|
12/14/2022
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Shower Pan
|
12/23/2022
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Rough-Elec/Plmb/HVAC
|
1/13/2023
|
Not Ready for Inspection
|
CARLOS MATAMOROS
|
|
HVAC-Rough
|
1/17/2023
|
Partial Approval
|
JUAN VALENZUELA
|
|
PLUMBING-Rough
|
1/24/2023
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
PLUMBING-Rough
|
1/25/2023
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Gas Test
|
1/26/2023
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
PLUMBING-Rough
|
1/26/2023
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
HVAC-Rough
|
2/2/2023
|
Partial Approval
|
CARLOS MATAMOROS
|
|
Wood Frame
|
2/3/2023
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Wood Frame
|
2/7/2023
|
Partial Approval
|
CARLOS MATAMOROS
|
|
Insulation
|
2/10/2023
|
Partial Approval
|
MICHAEL PELHAM
|
|
Interior/Exterior Lathing
|
2/21/2023
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Interior/Exterior Lathing
|
4/4/2023
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Interior/Exterior Lathing
|
4/7/2023
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Drywall Nailing
|
4/11/2023
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Green Building Rough
|
4/11/2023
|
Approved
|
CHRISTOPHER WILSON
|
|
Drywall Nailing
|
5/9/2023
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Drywall Nailing
|
5/16/2023
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Drywall Nailing
|
5/30/2023
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Drywall Nailing
|
7/31/2023
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
ELECTRICAL-Rough
|
9/11/2023
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Drywall Nailing
|
9/14/2023
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Drywall Nailing
|
9/26/2023
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
ELECTRICAL-Rough
|
9/26/2023
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
PLUMBING-Rough
|
9/26/2023
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Verify Sprinkler Sign Off
|
9/26/2023
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
HVAC-Rough
|
9/28/2023
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
ELECTRICAL-Rough
|
10/6/2023
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
HVAC-Rough
|
10/19/2023
|
Approved
|
CHRISTOPHER WILSON
|
|
ELECTRICAL-Rough
|
11/8/2023
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
ELECTRICAL-Rough
|
11/16/2023
|
Approved
|
CHRISTOPHER WILSON
|
|
Insulation
|
11/27/2023
|
Approved
|
CHRISTOPHER WILSON
|
|
Drywall Nailing
|
12/1/2023
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Drywall Nailing
|
12/8/2023
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Drywall Nailing
|
12/20/2023
|
Approved
|
CHRISTOPHER WILSON
|
|
Sewer
|
4/23/2024
|
Approved
|
CHRISTOPHER WILSON
|
|
Service/Power Release
|
5/13/2024
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Pre-Inspection
|
5/14/2024
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Service/Power Release
|
5/20/2024
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Shower Pan
|
5/30/2024
|
Corrections Issued
|
STEPHANIE SWANSON
|
|
Shower Pan
|
6/3/2024
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Gas Test
|
6/6/2024
|
Approved
|
CHRISTOPHER WILSON
|
|
Shower Pan
|
6/6/2024
|
Approved
|
CHRISTOPHER WILSON
|
|
Grounding or Bonding
|
6/7/2024
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Service/Power Release
|
6/12/2024
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Service/Power Release
|
7/22/2024
|
Approved
|
CHRISTOPHER WILSON
|
|
Interior/Exterior Lathing
|
11/12/2024
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
HVAC-Final
|
1/3/2025
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Special/Order Compliance
|
1/3/2025
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
HVAC-Final
|
1/9/2025
|
Approved
|
CARLOS MATAMOROS
|
|
Special/Order Compliance
|
1/14/2025
|
Partial Approval
|
CARLOS MATAMOROS
|
|
Special/Order Compliance
|
1/31/2025
|
Corrections Issued
|
MICHAEL PELHAM
|
|
Enclosure/Fence
|
2/26/2025
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Gas Test
|
2/26/2025
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
Gas Test
|
2/27/2025
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
ELECTRICAL-Final
|
3/4/2025
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
ELECTRICAL-Final
|
4/22/2025
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
ELECTRICAL-Final
|
6/10/2025
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
ELECTRICAL-Final
|
6/18/2025
|
Approved
|
CHRISTOPHER WILSON
|
|
PLUMBING-Final
|
6/26/2025
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Green Building Final
|
7/1/2025
|
Approved
|
CHRISTOPHER WILSON
|
|
PLUMBING-Final
|
7/1/2025
|
Approved
|
CHRISTOPHER WILSON
|
|
SGSOV-Seismic Gas S/O Valve
|
7/1/2025
|
SGSOV Approved
|
CHRISTOPHER WILSON
|
|
BUILDING-Rough-Frame
|
7/30/2025
|
Approved
|
CHRISTOPHER WILSON
|
|
Final
|
7/30/2025
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Footing/Foundation/Slab
|
7/30/2025
|
Approved
|
CHRISTOPHER WILSON
|
|
Reinforced Concrete Frame
|
7/30/2025
|
Approved
|
CHRISTOPHER WILSON
|
|
Reinforced Masonry Frame
|
7/30/2025
|
Approved
|
CHRISTOPHER WILSON
|
|
Smoke Detectors
|
7/30/2025
|
Approved
|
CHRISTOPHER WILSON
|
|
Structural Steel Frame
|
7/30/2025
|
Approved
|
CHRISTOPHER WILSON
|
|
Verify Sprinkler Sign Off
|
7/30/2025
|
Approved
|
CHRISTOPHER WILSON
|
|
Final
|
8/25/2025
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Final
|
8/28/2025
|
OK to Issue CofO
|
CHRISTOPHER WILSON
|